Formwork, Joist, Stringer and Shoring Prop Calculation Sheet

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 18

FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET

TCVN 4453-1995; TCVN 5575-2012


Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTH 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Slab 1
SI Unit System
I / GENERAL PARAMETER
1. Section of slab formwork

Plywood Joist

Support Stringer
Distance of support
Stringer's spacing
2. Material characteristics
+ Concrete
Concrete slab thickness hs 0.12 m
Specific weight gb 25 kN/m3
+ Formwork panel
Plywood thickness h1 0.015 m
Strip width b 1m
Moment of Inertial J1 28.125 cm4
Section modulus W1 37.5 cm3
Strength f1 18,000 kN/m2
Elastic modulus E1 5,000,000 kN/m2
+ Joist
Type of Joist Box steel 50x50x1.4
Moment of Inertial J2 10.72 cm4
Section modulus W2 4.29 cm3
Strength f2 210,000 kN/m2
Shear strength fv2 121,800 kN/m2
Elastic modulus E2 200,000,000 kN/m2
+ Stringer
Type of Stringer Box steel 50x100x1.4
Moment of Inertial J3 55.46 cm4
Section Modulus W3 11.09 cm3
Strength f3 210,000 kN/m2
Shear strength fv3 121,800 kN/m2
Elastic Modulus E3 200,000,000 kN/m2
+ Shoring prop
Type of Shoring prop Nêm
Bearing capacity of 1 shoring prop [P] 14.4 kN
Distance between 2 stringers L2 1.2 m
Distance between 2 shoring props L3 1.2 m
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTH 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Slab 1
SI Unit System
3. Applied standard
+ TCVN 4453-1995
+ TCXDVN 5575-2013
II / CALCULATION
1. Vertical Load
Standard Load Calculated Load
Type of loads Symbol n
kN/m2 kN/m2
Weight of concrete p1 3 1.2 3.6
Weight of formwork p2 1 1.1 1.1
Weight of worker & equipment p3 2.5 1.3 3.25
Load from vibrating compactor p4 2 1.3 2.6
Total Sp 8.05 9.97
2. Formwork calculation
Calculated Load q1 9.97 kN/m
Standard Load q 1
tc
8.05 kN/m
+ Preliminary calculation L1

10.[ ].W = 0.823 m


L1 
q1 Sheathing

q1
Joist
L1 L1 L1 L1 L1

+ Spacing between joists L1 0.25 m OK


+ Strength Check

Moment q1×L21 = 0.062 kNm


M1 =
10
Stress = 1,661 kN/m2 OK <[s]
M
1 = 1
+ Deflection Check W

𝑓_1= 1/128×(𝑞_1×𝐿_1^4)/(𝐸×𝐼)
Deflection = 0.175 mm OK
𝑓_𝑚𝑎𝑥=max⁡(𝐿_1/400;3𝑚𝑚)
Deflection limitation = 3 mm > f1

3. Joist Calculation
Calculated Load q2 2.491 kN/m
Standard Load q 2
tc
2.013 kN/m
Spacing between stringers L2 1.2 m
Joist
q2
Stringer
L2 L2 L2 L2
+ Strength Check
𝑀_2=(𝑞_2×𝐿_2^2)/8
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTH 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Slab 1
𝑀_2=(𝑞_2×𝐿_2^2)/8 SI Unit System
Moment = 0.448 kNm

Stress
M2 = 104,550 kN/m2 OK <[s]
2 =
W
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTH 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Slab 1
SI Unit System
+ Deflection Check

Deflection 5 q2 ×L42 = 2.534 mm OK


f2 =
384 E.I
𝑓_𝑚𝑎𝑥=max⁡(𝐿_2/400;3𝑚𝑚)
Deflection limitation = 3 mm > f2

4. Stringer Calculation
Calculated Load q3 11.958 kN/m
Standard Load q3 9.660 kN/m
Spacing between shoring props L3 1.2 m

Stringer
q3
Shore
L3 +
L3 L3
Strength Check
L3 L3
𝑀_3=(𝑞_3×𝐿_3^2)/8
Moment = 2.152 kNm

Stress M3 = 194,064 kN/m2 OK <[s]


3 =
W
+ Deflection Check

Deflection 5 q3 ×L43 = 2.352 mm OK


f3 =
384 E.I
𝑓_𝑚𝑎𝑥=max⁡(𝐿_3/400;3𝑚𝑚)
Deflection limitation = 3 mm

5. Shoring prop Calculation


Area 1.44 m2
Load on 1 shoring prop 14.35 kN <[P] OK
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTH 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Slab 1
SI Unit System

Picture is for illustration only


FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 300x600 1
SI Unit System
I / GENERAL INFORMATION
1. Section of beam formwork

Plywood Joist

Support Stringer
Distance of support
Stringer's spacing

2. Material parameter
+ Concrete
Concrete beam height hd 0.6 m
Concrete beam width bd 0.33 m
Specific weight gb 25 kN/m3
+ Formwork panel
Plywood thickness h1 0.015 m
Strip width b 1m
Moment of Inertial J1 28.125 cm4
Section modulus W1 37.5 cm3
Strength f1 18,000 kN/m2
Elastic modulus E1 5,000,000 kN/m2
+ Joist
Type of Joist Box steel 50x50x1.4
Moment of Inertial J2 10.72 cm4
Section modulus W2 4.29 cm3
Strength f2 210,000 kN/m2
Shear strength fv2 121,800 kN/m2
Elastic modulus E2 200,000,000 kN/m2
+ Stringer
Type of Stringer Box steel 50x100x1.4
Moment of Inertial J3 55.46 cm4
Section Modulus W3 11.09 cm3
Strength f3 210,000 kN/m2
Shear strength fv3 121,800 kN/m2
Elastic Modulus E3 200,000,000 kN/m2
+ Shoring prop
Type of Shoring prop Nêm
Bearing capacity of 1 shoring prop [P] 14.4 kN
Distance between 2 stringers L2 0.9 m
Distance between 2 shoring props L3 0.6 m
3. Applicable standard
+ TCVN 4453:1995
+ TCXDVN 338:2005
II / CALCULATION
1. Vertical Load
Standard Load Calculated Load
Load items Symbol n
kN/m2 kN/m2
Weight of concrete p1 15 1.2 18
Weight of formwork p2 1 1.1 1.1
Weight of people & equipment p3 2.5 1.3 3.25
Load from vibrating compactor p4 2 1.3 2.6
Total load Sp 20.05 24.37
2. Formwork calculation
Calculated Load q1 24.365 kN/m
Standard Load q1tc 20.05 kN/m
+ Preliminary calculation L1

10.[ ].W = 0.526 m


L1 
q1
Sheathing

q1
Joist
L1 L1 L1 L1 L1

+ Spacing between joists L1 0.33 m OK


+ Strength Check

Moment
q1×L21 = 0.265 kNm
M1 =
10
Stress
M = 7,076 kN/m2 OK <[s]
1 = 1
W
+ Deflection Check
𝑓_1= 1/128×(𝑞_1×𝐿_1^4)/(𝐸×𝐼)
Deflection = 1.321 mm OK
𝑓_𝑚𝑎𝑥=max⁡(𝐿_1/400;3𝑚𝑚)
Deflection limitation = 3 mm > f1

3. Joist Calculation
Calculated Load q2 8.040 kN/m
Standard Load q 2
tc
6.617 kN/m
Spacing between stringers L2 0.9 m

Joist

q2
Stringer
L2 L2 L2 L2 L2
+ Strength Check
𝑀_2=(𝑞_2×𝐿_2^2)/10
Moment = 0.651 kNm

Stress M2 = 151,845 kN/m2 OK <[s]


2 =
W
+ Deflection Check

1 q2 ×L42
f2 =
128 E.I
Deflection 1 q2 ×L42 = 1.581 mm OK
f2 =
128 E.I
𝑓_𝑚𝑎𝑥=max⁡(𝐿_2/400;3𝑚𝑚)
Deflection limitation = 3 mm > f2

4. Stringer Calculation
Calculated Load q3 21.929 kN/m
Standard Load q3 18.045 kN/m
Spacing between shoring props L3 0.6 m

Stringer

Shore

+ Strength Check
𝑀_3= (𝑞_3×𝑏_𝑑×𝐿_3)/4−(𝑞_3×𝑏_𝑑^2)/8
Moment = 0.787 kNm

Stress M3 = 70,952 kN/m2 OK <[s]


3 =
W
+ Deflection Check
𝑓_3=(𝑞_3×𝑏_𝑑)/(384×𝐸×𝐼)×(8×𝐿_3^3−4×𝐿_3×𝑏_𝑑^2+𝑏_𝑑^3)
Deflection

= 0.210 mm OK
𝑓_𝑚𝑎𝑥=max⁡(𝐿_3/400;3𝑚𝑚)
Deflection limitation = 3 mm > f3

5. Shoring prop Calculation


Area 0.1485 m2
Coefficient due to eccentric loading 1.4
Load on 1 shore support 5.07 kN OK

Picture is for illustration only


FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x400 1
SI Unit System
I / GENERAL INFORMATION
1. Section of beam formwork

Plywood Joist

Support Stringer
Distance of support
Stringer's spacing

2. Material parameter
+ Concrete
Concrete beam height hd 0.4 m
Concrete beam width bd 0.22 m
Specific weight gb 25 kN/m3
+ Formwork panel
Plywood thickness h1 0.015 m
Strip width b 1m
Moment of Inertial J1 28.125 cm4
Section modulus W1 37.5 cm3
Strength f1 18,000 kN/m2
Elastic modulus E1 5,000,000 kN/m2
+ Joist
Type of Joist Box steel 50x50x1.4
Moment of Inertial J2 10.72 cm4
Section modulus W2 4.29 cm3
Strength f2 210,000 kN/m2
Shear strength fv2 121,800 kN/m2
Elastic modulus E2 200,000,000 kN/m2
+ Stringer
Type of Stringer Box steel 50x100x1.4
Moment of Inertial J3 55.46 cm4
Section Modulus W3 11.09 cm3
Strength f3 210,000 kN/m2
Shear strength fv3 121,800 kN/m2
Elastic Modulus E3 200,000,000 kN/m2
+ Shoring prop
Type of Shoring prop Nêm
Bearing capacity of 1 shoring prop [P] 19.9 kN
Distance between 2 stringers L2 1.2 m
Distance between 2 shoring props L3 0.6 m
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x400 1
SI Unit System
3. Applicable standard
+ TCVN 4453:1995
+ TCXDVN 338:2005
II / CALCULATION
1. Vertical Load
Standard Load Calculated Load
Load items Symbol n
kN/m2 kN/m2
Weight of concrete p1 10 1.2 12
Weight of formwork p2 1 1.1 1.1
Weight of people & equipment p3 2.5 1.3 3.25
Load from vibrating compactor p4 2 1.3 2.6
Total load Sp 15.05 18.37
2. Formwork calculation
Calculated Load q1 18.365 kN/m
Standard Load q 1
tc
15.05 kN/m
+ Preliminary calculation L1

10.[ ].W = 0.606 m


L1 
q1
Sheathing

q1
Joist
L1 L1 L1 L1 L1

+ Spacing between joists L1 0.22 m OK


+ Strength Check

Moment
q1×L21 = 0.089 kNm
M1 =
10
M1
Stress 1 = = 2,370 kN/m2 OK <[s]
W
+ Deflection Check
𝑓_1= 1/128×(𝑞_1×𝐿_1^4)/(𝐸×𝐼)
Deflection = 0.196 mm OK
𝑓_𝑚𝑎𝑥=max⁡(𝐿_1/400;3𝑚𝑚)
Deflection limitation = 3 mm > f1

3. Joist Calculation
Calculated Load q2 4.040 kN/m
Standard Load q2tc 3.311 kN/m
Spacing between stringers L2 1.2 m

Joist

q2
Stringer
L2 L2 L2 L2 L2
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction q2 Revision:
Item to be checked: Beam 220x400 1
L2 L2 L2 L2 L2 SI Unit System
+ Strength Check
𝑀_2=(𝑞_2×𝐿_2^2)/10
Moment = 0.582 kNm
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x400 1
SI Unit System

Stress M2 = 135,647 kN/m2 OK <[s]


2 =
W
+ Deflection Check

Deflection 1 q2 ×L42 = 2.501 mm OK


f2 =
128 E.I
𝑓_𝑚𝑎𝑥=max⁡(𝐿_2/400;3𝑚𝑚)
Deflection limitation = 3 mm > f2

4. Stringer Calculation
Calculated Load q3 22.038 kN/m
Standard Load q3 18.060 kN/m
Spacing between shoring props L3 0.6 m

Stringer

Shore

+ Strength Check
𝑀_3= (𝑞_3×𝑏_𝑑×𝐿_3)/4−(𝑞_3×𝑏_𝑑^2)/8
Moment = 0.594 kNm

Stress M3 = 53,548 kN/m2 OK <[s]


3 =
W
+ Deflection Check
𝑓_3=(𝑞_3×𝑏_𝑑)/(384×𝐸×𝐼)×(8×𝐿_3^3−4×𝐿_3×𝑏_𝑑^2+𝑏_𝑑^3)
Deflection

= 0.151 mm OK
𝑓_𝑚𝑎𝑥=max⁡(𝐿_3/400;3𝑚𝑚)
Deflection limitation = 3 mm > f3

5. Shoring prop Calculation


Area 0.132 m2
Coefficient due to eccentric loading 1.4
Load on 1 shore support 3.39 kN OK
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x400 1
SI Unit System

Picture is for illustration only


FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x600 1
SI Unit System
I / GENERAL INFORMATION
1. Section of beam formwork

Plywood Joist

Support Stringer
Distance of support
Stringer's spacing

2. Material parameter
+ Concrete
Concrete beam height hd 0.6 m
Concrete beam width bd 0.22 m
Specific weight gb 25 kN/m3
+ Formwork panel
Plywood thickness h1 0.015 m
Strip width b 1m
Moment of Inertial J1 28.125 cm4
Section modulus W1 37.5 cm3
Strength f1 18,000 kN/m2
Elastic modulus E1 5,000,000 kN/m2
+ Joist
Type of Joist Box steel 50x50x1.4
Moment of Inertial J2 10.72 cm4
Section modulus W2 4.29 cm3
Strength f2 210,000 kN/m2
Shear strength fv2 121,800 kN/m2
Elastic modulus E2 200,000,000 kN/m2
+ Stringer
Type of Stringer Box steel 100x100x1.4
Moment of Inertial J3 89.49 cm4
Section Modulus W3 17.90 cm3
Strength f3 210,000 kN/m2
Shear strength fv3 121,800 kN/m2
Elastic Modulus E3 200,000,000 kN/m2
+ Shoring prop
Type of Shoring prop Nêm
Bearing capacity of 1 shoring prop [P] 19.9 kN
Distance between 2 stringers L2 0.9 m
Distance between 2 shoring props L3 0.6 m
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x600 1
SI Unit System
3. Applicable standard
+ TCVN 4453:1995
+ TCXDVN 338:2005
II / CALCULATION
1. Vertical Load
Standard Load Calculated Load
Load items Symbol n
kN/m2 kN/m2
Weight of concrete p1 15 1.2 18
Weight of formwork p2 1 1.1 1.1
Weight of people & equipment p3 2.5 1.3 3.25
Load from vibrating compactor p4 2 1.3 2.6
Total load Sp 20.05 24.37
2. Formwork calculation
Calculated Load q1 24.365 kN/m
Standard Load q 1
tc
20.05 kN/m
+ Preliminary calculation L1

10.[ ].W = 0.526 m


L1 
q1
Sheathing

q1
Joist
L1 L1 L1 L1 L1

+ Spacing between joists L1 0.22 m OK


+ Strength Check

Moment
q1×L21 = 0.118 kNm
M1 =
10
M1
Stress 1 = = 3,145 kN/m2 OK <[s]
W
+ Deflection Check
𝑓_1= 1/128×(𝑞_1×𝐿_1^4)/(𝐸×𝐼)
Deflection = 0.261 mm OK
𝑓_𝑚𝑎𝑥=max⁡(𝐿_1/400;3𝑚𝑚)
Deflection limitation = 3 mm > f1

3. Joist Calculation
Calculated Load q2 5.360 kN/m
Standard Load q2tc 4.411 kN/m
Spacing between stringers L2 0.9 m

Joist

q2
Stringer
L2 L2 L2 L2 L2
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction q2 Revision:
Item to be checked: Beam 220x600 1
L2 L2 L2 L2 L2 SI Unit System
+ Strength Check
𝑀_2=(𝑞_2×𝐿_2^2)/10
Moment = 0.434 kNm
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x600 1
SI Unit System

Stress M2 = 101,230 kN/m2 OK <[s]


2 =
W
+ Deflection Check

Deflection 1 q2 ×L42 = 1.054 mm OK


f2 =
128 E.I
𝑓_𝑚𝑎𝑥=max⁡(𝐿_2/400;3𝑚𝑚)
Deflection limitation = 3 mm > f2

4. Stringer Calculation
Calculated Load q3 21.929 kN/m
Standard Load q3 18.045 kN/m
Spacing between shoring props L3 0.6 m

Stringer

Shore

+ Strength Check
𝑀_3= (𝑞_3×𝑏_𝑑×𝐿_3)/4−(𝑞_3×𝑏_𝑑^2)/8
Moment = 0.591 kNm

Stress M3 = 33,020 kN/m2 OK <[s]


3 =
W
+ Deflection Check
𝑓_3=(𝑞_3×𝑏_𝑑)/(384×𝐸×𝐼)×(8×𝐿_3^3−4×𝐿_3×𝑏_𝑑^2+𝑏_𝑑^3)
Deflection

= 0.094 mm OK
𝑓_𝑚𝑎𝑥=max⁡(𝐿_3/400;3𝑚𝑚)
Deflection limitation = 3 mm > f3

5. Shoring prop Calculation


Area 0.099 m2
Coefficient due to eccentric loading 1.4
Load on 1 shore support 3.38 kN OK
FORMWORK, JOIST, STRINGER AND SHORING PROP CALCULATION SHEET CALCULATION SHEET
TCVN 4453-1995; TCVN 5575-2012 0
Project: VUNG ANG II THERMAL POWER PLANT PROJECT Date:
Location: MULTIFUNCTION GYM AND HEALTHY 5/26/2022
Main Contractor: Hop Luc Construction Revision:
Item to be checked: Beam 220x600 1
SI Unit System

Picture is for illustration only

You might also like