1 Cement Grout Specification No.

2806

Sealing of cracks/ porous concrete by injection process through nipples complete as per Technical specifications

Unit kg
Taking output 1 kg

Description Unit Quantity Rate (INR)


a) Material
Cement including 10 % wastage kg 1.10 2.70

Admixtures (anti shrinkage compound) @ 20% of cost of cement

b) Labour
Mate/Supervisor day 0.10 611.67
Mazdoor/ Skilled Labor day 0.10 611.67
Mazdoor/Unskilled Labor day 0.10 337.47
c) Machinery & Accessories
Grout pump with agitator and accessories hour 0.10 100.00
Nozzles Nos. 2.00 100.00
Total
d) Overheads (a+b+c) @ % 20.00
Total with overhead
e) Contractor's profit (a+b+c+d) @ % 0.00
Total Rate per kg
Assuming 0.2 kg for 1 sqm of surface, Rate for cracking sqm 88.71

2 Cement Sand mortar (1:1) Grouting Specification No. 2806

Sealing of cracks/ porous concrete by injection process through grouting complete as per Technical specifications

Unit kg
Taking output 1 kg

Description Unit Quantity Rate (INR)


a) Material
Cement including 10 % wastage kg 0.55 2.70
Sand including 10% wastage kg 0.55 0.37
Admixtures (anti shrinkage compound) @ 20% of cost of cement

b) Labour
Mate/Supervisor day 0.08 611.67
Mazdoor/ Skilled Labor day 0.10 611.67
Mazdoor/Unskilled Labor day 0.10 337.47
c) Machinery
Grout pump with agitator and accessories hour 0.10 100.00
Total
d) Overheads (a+b+c) @ % 20.00
Total with overhead
e) Contractor's profit (a+b+c+d) @ % 0.00
Total Rate per kg
Assuming 0.25 kg for 1 sqm of surface, Rate for cracking sqm 46.75
3 Epoxy Grout Specification No. 2803

Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per Technical specifications

Unit kg
Taking output 1 kg

Description Unit Quantity Rate (INR)


a) Material
Epoxy including 10 per cent wastage kg 1.10 100.00
b) Labour
Mate/Supervisor day 0.08 611.67
Mazdoor/ Skilled Labor day 0.10 611.67
Mazdoor/Unskilled Labor day 0.10 337.47
c) Machinery & Accessories
Epoxy Injection gun hour 0.10 100.00
Total
d) Overheads (a+b+c) @ % 20.00
Total with overhead
e) Contractor's profit (a+b+c+d) @ % 0.00
Total Rate per kg
Assuming 0.3 kg for 1 sqm of surface, Rate for cracking sqm 94.99

4 Epoxy Bonding Specification No. 2805

Eproxy bonding of new concrete to old concrete

Unit sqm
Taking output 10 sqm

Description Unit Quantity Rate (INR)


a) Material
Epoxy resin with pot life not less than 60-90 minutes kg 8.00 100.00
Add 3 per cent wastage
b) Labour
Mate/Supervisor day 0.04 611.67
Mazdoor/ Skilled Labor day 0.50 611.67
Mazdoor/Unskilled Labor day 0.50 337.47
Total
d) Overheads (a+b+c) @ % 20.00
Total with overhead
e) Contractor's profit (a+b+c+d) @ % 0.00
Total Rate for 10 sqm
Rate for spalling sqm 158.76

5 Shotcreting Specification No. 2807

Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under
pressure, comprissing of cement, sand, coarse aggregates, water and quick setting compound in the propertion as per Clause 2807.1, sand
Unit sqm
Taking output 10 sqm, 30 mm average thickness

Description Unit Quantity Rate (INR)


a) Material
Cement kg 90.00 2.70
Sand cum 0.10 600.00
Coarse aggregate of size 4.75 mm cum 0.10 426.87
Quick setting compound kg 2.00 100.00
Water KL 0.08 3.80
b) Labour
Mate/Supervisor day 0.03 611.67
Mazdoor/ Skilled Labor day 0.40 611.67
Mazdoor/Unskilled Labor day 0.40 337.47
c) Machinery
Air compressor 250 cfm hour 0.75 259.25
Shotcreting equipment hour 0.75 100.00
Water tanker 6 KL capacity hour 0.10 485.53
Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Total Rate per sqm
Rate for spalling sqm 151.44

6 Shotcreting Specification No. 2807

Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under
pressure, comprissing of cement, sand, coarse aggregates, water and quick setting compound in the propertion as per Clause 2807.1, sand
Unit sqm
Taking output 10 sqm, 40 mm average thickness

Description Unit Quantity Rate (INR)


a) Material
Cement kg 120.00 2.70
Sand cum 0.15 600.00
Coarse aggregate of size 4.75 mm cum 0.15 426.87
Quick setting compound kg 2.50 100.00
Water KL 0.10 3.80
b) Labour
Mate/Supervisor day 0.04 611.67
Mazdoor/ Skilled Labor day 0.50 611.67
Mazdoor/Unskilled Labor day 0.50 337.47
c) Machinery
Air compressor 250 cfm hour 1.00 259.25
Shotcreting equipment hour 1.00 100.00
Water tanker 6 KL capacity hour 0.02 485.53
Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Total Rate per sqm
Rate for spalling sqm 191.57

7 Painting Specification No. 1906

Cleaning the surface with Wire brush to remove all lose rust and scale and 1 coats drying oil type primer, and 1 under coat alkyd
type paint; 1 finisihing coat alkyd type

Unit sqm
Taking output 10 sqm

Description Unit Quantity Rate (INR)


a) Material
One coat drying oil type primerr including 10 % wastage Ltr 0.70 100.00
One under coat alkyd type paint including 10 % wastage Ltr 0.70 100.00
One coat finisihing coat alkyd type including 10 % wastage Ltr 0.70 100.00
b) Labour
Mate/Supervisor day 0.05 611.67
Painter day 0.70 611.67
Mazdoor/Unskilled Labor day 0.40 337.47
c) Accessories
Wire brush Nos. 5.00 100.00
Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Rate
Rate for exposed reinforcement sqm 156.45

8 Painting Specification No. 1906

Cleaning the surface with Wire brush to remove all lose rust and scale and 2 coats drying oil type primer, and 1 under coat alkyd
type paint; 1 finisihing coat alkyd type. Total dry thickness 150 micro meter

Unit sqm
Taking output 10 sqm

Description Unit Quantity Rate (INR)


a) Material
Two coats drying oil type primerr including 10 % wastage Ltr 1.40 100.00
One under coat alkyd type paint including 10 % wastage Ltr 0.70 100.00
One coats finisihing coat alkyd type including 10 % wastage Ltr 0.70 100.00
b) Labour
Mate/Supervisor day 0.06 611.67
Painter day 0.90 611.67
Mazdoor/Unskilled Labor day 0.50 337.47
c) Accessories
Wire brush Nos. 5.00 100.00
Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Rate
Rate for exposed reinforcement sqm 184.31

9 Painting Specification No. 1906

Grit blast: 1 coat of sprayed aluminium followed by suitable sealer. Total thickness 150 micro meter

Unit sqm
Taking output 10 sqm

Description Unit Quantity Rate (INR)


a) Material
One coat of sprayed aluminium including 10 % wastage Ltr 0.70 100.00
One under coat sealer including 10 % wastage Ltr 0.70 100.00
b) Labour
Mate/Supervisor day 0.03 611.67
Painter day 0.45 611.67
Mazdoor/Unskilled Labor day 0.25 337.47
c) Accessories
Grit blast LS 1.00 100.00
Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Rate
Rate for exposed reinforcement sqm 74.16

10 Epoxy mortar Specification No. 2804

Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per
Technical Specifications
Unit sqm
Taking output 10 sqm, Assuming average 10 mm thickness of epoxy mortar

Description Unit Quantity Rate (INR)


a) Material
Epoxy resin-hardner mix for prime coat kg 2.50 100.00
Epoxy mortar kg 2.20 100.00
Epoxy resin-hardner mix for seal coat kg 2.00 100.00
Add 3% cost of materials for other consumables, like, acetone, etc. and to
cover wastage
b) Labour
Mate/Supervisor day 0.04 611.67
Mazdoor/ Skilled Labor day 0.50 611.67
Mazdoor/Unskilled Labor day 0.50 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Rate per sqm
Rate for honeycombing sqm 142.70

11 Bearing Resetting Specification No. 2810

Rectification of Bearings as per Technical Specifications

Unit Nos.
Taking output 3 Nos.

Description Unit Quantity Rate (INR)

a) Lifting of superstructure span by jacking up from below i.e. by placing


the jacks on pier/abutment caps for span length of 30m.
Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Resetting Nos. 2881.12

12 Bearing Rectification for Material Damage Specification No. 2810

Rectification of Bearings as per Technical Specifications

Unit Nos.
Taking output 3 Nos.

Description Unit Quantity Rate (INR)

a) Lifting of superstructure span by jacking up from below i.e. by placing


the jacks on pier/abutment caps for span length of 30m.

Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Cleaning metal bearings
Assuming 15 % of actual bearing price % 0.15 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Material Damage Nos. 2899.12
13 Bearing Rectification for Anchorage Specification No. 2810

Rectification of Bearings as per Technical Specifications

Unit Nos.
Taking output 3 Nos.

Description Unit Quantity Rate (INR)

a) Lifting of superstructure span by jacking up from below i.e. by placing


the jacks on pier/abutment caps for span length of 30m.

Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Cost of parts to be replaced for 3 bearings
Assuming 20 % of actual bearing price % 0.20 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Material Damage Nos. 2905.12

14 Replacement of Bearing Specification No. 2810

Rectification of Bearings as per Technical Specifications

Unit Nos.
Taking output 3 Nos.

Description Unit Quantity Rate (INR)

a) Lifting of superstructure span by jacking up from below i.e. by placing


the jacks on pier/abutment caps for span length of 30m.

Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Replacement of bearing
Cost of bearing including installment Nos. 3.00 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Material Damage Nos. 3241.12
15 Repair of Pedestal Specification No. 2810

Repair pedestals & resetting of bearings

Unit Nos.
Taking output 3 Nos.

Description Unit Quantity Rate (INR)

a) Lifting of superstructure span by jacking up from below i.e. by placing


the jacks on pier/abutment caps for span length of 30m.

Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Repair pedestals & resetting of bearings
(i) Micro concrete: Ready made powder bags of 25 Kg @1760 Kg/cum Nos. 0.10 100.00
(assuming 50% damage)
(ii)Centering arrangement for span lifting (erection and rent) Ls 1.00 100.00
(iii) Shuttering LS 1.00 100.00
(iV) Steel reinforcement LS 1.00 100.00
(v) T&P (hydrauluc jacks, welding machine, electric generator, concrete LS 1.00 100.00
mixer, vibrator and other minor items) hired
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Pedestal Damage Nos. 3045.12

16 Replacement of Pedestal Specification No. 1700/2810

Replacement pedestals & resetting of bearings

Unit Nos.
Taking output 3 Nos.

Description Unit Quantity Rate (INR)

a) Lifting of superstructure span by jacking up from below i.e. by placing


the jacks on pier/abutment caps for span length of 30m.

Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.70 611.67
Mason/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.50 337.47
Wooden packing cum 0.15 100.00
b) Replacement of pedestals & resetting of bearings
(i) Cement MT 0.40 100.00
(ii) Sand cum 0.20 100.00
(iii) Aggregate cum 0.35 100.00
(iv) HYSD bar kg 45.00 100.00
(v)Centering arrangement for span lifting (erection and rent) Ls 1.00 100.00
(vi) Shuttering LS 1.00 100.00
(vii) Steel reinforcement LS 1.00 100.00
(viii) T&P (hydrauluc jacks, welding machine, electric generator, concrete LS 1.00 100.00
mixer, vibrator and other minor items) hired
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Pedestal Replacement Nos. 4961.29

17 Replacement of Expansion Joint Specification No. 2600

Replacement of Expansion Joints complete as per drawings

Unit RM
Taking output 12 RM

Description Unit Quantity Rate (INR)


a) Material
Epoxy for bonding new concrete to old concrete @0.8 kg/sqm kg 9.60 100.00
M-30 grade cement concrete excluding OH & CP cum 3.60 100.00
a) Labour
Mate/Supervisor day 0.26 611.67
Mazdoor/ Skilled Labor day 0.50 611.67
Mazdoor/Unskilled Labor day 6.00 337.47
c) Replacement of Expansion Joint
Cost of Expansion Joint including installment RM 12 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Expansion Joint Replacement RM 500.97

18 Providing and laying Cement Concrete Wearing Coat Specification No. 2702/2811

Removal of existing cement concrete wearing coat including its disposal complete as per Technical Specification without causing any
detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000 m

Unit sqm
Taking output 10 sqm, Thickness 75 mm

Description Unit Quantity Rate (INR)


a) Labour
Mate/Supervisor day 0.06 611.67
Mazdoor/Unskilled Labor day 1.00 337.47
b) Machinery
Air compressor 250 cfm with pneumatic breaker hour 1.00 259.25
Tractor-trolley hour 0.50 241.27
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Removal of Cement Concrete Wearing Coat sqm 90.49

Providing and laying cement concrete wearing coat M 30 grade including reinforcement complete as per drawing and Technical
Specifications

Unit sqm
Taking output 1 cum

Description Unit Quantity Rate (INR)


a) Material
Cement concrete M 30 grade cum 1.00 8500.00
HYSD bar reinforcement MT 0.08 49500.00
b) Labor
Mate/Supervisor day 0.06 611.67
Mazdoor/ Skilled Labor day 0.10 611.67
Mazdoor/Unskilled Labor day 1.40 337.47
c) Formwork
Height 5-10 m add 25% 12782.83 0.25
Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Cost per Cum
Rate for laying cement concrete wearing coat of 75 mm sqm 1438.07

Rate for cement concrete wearing coat of 75 mm sqm 1528.55

19 Providing and laying Bituminous Wearing Coat Specification No. 2702/2811

Removal of existing asphaltic wearing coat including disposal with all lift and lead upto 1000 m

Unit sqm
Taking output 10 sqm

Description Unit Quantity Rate (INR)


a) Labour
Mate/Supervisor day 0.03 611.67
Mazdoor/Unskilled Labor day 0.75 337.47
b) Machinery
Air compressor 250 cfm with pneumatic breaker hour 0.75 259.25
Tractor-trolley hour 0.40 241.27
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Removal of Asphalt Concrete Wearing Coat sqm 67.49

Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen
meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the
surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of
0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.

Unit sqm
Taking output 72.46 sqm

Description Unit Quantity Rate (INR)


a) Material
Base mastic (without coarse aggregates) 60 %
Coarse aggregate (3.35 mm to 9.5 mm) 40 %
Proportion of material required for mastic asphalt with coarse aggregates
(based on mix design)
(i) Bitumen 80/100 or 60/70 @ 10.20 % by weight of mix (2x10.2/100) tone 0.20 100.00

(ii) Crusher stone dust @ 31.9 % by weight of mix (2x31.9/100) cum 0.39 100.00

(iii) Lime stone dust filler with calcium carbonate content not less than MT 0.36 100.00
80% by weight @ 17.92% by weight of mix (2x17.92/100)

(iv) Coarse aggregates 3.35 mm to 9.5 mm @ 40% by weight of mix (2x cum 0.55 100.00
40/100/1.456)
(v) Pre-coated stone chips of 13.2 mm nominal size for skid resistance cum 0.04 100.00
(72.46x0.005/10)
(vi) Bitumen for coating of chips @ 2% by weight (0.036 x 1.456 x 2/100 x kg 1.05 100.00
1000)
b) Lobour
Mate/Supervisor day 0.49 611.67
Mazdoor/ Skilled Labor day 11.00 611.67
Mazdoor/Unskilled Labor day 1.25 337.47
a) Machinery
Mechanical broom @ 1250 sqm per hour hour 0.06 100.00
Air compressor 250 cfm hour 0.06 259.25
Mastic cooker 1 tone capacity hour 6.00 100.00
Bitumen boiler 1500 liters capacity hour 6.00 100.00
Tractor for towing and positioning of mastic cooker and bitumen boiler hour 1.00 100.00

Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Cost
Rate for laying sqm 154.81

Rate for asphaltic wearing coat sqm 222.30


20 Providing and laying of Floor Tiles Specification No. 2811

Removal of existing Tiles including its disposal complete as per Technical Specification without causing any detrimental effect to any part of
the bridge structure and removal of dismantled material with all lifts and lead upto 1000 m

Unit sqm
Taking output 10 sqm

Description Unit Quantity Rate (INR)


a) Labour
Mate/Supervisor day 0.05 611.67
Mazdoor/Unskilled Labor day 0.80 337.47
b) Machinery
Tractor-trolley hour 0.50 241.27
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Removal of Tiles sqm 50.54

Providing and laying of Tiles complete as per drawing and Technical Specifications

Unit sqm
Taking output 1 sqm

Description Unit Quantity Rate (INR)


a) Laying of Tiles
Laying of tiles including cement, sand and labor cost sqm 1.00 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost per sqm
Rate for laying of tiles sqm 120.00

Rate for Tiles sqm 170.54

21 Repair of Masonry Railing Specification No. 1500/1600/1700

Repair of masonry railing with cement and mortar by cutting and trimming the damaged portion to a regular shape, cleaning the area to be
repaired

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Material
M-30 grade cement concrete excluding OH & CP cum 0.30 100.00
b) Labour
Labour for for dismantling and trimming the surface to a regular shape
and removal of damaged material
Mate/Supervisor day 0.04 611.67
Mazdoor/ Unskilled Labor day 1.00 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for repair RM 47.03

22 Construction of New Masonry Railing Specification No. 1500/1600/1700

Removal of existing railing

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Labour
Labour for dismantling old railing and disposal of dismantled material

Mate/Supervisor day 0.40 611.67


Mazdoor/ Unskilled Labor day 10.00 337.47
b) Machinery
Tractor-trolley for disposal of dismantled material hour 1.00 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for removal RM 446.32

Construction of new Railing

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Material
M 20 grade concrete cum 3.50 100.00
Pre-moulded asphalt filler board sqm 0.32 100.00
b) Labour
Mate/Supervisor day 0.03 611.67
Mazdoor/ Unskilled Labor day 0.80 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for new construction RM 80.44

Rate for new Masonry Railing RM 526.76

23 Repair of RC Railing Specification No. 1500/1600/1700

Repair of RC Railing railing with cement and mortar by cutting and trimming the damaged portion to a regular shape, cleaning the area to
be repaired

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Material
M-30 grade cement concrete excluding OH & CP cum 0.30 100.00
b) Labour
Labour for for dismantling and trimming the surface to a regular shape
and removal of damaged material
Mate/Supervisor day 0.04 611.67
Mazdoor/ Unskilled Labor day 1.00 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for repair RM 47.03

24 Construction of RC Railing Specification No. 1500/1600/1700

Removal of existing RC Railing

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Labour
Labour for dismantling old railing and disposal of dismantled material

Mate/Supervisor day 0.40 611.67


Mazdoor/ Unskilled Labor day 10.00 337.47
b) Machinery
Tractor-trolley for disposal of dismantled material hour 1.00 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for removal RM 446.32

Construction of new RC Railing


Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Material
M 20 grade concrete cum 3.00 100.00
HYSD steel reinforcement including dowel bars tone 0.28 100.00
Pre-moulded asphalt filler board sqm 0.32 100.00
b) Labour
Mate/Supervisor day 0.04 611.67
Mazdoor/ Unskilled Labor day 1.00 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for new construction RM 86.63

Rate for new RC Railing RM 532.96

25 Repair of Mild Steel Railing Specification No. 1900/2703

Repair of steel railing to bring it to the original shape

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Material
Mild steel ISMC series kg 29.00 100.00
Flat iron kg 10.00 100.00
MS Bolt and nuts kg 1.00 100.00
Add 5% of cost of material for painting
b) Labour
Mate/Supervisor day 0.02 611.67
Mazdoor/ Skilled Labor day 0.20 611.67
Mazdoor/ Unskilled Labor day 0.20 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for repair RM 527.95

26 Construction of Mild Steel Railing Specification No. 1900/2703

Removal of existing mild steel railing

Unit RM
Taking output 10 RM
Description Unit Quantity Rate (INR)
a) Labour
Labour for dismantling old railing and disposal of dismantled material

Mate/Supervisor day 0.16 611.67


Mazdoor/ Unskilled Labor day 4.00 337.47
b) Machinery
Tractor-trolley for disposal of dismantled material hour 1.00 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for removal RM 185.73

Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification

Unit RM
Taking output 2 x 50 m span = 100 m

Description Unit Quantity Rate (INR)


a) Material
ISMC 100 = 2.806 x 1.05 = 2.946 MT tone 2.95 100.00
MS Flat = 0.964 x 1.05 = 1.012 MT tone 1.01 100.00
MS bars = 0.17 x 1.05 = 0.180 MT tone 0.18 100.00
MS bolts, nuts and washers tone 0.15 100.00
Add @ 5 per cent of cost of material for painting one shop coat with red
oxide primer and three coats of synthetic enamel paint and consumables
to safeguard against weathering and corrosion.

Add for cost of concrete for fixing vertical posts in the performed recess
@ 1 per cent of cost of material

Add for electricity charges, welding and drilling equipment, electrodes


and other consumables @ 1 per cent of cost of material
b) Labour
Mate/Supervisor day 2.80 611.67
Mazdoor/ Skilled Labor day 30.00 611.67
Mazdoor/ Unskilled Labor day 40.00 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for new construction RM 408.24

Rate for new Mild Steel Railing RM 593.97

27 Repair of Composite Railing Specification No. 808/1500/1600/1700

Repair of Composite railing to bring it to the original shape


Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Material
M-30 grade cement concrete excluding OH & CP cum 0.30 100.00
Add 7% of cost of material for painting
b) Labour
Mate/Supervisor day 0.06 611.67
Mazdoor/ Skilled Labor day 0.80 611.67
Mazdoor/ Unskilled Labor day 0.80 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for repair RM 99.37

28 Construction of Composite Railing Specification No. 808/1500/1600/1700

Removal of existing composite railing

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Labour
Labour for dismantling old railing and disposal of dismantled material

Mate/Supervisor day 0.18 611.67


Mazdoor/ Unskilled Labor day 5.00 337.47
b) Machinery
Tractor-trolley for disposal of dismantled material hour 1.00 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for removal RM 227.69

Construction of new Composite Railing

Unit RM
Taking output 10 RM

Description Unit Quantity Rate (INR)


a) Material
M 20 grade concrete cum 3.00 100.00
Steel pipe including fixtures RM 10.00 100.00
Painting of pipe sqm 4.70 100.00
Pre-moulded asphalt filler board sqm 0.32 100.00
b) Labour
Mate/Supervisor day 0.04 611.67
Mazdoor/ Skilled Labor day 1.00 611.67
Mazdoor/ Unskilled Labor day 1.00 337.47
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for new construction RM 333.07

Rate for new Composite Railing RM 560.77


s

Amount in INR

2.97
0.59

61.17
61.17
33.75

10.00
200.00
369.65
73.93
443.57
0
443.57

ns

Amount in INR

1.49
0.20
0.30

48.93
61.17
33.75

10.00
155.83
31.17
187.00
0
187.00
ecifications

Amount in INR

110.00

48.93
61.17
33.75

10.00
263.85
52.77
316.62
0
316.62

Amount in INR

800.00
24.00

24.47
305.84
168.74
1323.04
264.61
1587.64
0
1587.64

mpressed air under


Clause 2807.1, sand
Amount in INR

243.00
60.00
42.69
200.00
0.30

18.35
244.67
134.99

194.44
75.00
48.55
1261.99
252.40
1514.39
0
1514.39

mpressed air under


Clause 2807.1, sand

Amount in INR

324.00
90.00
64.03
250.00
0.38

24.47
305.84
168.74

259.25
100.00
9.71
1596.41
319.28
1915.69
0
1915.69
under coat alkyd

Amount in INR

70.00
70.00
70.00

30.58
428.17
134.99

500.00
1303.74
260.75
1564.49
0
1564.49

under coat alkyd

Amount in INR

140.00
70.00
70.00

36.70
550.50
168.74

500.00
1535.94
307.19
1843.13
0
1843.13

Amount in INR

70.00
70.00

18.35
275.25
84.37

100.00
617.97
123.59
741.56
0
741.56

omplete as per

Amount in INR

250.00
220.00
200.00
20.10

24.47
305.84
168.74
1189.14
237.83
1426.96
0
1426.96

Amount in INR

300.00
391.47
2446.68
4049.64
15.00
7202.79
1440.56
8643.35
0
8643.35

Amount in INR

300.00
391.47
2446.68
4049.64
15.00

45.00
7247.79
1449.56
8697.35
0
8697.35
Amount in INR

300.00
391.47
2446.68
4049.64
15.00

60.00
7262.79
1452.56
8715.35
0
8715.35

Amount in INR

300.00
391.47
2446.68
4049.64
15.00

900.00
8102.79
1620.56
9723.35
0
9723.35
Amount in INR

300.00
391.47
2446.68
4049.64
15.00

10.00

100.00
100.00
100.00
100.00

7612.79
1522.56
9135.35
0
9135.35

Amount in INR

300.00
428.17
2446.68
4218.38
15.00

40.00
20.00
35.00
4500.00
100.00
100.00
100.00
100.00

12403.22
2480.64
14883.87
0
14883.87

Amount in INR

960.00
360.00

159.03
305.84
2024.82

1200.00
5009.69
1001.94
6011.63
0
6011.63

causing any
0m

Amount in INR

36.70
337.47

259.25
120.64
754.06
150.81
904.87
0
904.87

Technical

Amount in INR

8500.00
3712.50

36.70
61.17
472.46

3195.71
15978.53
3195.71
19174.24
0
19174.24

Amount in INR

18.35
253.10

194.44
96.51
562.40
112.48
674.88
0
674.88

grade bitumen
after cleaning the
inal size at the rate of
e when the
ause 515.

Amount in INR

20.40

39.00

36.00

55.00

3.60

105.00

299.72
6728.37
421.84

6.00
15.56
600.00
600.00
100.00

9030.48
1806.10
10836.58
0
10836.58
effect to any part of

Amount in INR

30.58
269.98

120.64
421.20
84.24
505.44
0
505.44

Amount in INR

100.00
100.00
20.00
120.00
0
120.00

/1700

ning the area to be

Amount in INR
30.00

24.47
337.47
391.94
78.39
470.32
0
470.32

/1700

Amount in INR

244.67
3374.70

100.00
3719.37
743.87
4463.24
0
4463.24

Amount in INR

350.00
32.00

18.35
269.98
670.33
134.07
804.39
0
804.39
/1700

cleaning the area to

Amount in INR

30.00

24.47
337.47
391.94
78.39
470.32
0
470.32

/1700

Amount in INR

244.67
3374.70

100.00
3719.37
743.87
4463.24
0
4463.24
Amount in INR

300.00
28.00
32.00

24.47
337.47
721.94
144.39
866.32
0
866.32

Amount in INR

2900.00
1000.00
100.00
200.00

9.79
122.33
67.49
4399.61
879.92
5279.54
0
5279.54
Amount in INR

97.87
1349.88

100.00
1547.75
309.55
1857.30
0
1857.30

Amount in INR

294.60
101.20
18.00
15.00
21.44

4.29

4.29

1712.68
18350.10
13498.80
34020.39
6804.08
40824.47
0
40824.47

1600/1700
Amount in INR

30.00
2.10

36.70
489.34
269.98
828.11
165.62
993.73
0
993.73

1600/1700

Amount in INR

110.10
1687.35

100.00
1897.45
379.49
2276.94
0
2276.94

Amount in INR

300.00
1000.00
470.00
32.00
24.47
611.67
337.47
2775.61
555.12
3330.73
0
3330.73