Clearing and grubbing the land including uprooting rank vegetation, grass,
bushes, shrubs, saplings, and trees of girth upto 300 mm by any means in area
of light jungle, removal of stumps, disposal of unserviceable materials,
stacking the serviceable materials with all leads and lifts, as per specification,
disposal as directed by the engineer-in-charge.
1 SMT 97.43 0.00
Earth work excavation in all types of soil up to 2m depth for column footing,
Trenches etc. below formation level, stacking the excavated earth &
disposable material where ever indicated in site, including disposing excess
earth away from the site or stacking within the site as instructed by
Client/Architect ,filling depressions wherever necessary, watering,
consolidating, shoring, bailing out water, etc. complete.
2 CMT 57.30 0.00
Page 1
BOQ
C CONCRETE WORKS
a) For DAMP PROOF COURSE over plinth and sills ,using water proofing
compound of approved brand in concrete at one kg per bag of cement as
directed and specified. SMT 73.96 0.00
1. All concrete used for reinforced concrete work (structural concrete) shall
be "Controlled concrete" and the use of weight batching is a must and shall be
insisted upon.
Page 2
BOQ
The successful tenderer shall maintain at site, cube testing machine in good
working order, sieves, slump cone, graduated cylinder and weights, scales for
material testing.
NOTE: A qualified mechanic shall always be available during working hours
for maintenance of weight batching machines.
E REINFORCING STEEL
Supplying and fixing Reinforcement for R.C.C. In all items works including
transporting, decoiling, cutting, straightening bending and placing in position
at all levels and binding with approved gauge binding wire. The rate shall
include cost of binding wire, chairs, spacers which will not be measured
separately for payment. Quantity of steel as per drawing and with authorized
overlaps only shall be measured and paid for. High yield strength deformed
bars conforming to Yst 550 N/mm2 as per IS 1786 (Basic rate - Rs 50000/
MT)
18 MT 19.02 0.00
Page 3
BOQ
F MASONRY WORK
G FLOORING/CLADDING
Providing & fixing 8mm thk. Glossy Vitrified tile floor of (600X600 mm)
size set in 12mm thick CM 1:3, with cement slurry, pointing of tiles with
Tilemate or equivalent to match the colour of the tiles,curing ,oxalic acid
wash etc., complete. Laid as per pattern in the drawings. (no extra charge
22 payable for cutting borders)( Basic Rate of 70 Rs/sft) SMT 131.00 0.00
Providing and laying Non Slip Ceramic tile flooring in Toilet floors of
approved size, brand and shade set in 20mm thick cement mortar 1:4,
suitably roughened cement slurry and pointing of joints with white cement
mixed with pigment to match the tiles, curing, oxalic acid washing etc.,
25 complete. (works at all levels)( Basic Rate of 50 Rs/sft) SMT 13.01 0.00
Providing & fixing 6mm thk. Tile Swimming pool of approved size set in
12mm thick CM 1:3, with cement slurry, pointing of tiles with Tilemate or
equivalent to match the colour of the tiles, fixing PVC corner beading at
corners of walls, curing ,oxalic acid wash etc., complete. no extra charge
payable for cutting borders)( Basic Rate of 80Rs/sft)
26 SMT 28.00 0.00
Page 4
BOQ
Providing & fixing 6mm thk. Ceramic tile Dado in Toilets of approved size
set in 12mm thick CM 1:3, with cement slurry, pointing of tiles with
Tilemate or equivalent to match the colour of the tiles, fixing PVC corner
beading at corners of walls, curing ,oxalic acid wash etc., complete. no extra
charge payable for cutting borders)( Basic Rate of 80Rs/sft)
27 SMT 43.24 0.00
H PLASTER WORK
Preparing surface providing and applying Rough plaster over walls, for
dadoing or cladding portion in 15 - 20 mm thick in CM 1:6 etc., including
scaffolding, curing etc., complete at all levels.
30 SMT 117.27 0.00
Preparing surface, providing & applying sponge finish water proof plaster
using integral water proofing liquid admixture over external walls in two
layers of base coat with 15mm thick CM 1:6 & finishing coat 10mm thick in
CM 1:4 laid in panels with jointless finish as per design including
scaffolding, curing etc., Chajjas should finished with necessary Drip Molds.
complete at all levels.
31 SMT 507.53 0.00
I WATER PROOFING
Roof slab water proofing with Brick Bat Coba: Providing and laying water
proofing concrete layer using 10mm and downsize aggregate over the slab
with waterproofing chemicals admixtures. The surface finished with Brick
Bats. The gaps between bricks to be filled with cement sand mortar, 1:4,
32 admixed with waterproofer. SMT 58.26 0.00
J PAINTING WORKS
Providing two coats of painting Internal walls with Asian Paints Premium
Emulsion of approved brand, shade & manufacture over a coat of primer
including preparing the surface to receive the paintings for internal walls &
ceilings at all levels with primer & putty etc., complete.
34 SMT 531.06 0.00
Page 5
BOQ
Providing one primer coat and two coats of Apex Ultima Exterior paint
(Asian Paints) or equivalent ,as per approved shade & manufacture after
thoroughly sand papering the surfaces, removing the dust, dirt, repairing
dents, holes, cracks, etc., applying a coat of primer including labour,
scaffolding at all levels with primer & putty etc., complete
35 SMT 599.49 0.00
K DOORS/ WINDOWS
Providing and fixing Main door with Machine finished Teak wood frame
of 125mmx75mm, with 30mm thick Teak wood plank shutter, including
Providing and fixing of , 2no. of tower bolt, 2no. handle and other necessary
hardware fittings, shutters fixed with 4 no. SS hinges, by providing
concrete/anchor fasteners including enamel paint for plastic coated surface
etc. as per design and drawing complete at all levels.
36 SMT 5.67 0.00
Supply and installation of UPVC Window and ventilator, as per the ISI
standard. Cost includes material, labour, fixing and transport etc.,
38 SMT 23.00 0.00
Providing and fabricating and fixing of MS window grills with Bright rods
and MS Flats as per the design and drawing. The work shall include the cost
of all materials, cost of two coats of Enamel Painting with primer, cost of
labour, HOM equipment and machinery, all lead and lift, loading and
unloading, transportation, and all other incidental charges etc., complete. The
work shall be carried out as per the directions of the Engineer in charge.
39 SMT 23.00 0.00
Providing and fabricating and fixing of MS Frame for Glass/ Mirror fixing
as per the design and drawing. The work shall include the cost of all
materials, cost of two coats of Enamel Painting with primer, cost of labour,
HOM equipment and machinery, all lead and lift, loading and unloading,
transportation, and all other incidental charges etc., complete. The work shall
be carried out as per the directions of the Engineer in charge.
40 SMT 21.22 0.00
Providing and fixing of 12mm Thk. toughened glass as per the design and
drawing. The work shall include the cost of all materials, cost of labour, all
lead and lift, loading and unloading, transportation, and all other incidental
42 charges etc., complete. SMT 29.92 0.00
N HAND RAIL
Page 6
BOQ
Providing, fabricating and fixing MS railing as per the design and drawing.
The work shall include the cost of all materials, cost of two coats of Enamel
Painting with primer, cost of labour, HOM equipment and machinery, all lead
and lift, loading and unloading, transportation, and all other incidental
43 charges etc., complete. SMT 32.79 0.00
SUMP TANK
Constructing of sump tank for the water storage of capacity 15000 Litre
capacity, by fully concrete structure with necessary reinforcement. Internal
and external surface should finished with water proof plaster. Manhole cover
has to be provided for the Tank
44 Lit 15,000.00 0.00
Total
Plumbing 10%
Electrical 10%
Miscellaneous 5%
Grand Total 0