WLGP - Wafa Plants Desert Plant Project Specification 110/WA/02 J-53-S-Z-0001-00 F1 0-2465 S-53-1222-001J F1

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 49

Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 2 of 50

INDEX

1. PROJECT GENERAL INFORMATION

1.1. References
1.2. Measure systems
1.3. Codes
1.4. Climatic conditions (WAFA)
1.5. Raw materials, products, chemicals, catalyst and wastes specification
1.6. Documents Code
1.7. Safety Criteria
1.8. Engineering standard and specifications
1.9. Reference levels
1.10. Soil Report

2. DETAILED ENGINEERING SPECIFICATIONS AND STANDARDS

2.1. Heat exchangers


2.2. Piping Design
2.3. Instruments
2.4. Insulation
2.5. Fire proofing
2.6. Painting
2.7. Buildings
2.8. Telecommunication Systems

ATTACHMENT N° 1: UTILITIES, DRAINAGE AND SEWERS, ENVIRONMENT PROTECTION

1. STEAM OUT
2. DEMINERALIZED WATER, BFW
3. RAW, TREATED, COOLING, FIRE, POTABLE WATERS
4. FUEL
5. COMPRESSED AIR, NITROGEN
6. ELECTRICITY
7. HOT OIL
8. BLOW-DOWN AND FLARE
9. DRAINAGE AND SEWERS
10. NOISE SPECIFICATION
11. RADIATION SPECIFICATION
12. WASTE WATER EFFLUENT SPECIFICATION

ATTACHMENT N° 2: HEAT EXCHANGERS GENERAL SPECIFICATION

ATTACHMENT N° 3: LIST OF INTERFACES

ATTACHMENT N° 4: APPLICABLE CODES

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 3 of 50

1. PROJECT GENERAL INFORMATION

1.1. References

- Technip project number: 1989

- Name of Client: AGIP GAS BV

- Plant name: WAFA PLANT

- Plant location: WAFA (in Libyan desert, 500 km from coast)

- Client references of project: 110/WA/02 0001GP99

- Language: English

- The plant will be divided into units

YES  NO

Units name: Number

Process Units:

Inlet Oil Reception facilities 200

Liquid Stabilization 210

Gas Inlet Reception facilities 300

Gas dehydration 310

Gas sweetening 330

Gas dew point control 340

Inlet Gas Compression 360

Off Gas Compression 361

Export Gas Compression 362

Utility Systems:

Condensate Storage 220

Flare 230

Burn Pit 240

Hot oil 410

Diesel Oil 430

Air system 460

Fuel gas 420

Main power generation 470

Emergency power generation 480

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 4 of 50

Cooling water 520

Service water 530

Winning water 530

Desalinated water 530

Demineralized water 530

Potable water 530

Open drain 540

Closed drain 550

Waste water treatment 560

Sewage treatment and storage 570

Inert gas 600

Steam out 620

Water/foam fire fighting 730

Halon fire fighting 740

CO2 fire fighting 750

Dry chemicals fire fighting 760

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 5 of 50

1.2. Measure systems

In principle the measure system will be:

British Metric S.I. 

However the specific following selections shall be made.

1.2.1. Piping standardization

ANSI  OTHER .............................

AFNOR

DIN

UNI

1.2.2. Piping nominal diameter 1.2.3. Piping thickness

Inches  Schedule  Inches

Millimeters Millimeters

1.2.4. Insulation thickness 1.2.5. Temperature

Inches Fahrenheit

Millimeters  Centigrade/Kelvin 

1.2.6. Capacity 1.2.7. Linear dimensions

Cubic meters  Meters and millimeters 

Cubic feet Feet and inches

1.2.8. Pressure 1.2.9. Liquid flow-rate

psi l/h and m3/h 

Sm3/h  (@ 15.5°C and 1.013 bar)

kg/cm² GPM 

atm kg/h 

bar  lb/h

kPa

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 6 of 50

1.2.10. Weight 1.2.11. Surfaces

kg  m²/cm²/mm² 

lb Sq.inch./Sq. feet

1.2.12. Density 1.2.13. Gas and vapour flow-rate

kg/m³  m³/h 

N m³/h  (@ 0°C and 1.013 bar)

S m³/h  (@ 15.5°C and 1.013 bar)

lb/ft³ ft³/h

°API  kg/h 

Specific gravity  lb/h

1.2.14. Steam flow-rate 1.2.15. Energy

kg/h  kWh 

lb/h kJ 

kcal

Btu

1.2.16. Power 1.2.17 Radiation

kW  Btu/hft 2 

kJ/h

kcal/h

Btu/h

1.2.18 Multiplying Factors

Factors of one thousand shall be normally used e.g. m 3, km3, Mm 3, Gm 3.


Exception will be permitted where universally recognized e.g. Centi poise (CP) and Centi stoke (CS)

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 7 of 50

1.3. Codes

Performance of the contract shall be in conformity with the listed revision of the applicable sections of the
codes. local laws, or accepted engineering practice, as per Attachment 4.

1.4. Climatic conditions (WAFA)

Further information are given in the “Environmental and Meteo Study for Wafa” (T-51-T-V-0001-00).

1.4.1. Temperature

a. Minimum winter temperature dry bulb -2.5°C

b. Maximum summer temperature dry bulb +48.2°C

c. Temperature to be used for cooling tower (wet bulb) 25°C

d. Temperature to be used for air coolers (dry bulb) 45°C

e. Temperature to be used for electrical equipment rating (dry bulb) 50°C

f. Expected temperature for piping erection 20°C

g. Design thermal variation (T) for structural calculation 40°C

1.4.2. Relative humidity

a. Minimum value 9%

b. Maximum value 83%

c. Design values for:

- air fans, compressors and blowers 60%


- insulation thermal calculations 70%

1.4.3. Air barometric pressure

Min 936.7 hPa

Max 963.4 hPa

1.4.4. Wind

a. Direction of prevailing wind From E

b. Velocity to be used for insulation calculation 2.5 m/sec

c. Highest recorded wind speed (at Gadames) 133 km/h

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 8 of 50

1.4.5. Rain and snow

a. Maximum rainfall recorded in 10 minutes: Not available

b. Maximum rainfall recorded in 1 hour: Not available

c. Maximum rainfall recorded in 12 hours: Not available

d. Maximum rainfall recorded in 24 hours: 20 mm

e. Maximum snow depth: N.A.

f. Design intensity for sewer design (H =  Tn) I=20 mm/h

g. Design snow load: N.A.

h. Run off coefficients:

- roofs: 1
- paved floors:  0.85
- greens:  0.20

1.4.6. Earthquake

a. Are earthquakes to be taken into account?

YES  NO

b. if yes, design shall be as per code UBC, zone 2 A

c. In case of UBC application, the following will be applied:

Seismic zone factor : Z=0.15

I importance factor : To be defined based on occupancy

S soil profile type : Sc (Based on Soil Report)

PGA horizontal ground acceleration: N.A.

PGV vertical ground acceleration: N.A.

SPECTRUM: N.A.

1.4.7. Air corrosiveness to be taken into account:

YES  NO 

due to presence of /

1.4.8. Wind erosion to be taken into account due to sand storms:

YES  NO

1.4.9. Indoor design climatic data.

For air conditioning refer to General design specification HVAC.

1.4.10. Tropicalization requirement for instrument

YES  NO

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 9 of 50

1.5. Raw materials

1.5.1. Raw materials

1.5.1.1. Gas Wells Feedstock

Composition Measure Unit Year 1 Year 2 Year 10


H2O % mol. 2.4992 2.8203 3.0876
N2 % mol. 0.3411 0.3404 0.3387
CO2 % mol. 3.1708 3.1610 3.1551
C1 % mol. 76.5621 76.3813 76.2276
C2 % mol. 8.3343 8.3032 8.2835
C3 % mol. 3.3735 3.3738 3.3833
I-C4 % mol. 0.6405 0.6318 0.6632
N-C4 % mol. 1.3600 1.3527 1.3534
I-C5 % mol. 0.5895 0.5807 0.5679
N-C5 % mol. 0.5895 0.5807 0.5594
N-C6 % mol. 0.7261 0.7162 0.6978
N-C7 % mol. 0.6288 0.6190 0.5967
N-C8 % mol. 0.5505 0.5461 0.5102
N-C9 % mol. 0.3260 0.3151 0.2854
N-C10 % mol. 0.1485 0.1402 0.1295
N-C11 % mol. 0.0729 0.0655 0.0564
G-C12+ % mol. 0.0868 0.0720 0.0482
0-C12+ % mol. 0.0000 0.0000 0.0561

- Flowrate Kg/h 610030 510193 680068

- Molecular weight Kg/Kmol 23.02 22.93 22.94

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 10 of 50

1.5.1.2. Oil Wells Feedstock

Composition Measure Unit Year 1 Year 2 Year 10


H2O % mol. 27.3492 16.4362 96.9190
N2 % mol. 0.1510 0.2369 0.0090
CO2 % mol. 2.0299 2.5394 0.0950
C1 % mol. 39.9188 56.4670 2.1500
C2 % mol. 5.7598 6.8984 0.2560
C3 % mol. 3.4299 3.3892 0.1220
I-C4 % mol. 0.7300 0.6798 0.0250
N-C4 % mol. 1.8800 1.6296 0.0570
I-C5 % mol. 1.1000 0.8568 0.0290
N-C5 % mol. 1.1900 0.9008 0.0300
N-C6 % mol. 1.8199 1.3097 0.0430
N-C7 % mol. 2.1399 1.4297 0.0460
N-C8 % mol. 2.3199 1.4997 0.0470
N-C9 % mol. 1.7799 1.0998 0.0340
N-C10 % mol. 1.3100 0.7678 0.0230
N-C11 % mol. 0.8830 0.5019 0.0150
G-C12+ % mol. 0.0290 0.0480 0.0010
0-C12+ % mol. 6.1798 3.3092 0.0990

- Flowrate Kg/h 293105 376264 28165

- Molecular weight Kg/Kmol 51.44 38.18 18.64

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 11 of 50

1.5.2. Products

1.5.2.1. Gas to Wafa-Mellitah Pipeline

Composition Measure Unit Year 1 Year 2 Year 10


H2O % mol. 0.0000 3.4376E-05 0.0000
N2 % mol. 0.3857 0.3864 0.3920
CO2 % mol. 1.8011 1.7976 1.8013
C1 % mol. 87.8682 87.9124 88.1732
C2 % mol. 9.8308 9.7936 9.5387
C3 % mol. 0.1141 0.1099 0.0948
I-C4 % mol. 0.0000 5.9207E-07 0.0000
N-C4 % mol. 0.0000 7.4693E-08 0.0000
I-C5 % mol. 0.0000 5.7109E-13 0.0000
N-C5 % mol. 0.0000 1.2258E-13 0.0000
N-C6 % mol. 0.0000 0.0000 0.0000
N-C7 % mol. 0.0000 0.0000 0.0000
N-C8 % mol. 0.0000 0.0000 0.0000
N-C9 % mol. 0.0000 0.0000 0.0000
N-C10 % mol. 0.0000 0.0000 0.0000
N-C11 % mol. 0.0000 0.0000 0.0000
G-C12+ % mol. 0.0000 0.0000 0.0000
0-C12+ % mol. 0.0000 0.0000 0.0000

- Flowrate Kg/h 403736 403202 402591

- Molecular weight Kg/Kmol 18.00 18.00 17.96

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 12 of 50

1.5.2.2. Liquid to Wafa-Mellitah Pipeline

Composition Measure Unit Year 1 Year 2 Year 10


H2O % mol. 0.01 0.01 0.00
N2 % mol. 0.00 0.00 0.00
CO2 % mol. 0.00 0.00 0.00
C1 % mol. 0.00 0.00 0.00
C2 % mol. 0.33 0.34 0.44
C3 % mol. 27.85 28.52 37.17
I-C4 % mol. 5.55 5.61 7.47
N-C4 % mol. 12.28 12.47 15.26
I-C5 % mol. 5.75 5.77 6.40
N-C5 % mol. 5.89 5.89 6.31
N-C6 % mol. 7.78 7.79 7.87
N-C7 % mol. 7.58 7.53 6.74
N-C8 % mol. 7.31 7.27 5.77
N-C9 % mol. 4.93 4.82 3.23
N-C10 % mol. 2.99 2.89 1.47
N-C11 % mol. 1.83 1.73 0.64
G-C12+ % mol. 0.65 0.56 0.54
0-C12+ % mol. 9.25 8.81 0.69

- Flowrate Kg/h 379121 362314 183475

- Molecular weight Kg/Kmol 99.62 97.87 62.59

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 13 of 50

1.5.3. Chemicals

DEA, Corrosion Inhibitor, Demulsifier, Antifoam, Methanol, pH controller

1.5.4. Catalysts and Desiccants

Molecular sieves

1.5.5. Wastes

Waste water

1.5.6. Other

Winning water (see Attachment 1 – Table 3)

Diesel oil (see Attachment 1 – Table 4)

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 14 of 50

1.6. Documents Code

1.6.1. General documents code to be utilized

Technip Italy Client  Other ................

According to AGIPGAS specification A 00 P Q 0002 00 A2 Document Numbering System

1.6.2. Drawings numbering system


Contractor
Technip Italy Client  Other ................

According to AGIPGAS specification A 00 P Q 0002 00 A2 Document Numbering System

1.6.3. P & I symbols


Contractor
Technip Italy Client  Other ................

According to AGIP Standard 20250.DOC.MEC.SDS

1.6.4. Line numbering system


Contractor
Technip Italy  Client  Other ................

According to specification T-00-P-Z-0006-00 J-00-P-Z-0006-00.

1.6.5. Equipment itemization system


Contractor
Technip Italy  Client  Other ................

According to specification T-00-P-Z-0006-00 J-00-P-Z-0006-00.

1.6.6. Instrument itemization and numbering


Contractor
Technip Italy  Client  Other ................
(in accordance to ISA)

According to specification T-00-P-Z-0006-00 J-00-P-Z-0006-00.

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 15 of 50

1.7. Safety Criteria

Safety criteria shall be addressed to following aspects:

 optimization of lay-out for onsite and offsite facilities (spacing among equipment, division into fire
areas, equipment stacking, escape routes, proper tank bunding, etc.) to reduce consequences of
accidental spills;
 use of high quality standards for the engineering of equipment and piping, based on hazardous
characteristics and operating conditions of fluids to be handled;
 limitation of ignition sources (proper selection of electrical and instrument equipment based on area
classification drawings);
 safe disposal of hazardous substances (by means of flare and closed drain systems);
 accidental releases prevention and mitigation (by means of ESD systems, remote operated valves,
flammable/toxic gas detectors network, active and passive fire protection);
 proper selection of equipment for personnel protection.

Main codes to be followed to ensure a safe design will be NFPA and API.

Safety oriented principle will be identified and summarized in a dedicated document:


General Safety Criteria.

Project Specifications and other project drawings will incorporate and expand such criteria.

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 16 of 50

1.8. Engineering standard and specifications

Engineering project specification for each discipline have been prepared by TP Contractor. The project
specifications are based on standards and Company standard specifications.

The following Company standards and Company standard specifications have been taken, per each
discipline, as reference:

a) Pressure Vessels/Heat exchangers/storage tanks

N° L Act. Disc. Title

- 04930 EQP MEC SPC GEN. SPC. TRAYS FOR COLUMN (AMEND. BY TP SPEC)
- 04931 EQP MEC SPC GEN. SPC STORAGE TANKS
- 05490 MAT MEC SPC GEN. SPC FOR FABRICATION AND TESTING OF CARBON STEEL PRESSURE
VESSELS
- 04937 EQP MEC SPC TUBE BUNDLE HEAT EXCHANGERS
- 06586 MAC MEC SDS AIR COOLER
- 20182 COO GEN SDS SPARE PARTS (AMEND BY TP SPEC)
- 07000 EQP MEC STD VESSEL TOLERANCES
- 07001 EQP MEC STD NAMEPLATE FOR PRESSURE VESSEL
- 07002 EQP MEC STD NAMEPLATE FOR JACKETED PRESSURE VESSELS
- 07003 EQP MEC STD NAMEPLATE HOLDER FOR VESSELS
- 07004 EQP MEC STD CATALYST LOADING & UNLOADING ACCESSORIES
- 07005 EQP MEC STD CATALYST LOADING HOPPER
- 07006 EQP MEC STD CATALYST UNLOADING SPOUT
- 07007 EQP MEC STD CATALYST LOADING CANVAS TUBES
- 07008 EQP MEC STD DRUM AND BARREL TILT DEVICE
- 07009 EQP MEC STD SUPPORT SKIRTS AND ANCHOR BOXES
- 07010 EQP MEC STD VERTICAL VESSEL SUPPORTING LEGS
- 07011 EQP MEC STD LUG SUPPORTS FOR VERTICAL VESSELS
- 07012 EQP MEC STD SUPPORT SADDLES FOR VESSELS
- 07013 EQP MEC STD DIMENSIONS OF TRAY SUPPORT RINGS
- 07014 EQP MEC STD VORTEX BREAKER FOR LEVEL CONNECTION
- 07015 EQP MEC STD VORTEX BREAKERS
- 07016 EQP MEC STD VORTEX BREAKERS
- 07017 EQP MEC STD VORTEX BREAKERS
- 07018 EQP MEC STD VORTEX BREAKERS
- 07019 EQP MEC STD VORTEX BREAKERS
- 07020 EQP MEC STD MANHOLE SUPPORT
- 07021 EQP MEC STD MANHOLE OR HANDHOLE HINGES
- 07022 EQP MEC STD VESSEL INSULATION SUPPORTS
- 07023 EQP MEC STD GUNITE LINING ANCHORS FOR VESSELS
- 07024 EQP MEC STD INSULATING CONCRETE ANCHORS
- 07025 EQP MEC STD NOZZLES FOR VESSEL
- 07026 EQP MEC STD ANGLE NOZZLES FOR VESSEL
- 07027 EQP MEC STD ANGLE NOZZLES FOR VESSEL
- 07028 EQP MEC STD NOZZLE DETAILS FOR CLAD OR LINED VESSELS
- 07029 EQP MEC STD TANGENTIAL INLET WITH ANTI-EROSION PLATE
- 07030 EQP MEC STD INLET WITH ELBOW AND ANTIEROSION PLATE ON HORIZONTAL VESSELS
- 07031 EQP MEC STD TANGENTIAL DISTRIBUTOR FOR VERTICAL VESSELS
- 07032 EQP MEC STD INLET WITH OPEN DISTRIBUTOR
- 07033 EQP MEC STD INLET WITH SLOTTED DISTRIBUTOR
- 07034 EQP MEC STD INLET WITH ANGLE CUT
- 07035 EQP MEC STD CENTRAL INLET WITH ELBOW

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 17 of 50

N° L Act. Disc. Title

- 07036 EQP MEC STD INLET WITH TANGENTIAL ELBOW


- 07037 EQP MEC STD INLET WITH TANGENTIAL ELBOW AND ANTI-EROSION PLATE
- 07038 EQP MEC STD STD INLET WITH ELBOW
- 07040 EQP MEC STD FEEDING OR REFLUX DISTRIBUTORS
- 07041 EQP MEC STD FEEDING OR REFLUX DISTRIBUTORS
- 07042 EQP MEC STD OVERHEAD VAPOR SIDE OUTLET-BOTTOM LIQUID SIDE OUTLET
- 07044 EQP MEC STD TRAY SUPPORTS DIMENSIONAL TOLERANCES
- 07045 EQP MEC STD OUTLET WITH INTERNAL PIPE
- 07046 EQP MEC STD OUTLET WITH INTERNAL PIPE
- 07047 EQP MEC STD OUTLET WITH INTERNAL PIPE
- 07048 EQP MEC STD OUTLET WITH INTERNAL PIPE
- 07049 EQP MEC STD COKE STRAINER
- 07050 EQP MEC STD DEMISTER BAFFLES FOR HORIZONTAL VESSELS
- 07051 EQP MEC STD DEMISTER WIRE MESH BLANKET SUPPORTS FOR HORIZONTAL VESSELS
- 07052 EQP MEC STD DEMISTER WIRE MESH BLANKET SUPPORTS FOR VERTICAL VESSELS
- 07053 EQP MEC STD DEMISTER WIRE MESH BLANKET SUPPORTS FOR VERTICAL VESSELS
- 07054 EQP MEC STD DEMISTER WIRE MESH BLANKET SUPPORT FOR HORIZONTAL VESSELS
- 07055 EQP MEC STD DEMISTER WIRE MESH BLANKET SUPPORT FOR VERTICAL VESSELS
- 07060 EQP MEC STD WEIRS FOR HORIZONTAL VESSELS
- 07065 EQP MEC STD PLATE FLANGES FOR ATMOSPHERIC VESSELS
- 07066 EQP MEC STD ANTIVIBRATION PROPELLERS
- 07068 EQP MEC STD INTERNAL HANDLE AND RUNG DETAILS
- 07070 EQP MEC STD LIFTING LUG TO LIFT EQUIPMENT UP TO 60 TONS
- 07071 EQP MEC STD LIFTING LUG TO LIFT EQUIPMENT UP TO 200 TONS
- 07072 EQP MEC STD LIFTING LUG TO LIFT EQUIPMENT UP TO 400 TONS
- 07073 EQP MEC STD BLIND FLANGE FOR REACTOR LIFTING WITH 18"N.D. TOP FLANGE
- 07074 EQP MEC STD LIFTING LUG TO LIFT AND OVER TURN BY 180ø FOR EQUIPMENT UP TO 160
TONS.
- 07075 EQP MEC STD RETENTION LUG APPLIED ON SHELL
- 07076 EQP MEC STD RETENTION LUG APPLIED ON SKIRT BOTTOM
- 07077 EQP MEC STD LIFTING LUG TO LIFT LOWER OR INTERM.SECTION OF EQUIPMENT ASSEMBLED
AT FIELD
- 07078 EQP MEC STD LIFTING LUG TO LIFT TOP SECTIONS OF LARGE DIAMETER EQUIPMENT
ASSEMBLED AT FIELD
- 07079 EQP MEC STD LIFTING LUG TO LIFT EQUIPMENT UP TO 3 TONS.
- 07100 EQP MEC STD SADDLES FOR HEAT EXCHANGERS
- 07101 EQP MEC STD CHANNEL DETAIL VENTS AND DRAINS ON PARTITION PLATES
- 07102 EQP MEC STD HEAT EXCHANGER MAIN FLANGES - NUBBIN DETAIL
- 07103 EQP MEC STD TUBE SHEET FOR HEAT EXCHANGERS - EXPANDING DETAIL
- 07104 EQP MEC STD LIFTING LUGS AND EYE BOLTS FOR HEAT EXCHANGERS
- 07105 EQP MEC STD AIR COOLERS - PLUG AND GASKET
- 07106 EQP MEC STD AIR COOLERS - FINNED TUBES SUPPORT
- 07107 EQP MEC STD HEAT EXCHANGERS NAMEPLATE
- 07108 EQP MEC STD NAMEPLATE HOLDER FOR HEAT EXCHANGER
- 07109 EQP MEC STD HEAT EXCHANGERS NAMEPLATE INDICATING THERMOD.DESIGN BY Agip
- 07110 EQP MEC STD AIR COOLERS NAMEPLATE INDICATING THERMOD.DESIGN BY Agip
- 07111 EQP MEC STD NAMEPLATE SUPPORT FOR AIR COOLERS
- 07112 EQP MEC STD JOINTS AND TOLERANCES FOR FLANGED ITEMS
- 07113 EQP MEC STD HYDRAULIC TESTS ON SHELL AND TUBE HEAT EXCHANGERS
- 07114 EQP MEC STD LUG SUPPORTS FOR VERTICAL HEAT EXCHANGERS
- 07116 EQP MEC STD SACRIFICIAL PLATE FOR HEAT EXCHANGERS WITH FLAT COVER
- 07117 EQP MEC STD VENT FOR AIR COOLED HEAT EXCHANGER HEADERS

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 18 of 50

N° L Act. Disc. Title

- 07118 EQP MEC STD HEAT EXCHANGERS: LONGITUDINAL BAFFLE WITH SEALING STRIPS
- 07211 EQP MEC STD GENERAL CONSTRUCTION NOTES
- 07212 EQP MEC STD SYMBOLS - REFERENCES AND MISCELLANEOUS
- 07213 EQP MEC STD STD WELDED KNEES FOR FRAME
- 07214 EQP MEC STD BOLDED KNEES FOR FRAME
- 07215 EQP MEC STD BOLTED ATTACHMENTS FOR BEAMS ON COLUMNS
- 07216 EQP MEC STD BOLTED ATTACHMENTS FOR BEAMS ON COLUMNS
- 07217 EQP MEC STD BRACING KNOTS WITH BEAM CONNECTION
- 07218 EQP MEC STD CONNECTION OF BEAMS ONLY
- 07219 EQP MEC STD VERTICAL LADDERS
- 07220 EQP MEC STD STAIRS
- 07221 EQP MEC STD HANDRAIL-TOE BOARD
- 07222 EQP MEC STD BRACKETS FOR INTERMEDIATE CIRCULAR PLATFORMS
- 07223 EQP MEC STD CIRCULAR PLATFORMS FOR COLUMNS AND VESSELS
- 07224 EQP MEC STD CIRCULAR PLATFORMS FOR VESSELS
- 07225 EQP MEC STD DAVIT FOR VERTICAL VESSELS
- 07227 EQP MEC STD SKETCH FOR CARPENTERY PACKING
- 07228 EQP MEC STD TYPICAL CONNECTIONS FOR LADDERS AND PLATFORMS ON CIRCULAR
VESSELS
- 07229 EQP MEC STD TYPICAL CONNECTIONS FOR TOP PLATFORMS
- 07230 EQP MEC STD SUPPORTS FOR DAVIT FOR VERTICAL VESSELS
- 07231 EQP MEC STD SYMBOLS AND REFERENCES FOR LADDERS AND CIRCULAR PLATFORMS
- 07232 EQP MEC STD TYPICAL CONNECTIONS FOR PLATFORMS ON HORIZONTAL VESSELS
- 07233 EQP MEC STD SAFETY LOOK
- 07250 EQP MEC STD PLATFORMS ON CYLINDRICAL VESSELS-MINIMUM AMPLITUDE OF PLATFORMS
- 07251 EQP MEC STD PLATFORMS ON CYLINDRICAL VESSELS-MINIMUM AMPLITUDE OF PLATFORMS
- 07252 EQP MEC STD PLATFORMS ON CYLINDRICAL VESSELS-MINIMUM AMPLITUDE OF PLATFORMS
- 07253 EQP MEC STD PLATFORMS ON CYLINDRICAL VESSELS-MINIMUM AMPLITUDE OF PLATFORMS
- 07254 EQP MEC STD PLATFORMS ON CYLINDRICAL VESSELS-MINIMUM AMPLITUDE OF PLATFORMS
- 07255 EQP MEC STD PLATFORMS ON CYLINDRICAL VESSELS-MINIMUM AMPLITUDE OF PLATFORMS
- 07256 EQP MEC STD PLATFORMS ON CYLINDRICAL VESSELS-MINIMUM AMPLITUDE OF PLATFORMS
- 07300 EQP MEC STD STORAGE TANKS - JOINTS PREPARATION FOR WELDING
- 07302 EQP MEC STD FIXED AND FLOATING ROOF STORAGE TANKS - BOTTOM DRAW OFF WITH SUMP
- 07305 EQP MEC STD STORAGE TANKS-SHELL NOZZLE FOR STEAM AND CONDENSATE
- 07308 EQP MEC STD CONE ROOF TANKS-SHELL MANHOLE WITHOUT REINFORCING
- 07309 EQP MEC STD STD EXTERNAL STAIRWAY FOR STORAGE TANKS
- 07311 EQP MEC STD STORAGE TANKS - VERTICAL LADDER WITH CAGE
- 07312 EQP MEC STD CONE ROOF TANKS - VERTICAL LADDER
- 07314 EQP MEC STD BOTTOM ANCHOR PLATES
- 07316 EQP MEC STD FIXED AND FLOATING ROOF STORAGE TANKS -DETAILS-
- 07318 EQP MEC STD FIXED ROOF TANKS - INSULATION RINGS SUPPORT
- 07322 EQP MEC STD CONE ROOF TANKS - FLAME TRAP VENT
- 07323 EQP MEC STD CONE ROOF TANKS - FLAME TRAP VENT
- 07324 EQP MEC STD CONE ROOF TANKS - OPEN VENT
- 07325 EQP MEC STD FIXED ROOF STORAGE TANKS - CIRCUMFERENTIAL HANDRAIL
- 07326 EQP MEC STD FLOATING ROOF TANKS: MIND GIRDER HANDRAIL
- 07329 EQP MEC STD FOAM DISTRIBUTOR FOR FLOATING ROOF
- 07330 EQP MEC STD STORAGE TANKS - SPRAY NOZZLE
- 07331 EQP MEC STD FLOATING ROOF TANKS - PROTECTIVE SHIELD
- 07335 EQP MEC STD STORAGE TANKS - VERTICAL LADDER – INTERNAL
- 07340 EQP MEC STD STORAGE TANKS – GROUNDING
- 07341 EQP MEC STD FLOAT ROOF TANKS GUIDE POLE WITH GAUGE HATCH NOZZLE

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 19 of 50

N° L Act. Disc. Title

- 07342 EQP MEC STD FLOATING ROOF TANKS GUIDE POLE AUTOMATIC LEVEL INDICATOR NOZZLE
- 07343 EQP MEC STD FLOATING ROOF TANK: TOP PLATFORM
- 07344 EQP MEC STD AUTOMATIC LEVEL INDICATOR ASSEMBLY
- 07346 EQP MEC STD STORAGE TANKS - DIP PLATE
- 07347 EQP MEC STD NAMEPLATE FOR STORAGE TANKS
- 07348 EQP MEC STD JET MIXER
- 07349 EQP MEC STD WORKING HEIGHT DEFINITION

b) Piping

N° L Act. Disc. Title

- 06285 DOC GEN PRG MECHANICAL EQUIPMENT ARRANGEMENT DRAWING EXECUTION CRITERIA (*)
- 05892 PIP MEC SDS PIPES AND PIPING COMPONENTS FOR PLANTS (*)
- 05329 PIP MEC PRG PIPING SUPPORTS (**)
- 06594 VAR GEN PRG SIZING AND ESTIMATING LOADS ON PIPE RACK (**)
- 05862 PIP MEC SPT STANDARD PIPING SUPPORTS (**)
- 05863 PIP MEC SPT TYPICAL PIPING SUPPORTS (**)
- 07616 PIP MEC SPT PIPING SUPPORTS (**)
- 20199 VON SAF SDS ONSHORE INSTALLATION – SAFETY GENERAL CRITERIA
- 20243 VON SAF SDS ONSHORE INSTALLATION – DESIGN LAYOUT AND SAFETY SPACING
- 0586 OPT GEN PRG ONSHORE PLANT – GENERAL DESIGN CRITERIA

(*) (Called as reference by TP Contractor specification)


(**) (Amended with additional cmplementary requirements by TP Contractor specification)

C) Material

N° L Act. Disc. Title

- 02555 VAR COR PRG INTERNAL CORROSION – CORROSION PARAMETERS AND CLASSIFICATION OF
THE FLUIDS
- 03580 MAT COR PRG INTERNAL CORROSION – METALLIC MATERIALS IN CONTACT WITH SEA WATER
- 06574 VAR PRC SPC SPC GEN STUDIO SUGLI INIBITORI DI CORROSIONI
- 03587 MAT COR PRG DESIGN CRITERIA – MATERIAL REQUIREMENTS FOR H2S CONTAINING
ENVIRONMENTS
- 03588 MAT COR PRG INTERNAL CORROSION – MATERIALS AND MATERIALS SELECTION CRITERIA

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 20 of 50

d) Electrical

AGIP SPECIFICATIONS

N° L Act. Disc. Title

- 20163 EQP ELE FUN


ELECTRICAL STORAGE BATTERIES FOR STATIONARY SYSTEM
- 20223 BLD ELE SDS
ELECTRIC PLANTS IN BUILDINGS
- 20169 EQP ELE FUN
FUNCTIONAL SPECIFICATION ELECTRICAL POWER AND CONTROL
CABLES
- 02788 EQP ELE SPC TRANSFORMER-RECTIFIER UNIT FOR CATHODIC PROTECTION
PLANTS
- 20162 EQP ELE FUN D.C. SWITCHBOARD
- 20164 EQP ELE FUN ELECTRIC CONTROL PANELS AND DESKS
- 20123 PKG GEN SDS DIESEL/GAS DRIVEN ENGINE GENERATOR SET
- 20214 EQP ELE SDS CONTROL PANELS FOR ENGINE GENERATOR SET
- 06137 VAR ETI SPC ELECTRICAL TRACING SYSTEMS FOR PLANTS USED TO TREAT
HYDROCARBONS
- 06170 VAR ETI SPC INSTALLATION OF TRACING SYSTEMS
- 05242 VAR ELE SPC INSTALLATION OF ELECTRICAL PLANTS
- 20161 EQP ELE FUN LOW VOLTAGE SWITCHBOARD (up to 1000 V a.c 1500 V d.c)
- 20160 EQP ELE FUN MEDIUM VOLTAGE SWITCHBOARD (over 1000 V and up to 72.5kV a.c)
- 20166 EQP ELE FUN ELECTRIC POWER TRANSFORMERS
- 20171 EQP ELE FUN RESISTORS FOR EARTHING THE NEUTRAL OF ELECTRICAL SYSTEM
- 20168 EQP ELE FUN SYNCHRONOUS ELECTRIC MACHINES
- 03778 PKG GEN SPC ELECTRIC GENERATOR DRIVEN BY GAS TURBINE
- 03742 CMP STA SPC STATIC UNINTERRUPTIBLE A.C. POWER SUPPLY UNIT
- 05221 VAR ELE SPC PROGRAM OF CHECKS AND TESTS FOR ELECTRICAL INSTALLATIONS
- 06677 VAR ELE SPC LIST OF CHARGES COVERING THE BASIC INSTALLATION ACTIVITIES
- 05497 VAR ELE SPC CONSTRUCTION METHODS FOR ELECTRICAL MATERIAL FOR
TROPICAL CLIMATES
- 20167 EQP ELE FUN ASYNCHRONOUS MOTORS
- 20208 VAL ELE SDS ELECTRICAL POWER SYSTEM
- 20209 VAL ELE SDS LIGHTING SYSTEMS
- 20210 VAL ELE SDS EARTHING AND LIGHTNING PROTECTION SYSTEM
- 06249 DOC GEN PRG DESIGN PRACTICE – DANGEROUS AREA CLASSIFICATION DRAWING
EXECUTION

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 21 of 50

AGIP INSTALLATION DRAWINGS

Earthing System Drawings

NUMBER TITLE REV DATE SH.


06773.ICO.ELE.STD TYPICAL EARTHING DETAILS FOR ON SHORE SYSTEM 1 07/96 10
06774.ICO.ELE.STD TYPICAL EARTHING DETAILS FOR PACKAGE UNITS 1 07/96 5
06775.ICO.ELE.STD TYPICAL EARTHING DETAILS FOR METALLIC STRUCTURE 1 07/96 8
SYSTEM
06776.ICO.ELE.STD TYPICAL EARTHING DETAILS FOR OFF SHORE SYSTEM 1 07/96 9
06777.ICO.ELE.STD TYPICAL EARTHING DETAILS FOR REINFORCED 1 07/96 16
CONCRETE WORKS AND BUILDING
06778.ICO.ELE.STD TYPICAL EARTHING DETAILS FOR SKID UNITS 1 07/96 7

Power System Drawings

NUMBER TITLE REV DATE SH.


06749.ICO.ELE.STD TYP.FITT.UP OF MOT.CONTR.STAT.ON FOUND.BLOCK WITH 2 06/96 1
CABL.INCOM.BELOW-EXPL.(CL.1/ZON.1)
06750.ICO.ELE.STD TYP.FITT.UP OF DOUB.MOT.CONTR.STAT.ON FOUND.BLOCK 2 06/96 1
WITH CAB.INCOM.BEL.-EX.(CL.1/ZON.1)
06751.ICO.ELE.STD TYP.FITT.UP OF POW.SOCK.ON FOUND.BLOCK WITH 1 06/96 1
CAB.INCOM.BEL.-EXPL.(CL.1/ZON.1)
06754.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED VERT.MOTOR 2 06/96 1
(V1) WITH CAB.INCOM.BEL.(CL.1/ZON.1)
06755.ICO.ELE.STD CABLE OUTLET FROM CABLE TRAY TO CONDUIT, USING 1 06/96 9
BUSHING, FOR NON-AZARDEOUS AREAS
06756.ICO.ELE.STD CABLE OUTLET FROM CABLE TRAY TO CONDUIT, USING 1 06/96 8
CABLE GRANDS FOR AZARDEOUS AREAS
06757.ICO.ELE.STD TYP.FITT.UP OF MOT.CONTR.STAT.ON FOUND.BLOCK WITH 2 06/96 1
CABL.INCOM.BELOW-EXPL.(CL.1/ZON.1)
06758.ICO.ELE.STD TYP.FITT.UP OF DOUB.MOT.CONTR.STAT.ON STRUCT.WITH 3 06/96 1
CAB.INCOM.BELOW EXPL.(CL.1/ZON.1)
06759.ICO.ELE.STD TYP.FITT.UP OF POWER SOCK.ON STRUCT.WITH 3 06/96 1
CAB.INCOM.BELOW.BELOW EXPL.(CL.1/ZON.1)
06760.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED 2 06/96 1
HORIZ.MOTOR (B3 OR B5) (CL.1/ZON.1)
06761.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED 2 06/96 1
HORIZ.MOTOR (B3 OR B5) (CL.1/ZON.1)
06762.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED VERT.MOTOR 2 06/96 1
(V1) (CL.1/ZON.1)
06763.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED 2 06/96 1
HORIZ.MOTOR (B3 OR B5) (CL.1/ZON.1)
06764.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED VERT.MOTOR 2 06/96 1
(V1) (CL.1/ZON.1)
06765.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED HOR.MOTOR 2 06/96 1
(B3 OR B5) (CL.1/ZON.1)
06766.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED HOR.MOTOR (B3 2 06/96 1
OR B5) (CL.1/ZON.1)
06767.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED HOR.MOTOR (B3 2 06/96 1
OR B5) (CL.1/ZON.1)
06768.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED HOR.MOTOR (B3 2 06/96 1
OR B5) (CL.1/ZON.1)
06769.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED HOR.MOTOR (B3 2 06/96 1
OR B5) (CL.1/ZON.1)

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 22 of 50

NUMBER TITLE REV DATE SH.


06770.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED VERT.MOTOR (V1) 2 06/96 1
(CL.1/ZON.1)
06771.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED HOR.MOTOR (B3 2 06/96 1
OR B5) (CL.1/ZON.1)
06772.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED VERT.MOTOR (V1) 2 06/96 1
(CL.1/ZON.1)
06921.ICO.ELE.STD TYP.FITT.UP OF BASE MOUNTED CONTR.STAT.WITH 3 06/96 1
CABL.INCOM.FROM ABOVE - EXPL.(CL.1/ZON.1)
06922.ICO.ELE.STD TYP.FITT.UP OF BEDPLATE MOUNT.MOT.CONTR.STAT.WITH 3 06/96 1
CAB.INCOM.ABOVE - EXPL.(CL.1/ZON.1)
06923.ICO.ELE.STD TYP.FITT.UP OF BASE MOUNT.POW.SOCK.WITH 3 06/96 1
CAB.INCOM.ABOVE - EXPL.(CL.1/ZON.1)
06924.ICO.ELE.STD TYP.FITT.UP OF BASEPLATE MOUNT.POW.SOCK.WITH 3 06/96 1
CAB.INCOM.ABOVE - EXPL.(CL.1/ZON.1)
06925.ICO.ELE.STD TYP.FITT.UP OF DOUBLE MOT.CONTR.STAT.ON 3 06/96 1
FOUND.BLOCK WITH CAB. - EXPL.(CL.1/ZON.1)
06926.ICO.ELE.STD TYP.FITT.UP OF BEDPLATE MOUNTED DOUBLE 3 06/96 1
MOT.CONTR.STAT.WITH CAB. - EXPL.(CL.1/ZON.1)
06927.ICO.ELE.STD TYP.FITT.UP OF MOT.CONTROL STAT.ON FOUND.BLOCK 2 06/96 1
WITH CAB. - EXPL.(CL.1/ZON.2)
06928.ICO.ELE.STD TYP.FITT.UP OF DOUBLE MOT.CONTROL STAT.ON 2 06/96 1
FOUND.BLOCK WITH CAB. - EXPL.(CL.1/ZON.2)
06929.ICO.ELE.STD TYP.FITT.UP OF POW.SOCK.ON FOUND.BLOCK WITH CABLE 3 06/96 1
(CL.1/ZON.2)
06932.ICO.ELE.STD TYP.FITT.UP OF MOT.CONTR.STAT.ON FOUND.BLOCK WITH 2 06/96 1
CABLE (CL.1/ZON.2)
06933.ICO.ELE.STD TYP.FITT.UP OF DOUBLE MOTOR CONTROL STAT.ON 2 06/96 1
STRUCTURE (CL.1/ZON.2)
06934.ICO.ELE.STD TYP.FITT.UP OF POW.SOCK.ON STRUCTURE WITH CABLE 2 06/96 1
(CL.1/ZON.2)
06935.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED HOR.MOT.(B3 2 06/96 1
OR B5) WITH TWO CABLE (CL.1/ZON.2)
06936.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED HOR.MOT.(B3 2 06/96 1
OR B5) WITH TWO CABLE (CL.1/ZON.2)
06937.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED HOR.MOT.(B3 2 06/96 1
OR B5) WITH TWO CABLE (CL.1/ZON.2)
06938.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNTED HOR.MOT.(B3 2 06/96 1
OR B5) WITH TWO CABLE (CL.1/ZON.2)
06939.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED VERT.MOT.(V1) 2 06/96 1
WITH TWO CABLE (CL.1/ZON.2)
06940.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED VERT.MOT.(V1) 2 06/96 1
WITH TWO CABLE (CL.1/ZON.2)
06941.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNTED VERT.MOT.(V1) 2 06/96 1
WITH CABL.INCOM.FR.ABOVE (CL.1/ZON.2)
06942.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNT.VERT.MOT.(V1) 2 06/96 1
WITH CAB.INCOM.FR.ABOV.(CL.1/ZON.2)
06943.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPLATE MOUNT.VERT.MOT.(V1) 2 06/96 1
WITH CAB.INCOM.FR.ABOV.(CL.1/ZON.2)
06944.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNT.VERT.MOT.(V1) WITH 2 06/96 1
CAB.INCOM.FR.ABOV.(CL.1/ZON.2)
06945.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPL.MOUNT.HOR.MOT.(B3 OR B5) 2 07/96 1
WITH CAB.INC.FR.ABOV.(CL.1/ZON.2)
06946.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNT.HOR.MOT.(B3 OR B5) 2 06/96 1
WITH TWO CAB.INC.BEL.(CL.1/ZON.2)
06947.ICO.ELE.STD TYP.CONNECT.OF EEx-d BASE MOUNT.VERT.MOT.(V1) WITH 2 06/96 1
TWO CAB.INCOM.FR.BEL.(CL.1/ZON.2)

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 23 of 50

NUMBER TITLE REV DATE SH.


06948.ICO.ELE.STD TYP.CONNECT.OF EEx-d BEDPL.MOUNT.VERT.MOT.(V1) WITH 2 06/96 1
TWO CAB.INCOM.FR.BEL.(CL.1/ZON.2)
06949.ICO.ELE.STD TYP.FITTING UP OF BEDPL.MOUNT.MOT.CONTR.STAT.WITH 3 06/96 1
CABLE INCOM.FROM ABOVE (CL.1/ZON.2)
06950.ICO.ELE.STD TYP.FITTING UP OF BASE MOUNT.MOT.CONTR.STAT.WITH 3 06/96 1
CABLE INCOM.FROM ABOVE (CL.1/ZON.2)
06951.ICO.ELE.STD TYP.FITTING UP OF BASE MOUNT.POWER SOCKET WITH 3 06/96 1
CABLE INCOM.FROM ABOVE (CL.1/ZON.2)
06952.ICO.ELE.STD TYP.FITTING UP OF BEDPL.MOUNT.POWER SOCKET WITH 3 06/96 1
CABLE INCOM.FROM ABOVE (CL.1/ZON.2)
06953.ICO.ELE.STD TYP.FITTING UP OF DOUB.MOT.CONTR.STAT.ON 3 06/96 1
FOUND.BLOC.WITH CAB.INCOM.FR.AB.(CL.1/ZON.2)
06954.ICO.ELE.STD TYP.FITTING UP OF 3 06/96 1
BEDPL.MOUNT.DOUB.MOT.CONTR.STAT.WITH
CAB.INCOM.FR.AB.(CL.1/ZON.2)
06964.ICO.ELE.STD TYP.CONNECTION OF HEATER WITH CABLE INCOMING 2 07/96 1
FROM BELOW EXPL.PROOF EXEC.(CL.1/ZONE 1)
06965.ICO.ELE.STD TYP.CONN.OF WALL MOUNT.AIR FAN WITH 2 06/96 1
CABL.INCOM.FROM BEL.EXPL.PROOF EXEC.(CL.1/ZONE 1)
06966.ICO.ELE.STD TYP.FITT.UP OF EEx-d JUNCT.BOX FOR EXT.CIRC.S 1 07/96 1
SUPPL.EXPL.FUNCT.SAF.EXEC.(CL.1/ZONE 2)
06967.ICO.ELE.STD TYPICAL FITTING UP CABLES PENETRATION FIRE STOP 1 06/96 1
SYSTEM "FIRE BARRIER"
11094.ICO.SAF.STD TYPICAL INSTALLATION FOR COMMAND MANUAL STATION- 0 06/93 2
EMERGENCY DEVICE
14113.ICO.ELE.STD NAV. AIDS SYS. TYP. FITT. UP FOR POLE WITH DIR. FOG 0 07/96 1
HORNS EXPL. PROOF EX (CL1/ZN1)

Lighting System Drawings

NUMBER TITLE REV DATE SH.


06752.ICO.ELE.STD TYP.ERCT.OF LIGHTING POLE ON FOUND.BL.WITH 2 07/96 1
CAB.INCOM.BEL.-EXPL.(CL.1/ZON.1)
06753.ICO.ELE.STD TYP.ERCT.OF LIGHTING POLE ON STRUCTURE 2 07/96 1
EXPL.(CL.1/ZON.1)
06930.ICO.ELE.STD TYP.ERECT.OF LIGHT.POLE ON FOUND.BLOCK WITH CABLE 2 07/96 1
(CL.1/ZON.2)
06931.ICO.ELE.STD TYP.FITT.UP OF LIGHT.POLE ON STRUCUTRE 2 07/96 1
EXPLOS.(CL.1/ZON.2)
06955.ICO.ELE.STD TYP.FITTING UP OF FLOODLIGHT ON 2 07/96 1
STRUCT.EXPLOS.FUNCTIONAL SAFETY EXECUT.(CL.1/ZON.2)
06956.ICO.ELE.STD TYP.FITTING UP FOR /HANDRAIL/ 3 07/96 1
LIGHT.FIXTUR.EXPLOS.FUNCTION.SAFETY
EXECUT.(CL.1/ZON.2)
06957.ICO.ELE.STD TYP.FITTING UP /SUSPENSION/ 3 07/96 1
LIGHT.FIXTUR.EXPLOS.FUNCTION.SAFETY
EXECUT.(CL.1/ZON.2)
06958.ICO.ELE.STD TYP.FITTING UP FOR /HANDRAIL/ 4 07/96 1
LIGHT.FIXTUR.EXPLOS.PROOF EXECUT.(CL.1/ZON.1)
06959.ICO.ELE.STD TYP.FITTING UP /SUSPENSION/ 3 06/96 1
LIGHT.FIXTUR.EXPLOS.PROOF EXECUT.(CL.1/ZON.1)
06960.ICO.ELE.STD TYP.FITTING UP /SUSPENSION/ LIGHT.FIXTUR.FOR 2 07/96 1
FLUORESC.TUB.LAMPS EXPL.(CL.1/ZON.2)
06961.ICO.ELE.STD TYP.FITTING UP /SUSPENSION/ LIGHT.FIXTUR.FOR 2 07/96 1
FLUORESC.TUB.LAMPS EXPL.(CL.1/ZON.1)

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 24 of 50

NUMBER TITLE REV DATE SH.


06962.ICO.ELE.STD TYP.FITTING UP FOR EEx-d LIGHTING SWITCH EXPL.PROOF 1 07/96 1
EXECUTION (CLASS 1/ZONE 1)
06963.ICO.ELE.STD TYP.FITTING UP FOR FLOODLIGHT ON STRUCTURE 3 07/96 1
EXPL.FUNCT.SAFETY EXEC.(CLASS 1/ZONE 1)
06968.ICO.ELE.STD TYPICAL FITTING UP OF LIGHT.FIXTURE FOR PERIMETRICAL 2 07/96 1
HELIPORT LIGHT WEATH.EXEC.IP55
06969.ICO.ELE.STD TYPICAL FITTING UP OF GRAZING FLOODLIGHT FOR 2 07/96 1
HELIPORT WEATHERPROOF EXECUTION IP55
06970.ICO.ELE.STD TYPICAL FITTING UP OF LIGHTING POLE FOR NAVIGATION 3 07/96 1
AIDS WHITE FLASHLIGHT SAF.EXEC.
06972.ICO.ELE.STD TYPICAL LIGHTING CIRCUITS OF CONNECTING EQUIPMENT 1 07/96 1
EXECUTION IP55
06973.ICO.ELE.STD TYPICAL LIGHTING CIRCUITS OF CONNECTING EQUIPMENT 1 07/96 1
EXECUTION IP23
06975.ICO.ELE.STD TYPICAL FITTING UP OF AERONAUTICAL OBSTRUCTION 1 07/96 1
LAMPS EXPL.PROOF EXEC.(CL.1/ZONE 2)
14112.ICO.ELE.STD NAV. AIDS SYS. TYP. FITT. UP FOR POLE WITH FLASHLIGHT & 0 07/96 1
DIR. FOG HORNS EXPL. PROOF EX (CL1/ZN1)

d) Insulation

NUMBER TITLE REV DATE SH.


03653.VAR.GEN.SPC (CALLED AS REFERENCE BY TP SPECIFICATION

e) Painting and Packing

NUMBER TITLE REV DATE SH.


AGIP 20000 Protective Treatment and Galvanizing 12 09/99
VAR.PAI.FUN
AGIP 05883 Packing for the dispatching of material and equipment 1 11/97
var.gen.spc

e) Instrumentation

J-51-S-I-0002-00
See T-50-S-I-0002-00 – “Company Standards for Instrumentation and Automation”

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 25 of 50

1.9. Reference levels

1.9.1. Plant elevation is 675 meters in respect of the National Vertical Datum.

1.9.2. Plant reference levels are established from the elevations of pertinent terraces.

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 26 of 50

1.10. Soil Report

Available YES  NO

a. if yes, nature of soil: With respect to mechanical properties of material, two geotechnical strata
can be recognised in the foundation soil. The upper layer consists of clayey
and silty snad/gravel and the thickness varies from 0.45 to 3.8 m. The
lower layer consists of rock. The upper part of the rock layer is always the
limestone which may change into other type of rock as depth increases.
The upper part of the rock layer is moderately to highly weathered.
The analysis of information from boreholes and test pits justify the
conclusion that a matrix of soil consists of coarse material, sand and
gravel. This material determines mechanical properties of the whole mass
of soil. The soil characteristics based on the observed heterogeneity of the
soil, between the locations of planned facilities do not substantially differ.

if yes, type of foundation: Shallow

b. if not, to be provided by N.A.

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 27 of 50

2. DETAILED ENGINEERING SPECIFICATIONS AND STANDARDS

The following definitions have to be considered as starting point for detailed analysis and development of
Design Basis. They have to be checked and confirmed by Discipline coordinators during development of
Design Basis and Philosophies.

2.1. Heat exchangers

See attachment 2

2.2. Piping Design

2.2.1. Piping material classes


Contractor
Technip Italy  Client

2.2.2. Piping classes type

Dimensional  Non dimensional

2.2.3. Line list form


Contractor
Technip Italy  Client

2.2.4. Material summary form


Contractor
Technip Italy  Client

2.2.5. Underground net-works

ONSITE OFFSITE
- Fire Water X X
- Cooling Water X X
- Potable Water X X
- Winning Water X X

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 28 of 50

2.3. Instruments

2.3.1. Instrumentation type

Pneumatic

Electronic (Smart) 

2.3.2. Process Control System Type


DCS 

2.3.3. Package Unit Control System Type


DCS 

Dedicated PLC 

2.3.4. Control room Operator Interface

Console (DCS) 

Semi-graphic Graphic

2.3.5. Primary hook-up connections

Stainless steel tubing & compression fittings 

Rigid pipe and fittings as per piping classes

2.3.6. Field Instrumentation type

Conventional Miniature

Pneumatic Electronic (Smart) 

Ex-proof  Intrinsic safe

Connection to process computer

Microprocessor dedicated type 

Microprocessor distributed system

2.3.7. Interlock system

ESD (PLC type) 

DCS (Local Interlock) 

DCS (Sequences) 

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 29 of 50

2.3.8. Alarm system

Hardwired Integrated in DCS 


(Process alarms)
and ESD alarm

Integrated in PLC

(ESD alarms)

2.3.9. Process computer

NO  YES Future

2.3.10. Computer tasks N.A.

Data acquisition

Set-point control

Direct digital control

2.3.11. Control and on/off valve actuators

Pneumatic  Electro/pneumatic

Electric 

Hydraulic 

2.3.12. Cable overhead install.

Single pair  Multipair

Conduit Trays 

2.3.13. Cable underground install.

Direct buried  Multipair 

Conduit

In trenches

2.3.14. Instrumentation protection, tracing and winterizing

Steam Electric  (if any)

Prefabr. boxes Insulation

Sunshield  Header

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 30 of 50

2.3.15. Analyzer buildings

Prefabricated 

Built on the spot

2.3.16. Power supply

UPS  redundant

Solar panels

2.3.17. Fire & Gas System

PLC based 

Dedicated microprocessor based

2.3.18. Scada System

Data acquisition 

Control (local only) 

Data transmission media

Radio Link 

Fibre Optic System 

Wire

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 31 of 50

2.4. Insulation

2.4.1. General

YES NO
As required

Hot insulation 
Cold insulation 
Antisweet insulation 
Pers. Prot. 
Winterizing 
Steam tracing

Electr. tracing 
Hot oil tracing

Hot water tracing

Contractor
Insulation design Technip Italy Client Other

Material  ......................

Application  ......................

Thicknesses calc.  ......................

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 32 of 50

2.4.2. Piping

a. Hot insulation

- Minimum external temperature for hot insulation -2°C


- Wind velocity 2 m/sec
- ........................... ......................
- ........................... ......................
- ........................... ......................
- ........................... ......................

b. Cold insulation

- Maximum external temperature for cold insulation 45°C


- Wind velocity 2 m/sec
- Dew point 17°C
- ........................... ......................
- ........................... ......................
- ........................... ......................

c. Personnel protection

- Minimum temperature for personnel protection 60°C

d. Winterizing, applicable YES NO 


- External temperature for winterizing design
- Tracing size(s)
- Tracing material
- Steam pressure (operating absolute)

f. Steam tracing

- External temperature N.A.


- Tracing size(s) N.A.
- Tracing material N.A.
- Steam pressure (operating absolute) N.A.

g. Electrical tracing

- Electrical tracing system shall be:

imposed calculated 
- Tracing size(s) HOLD
- Tracing material HOLD

h. Hot oil/water tracing

- Tracing size(s) N.A.


- Tracing material N.A.

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 33 of 50

2.5. Fire proofing

2.5.1. Is fire proofing to be provided? YES  NO

2.5.2. Material: Concrete

2.6. Painting

2.6.1. Ambient conditions

- Normal 

- Marine

- Light industrial

- Heavy industrial

- Corrosive for

2.6.2. Painting specifications to be provided by


Contractor
Technip Italy  Client 

2.6.3. Sand blasting can be carried out in field

YES  NO

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 34 of 50

2.7. Buildings

2.7.1. Drawings and technical report for Municipal Authorities will be prepared.

YES NO 

2.7.2. Drawings and technical report for Antifire Safeguard Authorities will be prepared.

YES NO 

2.7.3. Calculation for reinforced concrete structures and for steel structures for Authorities approval will be
prepared.

YES NO 

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 35 of 50

2.8. Telecommunication Systems ( to be confirmed by Company )

2.8.1. In-plant communication

2.8.1.1. Systems

Pabx teleph. set  Intercomm. Station

Party/page station Public address 

Radio mobile/pager system  Plant alarm system 

2.8.1.2. Radio system (Radio mobile/pager system)

VHF  UHF 

Omnidirectional antenna  Directional antenna

EEx-i portable radio set  General purpose radio set 

2.8.1.3. In-plant equipment type

Conventional EEx-d 

Weather proof 

2.8.1.4. Cable overhead installation

Single pair  Multipair/Multicore 

Conduit Trays 

2.8.1.5. Cable underground installation

Direct buried  Multipair/Multicore 

Conduit Armoured cable 

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 36 of 50

2.8.2. Inter-building network cables

Multipair cable  Single pair cable

Multimode F.O. cable (short dist.)  Single mode F.O. cable (long dist.) 

Armoured cable  Not armoured cable 

Direct buried  Buried PVC conduit

Underground duct bank (PVC conduit)  Trays

2.8.3. Process buildings (inside) communication systems

2.8.3.1. Laboratory

Local area network point  (PABX) telephone set 

Public address equipment (Loud speaker)  Plant alarm system 

Plant telephone (indoor station)

2.8.3.2. Electrical substation

Local area network point (PABX) telephone set 

Public address equipment  Plant alarm system 

2.8.3.3. Control building

Local area network point  (PABX) telephone set 

Public address main equipment  Plant alarm system 

Public address console 

2.8.4. Premises distribution system

UTP Cat 5 cable  UTP Cat 3 cable

EMT conduit 

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 37 of 50

3. STEAM OUT

PRESSURE (barg) TEMPERATURE (°C)


SYSTEM IDENTIFICATION
AND SYMBOL
MINIMUM NORMAL MAXIMUM DESIGN MINIMUM NORMAL MAXIMUM DESIGN

OUTLET CONDITIONS FROM STEAM PRODUCERS (1)

LOW PRESSURE STEAM 4,5 5 5,5 10 165 170 175 240

STEAM CONDITION TO USERS

LOW PRESSURE STEAM 4 4,5 5,5 10 160 165 170 240

NOTES: (1) After Block Valves

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 38 of 50

4. DEMINERALIZED WATER, BOILER FEED WATER (1)

SYSTEM IDENTIFICATION AND DEMINERALIZED BOILER FEED


SYMBOL WATER WATER

C PRESSURE (barg)
min
O - Operating normal 6,4 6
max
N

D - Design 10 10

I TEMPERATURE (°C)

T min
- Operating normal AMB AMB
I max

O
- Design 70 70
N FOULING FACTOR 0,0002 0,0002
S (°C m2 h Kcal)

pH 7 9

C Conductivity, S/cm <0,2 <0,2


H TDS ppm wt 5 5
E
M Total hardness as CaCO3, ppm wt not detectable not detectable
I
C SILICA as SIO2, ppm wt <0,02 <0,02
A
L IRON, ppm wt <0,02 <0,02
COPPER, ppm wt <0,003 <0,003
A OXYGEN, ppm wt <0,005 <0,005
N
A OXYGEN SCAVENGER, ppm wt
L
Y PHOSPHATE as P2O5 ppm wt
S OIL ppm wt <0,05 <0,05
I
S CO2 not detectable not detectable

NOTES: (1) At Unit B.L. ground level

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 39 of 50

5. RAW WATER, TREATED WATER, COOLING WATER, FIRE WATER, POTABLE WATER

COOLING COOLING WINNING SERVICE FIRE


SYSTEM IDENTIFICATION AND WATER WATER WATER WATER FIGHTING
C WATER
O SYMBOL “SUPPLY” “RETURN (3) (3) (3)

N
Pressure - Operating (2) 4 2 6 3 11
D (barg)
I

T - Design 10 (4) 10 (4) 10 10 16

O Temperature - Operating 29 40 Amb Amb Amb

N
- Design 70 70 70
S

Ph 8-9 8-9 7,8 7,8 7,8

Total hardness as CaCO3 ppm wt 200 200 200

C N Alkalinity as CaCO3 ppm wt 77 77 77

H -- -- --

E Carbon dioxide as Co2CaCO3 ppm wt -- -- --

M Calcium as Ca CaCO3 ppm wt 40 mg/l 40 4m mg/l


I
Magnesium as Mg CaCO3 ppm wt 24 mg/l 24 24 mg/l
C
Sodium as Na CaCO3 ppm wt 140 mg/l 140 140 mg/l
A
K 20 mg/l 20 20 mg/l
L
Sulphate as SO4 CaCO3 ppm wt 239 mg/l 239 239 mg/l

HCO3 94 mg/l 94 94 mg/l

A Fouling factor °Cm2h/kcal 0,0002

N Chloride as Cl CaCO3 ppm wt 150 mg/l 150 150 mg/l

A H2 S 1,5 mg/l 1,5 1,5 mg/l

L Silica as SiO2 ppm wt --

Y TDS as ppm wt 600 600 707


S
Turbidity as ppm wt --
I
Chlorine as ppm wt
S
Corrosion inhibitor as ppm wt --

NOTES: 1. Max return temperature from individual user


2. Pressure at grade
3. Winning water is used for Service Water and also for fire water
4. 18 barg where tube rupture is to be considered.

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 40 of 50

3. RAW WATER, TREATED WATER, COOLING WATER, FIRE WATER, POTABLE WATER

DESALINATE POTABLE DESALINAT.


SYSTEM IDENTIFICATION AND D WATER WATER WATER
(WASHING
C WATER)
SYMBOL
O

N
Pressure - Operating (1) 5,5 4/5,5 25
D (barg)
I

T - Design 10 10 33

O Temperature - Operating AMB AMB AMB


N (°C)

S
- Design 70 70 70

C pH

H Total hardness as CaCO3 ppm wt

E N Alkalinity as CaCO3 ppm wt

M Carbon dioxide as CaCO3 ppm wt


I
Calcium as Ca CaCO3 ppm wt
C
Magnesium as Mg CaCO3 ppm wt
A
Sodium as Na CaCO3 ppm wt
L

Sulphate as SO4 CaCO3 ppm wt

A Chloride as Cl CaCO3 ppm wt

N H2S

A Silica as SiO2 ppm wt

L TDS as ppm wt 50 mg/l 50


Y Turbidity as ppm wt
S
Chlorine as ppm wt
I
Corrosion inhibitor as ppm wt
S

NOTES: 1. Pressure at grade

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 41 of 50

6. FUEL

6.1. Diesel Oil

SYSTEM IDENTIFICATION AND DIESEL OIL DIESEL OIL


SYMBOL RAW TO USERS
C
Pressure - Operating 5 5
O
(barg) - Design 9 9
N

D
Temperature - Operating AMB AMB
I (°C) - Design 70 70

C Specific gravity 0,83 – 0,84 0,83 – 0,84


H Molecular weight (hold)
E
Flash point
M
Pour point
I
Viscosity at , cst
C
A Viscosity at , cst

L (LHV) heating value kJ/kg


Gross heating value
Sulphur
A
Vanadium
N
Nickel
A
Sodium
L
Y Potassium

S Calcium
I ASH
S Hydrogen sulphide
Water content ppm 800 50
Solid content mg/l 12

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 42 of 50

6.2. MP Fuel Gas

MP Fuel gas conditions at user B.L.


Normal case / Dry start-up case Wet start-up Case
Composition % mol Year 1 Year 2 Year 10 Year 1 Year 2 Year 10
H2O 3.483E-05 3.438E-05 3.151E-05 0.129 0.130 0.353
N2 0.386 0.386 0.392 0.367 0.367 0.358
CO2 1.801 1.798 1.801 3.327 3.326 3.316
Methane 87.870 87.913 88.173 81.647 81.635 80.403
Ethane 9.832 9.794 9.539 8.537 8.533 8.650
Propane 0.112 0.110 0.095 3.212 3.229 3.443
Ibutane 6.1016E-7 5.92E-7 5.46E-7 0.551 0.548 0.645
Butane 7.62E-08 7.47E-8 6.48E-8 1.105 1.109 1.278
Ipentane 5.86E-13 5.71E-13 4.46E-13 0.390 0.389 0.474
Pentane 1.26E-13 1.23E-13 9.37E-14 0.361 0.360 0.444
Hexane 0.000 0.000 0.000 0.252 0.253 0.375
Heptane 0.000 0.000 0.000 0.094 0.094 0.175
Octane 0.000 0.000 0.000 0.025 0.025 0.068
Nonane 0.000 0.000 0.000 3.19E-3 3.14E-3 1.52E-02
Decane 0.000 0.000 0.000 3.13E-4 3.02E-4 2.82E-03
NC11 0.000 0.000 0.000 3.27E-5 3.00E-05 4.97E-04
G-C12+ 0.000 0.000 0.000 3.29E-8 2.81E-8 9.26E-06
O-C12+ 0.000 0.000 0.000 0.000 0.000 3.75E-09
TOTAL 100.0 100.0 100.0 100.0 100.0 100.0

Operating Pressure Bar g 18/20 18/20 18/20 18/20 18/20 16/17


Design Pressure Bar g 24 24 24 24 24 24
Operating Temperature °C 49.1/30 49.1/30 49.1/30 41.3/52.2 41.24/52.2 57/67.3
Design Temperature °C 95 95 95 95 95 95
Molecular weight 18.00 17.99 17.96 20.52 20.52 21.02
Low Heating Value (LHV) KJ/kg 47091 47095 47092 45161 45162 45055
KJ/Sm3 35855 35845 35767 39193 39201 40058
Gross Heating value (GHV) KJ/kg 52163 52169 52169 49863 49864 49712
KJ/Sm3 39717 39707 39622 43274 43283 44198
Wobbe Index KJ/Sm3 50400 50395 50341 51464 51469 51949

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 43 of 50

6.3. LP Fuel Gas

LP Fuel gas conditions at user B.L.


Normal case / Dry start-up case West start-up Case
Composition % mol Year 1 Year 2 Year 10 Year 1 Year 2 Year 10
H2O 0.065 0.065 0.065 0.188 0.188 0.399
N2 0.377 0.378 0.383 0.360 0.360 0.351
CO2 1.709 1.706 1.710 3.157 3.156 3.416
Methane 87.844 87.885 88.132 81.942 81.931 80.762
Ethane 9.679 9.643 9.401 8.451 8.446 8.558
Propane 0.272 0.271 0.256 3.214 3.230 3.433
Ibutane 7.20E-3 7.20E-3 7.20E-3 0.530 0.527 0.619
Butane 0.033 0.033 0.033 1.081 1.085 1.245
Ipentane 4.48E-03 4.48E-03 4.48E-3 0.374 0.373 0.454
Pentane 4.25E-3 4.25E.3 4.25E.3 0.346 0.346 0.425
Hexane 3.02E-03 3.02E-03 3.02E-3 0.242 0.243 0.359
Heptane 5.62E-04 5.62E-04 5.62E-4 0.089 0.90 0.167
Octane 0.000 0.000 0.000 0.024 0.024 0.065
Nonane 0.000 0.000 0.000 3.03E-3 2.98E-3 0.014
Decane 0.000 0.000 0.000 2.97E-4 2.87E-4 2.67E-03
NC11 0.000 0.000 0.000 3.11E-5 2.85E-5 4.71E-04
G-C12+ 0.000 0.000 0.000 3.12E-8 2.67E-8 8.79E-06
O-C12+ 0.000 0.000 0.000 0.000 0.000 3.55E-09
TOTAL 100.0 100.0 100.0 100.0 100.0 100.3

Operating Pressure Bar g 4/5 4/5 4/5 4/5 4/5 4/5


Design Pressure Bar g 8 8 8 8 8 8
Operating Temperature °C 50 50 50 50 50 51.4/61.6
Design Temperature °C 85 85 85 85 85 85
Molecular weight 18.03 18.02 17.98 20.41 20.42 20.89
Low Heating Value (LHV) KJ/kg 47164 47169 47166 45315 45317 45211
KJ/Sm3 35957 35947 35872 39123 39131 39943
Gross Heating value (GHV) KJ/kg 52241 52246 52246 50038 50039 49890
KJ/Sm3 39826 39816 39736 43200 43208 44077
Wobbe Index KJ/Sm3 50507 50503 50452 51507 51512 51948

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 44 of 50

7. COMPRESSED AIR, NITROGEN

INSTRUMENT AIR UTILITY AIR NITROGEN

SYMBOL

PRESSURE, Operating min/max 7-8 7-8 5,5/9

(barg) Minimum 4 (1) -- --

Design 12 12 12

TEMPERATURE, Operating 49 49 AMB

(°C) Design 70 70 70

DEW POINT AT -25°C @ 8 barg -25°C @ 8 barg --

PURITY % Vol. Min. 97

OXYGEN Vol. Max. 10 ppm

CARBON MONOXIDE Vol. Max.

CARBON DIOXIDE Vol. Max. 1 ppm

OIL ppm Wt, Max. oil free oil free Oil free

NOTES:

1) For valves actuator sizing

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 45 of 50

8. ELECTRICITY

SERVICE RATED VOLTAGE (V) PHASE/ FREQUENCY


WIRE (Hz)

INCOMING POWER N.A. N.A. N.A.

POWER GENERATION 11 KV 3/3 50

PRIMARY DISTRIBUTION (TO BE DEFINED)

MEDIUM VOLTAGE DISTRIBUTION 6.6 KV 3/3 50

LOW VOLTAGE DISTRIBUTION POWER 420/240 V 3/4 50

LOW VOLTAGE DISTRIBUTION LIGHTING & MISC. 420/240 V 3-1/4-2 50

EMERGENCY GENERATION 6.6 KV and 420/240 V 3/3 OR 3/4 50

AC UPS SYSTEM 230 V 1/2 50

DC SYSTEM (AUXILIARIES) 110 V / DC

MOTOR 151 KW AND ABOVE 6.6 KV 3/3 50

MOTOR 0,75 KW – 150 KW 400 V 3/3 50

MOTOR LESS THAN 0.75 KW 400 V OR 230 V 3-3/1-2 50

L.V. MOTOR SUPPLIED BY VSD MANUFACTURER STD

EMERGENCY LIGHTING 400 V/230 V 3-1/4-2

SAFETY LIGHTING IN S.S. AND CONTROL ROOM 110 V -- DC

SWITCHGEAR CONTROL POWER 110 V / DC

MOTOR CONTROL POWER 230 V / 110V 1/2 50 / DC

SOLENOID VALVES 24/48 V -- DC

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 46 of 50

9. HOT OIL

SYSTEM IDENTIFICATION PRESSURE bar g TEMPERATURE °C


AND SYMBOL MINIMUM OPERATING DESIGN RANGE OPERATING DESIGN

HOT OIL supply 6,5 18 -- 250 300

HOT OIL RETURN 2,5 18 140-216 180 300

GENERAL NOTE: The pressures and temperatures specified in this attachment will be used for users design.

Fluid used as Hot Oil: THERMINOL 66 or equivalent

Physical properties:

Autoignition temperature 399 °C


Boiling point @ 1013 mbnar 359 °C
Maximum mass temperature 345 °C
Maximum film temperature 375 °C
Flash point 170 °C
Fire point 216 °C
Power point -32 °C
Latent Heat of vaporisation 272 kJ/kg
H2O content (moisture) <150 ppm
Chloride content <10 ppm
Average molecular weight 252

Density (kg/m3) = 1020.62-0,614252xT (°C) – 0.000321xT12(°C)

Specific heat (kg/°C) = 1,496005+0.003313xT (°C) + 0,0000008970785xT12(°C)

Thermal conductivity (W/m°C) = 0,118294 – 0,000033xT (°C) - 0,00000015xT12(°C)

Kinematic viscosity (mm2/s) = e(586.375 / (T(°C)+62,5) - 2,2809)

Vapor pressure (kPa) = e(-9094,51 / (T(°C)+340) + 17,6371)

Fouling factor = 0,0003 °Cm2/W

Allowable pressure drop = 0,7 bar

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 47 of 50

10. BLOW-DOWN AND FLARE

Are new relief systems to be provided?

YES  NO

Are new relief systems to be connected to existing ones?

YES NO 

Is scope of Technip Italy to check the suitability of the existing relief system to be connected to the new
one?

YES NO 

Is new flare stack to be provided?

YES  NO

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 48 of 50

11. DRAINAGE AND SEWERS

Unit will be paved

YES NO PARTIALLY 

TYPE OF SEWER RAIN WATER SANITARY CHEMICAL


WHITE OILY

YES  YES  YES  YES


To be provided
NO NO NO NO 

Drains to be collected

Max. allow. Temp. °C

YES YES  YES  YES


Treatment
NO  NO NO NO 

Materials

Combined with

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 49 of 50

12. NOISE SPECIFICATION

J-51-SQ-0001 00
See: T-50-SQ-0001 00 Equipment Noise Specification

J-50-SQ-0002 00
T-50-SQ-0002 00 Plant Noise Control Specification

13. RADIATION SEPCIFICATION

FLARES:

- 1550 Btu/ hrft 2 max during emergency at plant boundary


- 500 Btu/hrft 2 max during normal operation at plant boundary
- 1500 Btu/hrft 2 max at external fencing area during emergency.

BURN PIT:

- 500 Btu/hft 2(*) at 100 m (ground level) from burner.

(*) including solar radiation (300 Btu/hft 2)

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.
Contract No. Company Doc. No. Rev.

WLGP – WAFA PLANTS 110/WA/02 J-53-S-Z-0001-00 F1


Jon No. Contractor Doc. No. Rev.
Desert Plant
0-2465 S-53-1222-001J F1
Project Specification
sheet 50 of 50

14. WASTE WATER EFFLUENT SPECIFICATION

Receiving Body Superficial Water Pond


Item
Substance / Parameter Unit Industrial Sanitary Industrial Sanitary
1 PH --- 5,5 to 9,5 5,5 to 9,5 6 to 8
2 Temperature °C (1) Ambient ---
3 Colour --- (2) (2) ---
4 Odour --- (3) (3) (3)
5 Trash --- Absent Absent Absent
6 Total Suspended Solids (TSS) mg/l < 80 < 40 25
7 BOD5 ( as O2 ) mg/l < 40 < 25 < 20
8 COD ( as O 2 ) mg/l < 160 < 125 < 100
9 Aluminum mg/l <1 <1 <1
10 Total Chromium mg/l <2 --- <1
11 Iron mg/l <2 <2 <2
12 Mercury mg/l < 0,005 --- ---
13 Zinc mg/l <0,5 <0,5 < 0,5
14 Total Cyanides ( as CN ) mg/l < 0,5 --- < 0,5
15 Free Chlorine mg/l < 0,2 < 0,2 < 0,2
16 Sulfurs ( as S ) mg/l <1 <1 < 0,5
17 Sulfide ( as SO2 ) mg/l <1 <1 < 0,5
18 Sulfate ( as SO3 ) mg/l < 1000 < 1000 < 500
19 Chlorides mg/l < 1200 < 1200 < 100
20 Fluorides mg/l <6 --- <1
21 Total Phosphorus ( as P ) mg/l < 10 < 10 <2
22 Ammonia Nitrogen ( as NH4 ) mg/l < 15 < 15 <5
23 NO2 ( as N ) mg/l < 0,6 < 0,6
total < 15
24 NO3 ( as N ) mg/l < 20 < 20
25 Greases and Oil (animal/vegetal) mg/l < 20 < 20 < 20
26 Total Hydrocarbons mg/l < 15 --- (5) <5
27 Phenols mg/l < 0,5 --- < 0,1
28 Aldehydes mg/l <1 --- < 0,5
29 Aromatic Solvents mg/l < 0,2 < 0,2 < 0,01
30 Organic Solvents with Nitrogen mg/l < 0,1 --- < 0,01
31 Bacterium Coli ( 4 ) NfC/100 ml 5000 5000 5000

Notes : 1) The temperature increase in the receiving body shall not be greater than 3°C at 1 km from offtake point
and in any direction
2) Not detectable after dilution 1 : 20
3) Not disagreeable
4) NfC : Number from Count
5) Hydrocarbons as Suspended Oils <15 ppm

Note : This specification is sourced from ITT design premises T-53-S-Z-0001-00. All the data in this specification unless marked-up are identical to
original ITT design premises.