LOCATION:
OWNER:
SUBJECT CONSTRUCTION UNIT COSTS
DATE:
UNIT
QTY DESCRIPTION QTY UNIT
COST
1/5
UNIT
QTY DESCRIPTION QTY UNIT
COST
Backfill 回填 1 cu.m. 300
Gravel Bedding, G1, 礫石 1 cu.m. 2,100
Earthfill 填土 1 cum 400
2 Concrete Works 混凝土工程
RMC 3000psi 混凝土 (含壓送整體粉光) 1 cu.m. 5,700
RMC 4000psi 混凝土 (含壓送整體粉光) 1 cu.m. 5,900
RMC 5000psi 混凝土 (含壓送整體粉光) 1 cu.m. 6,100
Formworks 模板 1 sqm 700
Scaffolds 鷹架 1 sqm 200
3 Masonry 泥作工程
#6 CHB Wall 空心磚牆 1 sqm 1,400
#5 CHB Wall 空心磚牆 1 sqm 1,250
#4 CHB Wall 空心磚牆 1 sqm 1,100
4 Rebars 竹節鋼筋
Grade 60 deformed bars 鋼筋 1 kgs. 56
Grade 40 deformed bars 鋼筋 1 kgs. 55
5 Structural Steel works 鋼結構工程
H-beams H鋼 1 kg 72
MS Plates 鋼板 1 kg 72
C-channel, Angle bars, Flat bars 1 kg 72
28mm x 1000m Anchor Bolt 預埋螺絲 1 pcs 800
25mm x 1000m Anchor Bolt 預埋螺絲 1 pcs 700
25mm heavy duty bolts 重型螺栓 1 pcs 100
22mm heavy duty bolts 重型螺栓 1 pcs 90
1.2mm x 0.915 Steel decking DECK板 1 sqm 800
2/5
UNIT
QTY DESCRIPTION QTY UNIT
COST
B ROOFING 屋頂工程
Ceramic floor & wall tiles, 1m*1m, 80*80 大廳區域 1 sqm 1,800
的地磚
Ceramic CR floor & wall tiles, 30 x 60, 30 x 30 1 sqm 1,300
Taiwan Wall tiles 2'' x 10'' 1 sqm 1,300
2 Doors 門
Copper sulfide door (1.00 x 2.10m) 1 set 14,000
Copper sulfide double door (1.00 x 2.10m) 1 set 14,000
Steel door with panic device (1.00 x 2.10m) 1 set 18,000
1 set 30,000.00
Copper Sulfidedouble swing door (1.80 x 2.15)
Alum frame double sliding shower door (1.85 x 1 set 30,000.00
2.20m)
Wooden flush door (1m x 2.10m) with 2 x 5 door
1 set 8,000
jamb, hinges and lockset, painted finish
PVC flush door (0.85 x 2.15m) PVC門 1 set 3,000
3 Windows 窗
S/S wdws mosquito screen 1 sqm 2,500
Alum. Frame sliding/awning glass window 1 sqm 6,500
3/5
UNIT
QTY DESCRIPTION QTY UNIT
COST
4/5
warehouse
1F 6,285.00
1.5F
ofc 2,159.99
stair/ lift (left) 44.22
lift (left) 26.85
stair outside 22.01
2F 6,165.05
2.5F
watertank, 2.5F 1,584.87
stair /lift (left) 44.22
stair /lift (left) 44.78
stair outside 22.54
total 16,399.53
waiting area 18