Professional Documents
Culture Documents
48 Fire Training Certificate
48 Fire Training Certificate
Certified that M/S. Swastik Industries, Kundli, Sonepat has made satisfactory fire drill
required by the rules on dated 05/07/19 at 16:30 p.m. General Shift, and fire fighting system
tested during the fire drill and found in good condition. Fire drill was made in the premise of the
factory and the following staff/workers were trained for how to use the different extinguish the
fire.
EXTINGUISHER:-
OTHER SYSTEM
FOR
Best Traders
(Best Fire Protection).
(Authorized Signatory)
EVACUATION DRILL CERTIFICATE
Certified that M/S. Swastik Industries, Kundli, Sonepat has made satisfactory Evacuation
training in the presence of Sh. Manoj Sharma, required by the rules, on dated 05/07/2019.
Shift : G
S.No. Description Time Duration Time Taken
a) Siren started at 16:30 p.m. 05 minutes
b) All employees come out in assembling area 16:35p.m. to 16:37p.m. 02 minutes
c) Head counting by In charge Total number 16:37p.m. to 16:40p.m 03 minutes
of Participants are 78
d) Workers send back to the work 16:40p.m. to 16:45p.m 05 minutes
e) Total Time Taken --------------------------- 15 minutes
f) Total No. of participants
FOR
Best Traders
(Best Fire Protection ).
(Authorized Signatory)
EVACUATION DRILL CERTIFICATE
Certified that M/S. OM Sakk India Industries(Ltd) G. T. Road Jattipur, Panipat has made
satisfactory Evacuation training in the presence of Sh. JITENDER CHAUHAN, required by the
rules, on dated 15/12/2008 in Shift A, Shift – B & Shift – C
Details of training is given below:
Shift : A& G
S.No. Description Time Duration Time Taken
a) Siren started at 12:05 p.m. -----------
b) All employees come out in assembling area 12:05p.m. to 12:08p.m. 03 minutes
c) Head counting by Incharge Total number 12:08p.m. to 12:10p.m 02 minutes
of Participants are 856
d) Workers send back to the work 12:10p.m. to 12:12p.m 02 minutes
e) Total Time Taken --------------------------- 07 minutes
f) Total No. of participants 856
Shift : B
a) Siren started at 04:10 p.m. -----------
b) All employees come out in assembling area 04:10p.m. to 04:12p.m. 02 minutes
c) Head counting by Incharge Total number 04:12p.m. to 04:13p.m 01 minutes
of Participants are 33
d) Workers send back to the work 04:13p.m. to 04:15p.m 02 minutes
e) Total Time Taken --------------------------- 05 minutes
f) Total No. of participants 33
Shift : C
a) Siren started at 10:10 p.m. -----------
b) All employees come out in assembling area 10:10p.m. to 10:12p.m. 02 minutes
c) Head counting by Incharge Total number 10:12p.m. to 10:14p.m 02 minutes
of Participants are 32
d) Workers send back to the work 10:14p.m. to10:15p.m 01 minutes
e) Total Time Taken --------------------------- 05 minutes
f) Total No. of participants 32