Appendix I (See Paragraph - 6) Form 1 (I) Basic Information Sr. No Item Details
Appendix I (See Paragraph - 6) Form 1 (I) Basic Information Sr. No Item Details
APPENDIX I
(See paragraph – 6)
FORM 1
Sr.
Item Details
No
1 Name of the Project Commerce House 6
2 S. number in schedule 8(a)
Proposed
capacity/area/length/tonnage to be Plot area: 3419 m2
3
handled/command area/lease Built up area: 23,354.31 m2
area/number of well to be drilled
4 New/expansion/modernization Expansion
Plot area: 3419 m2
5 Existing capacity/area etc.
Built up area: 22,873.90 m2
6 Category of project i.e. “A” or “B” ‘B’
Does it attract the general condition?
7 No
If yes please specify
Does it attract the specific condition?
8 No
If yes please specify
Location Makarba
Sub plot 2, F.P. Number 298+299+307, TPS Number 26, Makarba,
Plot/Survey/Khasra No
Ahmedabad
9 Village Makarba
Tehsil Ahmedabad
District Ahmedabad
State Gujarat
Nearest railway station/airport along Gandhigram railway station is ~7.8 km in NE direction
10
with distance in Kms. Ahmedabad Airport is ~14 km in NE direction
Nearest town, city, district
Ahmedabad city, it’s a Headquarter of District and project is
11 headquarter along with distance in
developed in Ahmedabad Municipal Corporation
Kms.
Village Panchayat, Zila Parishad,
Ahmedabad Municipal Corporation
Municipal Corporation, local body
12 Sardar Patel Bhavan, Danapith, Ahmedabad- 380001
(Complete postal address with
Ph no. 079-25391811
telephone nos to be given)
13 Name of the applicant M/s. Goyal Procon LLP
10th Floor Commerce House – 4
Beside Reliance Petrol Pump
14 Registered address 100ft. Road, Prahladnagar,
Satellite, Ahmedabad 380015.
10th Floor Commerce House – 4
Beside Reliance Petrol Pump
15 Address for correspondence
100ft. Road, Prahladnagar,
Satellite, Ahmedabad 380015.
Name Mr. Mukesh Agrawal
Designation Designated Partner
10th Floor Commerce House – 4
Beside Reliance Petrol Pump
Address
100ft. Road, Prahladnagar,
Satellite, Ahmedabad 380015.
Pin code 380015
E-mail account@goyalco.com
Telephone (079)26931677,78,79, Mobile: 9687610082
Fax No (079)26931770
Details of alternative sites examined,
No, location on topo sheet is attached vide Annexure 1.
16 if any. Location of these sites should
be shown on a topo sheet
1
M/s. Goyal Procon LLP Commerce House 6 Form 1
17 Interlinked Project No
Whether separate application for
18 interlinked project has been No
submitted?
19 If yes date of submission -
20 If no reason Individual project
Whether the proposal involves
approval/ clearance under: if yes,
details of the same and their status to
21 be given No
The Forest (Conservation) Act, 1980
The Wildlife (Protection) Act, 1972
The CRZ Notification 1991
Whether there is any Government
22 No
order/policy relevant/ relating to site
23 Forest Land involved? No
Whether there is any litigation
pending against the project and / or
land in which the project is propose
24 to be set up Name of court No litigation pending
Case no Order/directions of the
court, if any and its relevance with
the proposed project.
Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and
production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure,
generation capacity for power generation etc.,)
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in
the locality (topography, land use, changes in water bodies, etc.)
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy,
especially any resources which are non-renewable or in short supply):
3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human
health or the environment or raise concerns about actual or perceived risks to human health.
4
M/s. Goyal Procon LLP Commerce House 6 Form 1
5
M/s. Goyal Procon LLP Commerce House 6 Form 1
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters,
groundwater, coastal waters or the sea:
6
M/s. Goyal Procon LLP Commerce House 6 Form 1
8. Risk of accidents during construction or operation of the Project, which could affect human health or the
environment
9. Factors which should be considered (such as consequential development) which could lead to environmental effects
or the potential for cumulative impacts with other existing or planned activities in the locality
9.2 Lead to after-use of the site, which Yes Negligible increase in traffic and there will be positive impact on
could have an impact on the socio- economic environment.
7
M/s. Goyal Procon LLP Commerce House 6 Form 1