This document provides a bar bending schedule and concrete quantity estimate for a 125 KL overhead tank that is 15m in height. It details the rebar requirements by diameter and type of structural element. In total, 4506kg of rebar spanning 8mm to 20mm diameters is required. The concrete quantity estimate provides details of the volumes needed for each structural component along with the associated cement, sand and aggregate quantities. In total, 74.628 cubic meters of concrete will be required using 597.024 bags of cement, 1032.161 cubic feet of sand, and 2064.322 cubic feet of aggregate. The quantities shown should be verified before work execution.
This document provides a bar bending schedule and concrete quantity estimate for a 125 KL overhead tank that is 15m in height. It details the rebar requirements by diameter and type of structural element. In total, 4506kg of rebar spanning 8mm to 20mm diameters is required. The concrete quantity estimate provides details of the volumes needed for each structural component along with the associated cement, sand and aggregate quantities. In total, 74.628 cubic meters of concrete will be required using 597.024 bags of cement, 1032.161 cubic feet of sand, and 2064.322 cubic feet of aggregate. The quantities shown should be verified before work execution.
This document provides a bar bending schedule and concrete quantity estimate for a 125 KL overhead tank that is 15m in height. It details the rebar requirements by diameter and type of structural element. In total, 4506kg of rebar spanning 8mm to 20mm diameters is required. The concrete quantity estimate provides details of the volumes needed for each structural component along with the associated cement, sand and aggregate quantities. In total, 74.628 cubic meters of concrete will be required using 597.024 bags of cement, 1032.161 cubic feet of sand, and 2064.322 cubic feet of aggregate. The quantities shown should be verified before work execution.
NAME OF PROJECT:-125 KL OVER HEAD TANK 15m STAGING
TYPE OF WORK :- BAR BENDING SCHEDULE WITH CONCRETE QUANTITY
OVER ALL SUMMARY Sr.No. DESCRIPTION Dia. 8mm 10mm 12mm 16mm 20mm TOTAL (Kg.) 1 TOP DOME 176.15 0 0 0 0 176.15 2 CYLINDRICAL WALL 916.16 0 0 0 916.16 3 BALCONY 74.1 0 0 0 0 74.1 4 BOTTOM DOME 176.88 68.54 78.71 0 0 324.13 COLUMN MAIN BARS & 5 381.7 0 598.08 0 0 979.78 STIRRUPS 6 BRACES 283.05 0 580.2 0 0 863.25 7 RING BEAM TOP 81.9 0 0 130.69 209.55 422.14 8 FOUNDATION 0 264.26 0 0 0 264.26 9 STAIRS 46.51 191.66 0 0 0 238.17 10 LANDING BEAM 44.8 0 46.28 25.28 0 116.36 TOTAL STEEL (Kg.) 2181.3 524.46 1303.27 155.97 209.55 4374.5 TOTAL STEEL (Kg.) (INCLUDING 3% OF WASTAGE) 4506 ESTIMATE OF CONCRETE VOLUME S.NO DETAILS OF WORK Volume UNIT 1 Top Dome 6.09 CUM A QUANTITY OF CEMENT 48.72 NOS. B QUANTITY OF SAND 2.39 CUM 84.33725 CUFT C QUANTITY OF AGGREGATE 4.78 CUM 168.6745 CUFT 2 Container's Dome 14.72 CUM A QUANTITY OF CEMENT 117.76 NOS. B QUANTITY OF SAND 5.77 CUM 203.6092 CUFT C QUANTITY OF AGGREGATE 11.54 CUM 407.2184 CUFT 3 Bottom Dome 9.97 CUM A QUANTITY OF CEMENT 79.76 NOS. B QUANTITY OF SAND 3.91 CUM 137.9743 CUFT C QUANTITY OF AGGREGATE 7.82 CUM 275.9487 CUFT 4 Balcony 2.56 CUM A QUANTITY OF CEMENT 20.48 NOS. B QUANTITY OF SAND 1 CUM 1.152 CUFT C QUANTITY OF AGGREGATE 2 CUM 2.304 CUFT 5 Ring beam (TOP) 4.91 CUM A QUANTITY OF CEMENT 39.28 NOS. B QUANTITY OF SAND 1.92 CUM 67.7521 CUFT C QUANTITY OF AGGREGATE 3.84 CUM 135.5042 CUFT 6 Braces 5.38 CUM A QUANTITY OF CEMENT 43.04 NOS. B QUANTITY OF SAND 2.11 CUM 74.45673 CUFT C QUANTITY OF AGGREGATE 4.22 CUM 148.9135 CUFT 7 Columns 13.12 CUM A QUANTITY OF CEMENT 91.84 NOS. B QUANTITY OF SAND 4.5 CUM 158.794 CUFT C QUANTITY OF AGGREGATE 9 CUM 317.588 CUFT 8 Footing (RCC) 10.584 CUM A QUANTITY OF CEMENT 84.672 NOS. B QUANTITY OF SAND 4.15 CUM 146.4433 CUFT C QUANTITY OF AGGREGATE 8.3 CUM 292.8867 CUFT 9 Footing (PCC) 1.764 CUM A QUANTITY OF CEMENT 7.056 NOS. B QUANTITY OF SAND 0.35 CUM 12.35064 CUFT C QUANTITY OF AGGREGATE 0.7 CUM 24.70129 CUFT 10 Staircase with landing 5.53 CUM A QUANTITY OF CEMENT 44.24 NOS. B QUANTITY OF SAND 2.17 CUM 76.57399 CUFT C QUANTITY OF AGGREGATE 4.34 CUM 153.148 CUFT OVER ALL SUMMARY TOTAL 74.628 CUM 1 QUANTITY OF CEMENT 597.024 NOS. 2 QUANTITY OF SAND 29.25 CUM 1032.161 CUFT 3 QUANTITY OF AGGREGATE 58.5 CUM 2064.322 CUFT 4 QUANTITY OF REINFORCEMENT 4506 KG NOTE:- QUANTITY SHOULD BE VERIFY BEFORE EXECUTION OF THE WORK