Design Calculation Report: Section (1) Panels Arrangement
Design Calculation Report: Section (1) Panels Arrangement
Design Calculation Report: Section (1) Panels Arrangement
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
PREPARED BY :
T . Z
COMPANY :
REV NO : -
DATE : 11-Apr-22
PROJECT :
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Panel
First strip location = 1.88 m
Location of slab bottom = 1.10 m
Vertical sapcing of strip Sv = 0.75 m
Panel width b = 1.50 m
Panel height h = 1.50 m
Panel thickness t = 0.14 m
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Load Cases
Vertical Horizontal Live
Load Load Load
Load Factor ϒ (LRFD 11.5.5) ϒEV ϒEH ϒLS
Case I Strength I 1.00 1.50 -
Case II Strength II 1.35 1.50 1.75
Case III Service I 1.00 1.00 1.00
Resistance Factor φP φT
Case IV Static loading 0.90 0.75
Case V Combined static and impact loading 1.00 1.00
I. External Stability
Static Mass Stability
Forces :
V1 = ϒsoil H L
V2 = qs L
F1 = 0.5 ϒ H2 Ka
F2 = qs H Kaf
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Traffic surcharge
V2 = qL
V2 = 13.00 x 4.5
V2 = 58.50 kN/m
Factored V2 = 58.50 x 1.75
Factored V2 = 102.38 kN/m
Horizontal loads
ka = tan(45 - φ/2)2
For retained ka = 0.28
For surcharge kaf = 0.28
Retained Soil
F1 = 0.5 ϒsoil H2 Ka
= 60.65 kN/m
Case I F1 = 90.97 kN/m
Case II F1 = 90.97 kN/m
Case III F1 = 60.65 kN/m
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Traffic surcharge
F2 = q H Kaf
F2 = 16.61 kN/m
Factored F2 = 29.07 kN/m
Case I = 7.01 ≥ 2 OK
Case II = 7.53 ≥ 2 OK
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
σv = ∑V
L-2e
F.S = qult
σv
= 7.63 > 1.5 OK
F2 = q d ka
= 15.88 kN/m
∑F = 66.00 kN/m
F.S = ϒb d L tanφ C
∑F
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Friction
Static Load
Compute Kr (LRFD Figure 11.10.6.2.1-3)
At Z = 0 Kr = 0.48
Under Z = 6 m Kr = 0.34
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Layer 1
Vertical Stress
1 Reinforced Soil
Kr = 0.44
σv = ϒsoil H
= 39.48 kN/m2
Case I σv = 39.48 kN/m2
Case II σv = 53.30 kN/m2
Case III σv = 39.48 kN/m2
=
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv k r
Case I σh = 26.06 kN/m2
Case II σh = 50.19 kN/m2 BP 5
Case III σh = 23.09 kN/m2
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 9.77 kN per strip < 16.20 kN OK
Layer 2
Vertical Stress
1 Reinforced Soil
Kr = 0.42
σv = ϒsoil H
= 55.23 kN/m2
Case I σv = 55.23 kN/m2
Case II σv = 74.56 kN/m2
Case III σv = 55.23 kN/m2
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
PROJECT :
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv k r
Case I σh = 23.20 kN/m2
Case II σh = 40.87 kN/m2
BP 5
Case III σh = 28.66 kN/m2
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 13.05 kN per strip < 21.75 kN OK
Layer 3
Vertical Stress
1 Reinforced Soil
Kr = 0.40
σv = ϒsoil H
= 70.98 kN/m2
Case I σv = 70.98 kN/m2
Case II σv = 95.82 kN/m2
Case III σv = 70.98 kN/m2
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv k r
Case I σh = 29.81 kN/m2
Case II σh = 47.43 kN/m2
Case III σh = 33.59 kN/m2
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 16.77 kN per strip < 28.28 kN OK
Layer 4
Vertical Stress
1 Reinforced Soil
Kr = 0.38
σv = ϒsoil H
= 86.73 kN/m2
Case I = 86.73 kN/m2
Case II = 117.09 kN/m2
Case III = 86.73 kN/m2
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv k r
Case I σh = 33.30 kN/m2
Case II σh = 53.70 kN/m2
Case III σh = 38.30 kN/m2
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 18.73 kN per strip < 33.97 kN OK
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
α = 1
C = 2.00 for strip
Rc = 0.10 For 3 strip per panel
Rc = 0.07 For 2 strip per panel
Le ≥ Tmax ≥ 1m
φ F* α σv C Rc
Layer 1
F* = 1.45
Le = 1.83 m ≥ 1m
Take Le = 1.83 m
Layer 2
F* = 1.3
Le = 2.67 m ≥ 1m
Take Le = 2.67 m
Layer 3
F* = 1.16
Le = 2.70 m ≥ 1m
Take Le = 2.70 m
Layer 4
F* = 1.02
Le = 2.85 m ≥ 1m
Take Le = 2.85 m
PROJECT :
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
LA1 = 1.36 m
LA2 = 1.13 m
LA3 = 0.68 m
LA4 = 0.23 m
Ec = 1.99 mm
Ac = 99.72 mm2
PROJECT :
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Tal = AC FY
Case V φTall = 44.67 kN
Case IV φTall = 33.51 kN
Connection Strength
Strip width b = 60 mm
Stritp thickness t = 4 mm
Yield Strength Fy = 345 Mpa
C11.10.6.3.2 Tac = AC FY
ζ = Arc tan(Kh)
= 12.95
kae = cos2(φ - ζ)
cos ( ζ ) cos (ζ + δ) (1 + √(sin(φ + δ) sin(φ - ζ - δ)/cos (ζ + δ) cosδ))2
kae = 0.871
0.950 x 2.114
= 0.434
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Rv = 427.14 kN/m
Rh = 95.87 kN/m
= 3.82 > 2 OK
σv = ∑V
L - 2e
σv = 128.60 kN/m2
PROJECT :
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
F.S = qult
σv
= 5.50 > 1.5 OK
PI = Kh W a
= 22.20 kN/m
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
V. Impact Load
Traffic surcharge F2 = Ka q h
Case I F2 = 4.04 kN/m
Case II F2 = 7.08 kN/m
Δσhmax = 2 ∑F / L1
Case I Δσhmax = 6.29 kN/m2
Case II Δσhmax = 11.06 kN/m2
PROJECT :
PREPARED BY : T.Z.S.K
DATE : 4/11/2022
Tmax = σh Sv
Layer 1
Layer 2
Layer 3
Layer 4