Professional Documents
Culture Documents
SKETCH - Control Room Sag Assy IFT
SKETCH - Control Room Sag Assy IFT
MATERIAL LIST
FOR TENDER
D
Finish Note:
- Plate Out Door 1.2mm
- Plate Indoor Perforated Plate 1.2 dot 2mm
- lifting Lug 4 Position Plate 16
- Plate form Diamond Plate 6mm
- Windows Aluminium frame double Glass tempered 9mm
- Insulation Rock Wool
- Door insulation Copy With Existing Control desk Old
E MODEL NUMBER
PROJECT NUMBER
REFERENCE DRAWINGS & DOCUMENTS No.
COPYRIGHT - THIS DESIGN AND PRINT IS THE PROPERTY OF PT COMMONWEALTH STEEL INDONESIA
AND MUST NOT BE USED, REPRODUCED OR COPIED WHOLLY OR IN PART WITHOUT THE
WRITTEN PERMISSION OF THE COMPANY.
CILEGON - INDONESIA
H DRAWN Scale
CHECKED A1
ENGINEER Rev.
10 20 30 40 50 60 70 80 90 100
mm
PROJ. MGR.
PROJ. OWN.
SKETCH