CURRICULUM VITAE (CV)

Name: Adel Ali Ali Abdulrab

Email: adel.abdulrab2@gmail.com

Personal Data:

Marital Status: Married.

No. Of children: Four (4).

Date of Birth: 21 March 1954 Nationality: Yemeni

Address:
House # 13 Al-Muhandseen District
Dar Saa'd - Aden
Tel (Res.): 02-307554
Mobile: 777696353 / 739383006

Education

School, college and/or Degree/certificate or other Date Obtained


University Attended specialized education
obtained
Syria B.Sc. Civil Engineering 1983

Other Relevant Training:

 Course in the preservation of Historic Monuments; Norway, One month.


 Quality Control of Building Materials (Organized by UNDP project), One month.
 Conservation Reinstatement and Restoration of Historic Places course, (Conducted by
Bonifica S.P.A. expert from Italy: Sana'a), 16 months.
 Training in Introduction to Wastewater Treatment Process, One week. (ARABTEC JARDANEH-
YEMEN)
 Training in Design and Modeling of Wastewater Collection System, One week. (ARABTEC
JARDANEH- Jordon)
 Training in Design and Modeling of Water Distribution System, One week. (ARABTEC JARDANEH-
Jordon)
 Training in Polyethylene water pipe systems including the use of PE welding machine supervision of
welding works, One week. GOERGE FIESHER
 Training in Project Management and Certification Program, One week.(YEMEN)
Countries of Work Experience: : Yemen

Languages: Reading Speaking Writing

Arabic Excellent Excellent Excellent


English V. Good V. Good V. Good

Employment Record[Starting with present position, list in reverse order every employment held]:

From: June;2021 – Till Date


Employer: Eram Star Contracting and General Trading
Positions held: Project Manager for Upgrading of Water Resource and Rehabilitation
of Water and Sanitation Networks of Basateen Area and Dar Saa'd Aden.(WASH
project)

From: September;2019 – May;2021


Employer: Al-Yazidi Contracting and General Trading
Positions held: Project Manager for Rehabilitation and Upgrading Works for existing
Wastewater Treatment Plants.

From: August ;2017 – August;2019


Employer: Zainac Engineering and Enterprises
Positions held: Project Manager for Replacement of Water network for Unity Cement
Factory

From: March; 2014 – July; 2017


Employer: Al-Magd (Est.) for contracting
Positions held: Consultant Engineer (short term consultancies)/RC construction works

From: January; 2014 – March; 2014


Employer: World Bank & Social Fund for Development
Positions held: Project Manager for Climate Resilience of Coastal Communities
(This project was stopped because of the civil war)

From: October; 2011 –December; 2013


Employer: Social Fund for Development (SFD)
Positions held: Senior Engineer with Project Implementation Unit for Shibam
Infrastructure Project/water supply, sewerage, electricity, telecommunication
networks, street stone paving, street lighting.

From: October; 2010 – September ;2011


Employer: Canadian Nexen Petroleum
Positions held: Consultant Engineer / study of water supply and sewerage systems for
the villages surrounding oil wells field

From: 2008– 2010


Employer: GTZ
Positions held: Infrastructure Expert / water supply, sewerage, electricity,
telecommunication networks, street stone paving, street lighting.

From: 2004 – 2008


Employer: Social Fund Development
Positions held: Senior Project Officer

From: 2000 - 2004


Employer: Aden mills and Silos Company
Positions held: Resident Engineer /Responsible for implantation for all constructions
in the site.

From: 1998 – 2000


Employer: General Organization for the Preservation of Historic Cities in Yemen
Positions held: General Director/ saving and restoration for historic sites.

From: 1996 – 1998


Employer: UNDP, Yemen
Positions held: National Technical Advisor for Tawila historic water tanks / saving
and restoration for historic sites.

From: 1995– 1996


Employer: HS and Associates
Positions held: Designer and site manager

From: 1994 – 1995


Employer: Al-Hadda Gas Storage Facility
Positions held: Designer and Project consultant/ Responsible for implantation for all
constructions in the site.
From: 1987 – 1994
Employer: General Organization for the Preservation of Historic Cities in Yemen
Positions held: Designer and Supervisor Engineer/ saving and restoration for historic
sites.

From:1987
Employer: Modern Engineering Office, Sana’a, Yemen
Positions held: Structural Designer and Site Supervisor/construction works for the
private sector

From: 1984 – 1987


Employer: Howard Humphrey and Sons
Positions held: Assistant of Resident Engineer for Sana’a Sewerage Project/ sewerage
site works.

From: 1983 – 1984


Employer: Chinese Company
Positions held: Site Engineer
Detailed Tasks Assigned Project Manager for Upgrading of Water Resource and
Rehabilitation of Water and Sanitation Networks of
Basateen Area and Dar Saa'd Aden.(WASH project)
(June; 2021 –Till Date)
Employer: Eram Star for Trading and General Contract
Responsible as project manager for the performing the whole
work in the three components of the project (three new wells,
elevated water tank 1000 m3 capacity , water supply network
(35400 ml of diameters 200 mm till 63 mm, and sewerage
network (7500 ml) of diameters from 700 mm to 200 mm ,
following up the site works, preparation of work plans,
reports, and preparation of workshop drawings, reflecting any
required amendments for the original drawings, and
preparing invoices for the completed works.

I. Review project drawings and documents.


II. Making site visits during implementation of work
giving support to site engineer, and check all items
of work are properly done.
III. Attend meetings with UNCHR Consultant
Engineers
IV. Inspection and acceptance for all material, tools,
and machines purchased for the project.
V. Prepare monthly progress report for the
implementation of work.
VI. Following the Quality Control for the
implementation works, in accordance with WASH
rules and standard tests. including tests for quality
of water of wells.

Project Manager for Rehabilitation and Upgrading Works


for Existing Wastewater Treatment Plants. (Sep. 2019 –May
2021)
Employer: Al-Yazidi Contracting and General Trading

Responsible as project manager for the performing the whole


work in the treatment plant, following up the site works,
preparation of work plans, reports, and preparation of
workshop drawings, reflecting any required amendments for
the original drawings, and preparing invoices for the
completed works.

VII. Review project drawings and documents.


VIII. Making site visits during implementation of
work giving support to site engineer, and check all
items of work are properly done.
IX. Attend the weekly meeting with the Consultant
Engineers
X. Inspection and acceptance for all material, tools,
and machines purchased for the project.
XI. Prepare monthly progress report for the
implementation of work.
XII. Quality Control for the implementation works
including the standard tests.

Project Manager for Replacement of Water network for


Unity Cement Factory (Aug. 2017 –Aug. 2019)
Employer: Zainac Engineering & Enterprise
Responsible as project manager for the performing the whole
water network components (raw water, firefighting system,
cooling system, domestic water system) following up the site
works, preparation of work plans, reports, and discuss any
required amendments for the original drawings, and
preparing invoices for completed works.

I. Review project drawings and documents.


II. Making site visits during implementation of
work giving support to site engineer, and check
all items of work are properly done.
III. Attend the weekly meeting with the owner
representative staff.
IV. Inspection and acceptance for all material, tools,
and machines purchased for the project.
V. Prepare monthly progress report for the
implementation of work.
VI. Quality Control for the implementation works
including the standard tests.
Structural Designer Engineer for Private Sector Projects,
Sana’a – Yemen, (1987 till 2017)
Employer: Modern Engineering Office

Responsible for structural designs and preparation of bidding


document (BOQs and specifications). Completed structural
designs of more than 500 buildings of 4 to 15 stories buildings
for the private sector including:
Structural Designs and Site Supervision for AZAL HOSPITAL
–Sana’a (15 story building, 1487m2 each floor furnished with
all modern medical equipment)

Consultant Engineer for Al-Magd Est. projects


(March. 2014 –July 2017)
Employer: Al-Magd Est. for Contracting
responsible for preparation of implementation of work plans
for each system
I. Review project drawings and documents
II. Prepare cost estimate for the project
III. Making site visits during implementation of
work supporting the site engineer.
IV. Quality Control for the implementation works
including the standard tests.
V. Discuss any required amendments for the
original drawings.
VI. Preparing invoices for completed works.

Project Manager for Climate Resilience of Coastal Communities


Project (Jan. 2014 – March 2014):
Employer: The World Bank
I. Making site visits to villages of the targeted communities
making socioeconomic and background assessment;
assess the situation of infrastructure; and propose the
necessary intervention
II. Prepare a proposal for the adaptation system required for
each village
III. Estimating the costs of priority activities.

The war started, and the budget of the project was


stopped before finishing the project
Senior Engineer with Project Implementation Unit for Shibam
Infrastructure Project (Oct. 2011 – Dec. 2013)
Employer: Social Fund for Development (SFD)
The work includes but not limited to:
I. review and approve project drawings for the whole components
of the project.
II. review and approve tender documents for each component of
the project (sewerage, electricity, telecommunication, street
lighting, interior house plumping, and street stone paving)
III. Evaluation of the contractors' bids
IV. Inspection and acceptance for all material, tools, and machines
purchased for the project
V. Quality Control for the implementation works including the
standard tests for each component of project.
VI. Design of the rain water drainage system 270 m long,
and diameter 315 mm, 500mm up to 700mm.
VII. Redesign the main sewer 760 m long, and diameter of 200mm,
250 mm, and 315mm

Consultant Engineer for Ressib Water Supply & Sanitation


Project, (Oct. 2010- Sep 2011)
Employer: Canadian Nexen Petroleum Company

Responsible as a consultant engineer for the develop a Home


Inspection questionnaire, making site survey, collecting
design data, prepare a proposal for proper system for different
villages in Ressib area, making required tests to insure the
suitability of the proposed system to obtain a practical data for
design calculation, assist in preparation of design criteria,
assess availability of local supply of required construction
material for the implementation works, preparing design
calculation for the different sanitation systems, detailed
drawings, quantities, and cost estimate for each system, assess
skill sets of Ressib residents and assess their potential for
supply of technical skills.

Infrastructure Expert for Historic City of Shibam- Hadhramout


Infrastructure Project, (2008 – 2010)
Employer: GTZ
The implementation of an infrastructure project within the
historical city required the establishment of a support unit (SU)
with great experience to assist the Project Implementation Unit
(PIU) in the execution of project.
As Technical Director of the Support Unit (SU),
 I carried out awareness-raising for the master builders on
preserving the cultural heritage of the city,
 Training master builders to become contractors assigned
to work within the city.
 I trained newly graduated engineers of PIU to execute
project works

The work include the following:


I. Performing the whole infrastructure components (water
supply network, sewerage network, electricity,
communication, rain water drainage system, and stone
paving) in the Pilot Segment in the Old City of Shibam,
II. Preparation of TOR for consultants, Preparation of tender
documents, participating in the evaluation of bidder as a
member of the evaluation committee,
III. Develop proposals for the implementation of the work in
accordance with the instructions of UNISCO for Historic
Cities
IV. Assist in the planning, budgeting and scheduling of the
project.
V. Other associated tasks include to developing guidelines for
implementation, monitoring, reporting of the work for the
historic city.
VI. Coordination and follow-up of UNESCO missions visiting
the project to ensure that the implemented works conform
to UNESCO rules for historical cities

Senior Project Officer for Shibam- Hadhramout Infrastructure


Project, (2004 – 2008)
Employer: Social Fund for Development

Responsible as a senior project officer for the preparation of


request for proposals (using World Bank Guideline) and follow up
their submission to the short listed consultants, managing all the
correspondence up to the date of opening the proposals,
participating in the evaluation of the consultants proposals as a
committee member, reviewing and commenting on consultants
studies and designs, checking the hydraulic calculations and other
design criteria. Other associated tasks include to supervising the
replacement of defected sewers to maintain the existing sewerage
network, participate in workshops and discussions with
stakeholders on all issues of the project, preparation of request for
proposals for the environmental Impact Assessment (using World
Bank Guideline), participating in the evaluation of the consultants
proposals for conducting the EIA study as a committee member
and Follow up the work of the wastewater treatment plant in
Heridhah (Wadi Hadhramout).

Resident Engineer for Aden Mills and Silos Project


(2000 – 2004)
Employer: Aden Mills and Silos Company

Responsible as resident engineer for the construction supervision


of civil and structural works, quality control of Contractor’s
works, supervision of material testing and ensuring civil works
conform to contract to contract drawings and specifications.
Detailed tasks include determining the location of piles driving,
determining the Axis of all Structures in the site using Theodolite
Supervision the Piles Foundation work (Manufacturing,
Transporting, driving and testing), Supervision the concrete work
for pile Caps and Channels, Supervision the work of steel
structures for the steel Buildings (Mills of capacity 600 ton/day,
Wheat Backing, Pre-Cleaning tower, warehousing for finished
product, and the belt conveyer), Supervision the Construction
works for the Silos (75000 ton. Capacity), Supervision the
mechanical and electrical supply and erection works
Supervision the work of the firefighting systems for the project,
Design and Supervision for the facility Buildings (Restaurant,
Mosque, Sewerage Pump Station & Admin. Offices), Design and
Supervision of the Roads and Rain Water Drainage System &
Sewerage System for the project.

General Director for the General Organization for the


Preservation of Historic Cities in Yemen (GOPHCY) Aden
Branch (1998 –2000)
Employer: GOPHCY
Responsible for construction works to preserve urban historic
areas in Aden and Yemen.

Project Technical Advisor for Rehabilitation of Tawila Water


Tanks, in Aden (1996 – 1998)
Employer: UNDP
Provided technical advising, construction supervision and quality
control for Rehabilitation project of Tawila Water Tanks and
associated water system. Tasks performed included following the
concerned government authorities and discussing the
requirements of the site, quality control for the executed works
and solving problems appear during work execution. Other
performed tasks included the studies for history of Aden,
Hydrology (storm water drainage system for the town),
Surveying, Ecology, Laboratory tests for old building materials.
Other associated tasks included the restoration of an old building
and creating Documentation Center and the rehabilitation of
Tawila Garden.

Designer & Site Engineer for Restoration of Yemen Women’s


Union Building Project (1995 – 1996)
Employer: HS and Associates (Hani Sahooly)
Performed construction supervision, detailed design, and
evaluation of construction options for maintenance and repair of
Yemen Women Union Building. Tasks completed include
supervision of works, quality assurance of construction,
construction site management and administration. Project cost
was 1.2 million. Other associated tasks include the study of
building situation, existing cracks, building movements checking
verticality and load analysis.

Designer & Site Engineer for Al-Hadda Gas Filling Station (1994
– 1995)
Employer: Al-Hadda Company
Performed the design, quality control and detailed design services
for 9 million USD Gas Filling Station. Completed construction
supervision and design for reinforced concrete buildings,
foundation of a steel water tank 15 m diameter and 10 m height,
foundation and ground beams for a steel frame 30 m span for the
filling area, foundation and bearing walls of the liquid gas tanks
17.5 m span, roads and bridges for the site and rainwater drainage
system for the whole site. Specific tasks included supervision of
quality control works, supervision of testing, ensuring works
comply with design drawings and specifications, and project
management.

Design and construction supervision of the projects of the


General Organization for the Preservation of Historic Cities in
Yemen (GOPHCY) Sana’a (1987 – 1994)
Employer: (GOPHCY)
Acted as a Structural Designer and Site Supervisor engineer, scope
of services includes to review, redesign, update structural
drawings, preparation and verification of bidding documents,
BOQ, cost estimate, contract documents, tender documents and
specifications related to structural works for GOPHCY
construction contracts. Other associated tasks included to
completing structural design and sanitary system for Ibn Al-Amir
School, Site Supervisor for SOQ Al BAQER CLINIC in the old city
of Sana’a Supervisor Paving Roads in the Old City of Sana’a and
Wadi Sayla Project. Also participated together with German
Consultants in the study of Samsarat Al-Mansurah Restoration
Project. (IN CHRGE OF DESIGN DEPARTMENT of GOPHCY)

Assistant of Resident Engineer for Sana’a Sewerage Project,


(1984 – 1987)
Employer: Howard Humphrey and Sons Company Ltd.

Performed construction supervision, quality assurance, and


construction administration services for the 800 million Sana’a
Sewerage project. Tasks completed included supervision of
installation of sewer pipelines, reinforced concrete works,
manholes, and underground sewerage conveyance systems.
Provided quality assurance for Contractor’s testing of soil
backfilling, soil and concrete testing.
Supervised and verified Contractor’s pipeline survey routes and
completed detailed design of underground sewerage system
works.

Site Engineer (1983 – 1984)


Employer: Chinese Company for Construction
Responsible for construction supervision of reinforced concrete
structures, steel structures and concrete paving roads.

Certification

I certify that (1) to the best of my knowledge and belief, this CV correctly describes me, my
qualifications, and my experience; (2) that I am available for the assignment for which I am proposed;
and (3) that I am proposed only by one Offer or and under one proposal.

I understand that any wilful misstatement or misrepresentation herein may lead to my disqualification
or removal from the selected team undertaking the assignment.
Adel Ali Ali Abdulrab Date: 23rd ; April;2022
[Signature of staff member or authorized representative of the staff] Day/Month/Year