Professional Documents
Culture Documents
Admixtures (Anti Shrinkage Compound) at 20% of Cost of Cement
Admixtures (Anti Shrinkage Compound) at 20% of Cost of Cement
2806
Sealing of cracks/ porous concrete by injection process through nipples complete as per Technical specifications
Unit kg
Taking output 1 kg
b) Labour
Mate/Supervisor day 0.10 611.67
Mazdoor/ Skilled Labor day 0.10 611.67
Mazdoor/Unskilled Labor day 0.10 337.47
c) Machinery & Accessories
Grout pump with agitator and accessories hour 0.10 100.00
Nozzles Nos. 2.00 100.00
Total
d) Overheads (a+b+c) @ % 20.00
Total with overhead
e) Contractor's profit (a+b+c+d) @ % 0.00
Total Rate per kg
Assuming 0.2 kg for 1 sqm of surface, Rate for cracking sqm 88.71
Sealing of cracks/ porous concrete by injection process through grouting complete as per Technical specifications
Unit kg
Taking output 1 kg
b) Labour
Mate/Supervisor day 0.08 611.67
Mazdoor/ Skilled Labor day 0.10 611.67
Mazdoor/Unskilled Labor day 0.10 337.47
c) Machinery
Grout pump with agitator and accessories hour 0.10 100.00
Total
d) Overheads (a+b+c) @ % 20.00
Total with overhead
e) Contractor's profit (a+b+c+d) @ % 0.00
Total Rate per kg
Assuming 0.25 kg for 1 sqm of surface, Rate for cracking sqm 46.75
3 Epoxy Grout Specification No. 2803
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per Technical specifications
Unit kg
Taking output 1 kg
Unit sqm
Taking output 10 sqm
Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under
pressure, comprissing of cement, sand, coarse aggregates, water and quick setting compound in the propertion as per Clause 2807.1, sand
Unit sqm
Taking output 10 sqm, 30 mm average thickness
Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under
pressure, comprissing of cement, sand, coarse aggregates, water and quick setting compound in the propertion as per Clause 2807.1, sand
Unit sqm
Taking output 10 sqm, 40 mm average thickness
Cleaning the surface with Wire brush to remove all lose rust and scale and 1 coats drying oil type primer, and 1 under coat alkyd
type paint; 1 finisihing coat alkyd type
Unit sqm
Taking output 10 sqm
Cleaning the surface with Wire brush to remove all lose rust and scale and 2 coats drying oil type primer, and 1 under coat alkyd
type paint; 1 finisihing coat alkyd type. Total dry thickness 150 micro meter
Unit sqm
Taking output 10 sqm
Grit blast: 1 coat of sprayed aluminium followed by suitable sealer. Total thickness 150 micro meter
Unit sqm
Taking output 10 sqm
Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per
Technical Specifications
Unit sqm
Taking output 10 sqm, Assuming average 10 mm thickness of epoxy mortar
Unit Nos.
Taking output 3 Nos.
Unit Nos.
Taking output 3 Nos.
Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Cleaning metal bearings
Assuming 15 % of actual bearing price % 0.15 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Material Damage Nos. 2899.12
13 Bearing Rectification for Anchorage Specification No. 2810
Unit Nos.
Taking output 3 Nos.
Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Cost of parts to be replaced for 3 bearings
Assuming 20 % of actual bearing price % 0.20 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Material Damage Nos. 2905.12
Unit Nos.
Taking output 3 Nos.
Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Replacement of bearing
Cost of bearing including installment Nos. 3.00 100.00
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Material Damage Nos. 3241.12
15 Repair of Pedestal Specification No. 2810
Unit Nos.
Taking output 3 Nos.
Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.64 611.67
Mazdoor/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.00 337.47
Wooden packing cum 0.15 100.00
b) Repair pedestals & resetting of bearings
(i) Micro concrete: Ready made powder bags of 25 Kg @1760 Kg/cum Nos. 0.10 100.00
(assuming 50% damage)
(ii)Centering arrangement for span lifting (erection and rent) Ls 1.00 100.00
(iii) Shuttering LS 1.00 100.00
(iV) Steel reinforcement LS 1.00 100.00
(v) T&P (hydrauluc jacks, welding machine, electric generator, concrete LS 1.00 100.00
mixer, vibrator and other minor items) hired
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Pedestal Damage Nos. 3045.12
Unit Nos.
Taking output 3 Nos.
Hire charges for jack of 40 tonne lifting capacity each 3.00 100.00
Mate/Supervisor day 0.70 611.67
Mason/ Skilled Labor day 4.00 611.67
Mazdoor/Unskilled Labor day 12.50 337.47
Wooden packing cum 0.15 100.00
b) Replacement of pedestals & resetting of bearings
(i) Cement MT 0.40 100.00
(ii) Sand cum 0.20 100.00
(iii) Aggregate cum 0.35 100.00
(iv) HYSD bar kg 45.00 100.00
(v)Centering arrangement for span lifting (erection and rent) Ls 1.00 100.00
(vi) Shuttering LS 1.00 100.00
(vii) Steel reinforcement LS 1.00 100.00
(viii) T&P (hydrauluc jacks, welding machine, electric generator, concrete LS 1.00 100.00
mixer, vibrator and other minor items) hired
Total
c) Overheads @ % 20.00
Total with overhead
d) Contractor's profit @ % 0.00
Cost
Rate for Bearing Pedestal Replacement Nos. 4961.29
Unit RM
Taking output 12 RM
18 Providing and laying Cement Concrete Wearing Coat Specification No. 2702/2811
Removal of existing cement concrete wearing coat including its disposal complete as per Technical Specification without causing any
detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000 m
Unit sqm
Taking output 10 sqm, Thickness 75 mm
Providing and laying cement concrete wearing coat M 30 grade including reinforcement complete as per drawing and Technical
Specifications
Unit sqm
Taking output 1 cum
Removal of existing asphaltic wearing coat including disposal with all lift and lead upto 1000 m
Unit sqm
Taking output 10 sqm
Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen
meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the
surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of
0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.
Unit sqm
Taking output 72.46 sqm
(ii) Crusher stone dust @ 31.9 % by weight of mix (2x31.9/100) cum 0.39 100.00
(iii) Lime stone dust filler with calcium carbonate content not less than MT 0.36 100.00
80% by weight @ 17.92% by weight of mix (2x17.92/100)
(iv) Coarse aggregates 3.35 mm to 9.5 mm @ 40% by weight of mix (2x cum 0.55 100.00
40/100/1.456)
(v) Pre-coated stone chips of 13.2 mm nominal size for skid resistance cum 0.04 100.00
(72.46x0.005/10)
(vi) Bitumen for coating of chips @ 2% by weight (0.036 x 1.456 x 2/100 x kg 1.05 100.00
1000)
b) Lobour
Mate/Supervisor day 0.49 611.67
Mazdoor/ Skilled Labor day 11.00 611.67
Mazdoor/Unskilled Labor day 1.25 337.47
a) Machinery
Mechanical broom @ 1250 sqm per hour hour 0.06 100.00
Air compressor 250 cfm hour 0.06 259.25
Mastic cooker 1 tone capacity hour 6.00 100.00
Bitumen boiler 1500 liters capacity hour 6.00 100.00
Tractor for towing and positioning of mastic cooker and bitumen boiler hour 1.00 100.00
Total
d) Overheads @ % 20.00
Total with overhead
e) Contractor's profit @ % 0.00
Cost
Rate for laying sqm 154.81
Removal of existing Tiles including its disposal complete as per Technical Specification without causing any detrimental effect to any part of
the bridge structure and removal of dismantled material with all lifts and lead upto 1000 m
Unit sqm
Taking output 10 sqm
Providing and laying of Tiles complete as per drawing and Technical Specifications
Unit sqm
Taking output 1 sqm
Repair of masonry railing with cement and mortar by cutting and trimming the damaged portion to a regular shape, cleaning the area to be
repaired
Unit RM
Taking output 10 RM
Unit RM
Taking output 10 RM
Unit RM
Taking output 10 RM
Repair of RC Railing railing with cement and mortar by cutting and trimming the damaged portion to a regular shape, cleaning the area to
be repaired
Unit RM
Taking output 10 RM
Unit RM
Taking output 10 RM
Unit RM
Taking output 10 RM
Unit RM
Taking output 10 RM
Description Unit Quantity Rate (INR)
a) Labour
Labour for dismantling old railing and disposal of dismantled material
Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification
Unit RM
Taking output 2 x 50 m span = 100 m
Add for cost of concrete for fixing vertical posts in the performed recess
@ 1 per cent of cost of material
Unit RM
Taking output 10 RM
Unit RM
Taking output 10 RM
Amount in INR
2.97
0.59
61.17
61.17
33.75
10.00
200.00
369.65
73.93
443.57
0
443.57
ns
Amount in INR
1.49
0.20
0.30
48.93
61.17
33.75
10.00
155.83
31.17
187.00
0
187.00
ecifications
Amount in INR
110.00
48.93
61.17
33.75
10.00
263.85
52.77
316.62
0
316.62
Amount in INR
800.00
24.00
24.47
305.84
168.74
1323.04
264.61
1587.64
0
1587.64
243.00
60.00
42.69
200.00
0.30
18.35
244.67
134.99
194.44
75.00
48.55
1261.99
252.40
1514.39
0
1514.39
Amount in INR
324.00
90.00
64.03
250.00
0.38
24.47
305.84
168.74
259.25
100.00
9.71
1596.41
319.28
1915.69
0
1915.69
under coat alkyd
Amount in INR
70.00
70.00
70.00
30.58
428.17
134.99
500.00
1303.74
260.75
1564.49
0
1564.49
Amount in INR
140.00
70.00
70.00
36.70
550.50
168.74
500.00
1535.94
307.19
1843.13
0
1843.13
Amount in INR
70.00
70.00
18.35
275.25
84.37
100.00
617.97
123.59
741.56
0
741.56
omplete as per
Amount in INR
250.00
220.00
200.00
20.10
24.47
305.84
168.74
1189.14
237.83
1426.96
0
1426.96
Amount in INR
300.00
391.47
2446.68
4049.64
15.00
7202.79
1440.56
8643.35
0
8643.35
Amount in INR
300.00
391.47
2446.68
4049.64
15.00
45.00
7247.79
1449.56
8697.35
0
8697.35
Amount in INR
300.00
391.47
2446.68
4049.64
15.00
60.00
7262.79
1452.56
8715.35
0
8715.35
Amount in INR
300.00
391.47
2446.68
4049.64
15.00
900.00
8102.79
1620.56
9723.35
0
9723.35
Amount in INR
300.00
391.47
2446.68
4049.64
15.00
10.00
100.00
100.00
100.00
100.00
7612.79
1522.56
9135.35
0
9135.35
Amount in INR
300.00
428.17
2446.68
4218.38
15.00
40.00
20.00
35.00
4500.00
100.00
100.00
100.00
100.00
12403.22
2480.64
14883.87
0
14883.87
Amount in INR
960.00
360.00
159.03
305.84
2024.82
1200.00
5009.69
1001.94
6011.63
0
6011.63
causing any
0m
Amount in INR
36.70
337.47
259.25
120.64
754.06
150.81
904.87
0
904.87
Technical
Amount in INR
8500.00
3712.50
36.70
61.17
472.46
3195.71
15978.53
3195.71
19174.24
0
19174.24
Amount in INR
18.35
253.10
194.44
96.51
562.40
112.48
674.88
0
674.88
grade bitumen
after cleaning the
inal size at the rate of
e when the
ause 515.
Amount in INR
20.40
39.00
36.00
55.00
3.60
105.00
299.72
6728.37
421.84
6.00
15.56
600.00
600.00
100.00
9030.48
1806.10
10836.58
0
10836.58
effect to any part of
Amount in INR
30.58
269.98
120.64
421.20
84.24
505.44
0
505.44
Amount in INR
100.00
100.00
20.00
120.00
0
120.00
/1700
Amount in INR
30.00
24.47
337.47
391.94
78.39
470.32
0
470.32
/1700
Amount in INR
244.67
3374.70
100.00
3719.37
743.87
4463.24
0
4463.24
Amount in INR
350.00
32.00
18.35
269.98
670.33
134.07
804.39
0
804.39
/1700
Amount in INR
30.00
24.47
337.47
391.94
78.39
470.32
0
470.32
/1700
Amount in INR
244.67
3374.70
100.00
3719.37
743.87
4463.24
0
4463.24
Amount in INR
300.00
28.00
32.00
24.47
337.47
721.94
144.39
866.32
0
866.32
Amount in INR
2900.00
1000.00
100.00
200.00
9.79
122.33
67.49
4399.61
879.92
5279.54
0
5279.54
Amount in INR
97.87
1349.88
100.00
1547.75
309.55
1857.30
0
1857.30
Amount in INR
294.60
101.20
18.00
15.00
21.44
4.29
4.29
1712.68
18350.10
13498.80
34020.39
6804.08
40824.47
0
40824.47
1600/1700
Amount in INR
30.00
2.10
36.70
489.34
269.98
828.11
165.62
993.73
0
993.73
1600/1700
Amount in INR
110.10
1687.35
100.00
1897.45
379.49
2276.94
0
2276.94
Amount in INR
300.00
1000.00
470.00
32.00
24.47
611.67
337.47
2775.61
555.12
3330.73
0
3330.73