Download as pdf or txt
Download as pdf or txt
You are on page 1of 157

PUB Corenet Form Changes

Table of Contents
Summary of Corenet Form Changes ............................................................................................ 1 – 6
Forms with Changes ............................................................................................................................ 1
Forms with No Changes ...................................................................................................................... 6

Corenet Forms with Changes ..................................................................................................... 7 – 37


1 Development Control (DC) Clearance Forms ................................................................................... 7
1.1 Guide for Development Control (DC) Clearance Forms ....................................................... 7
1.2 Select Fields – DC Clearance Forms ................................................................................... 12

2 Detailed Plan (DP) Form ......................................................................................................... 24 – 28


2.1 Guide for Detailed Plan (DP) Form..................................................................................... 24
2.2 Select Fields – DP Form ...................................................................................................... 26

3 Completion of Work Form ...................................................................................................... 29 - 32


3.1 Guide for Completion of Work Form ................................................................................. 29
3.2 Select Fields – Completion of Work Form.......................................................................... 31

4 Temporary Occupation Permit (TOP) Forms .......................................................................... 33 – 35


4.1 Guide for Temporary Occupation Permit (TOP) Forms ..................................................... 33
4.2 Select Fields – TOP Forms .................................................................................................. 35

5 Certificate of Statutory Completion (CSC) Forms .................................................................. 36 – 37


5.1 Guide for Certificate of Statutory Completion (CSC) Forms .............................................. 36
5.2 Select Fields – CSC Forms ................................................................................................... 37

6 Water Submission Forms ....................................................................................................... 38 – 40


6.1 Guide for Water Submission Forms ................................................................................... 38
6.2 Select Fields – Water Submission Forms ........................................................................... 39
Appendix ............................................................................................................................... 41 – 153
Appendix 1 – ENV-CBPU-DCCLR-NEW SUBMISSION ............................................................... 41 – 64
Application for Development Control (DC) Clearance – New Submission
Appendix 2 – ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION ........................... 65 –90
Application for Development Control (DC) Clearance – Resubmission/Amendment/Revision
Appendix 3 – PUB-BPU-CLRDP01 ............................................................................................ 91 – 96
Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage
(Sanitary/Sewer) Works
Appendix 4 – PUB-BPU-COMPOFWORK ............................................................................... 97 – 109
Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works
Appendix 5 – ENV-CBPU-CLRTOP01-NEW SUBMISSION ..................................................... 110 – 113
Application for Clearance of Temporary Occupation Permit (TOP) – New Submission
Appendix 6 – ENV-CBPU-CLRTOP01-RESUBMISSION/AMENDMENT/REVISION ................ 114 – 118
Application for Clearance of Temporary Occupation Permit (TOP) –
Resubmission/Amendment/Revision
Appendix 7 – ENV-CBPU-CLRCSC01-NEW SUBMISSION ..................................................... 119 – 123
Application for Compliance Certificate – New Submission
Appendix 8 – ENV-CBPU-CLRCSC01-RESUBMISSION/AMENDMENT/REVISION ................. 124 – 128
Application for Compliance Certificate – Resubmission/Amendment/Revision
Appendix 9 – PUBWTR-0-MCG01 ....................................................................................... 129 – 130
Form for Manufacturing Category
Appendix 10 – PUBWTR-0-NMC01 ..................................................................................... 131 – 132
Form for Non-Manufacturing Category
Appendix 11 – PUBWTR-0-RCG01 ................................................................................................. 133
Form for Residential Category
Appendix 12 – PUBWTR-0-TSP01 ........................................................................................ 134 – 136
Form for Temporary Category
Appendix 13 – PUBWTR-0-PPC01 ....................................................................................... 137 – 139
Pre-Planning Consultation
Appendix 14 – PUBWTR-0-WLP01 ...................................................................................... 140 – 142
Notification of Water Service Work by Licensed Water Service Plumber
Appendix 15 – PUBWTR-0-WSW01 ..................................................................................... 143 – 146
Notification of Water Service Work by Professional Engineer
Appendix 16 – PUBWTR-0-CSC01 ....................................................................................... 147 – 148
Certificate of Statutory Completion of Water Service Work by Professional Engineer
Appendix 17 – Guideline on Corenet Form Submissions .................................................... 149 – 152
Appendix 18 – Contact List ........................................................................................................... 153
Summary of Corenet Form Changes
Forms with Changes

File Number Form Name Changes


ENV-CBPU-DCCLR-NEW SUBMISSION Application for Development Control Include fields to classify projects into major and minor.
(DC) Clearance - New Submission For minor projects, fields will be included to allow DC and DP to be submitted at
the same time.
ENV-CBPU-DCCLR- Application for Development Control
RESUBMISSION/AMENDMENT/REVISION (DC) Clearance –
Resubmission/Amendment/Revision

PUB-DD-CHECKLIST Checklist for Drainage DC Plans PUB (C&W) Checklist will be a section of the DC form
(No need for separate checklist to be submitted)

PUB-BPU-CLRDP01 Application for Clearance Certificate Drainage DP, Sewerage DP, Sewerage Form A, Sewerage Form D, and Sewerage
for Detailed Plan on Drainage and RC Trench combined into 1 form. Previously known as PUB-DD-CLRDPDRA01 &
Sewerage (Sanitary/Sewer) Works PUB-SEW-CLRDPSEW01.

• For Form A, Form DP, Form D, Form D1 and Form D2, please fill Section
A1: Sanitary Work
• For RC Trench, please fill Section A2: Sewerage Work, RC Trench

PUB-BPU-COMPOFWORK Certificate of Completion and All completion of work forms for sewerage, sanitary and M&E to merge into one
(for Completion of SEW Work only) Inspection of Sanitary, Sewerage and form. Previously known as Form C, Form C1, Annex A, Annex C and Annex D.
Drainage Works
• Form C is replaced by the COMPOFWORK form
• For Annex A, Annex C and Form C1, please fill Section A2: Sanitary Work
• For Annex D, please fill Section A1: Sewerage Work
• For PUB-SEW-RC TRENCH, please fill Section A3: RC Trench Completion

1
File Number Form Name Changes
PUB-BPU-COMPOFWORK Certificate of Completion and It is known that these different forms are submitted by different QPs at different
(for Completion of SEW Work only) Inspection of Sanitary, Sewerage and stages of the development of the project. Hence built into the form is a feature
Drainage Works which allows one particular section of the form to be submitted.

For example, if only the PE (Civil) is ready to make his submissions, he can
proceed to do so using the form. If more than one QP/PE is ready to make
theirs, more sections of the form may be submitted at the same time by
selecting the relevant sections.

ENV-CBPU-CLRTOP01-NEW SUBMISSION Application for Clearance of New declarations added for developer/owner to endorse with regards to:
Temporary Occupation Permit (TOP) • maximum allowable peak surface runoff stipulated in the COP and
- New Submission constructed according to approved plans
• SOP of the maintenance, operation and monitoring of the detention
tank system
• Inspection of crest levels being constructed to approved plans
ENV-CBPU-CLRTOP01-RESUBMISSION Application for Clearance of
annually/every 3 years upon obtaining the TOP
Temporary Occupation Permit (TOP)
- Resubmission • Submission of the following documents as required annually upon
obtaining the TOP

New attachments added:


• “As – built drawings for detention tank systems”
• “SOP for pumped drainage system”
• “SOP for flood barrier”

2
File Number Form Name Changes
ENV-CBPU-CLRCSC01-NEW SUBMISSION Application for Compliance Attachments section modified to comply with revised Code of Practice on
Certificate - New Submission Surface Water Drainage.

ENV-CBPU-CLRCSC01-RESUBMISSION Application for Compliance Attachments section modified to comply with revised Code of Practice on
Certificate – Resubmission Surface Water Drainage.

PUBWTR-0-PPC01 Pre-Planning Consultation Modified fields to indicate water demand for Potable and NEWater.

PUBWTR-0-WLP01 Notification of Water Service Work Modified fields to indicate water demand for Potable and NEWater.
by Licensed Water Service Plumber

PUBWTR-0-WSW01 Notification of Water Service Work Modified fields to indicate water demand for Potable and NEWater.
by Professional Engineer

PUBWTR-0-CSC01 Certificate of Satisfactory Added new section - “Particulars of the Licensed Water Service Plumber”
Completion of Water Service Work
by Professional Engineer

PUBWTR-0-MCG01 Form for Manufacturing Category Include fields to indicate water demand for Potable and NEWater.

PUBWTR-0-NMC01 Form for Non-Manufacturing Include fields to indicate water demand for Potable and NEWater.
Category

PUBWTR-0-RCG01 Form for Residential Category Include fields to indicate water demand for Potable and NEWater.

PUBWTR-0-TSP01 Form for Temporary Category Include fields to indicate water demand for Potable and NEWater.

PUB-SEW-FORM_A Notice to Commencement of Not in Use from 28 Feb 2014


Sanitary/Sewerage Works

3
File Number Form Name Changes
PUB-SEW-FORM_C Certificate of Completion and Not in Use from 28 Feb 2014
Inspection for Sanitary / Sewerage
Works

PUB-SEW-FORM_C1 Certificate of Completion and Not in Use from 28 Feb 2014


Inspection for the Mechanical and
Electrical Works for Sewerage
Installation

PUB-SEW-FORM_D Supplementary Information to the Not in Use from 28 Feb 2014


Application for Clearance Certificate
for Detailed Plan on Sewerage
(M&E) Works

PUB-SEW-FORM_D1 Details of Standby Generator & Not in Use from 28 Feb 2014
Automatic Transfer Switch

PUB-SEW-FORM_DP Application for Clearance Certificate Not in Use from 28 Feb 2014
for Detailed Plans on Sewerage
(M&E Works)

PUB-SEW-ANNEX_A Declaration By Qualified Person on Not in Use from 28 Feb 2014


Chargeable Sanitary Appliances
Installed

PUB-SEW-ANNEX_C Plumbers/Contractor's Confirmation Not in Use from 28 Feb 2014


of Completion of Sanitary/Sewerage
Works

4
File Number Form Name Changes
PUB-SEW-ANNEX_D Hydrostatic (Water) Tests for Not in Use from 28 Feb 2014
Sanitary Drainlines & Sewers
(<600mm DIA) and CCTV Inspection
Survey (>600mm DIA Sewers)
[Annex D to Form C/QP]

PUB-SEW-RC TRENCH Certificate of Completion for RC Not in Use from 28 Feb 2014
Trench

PUBWTR-0-WSP01 Application for License As a Water Not in Use from 28 Feb 2014
Service Plumber

PUBWTR-0-WSR01 Application for Renewal of Water Not in Use from 28 Feb 2014
Service Plumber Licence

PUBWTR-0-PWS01 Application for Potable Water Not in Use from 28 Feb 2014
Supply

5
Forms with No Changes

File Number Form Name


PUB-SEW-CLRDEV-OVER-SEW Application for Approval of Works Affecting Public Sewerage System

PUB-SEW-FORM DLP End of Defects Liability Period Inspection for Public Sewers

PUB-SEW-FORM_B Application for Work in Public Sewerage System

PUB-SEW-FORM_B1 Notice for Carrying out Sewer Connection Work

PUBWTR-0-WSW02 Certification of Satisfactory Completion of Water Service Work by Licensed Water Service Plumber

PUB-DD-CSIDRA Certificate of Inspection for Drainage Works

PUB-DD-PCWVDRA Pre-consultation / Waiver Application Form on Drainage Matters

PUB-SEW-PCWVSEW Pre-consultation / Waiver Application Form on Sewerage Matters

6
Corenet Forms with Changes

6
1.1 Guide for Development Control (DC) Clearance Forms

ENV-CBPU-DCCLR-NEW SUBMISSION
Application for Development Control (DC) Clearance – New Submission

a) The DC clearance form is updated to support the work flow process. As part of an effort to
improve our service to the industry, PUB has introduced the classification of projects into
major and minor. This allows processing through separate tracks so that minor projects can be
processed more quickly.

b) A development is considered a minor project if it meets all of the following criteria:


• The development area is less than 0.2 Ha
• The development is 3 storeys or less
• No linkage to MRT
• No Basements (no pumping system)
• No Drainage Reserve affected
• Single Residential, shophouse or simple infrastructure projects that does not generate
used water or Change of Use (e.g. conversion of void deck to Child Care Centre)
• Has used water discharge flow rate of less than 2 litres per second

c) All other projects are classified as major projects.

d) For minor projects, QPs may submit both the DC plan and Detailed Plan (DP) at the same time,
allowing for shorter processing time. Previously, QPs need to obtain DC clearance before DP
can be submitted.

7
e) On the second page of the forms, there is a section called Development Details. This section
must be filled to allow the sorting of the project – into major or minor – to take place.
Accurate information is necessary to facilitate processing of the submissions.

For single landed house, you may refer to the


Code of Practice on Sewerage and Sanitary
Works clause 2.1.2 on Design Flow. “The
design flow is based on the amount of sewage
discharged per person. The average domestic
sewage daily flow shall be taken as 230 litres
per person per day for public housing and 345
litres per person per day for private housing. A
single dwelling unit shall be taken to comprise
5 persons.”

To Calculate Total Used Water Discharge


(345L x 5 persons) / (24hrs x60mins x60secs)
= 0.02 L/s

Note
If a single dwelling unit has > 5 persons, please use the appropriate number of occupants in your
calculation.

If a development is using an ejector for its discharge to sewerage system, then the total used water
discharge rate should include the discharge rate of the ejector.

If in doubt you may wish to engage a licensed plumber or M&E professional engineer for an estimate
of the discharge from the premise.

Please refer to Section 1.2 for more information on the “Select” fields and how they can affect
your submissions.

f) For projects sorted as minor, QP will be directed to the next section – “SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) CLEARANCE WITH DETAIL PLAN”.

Please select name of owner

8
g) For projects sorted as major, QP will be directed to the next section – “SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) PLAN”.

Please select name of owner

h) There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i) sanitary / sewerage work, Section A needs to be selected and filled
(ii) sanitary / sewerage AND drainage work, Sections A and B need to be selected and filled

Please tick accordingly

Please select name of QP


submitting

i) The selection of the section can be done by marking the checkbox.

j) If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.

k) Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:

Submission for Development Control (DC) Clearance Plan (for MAJOR projects only)
Section A – Sanitary/ Sewerage Work
Section B – Drainage Work

Submission for Development Control (DC) Clearance with Detail Plan (for MINOR projects only)
Section A1 – Sanitary, M&E Work (Used Water)
Section A2 – Sewerage Work, RC Trench
Section B – Drainage Work
Section C – Infrastructure or other works affecting Sewer & Drainage (e.g. covered linkway,
bus stop)

9
l) To make attachments and declarations, QPs can similarly mark the provided checkboxes.

m) The Catchment & Waterways department’s Checklist for DC plans is now part of the DC
clearance forms. Please fill up the fields in the checklist if the project involves drainage works.

(i) Development site with area less than 0.2 hectares will be directed to the checklist
below.

(ii) Development site with area greater than or equal to 0.2 hectares will be directed to the
checklist below.

10
n) There are a number of “Select” fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 1.2 for more information on the “Select” fields and how they can affect
your submissions.

o) Compulsory fields are highlighted, as shown in Appendix 1. These must be filled to enable
successful submission of the forms in Corenet.

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Application for Development Control (DC) Clearance –
Resubmission/Amendment/Revision

p) Please refer to Appendix 2 for the ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION


form.

11
1.2 Select Fields – DC Clearance Forms

Field Detail

Industrial
Factories, warehouses, power plants, industrial parks

Non Industrial
Residential, commercial and institutional developments
This field can be found on Page 41

Please select one of the three options:


New Erection
Reconstruction
A&A (Addition and Alteration)

This field can be found on Page 42

Please select the most appropriate type of development for


your project.

This field can be found on Page 42

12
Field Detail
Please choose the catchment where your project is located.
For projects that take place in more than one catchment, please
select one catchment.

Used Water Catchment No.


The used water catchments in Singapore are divided into 6
regions:
1) Bedok
This field can be found on Page 42 2) Jurong
3) Kim Chuan
4) Kranji
5) Seletar
6) Ulu Pandan

Drainage Catchment No.


The drainage catchments in Singapore are divided into 10
regions:
1) Jurong 6) Bukit Timah
2) Kranji 7) (A) Singapore River
3) Pandan (B) Stamford Marina
4) Woodlands 8) Geylang
5) Kallang 9) Punggol
10) Changi

The used water and drainage catchment maps are available at


This field can be found on Page 42 the link below.
http://www.pub.gov.sg/customer/QPPortal/Pages/Catchment
Maps.aspx

13
Field Detail

Items have to be clearly indicated on plan.

Select YES from the corresponding fields in the checklist in order


to proceed with the DC submission.

This field can be found on Page 52

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 52

14
Field Detail

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 52 – 53

15
Field Detail

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 53 – 54

16
Field Detail

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 54

17
Field Detail

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 54 – 55


With direct / indirect linkage
Developments with linkages (direct or indirect) to special
underground facilities such as MRT stations shall comply with
the minimum platform level and crest level (Clause 2.1.1c and
Clause 2.2) as stated in the latest addendum or edition to the
Code of Practice on Surface Water Drainage.
This field can be found on Page 55
Quoting the example of Orchard MRT station, developments with
direct linkage are Ion Orchard and Wisma Atria which are directly
connected to Orchard MRT station. Developments with indirect
linkages are Ngee Ann City and Lucky Plaza which are indirectly
connected to MRT Station through another building with direct
or indirect connection to Orchard MRT Station.
18
Field Detail

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 55 – 56

19
Field Detail

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 56 – 57


20
Field Detail

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 58

21
Field Detail

Select YES if items are provided.

This field can be found on Page 58 Select NOT APPLICABLE if items are not relevant to the project.

Pumping Installation
A minimum of two pumps – duty and standby pumps – shall be
provided.
Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.
Sump
A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.
Carpark
A screen chamber is NOT needed for carpark pump sump.
Swimming Pool
Backwash from swimming pool filter.
This field can be found on Page 45

22
Field Detail

Particulars of Plumber
Please select the registered plumber/contractor’s name from the
drop – down list. Once selected, the rest of his particulars will
auto – populate in the form.

If plumber/contractor name does not appear in the drop – down


list, please set the Role Code of plumber/contractor in ESPro as
“Licensed Plumber”.

If the Role Code in ESPro is set as “Plumbing Contractor” or


“Licensed Water Service Plumber”, plumber/contractor’s name
will NOT appear in the drop – down list.

Type of Plumber
For PUB Licensed Plumber, tick “PUB LP” and input membership
This field can be found on Page 46 – 47 or license number.

For plumber registered by SPS, tick “SPS registered” and input


membership or license number.

For plumbing contractors, tick “N.A.”

23
2.1 Guide for Detailed Plan (DP) Form

PUB-BPU-CLRDP01
Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage
(Sanitary / Sewer) Works

a) Projects classified as major, as described in Chapter 1, will undergo a separate DP submission


process. This can be done with the PUB-BPU-CLRDP01 form.

b) Previously, there were two forms for DP submissions, one for sewerage works (PUB-SEW-
CLRDPSEW01) and one for drainage works (PUB-DD-CLRDPDRA01). These two forms are now
combined into one single PUB-BPU-CLRDP01 form.
OLD DP Forms NEW DP Form
PUB-SEW-CLRDPSEW01
PUB-BPU-CLRDP01
PUB-DD-CLRDPDRA01

c) There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i) sanitary work, Section A1 needs to be selected and filled
(ii) sanitary AND drainage work, Section A1 and Section B need to be selected and filled

d) The selection can be done by marking the checkbox.

e) If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.

f) Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:
Section A1 – Sanitary Work
Section A2 – Sewerage Work, RC Trench
Section B – Drainage Work

24
g) To make attachments and declarations, QPs can similarly mark the provided checkboxes.

h) There are a number of “Select” fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.
If applying for
drainage clearance
only, please ignore
t this field.

Please refer to Section 2.2 for more information on the “Select” fields and how they can affect
your submissions.

i) Compulsory fields are highlighted, as shown in Appendix 3. These must be filled to enable
successful submission of the forms in Corenet.

25
2.2 Select Fields – DP Form

Field Detail

Sanitary
Includes works on any sanitary plumbing or drainage system and
the fixing, alteration and repair of a sanitary appliance
Sewer
Includes engineering works for the construction, alteration and
maintenance of any sewerage system
Sewage Treatment Plant
This field can be found on Page 92
Refers to sewage treatment works, septic tank, imhoff tank,
percolating filter, sludge digestion tank, or any tank designed for
the pre-treatment, treatment or the stabilisation of sew

Drainage
Leave this field blank if applying for Clearance Certificate for
Detailed Plan on Drainage Work only.

New Submission
First DP submission for the particular project

Resubmission
Subsequent DP submission(s) of the same project
- Revised Plan Submission
This field can be found on Page 92
- Amendment Plan Submission

Industrial
Factories, warehouses, power plants, industrial parks

Non Industrial
This field can be found on Page 92 Residential, commercial and institutional developments

26
Field Detail

Particulars of Plumber
Please select the registered plumber/contractor’s name from the
drop – down list. Once selected, the rest of his particulars will
auto – populate in the form.

If plumber/contractor name does not appear in the drop – down


list, please set the Role Code of plumber/contractor in ESPro as
“Licensed Plumber”.

If the Role Code in ESPro is set as “Plumbing Contractor” or


“Licensed Water Service Plumber”, plumber/contractor’s name
will NOT appear in the drop – down list.

Type of Plumber
For PUB Licensed Plumber, tick “PUB LP” and input membership
This field can be found on Page 93 & 95 or license number.

For plumber registered by SPS, tick “SPS registered” and input


membership or license number.

For plumbing contractors, tick “N.A.”

27
Field Detail

Pumping Installation
A minimum of two pumps – duty and standby pumps – shall be
provided.

Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.

This field can be found on Page 94 Sump


A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.

Carpark
A screen chamber is NOT needed for carpark pump sump.

Swimming Pool
Backwash from swimming pool filter.

28
3.1 Guide for Completion of Work Form

PUB-BPU-COMPOFWORK
Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works

a) The PUB-BPU-COMPOFWORK form puts together all the Completion of Work forms for
sewerage, sanitary and M&E. These forms were previously known as Form C, Form C1, Annex
A, Annex C and Annex D. This is to give the project QP an overview of the various Completion
of Work forms that has to be submitted to PUB over the course of the project.

b) It is known that these different forms are submitted by different QPs at different stages of the
development of the project. Hence, built into the form is a feature which allows one particular
section of the form to be submitted even if other required sections are not ready for
submission. For example, if only the PE (Civil) is ready to make his submission, he can proceed
to do so using the form even if the PE (Mechanical) is not ready to submit theirs. If more than
one QP is ready to make their submissions, more sections of the form may be submitted at
the same time by selecting the relevant sections.

c) The table below shows the options and the respective sections that will be made available.
The options are available on the first page of the PUB-BPU-COMPOFWORK form.
Selection Options Sections Available for Submission
Completion of Sewerage Section A1 – Sewerage Work
Work only

Application for PUB Section A2 – Sanitary Work


Clearance for Temporary Section A3 – RC Trench Completion
Occupation Permit (TOP) Section B – Drainage Work (Not in Use)
Section C – Infrastructure Works Affecting Sewer & Drainage

Application for PUB Section D – Application for PUB Clearance for CSC (For SEW
Clearance for Clearance only)
Certificate of Statutory
Completion (CSC)

Application for PUB Section A2 – Sanitary Work


Clearance for both Section A3 – RC Trench Completion
Temporary Occupation Section B – Drainage Work (Not in Use)
Permit (TOP) & Section C – Infrastructure Works Affecting Sewer & Drainage
Certificate of Statutory Section D – Application for PUB Clearance for CSC (For SEW
Completion (CSC) Clearance only)

29
d) There are a number of “Select” fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 3.2 for more information on the “Select” fields and how they can affect
your submissions.

e) Compulsory fields are highlighted, as shown in Appendix 4. These must be filled to enable
successful submission of the forms in Corenet. Compulsory fields under the sections A1, A2,
A3, B, C and D must be duly filled only when the section is selected for submission.

30
3.2 Select Fields – Completion of Work Form

Field Detail

Completion of Sewerage Work Only


To select this for certifying completion of sewer work.

Application for PUB Clearance for TOP


For project with several phases and require multiple clearance
for TOP. This section is for SEW clearance only.

Application for PUB Clearance for CSC


For project which has earlier obtained clearance for TOP.
This section is for SEW clearance only.

For Drainage clearance, please use Certificate of Inspection for


Drainage Works form (PUB-DD-CSIDRA) which is to be submitted
by PE (Civil).

Application for PUB Clearance for both TOP & CSC


For all other projects.
This field can be found on Page 97

Please select the appropriate options:


a change
no change

This field can be found on Page 101 & 106

31
Field Detail

Please select one of the two options:


New Development / New Erection
A&A Works / Reconstruction

This field can be found on Page 101 & 106

32
4.1 Guide for Temporary Occupation Permit (TOP) Forms

ENV-CBPU-CLRTOP01-NEW SUBMISSION
ENV-CBPU-CLRTOP01-RESUBMISSION
Application for Clearance of Temporary Occupation Permit (TOP) – New Submission
Application for Clearance of Temporary Occupation Permit (TOP) – Resubmission

a) The following new declarations are added:


• The crest levels, platform levels, flood protection levels are in compliance with Code
of Practice on Surface Water Drainage and constructed according to approved plans.
• The maximum stormwater discharge from the development is in compliance with the
maximum allowable peak runoff stipulated in the COP and constructed according to
approved plans.
• As the QP, you will need to declare the following “I have liaised with the Developer/
Owner to ensure that a Maintenance/Managing Agent has been established to
undertake the SOP of the maintenance, operation and monitoring of the detention
tank system.”

b) The following new attachments are added to allow the submission of the following documents
(in line with the current edition of Code of Practice on Surface Water Drainage):
• As – built survey plans indicating crest levels, platform levels, flood protection levels
based on approved flood protection measures
• As – built drawings for detention tank systems and final design calculations, and
factory test report for its pumping system
• Standard Operating Procedure for pumped drainage system(basement / detention
tank)
• Standard Operating Procedure for flood barrier
• Developer/Owner declaration on the following - I shall inspect and declare that the
crest levels are constructed to approved plans annually / every 3 years upon obtaining
the TOP
• Developer/Owner declaration on the following:
- I shall submit the following documents as required annually upon obtaining
the TOP
- Certificate of inspection on flood barriers on site, including leak test
certificate
- Amendments to SOP for flood barrier
- Certificate of inspection on pumped drainage system (basement/detention
tank)
- Certificate of inspection on ABC Waters design features

33
c) To make attachments and declarations, QPs can mark the checkboxes provided.

d) Compulsory fields are highlighted, as shown in Appendix 5 & Appendix 6. These must be filled
to enable successful submission of the forms in Corenet.

34
4.2 Select Fields – TOP Forms

Field Detail

Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments

This field can be found on Page 110 & 114

35
5.1 Guide for Certificate of Statutory Completion (CSC) Forms

ENV-CBPU-CLRCSC01-NEW SUBMISSION
ENV-CBPU-CLRCSC01-RESUBMISSION
Application for Compliance Certificate – New Submission
Application for Compliance Certificate – Resubmission
[Under Section 33(7) of the Environmental Protection and Management Act (Chapter 94A) and
Compliance Certificate under Section 33(8) of the Sewerage and Drainage Act (Chapter 294)]

a) To indicate attachments and declarations, QPs can mark the checkboxes provided.

b) Compulsory fields are highlighted, as shown in Appendix 7 and Appendix 8. These must be
filled to enable successful submission of the forms in Corenet.

36
5.2 Select Fields – CSC Forms

Field Detail

Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments

This field can be found on Page 119 & 124

37
6.1 Guide to Water Submission Forms

PUBWTR-0-MCG01
PUBWTR-0-NMC01
PUBWTR-0-RCG01
PUBWTR-0-TSP01
PUBWTR-0-PPC01
PUBWTR-0-WLP01
PUBWTR-0-WSW01
PUBWTR-0-CSC01

Form for Manufacturing Category


Form for Non-Manufacturing Category
Form for Residential Category
Form for Temporary Category
Pre-Planning Consultation
Notification of Water Service Work by Licensed Water Service Plumber
Notification of Water Service Work by Professional Engineer
Certificate of Satisfactory Completion of Water Service Work by Professional Engineer

a) New fields are included to indicate water demand for PUB Water (Potable Water) and
NEWater in the following forms:
File Name Form Name
PUBWTR-0-PPC01 Pre-Planning Consultation
PUBWTR-0-WLP01 Notification of Water Service Work by Licensed
Water Service Plumber
PUBWTR-0-WSW01 Notification of Water Service Work by
Professional Engineer
PUBWTR-0-MCG01 Form for Manufacturing Category
PUBWTR-0-NMC01 Form for Non-Manufacturing Category
PUBWTR-0-RCG01 Form for Residential Category
PUBWTR-0-TSP01 Form for Temporary Category

b) New section is added to indicate the particulars of Licensed Water Service Plumber in the
following form:
File Name Form Name
PUBWTR-0-CSC01 Certificate of Satisfactory Completion of Water Service Work by
Professional Engineer

c) Compulsory fields are highlighted, as shown in Appendix 9 – 16. These must be filled to enable
successful submission of the forms in Corenet.

38
6.2 Select Fields – Water Submission Forms

Field Detail

Please select the most appropriate type of development for


your project.

This field can be found on Page 137, 143 and 147

Please select the most appropriate work nature of your project.

This field can be found on Page 143 and 147

39
Field Detail

Please select the most appropriate work nature of your project.

This field can be found on Page 140

40
Appendix
Appendix 1 ENV-CBPU-DCCLR-NEW SUBMISSION

APPLICATION FOR DEVELOPMENT CONTROL (DC)


CLEARANCE - NEW SUBMISSION
This form may take you 10 minutes to fill in. You will need the
following information to fill in the form:-
- Particulars of Project
- Particulars of Qualified Person

Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency
40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for the
works.

2. This form is to be accompanied by the relevant attachments.

3. Please read the DC checklist before filling the form.

Particulars of Project
Project Reference Number

Project Title

Location Description
[Include Lot/Plot, MK/TS,
Building Address, House
No and Road information]
Particulars of Application

Development Proposal Select


Application

File Ref No/ Dated


Case ID

SIP/DIP from CBPU


(if applicable)

41
ENV-CBPU-DCCLR-NEW SUBMISSION
Particulars of Qualified Person

Name Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Development Details

Type of Submission Select

Type of Development Select

Is there basement? Yes No

Is there sewer connection


Yes No
to neighbour house?

Is there public sewer in


Yes No
the development lot?

No.of storeys in Storeys

development

Total used water discharge L/s

Area of development ha

DR in the development? Yes No

Proposed MIN PLATFORM mRL


LEVEL
Max Adjacent Road mRL

Any linkage to MRT Yes No

Used Water Catchment No. Select


Drainage Catchment No. Select Please refer to www.pub.gov.sg for
catchment maps of used water and drainage.

42
ENV-CBPU-DCCLR-NEW SUBMISSION
Confirmation
Roof gutters (including rain water down pipes and outlets, and roof scupper
drains) are banned as an anti-mosquito breeding measure for all new
developments. Waiver in writing must be obtained from National Environment
Agency to erect roof gutters at the DC stage prior to BP submission
I confirm that :
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Dated:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A & A and reconstruction
building projects.
Attachments
Development Control Plan

Others, please specify

Add Delete

43
SUBMISSION FOR DEVELOPMENT CONTROL (DC)
CLEARANCE WITH DETAIL PLAN
Instruction:
1. This page of the form is applicable for minor projects.
2. First storey plan/site plan for section A1 and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant infromations have been indicated and provided
before submitting

Particulars of Owner(s)

Name Select

Address

Contact No

Email
(Tick if applicable)
SECTION A1: SANITARY, M&E WORK (Used Water)

Attachments

1. Site plan and first storey plan


(indicate the sewer setback, propose and existing sewer
connection, top/invert level of manhole(s), and platform levels,
propose and existing sanitary drainline.

2. Detailed sanitary plan (to show sanitary line)

3. Is there pumping system(s) for used water? Yes No


Declaration: Name Role Phone Email Firm Arch/PE
Reg No

By QP/PE: Select
I have carried out a
thorough investigation
of the existing
sewerage system within
and adjacent to the site
and will take every
practical measure to
ensure that the
proposed development
will not disrupt or affect
any existing
sewer/drain-line that
serves other properties/
premises.

by QP/PE: Select
I hereby certify that
these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
44
Drainage
Act (Chapter 294),
the Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and Sanitary
Works
by PE(M/E) if there is Select
pumping system(s)
I, being a Professional
Engineer hereby certify
that the propose
mechanical and
electrical(M&E) works
of the above
mentioned project are
design in accordance
with the current Code
of Practice on
Sewerage
and Sanitary Works,
Sewerage and
Drainage
Act (Chapter 294) and
other sewerage
requirements as
stipulated by Water
Reclamation (Network)
Department.
Attachments:

1. Detail plan drawings of used water pumping system(s)

2. Attached Form D2/QP if an alternate power source is not available

3. Design calculations

4. Pump and system curves

5. Relevant equipment catalogues

Please state if any deviation from


the COP
Pump Design Brand Model Estimated Pump Pump Solids Motor
Condition Inflow operating operating free Rating (kw)
(l/s) capacity (l/s) head (m) passage
Pump Application Size (mm)

Select

Add Delete

45
Particulars of Plumber/Contractor

Name Select

Firm Details

Contact No

Email

please indicate your PUB LP


membership/license
SPS registered
N.A.

Expected Date of Commencement

Expected Date of Completion


Tick if Applicable
SECTION A2: SEWERAGE WORK, RC Trench

Attachments:

1. Detail sewerage plan


To show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)

2. Design & calculation of RC trench (if applicable)

Declaration Name Role Phone Email Firm Arch/PE


Reg No

by PE (Civil): Select
I hereby certify that
the sewerage plans
and the works shown
therein comply with
the provisions of the
Sewerage and
Drainage
Act (Chapter 294), the
Sewerage and
Drainage
(Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.

Particulars of Plumber/Contractor
Tick if same as in Sanitary Work

Name Select

NRIC/Passport No.

Firm Details

Contact No

46
Email

please indicate your PUB LP


membership/license
SPS registered
N.A.

Expected Date of Commencement

Expected Date of Completion


Tick if applicable
SECTION B: DRAINAGE WORK

Attachment:

1. Site Plan and First Sty Plan

2. Basement Plans

3. Detail of Drainage Work

4. DC Checklist

5. Proposed plan showing crest levels, platform levels with and


without flood barriers at various entrance and exit points, and
flood barrier installed at all points of entry and exit for building
premises or for entire development

Declaration Name Role Phone Email Firm Arch/PE


Reg No

Select
I certify that the drainage
work are designed in full
compliance with PUB
requirements including
Sewerage and Drainage
Act (Chapter 294) and
current edition of COP on
Surface Water Drainage

Please state if any deviation from


the COP

Tick if applicable SECTION C: Infrastructure or other works affecting Sewer &


Drainage (eg. Covered link way, bus stop)

Attachment:

1. First storey plan, showing sewer setback, sewer alignment, diameter,


manhole & sewer ID.

2. Cross sectional plan

3. Sewer and drainage plan

4. Proposed plan showing crest levels, platform levels with and without
flood barriers at various entrance and exit points, and flood barrier
installed at all pints of entry and exit for building premises or for entire
development.

47
Declaration Name Role Phone Email Firm Arch/PE
Reg No

I hereby certify that these Select


plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on
Sewerage and Sanitary
Works.

48
DC SUBMISSION

SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN

1. This page of the form is applicable for major projects


2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant information have been indicated and provided
before submitting
4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the
DC clearance is obtained.

Particulars of Owner(s)
Name Select

Address

Contact No

Email

(Tick if applicable) SECTION A: SANITARY / SEWERAGE WORK

Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and
platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and
sewer identification number

2. Is there any sewerage pump system required? Yes No

Arch/PE
Declaration Name Role Contact Email Firm
Reg No

I hereby certify that Select


these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
Drainage Act
(Chapter 294), the
Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and
Sanitary Works.

I have carried out a Select


thorough investigation
of the existing
sewerage system
within the site
and will take every
practical measure to
ensure that the
proposed
development
will not disrupt or
affect any existing
sewer / drain-line that
serves other
properties / premises.

Please state if any

49
COP

50
DC SUBMISSION

(Tick if applicable) SECTION B: DRAINAGE WORK

Attachments:

1. Site Plan and First Sty Plan

2. Basement Plans

3. DC Checklist

4. Proposed plan showing crest levels, platform levels


with and without flood barriers at various entrance
and exit points, and flood barrier installed at all points
of entry and exit for building premises or for entire
development
Arch/PE
Declaration Name Role Contact Email Firm
Reg No

I certify that the Select


drainage work
are designed in
full compliance
with PUB
requirements
including
Sewerage and
Drainage Act
(Chapter 294)
and current
edition of COP
on Surface Water
Drainage

Please state if any


deviation from the
COP

51
PUB-DD-CHECKLIST

PUBLIC UTILITIES BOARD (PUB)


CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is equal to or
greater than 0.2 Ha*
(A) General

1. Date of Drainage Interpretation


Plan (DIP) issuance (Please indicate the date of DIP)

2. Site boundary lines are clearly Select


indicated on plan

3. Existing drains alignment, drain size, Select


drain type, summit point, flow direction
and discharge points of internal surface
drain system are clearly indicated on plan

4. All addition and alteration works Select


are highlighted

5. For JTC, HDB, URA developments, Select


the drainage masterplan of the
development site is attached together
with the submission.

6. There is provision of peak runoff control Select


measures within the development site.

Size of development site Ha

(a) Post-development Runoff Coefficient


(Please indicate value between 0 to 1)

(b) Type of measures to reduce


peak runoff

(i) Detention tanks: Volume


*For developments with detention tank systems, please also (Please indicate size
fill out section 6 (c) in the form* < width (m) x length (m) x
effective depth (m) >)

(ii) Retention/ sedimentation ponds Select

(iii) Green roofs Select

(iv) Planter boxes Select

(v) Porous pavements Select

(vi) ABC Waters Design Features


(to be endorsed by an ABC Waters
Professional - please fill out
Section 7 in the form)

Constructed Wetlands Select

52
Bioretention Swales/Basins Select

Rain Gardens Select

(vii) Others
(Please indicate if any)

(c) For developments with detention


tank systems

(i) Detention tank incorporates rainwater Select


harvesting feature

Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5 (Please indicate volume
of the latest edition of Code of Practice on Surface Water Drainage in cubic metre)
(Detention V)

Volume set aside for rainwater harvesting


storage (Rainwater Harvesting V) (Please indicate volume
in cubic metre)

Total volume of tank (Total V) 0


Total V = Detention V + Rainwater Harvesting V

(ii) Proposed drainage plan indicating Select


catchment and sub-catchment
boundaries, and the specific subcatchment
of each tank including the outlet discharge
point of the internal drainage system to the
public drain is attached with the submission.

(iii) Proposed site plan with runoff Select


coefficients and area of development
with varying characteristics of catchment/
sub-catchment clearly indicated.

(iv) Proposed site plan with features, and Select


catchment/sub-catchment of each feature,
to attenuate stormwater runoff to comply
with COP requirements clearly indicated.

(v) PE (Civil) -endorsed design calculations Select


or modelling results as per the design
calculations templates or equivalent, are
included in the submission. If there is any
pumped drainage system involved, the civil
and structural components shall be
endorsed by a PE (Civil) while the
mechanical and electrical components shall
be endorsed by a PE (Mechanical/Electrical).

(vi) Proposed site layout plans indicating Select


the location and footprint of the detention
tank(s), pumping facilities (if applicable),
the effective depth of the detention tank(s)
and the connection point to the internal
drainage system are attached in the
submission.

53
7. ABC Waters design features are incorporated
within the development. *If yes, please also respond
to 7(a), 7(b)*

(a) Names & Registration No. of ABC


Waters Professional (Please indicate name & registration
no. of ABC professional)

(b) Concept design and design calculations


(e.g. catchment area, treatment area and
detainment volume etc for the ABC Waters
design feature), endorsed by the ABC
Waters Professional are submitted to PUB.

(c ) Hydraulic calculation for the overflow


system, endorsed by ABC Waters
Professional (PE) are submitted to PUB.

8. If the proposed development site area


exceeds 0.4 ha, hydraulic calculations
for the proposed internal drainage facilities,
including sub-catchment plans for the
proposed development site endorsed by a
Professional Engineer (Civil) to be submitted
for PUB record.

9. There is upstream drainage connection


from the neighbouring lots into the
development site.

(B) DRAINAGE RESERVE

10. Drainage Reserve lines and lot boundaries


are indicated, dimensioned and highlighted.

11. All embankments and structures are set


outside the Drainage Reserve

12. Drainage Reserve are free from encumbrances

13. Design of embankment and structures


near a drain or Drainage Reserve (within 2m)
must not take into consideration the passive
resistance offered by the existing or
proposed drainage structures.
(Note clause 5.3 of the latest edition of
Code of Practice on Surface Water
Drainage). The structural and stability
calculations for an embankment or a structure
within 2 m from the edge of Drainage Reserve
shall be endorsed by a Professional Engineer
and submitted to the Board for record at
Detailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)

14. MPL of development mRL

15. All proposed/existing platform levels


are clearly indicated on plan

54
16. The proposed platform levels and
road/ground levels adjacent to the
internal drain outlet discharge point are
clearly indicated

17. For addition and alteration works


submission, the existing platform levels
are indicate

18. Linkages (direct/indirect) to special Select


underground facilities and basements,
if any, are indicated and complied with
the latest Code of Practice on Surface
Water Drainage

19. Flood barrier (as stipulated in Section 2.4 of


the latest Code of Practice on Surface *If Yes, please also respond
Water Drainage), if any, is incorporated into to 19(a)*
the development site.

(a) Proposed plans indicating the crest


levels and/or platform levels with and
without flood barrier at various entrance
and exit points are attached together
with the submission

For developments where flood barriers are automated and/or with more than 2
points of entry/exit, the following document shall be submitted at Detailed Planning
stage.
-- Details on the Standard Operating Procedure (SOP) including the operation and
maintenance of the flood barrier to be endorsed by Mechanical and/ or Electrical
QP or PE, and the developer/ building owner.
-- Details on the size, type and design of the flood barrier.

55
(D) PROPOSED DRAINAGE WORKS

20. Proposed/ existing drains and drains to be Select


deleted are clearly indicated using
different colour

21. Alignment, summit point, flow direction, type Select


& size and outlet discharge points of the
proposed internal surface drains are clearly
indicated.

22. Connection point to existing drain is indicated Select

23. Proposed internal surface drains are able to Select


discharge into roadside/ outlet drain as
shown on plan.

24. Sump size is indicated Select

25. Vertical grating at internal drain outlet Select


discharge point is provided

26. External drainage works (including culvert Select


details) to be submitted separately during
Detailed Planning stage. This shall be clearly
annotated on plan

(E) OPENING LEADING TO BASEMENT LEVEL

27. Crest level of access ways and openings Select


leading into the basement is indicated and
complied with the latest Code of Practice
on Surface Water Drainage

28. Proposed sizes and flow direction of cut off Select


drains are indicated

(F) COMMON DRAIN

29. Alignment, size and flow of existing Select


common drain within the development
lot are indicated.

30. If there is common drain within the Select


development site, the following shall be
endorsed on the plan:
"Surface runoff from the site and all
neighbouring lots shall continue to be
allowed to discharge through the common
drain within the site."

31. There is no permanent structure erected Select


above and over the common drain

32. If the proposal involves the reconstruction Select


of common drain, the proposed common
drain shall be at least 450mm wide as
stipulated in Section 4.5 of Code of
Practice on Surface Water Drainage or
56
any other sizes as directed by PUB

33. Details of the proposed common drain to Select


be submitted by Professional Engineer
(Civil) separately to PUB for approval
during Detailed Planning/ Building Plan
stage. This is to be annotated on the plan

34. The position of the existing/proposed Select


boundary wall/fence is clearly indicated

57
(G) PUMPED DRAINAGE SYSTEM

35. Pumped drainage system complies with the Select


latest Code of Practice on Surface Water
Drainage. Details of pumped drainage
system and design computations duly
endorsed by PE shall be submitted
separately to PUB for record during Detailed
Planning stage

36. Source catchment area with surface runoff Select


leading into the pumped drainage system is
clearly indicated

37. The location, size, inlet and outlet Select


connections of the rainwater pump sump
for the proposed pumped drainage system
are clearly indicated

(H) RETAINING WALL

38. If a retaining wall is erected to raise the Select


ground level of the development site above
adjacent premises, adequate internal
drainage system provided to effectively
intercept and drain away runoff including the
sub-soil flow from the development site

39. If a retaining wall is erected to lower the Select


ground level of the development site,
adequate internal drainage system provided
to effectively intercept and drain away
existing sub-soil and overland flows
discharging through the development site
from the adjacent premises

(I) DRAINAGE AFFECTING OTHER PREMISES

40. Minimum 600mm high solid boundary wall Select


around development site is erected to
prevent surface runoff from overflowing into
adjacent premises on lower ground

I hereby confirm that the above items have been complied with and endorsed on
the plans.
I hereby certify that the standard endorsement below will also be certified on the
plans:-
(a) The planning, design, construction activities and procedures for plan
submission shall comply fully with the requirements as stipulated in the
latest edition of the Code of Practice on Surface Water Drainage and the
Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge
all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas
outside the lot.
(d) There is no direct connection from the internal drains within the basement or

58
sub-basement to the external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of
information to the relevant professional bodies for action in accordance to the
Act/ethnics governing all the Qualified Professional.*

59
PUB-DD-CHECKLIST
PUBLIC UTILITIES BOARD (PUB)
CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is less than 0.2 Ha*
(A) General

1. Date of Drainage Interpretation Plan (DIP) issuance

2. Site boundary lines are clearly indicated on plan Select

3. Existing drains alignment, drain size, drain type, Select

summit point, flow direction and discharge


points of internal surface drain system are
clearly indicated on plan

4. All addition and alteration works are highlighted Select

5. For JTC, HDB, URA developments, the drainage Select

masterplan of the development site is attached


together with the submission.

6. ABC Waters design features are incorporated within Select

the development.
(a) Names & Registration No. of ABC Waters
Professional
(b) Concept design and design calculations, Select

endorsed by the ABC Waters Professional


are submitted to PUB.
(c ) Hydraulic calculation for the overflow Select

system, endorsed by ABC Waters


Professional (PE) are submitted to PUB.

7. If the proposed development site area exceeds Select

0.4 ha, hydraulic calculations for the proposed


internal drainage facilities, including
sub-catchment plans for the proposed development
site endorsed by a Professional Engineer (Civil) to
be submitted for PUB record.

8. There is upstream drainage connection from the Select

neighbouring lots into the development site.

60
PUB-DD-CHECKLIST
(B) DRAINAGE RESERVE

9. Drainage Reserve lines and lot boundaries Select

are indicated, dimensioned and highlighted.

10. All embankments and structures are set outside


the Drainage Reserve

11. Drainage Reserve are free from encumbrances

12. Design of embankment and structures near a drain


or Drainage Reserve (within 2m) must not take into
consideration the passive resistance offered by the
existing or proposed drainage structures. (Note
clause 5.3 of the latest edition of Code of Practice
on Surface Water Drainage). The structural and
stability calculations for an embankment or a
structure within 2 m from the edge of Drainage
Reserve shall be endorsed by a Professional
Engineer and submitted to the Board for record at
Detailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)

13. MPL of development mRL

14. All proposed/existing platform levels are clearly Select

indicated on plan

15. The proposed platform levels and road/ground Select

levels adjacent to the internal drain outlet


discharge point are clearly indicated

16. For addition and alteration works submission, the Select

existing platform levels are indicated

17. Linkages (direct/indirect) to special underground Select

facilities and basements, if any, are indicated and


complied with the latest Code of Practice on
Surface Water Drainage

18. Flood barrier (as stipulated in Section 2.4 of the Select

latest Code of Practice on Surface Water


Drainage), if any, is incorporated into the
development site.

(a) Proposed plans indicating the crest levels Select

and/or platform levels with and without


flood barrier at various entrance and exit
points are attached together with the
submission

For developments where flood barriers are automated and/or with more than 2 points of
entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.
-- Details on the standard operating procedure (SOP) including the proposed maintenance
plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person,
and the developer/owner.
-- Details on the size, type and design of the flood barrier.

(D) PROPOSED DRAINAGE WORKS

61
19. Proposed/ existing drains and drains to be deleted Select
are clearly indicated using different colour

20. Alignment, summit point, flow direction, type & size Select
and outlet discharge points of the proposed
internal surface drains are clearly indicated

21. Connection point to existing drain is indicated Select

22. Proposed internal surface drains are able to Select


discharge into roadside/ outlet drain as
shown on plan

23. Sump size is indicated Select

24. Vertical grating at internal drain outlet discharge Select


point is provided

25. External drainage works to be submitted separately Select


during Detailed Planning/ Building Plan stage. This
shall be clearly annotated on plan

(E) OPENING LEADING TO BASEMENT LEVEL


26. Crest level of access ways and openings leading Select
into the basement is indicated and complied with
the latest Code of Practice on Surface Water
Drainage

27. Proposed sizes and flow direction of cut off drains Select
are indicated

62
PUB-DD-CHECKLIST
(F) COMMON DRAIN
28. Alignment, size and flow of existing common drain Select
within the development lot are indicated

29. If there is common drain within the development Select


site, the following shall be endorsed on the plan:

“Surface runoff from the site and all


neighbouring lots shall continue to be
allowed to discharge through the
common drain within the site.”

30. There is no permanent structure erected above Select


and over the common drain

31. If the proposal involves the reconstruction of Select


common drain, the proposed common drain
shall be at least 450mm wide as stipulated in
Section 4.5 of Code of Practice on Surface Water
Drainage or any other sizes as directed by PUB

32. Details of the proposed common drain to be Select


submitted by Professional Engineer (Civil)
separately to PUB for approval during Detailed
Planning/ Building Plan stage. This is to be
annotated on the plan

33. The position of the existing/proposed boundary Select


wall / fence is clearly indicated

(G) PUMPED DRAINAGE SYSTEM


34. Pumped drainage system complies with the latest Select
Code of Practice on Surface Water Drainage.
Details of pumped drainage system and design
computations duly endorsed by PE shall be
submitted separately to PUB for record during
Detailed Planning / Building Plan stage

35. Source catchment area with surface runoff leading Select


into the pumped drainage system is clearly
indicated

36. The location, size, inlet and outlet connections of Select


the rainwater pump sump for the proposed
pumped drainage system are clearly indicated

(H) RETAINING WALL


37. If a retaining wall is erected to raise the ground Select
level of the development site above adjacent
premises, adequate internal drainage system
provided to effectively intercept and drain away
runoff including the sub-soil flow from the
development site

38. If a retaining wall is erected to lower the ground Select


level of the development site, adequate internal
drainage system provided to effectively intercept
and drain away existing sub-soil and overland flows
discharging through the development site from the
adjacent premises

(I) DRAINAGE AFFECTING OTHER PREMISES


39. Minimum 600mm high solid boundary wall around Select
development site is erected to prevent surface
runoff from overflowing into adjacent premises on
lower ground

I hereby confirm that the above items have been complied with and endorsed on the plans.

63
(a) The planning, design, construction activities and procedures for plan submission shall comply fully
with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the
development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained
away without causing flooding within the lot or in areas outside the lot.
(d) There is no direct connection from the internal drains within the basement or sub-basement to the
external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professional
bodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *

64
Appendix 2 ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

APPLICATION FOR DEVELOPMENT CONTROL (DC)


CLEARANCE - RESUBMISSION/AMENDMENT/REVISION
This form may take you 10 minutes to fill in. You will need the following information
to fill in the form:-
- Particulars of Project
- Particulars of Qualified Person

Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency
40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.

2. This form is to be accompanied by the relevant attachments.

3. Please read the DC checklist before filling the form.

Information
1. For enquiries on application of status, please call 67319681 / 67319513

Particulars of Project
Project Reference Number

New Project Title


(if original project title is
revised)

Location Description for


revised project title
above
[Include Lot/Plot, MK/TS,
Building Address, House
No and Road information]
Particulars of Application
Submission Type Select

File Ref No/ Dated


Case ID

Previous DC Advice from


CBPU (for resubmission
case)

Previous DC Clearance
from CBPU (for
amendment/revision)
65
CBPU Processing Officer
given in DC advice/
clearance

Remarks

Particulars of Qualified Person


Name Please Select

Role In Project

Registration No

66
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Particulars of Qualified Person (Continue)
Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Development Details

Type of Submission Select

Type of Development Select

Is there basement? Yes No

Is there sewer connection


Yes No
to neighbour house?

Is there public sewer in


Yes No
the development lot?

No.of storeys in Storeys


development

Total used water discharge L/s

Area of development ha

DR in the development? Yes No

Proposed MIN PLATFORM


mRL
LEVEL
Max Adjacent Road mRL
Any linkage to MRT Yes No

Used Water Catchment No. Select


Drainage Catchment No. Select Please refer to www.pub.gov.sg for
catchment maps of used water and drainage.

67
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Confirmation (Applicable for amendment/revised DC submission only)
Roof gutters (including rain water down pipes and outlets, and roof scupper
drains) are banned as an anti-mosquito breeding measure for all new
developments. Waiver in writing must be obtained from National Environment
Agency to erect roof gutters at the DC stage prior to BP submission
I confirm that :
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Dated:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A & A and reconstruction
building projects.

Attachments

Development Control Plan

Any change to previous PUB (C&W) checklist under same project


reference number? (If yes, please tick and enclose updated checklist)

Others, please specify

Add Delete

68
SUBMISSION FOR DEVELOPMENT CONTROL (DC)
CLEARANCE WITH DETAIL PLAN
Instruction:
1. This page of the form is applicable for minor projects.
2. First storey plan/site plan for section A1 and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant infromations have been indicated and provided
before submitting

Particulars of Owner(s)

Name Select

Address

Contact No

Email
(Tick if applicable)
SECTION A1: SANITARY, M&E WORK (Used Water)

Attachments:

1. Site plan and first storey plan


(indicate the sewer setback, propose and existing sewer
connection, top/invert level of manhole(s), and platform levels,
propose and existing sanitary drainline.

2. Detailed sanitary plan (to show sanitary line)

3. Is there pumping system(s) for used water? Yes No


Declaration: Name Role Phone Email Firm Arch/PE
Reg No

By QP/PE: Select
I have carried out a
thorough investigation
of the existing
sewerage system within
and adjacent to the site
and will take every
practical measure to
ensure that the
proposed development
will not disrupt or affect
any existing
sewer/drain-line that
serves other properties/
premises.

by QP/PE: Select
I hereby certify that
these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
69
Drainage
Act (Chapter 294),
the Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and Sanitary
Works
by PE(M/E) if there is Select
pumping system(s)
I, being a Professional
Engineer hereby certify
that the propose
mechanical and
electrical(M&E) works
of the above
mentioned project are
design in accordance
with the current Code
of Practice on
Sewerage
and Sanitary Works,
Sewerage and
Drainage
Act (Chapter 294) and
other sewerage
requirements as
stipulated by Water
Reclamation (Network)
Department.
Attachments:
1. Detail plan drawings of used water pumping system(s)

2. Attached Form D2/QP if an alternate power source is not available

3. Design calculations

4. Pump and system curves

5. Relevant equipment catalogues

Please state if any


deviation from the
COP

Pump Design Brand Model Estimated Pump Pump Solids Motor


Condition Inflow operating operating free Rating (kw)
(l/s) capacity (l/s) head (m) passage
Pump Application Size (mm)

Select

Add Delete

70
Particulars of Plumber/Contractor

Name Select

Firm Details

Contact No

Email

please indicate your PUB LP


membership/license
SPS registered
N.A.

Expected Date of Commencement

Expected Date of Completion


Tick if applicable
SECTION A2: SEWERAGE WORK, RC Trench

Attachment:

1. Detail sewerage plan


To show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)

2. Design & calculation of RC trench (if applicable)

Declaration Name Role Phone Email Firm Arch/PE


Reg No

by PE (Civil): Select
I hereby certify that
the sewerage plans
and the works shown
therein comply with
the provisions of the
Sewerage and
Drainage
Act (Chapter 294), the
Sewerage and
Drainage
(Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.

Particulars of Plumber/Contractor
Tick if same as in Sanitary Work

Name Select

NRIC/Passport No.

Firm Details

Contact No

71
Email

please indicate your PUB LP


membership/license
SPS registered
N.A.

Expected Date of Commencement

Expected Date of Completion


Tick if applicable
SECTION B: DRAINAGE WORK

Attachment:

1. Site Plan and First Sty Plan

2. Basement Plans

3. Detail of Drainage Work

4. DC Checklist

5. Proposed plan showing crest levels, platform levels with and


without flood barriers at various entrance and exit points, and
flood barrier installed at all points of entry and exit for building
premises or for entire development

Declaration Name Role Phone Email Firm Arch/PE


Reg No

Select
I certify that the drainage
work are designed in full
compliance with PUB
requirements including
Sewerage and Drainage
Act (Chapter 294) and
current edition of COP on
Surface Water Drainage

Please state if any deviation from


the COP

Tick if applicable SECTION C: Infrastructure or other works affecting Sewer &


Drainage (eg. Covered link way, bus stop)

Attachment:

1. First storey plan, showing sewer setback, sewer alignment, diameter,


manhole & sewer ID.

2. Cross sectional plan

3. Sewer and drainage plan

4. Proposed plan showing crest levels, platform levels with and without
flood barriers at various entrance and exit points, and flood barrier
installed at all pints of entry and exit for building premises or for entire
development.

72
Declaration Name Role Phone Email Firm Arch/PE
Reg No

I hereby certify that these Select


plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on
Sewerage and Sanitary
Works.

73
DC SUBMISSION

SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN

1. This page of the form is applicable for major projects


2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant information have been indicated and provided
before submitting
4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the
DC clearance is obtained.

Particulars of Owner(s)
Name Select

Address

Contact No

Email

(Tick if applicable) SECTION A: SANITARY / SEWERAGE WORK

Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and
platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and
sewer identification number

2. Is there any sewerage pump system required? Yes No

Arch/PE
Declaration Name Role Contact Email Firm
Reg No

I hereby certify that Select


these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
Drainage Act
(Chapter 294), the
Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and
Sanitary Works.

I have carried out a Select


thorough investigation
of the existing
sewerage system
within the site
and will take every
practical measure to
ensure that the
proposed
development
will not disrupt or
affect any existing
sewer / drain-line that
serves other
properties / premises.

Please state if any

75
COP

76
DC SUBMISSION

(Tick if applicable) SECTION B: DRAINAGE WORK

Attachments:

1. Site Plan and First Sty Plan

2. Basement Plans

3. DC Checklist

4. Proposed plan showing crest levels, platform levels


with and without flood barriers at various entrance
and exit points, and flood barrier installed at all points
of entry and exit for building premises or for entire
development
Arch/PE
Declaration Name Role Contact Email Firm
Reg No

I certify that the Select


drainage work
are designed in
full compliance
with PUB
requirements
including
Sewerage and
Drainage Act
(Chapter 294)
and current
edition of COP
on Surface Water
Drainage

Please state if any


deviation from the
COP

77
PUB-DD-CHECKLIST

PUBLIC UTILITIES BOARD (PUB)


CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is equal to or
greater than 0.2 Ha*
(A) General

1. Date of Drainage Interpretation


Plan (DIP) issuance (Please indicate the date of DIP)

2. Site boundary lines are clearly Select


indicated on plan

3. Existing drains alignment, drain size, Select


drain type, summit point, flow direction
and discharge points of internal surface
drain system are clearly indicated on plan

4. All addition and alteration works Select


are highlighted

5. For JTC, HDB, URA developments, Select


the drainage masterplan of the
development site is attached together
with the submission.

6. There is provision of peak runoff control Select


measures within the development site.

Size of development site Ha

(a) Post-development Runoff Coefficient


(Please indicate value between 0 to 1)

(b) Type of measures to reduce


peak runoff

(i) Detention tanks: Volume


*For developments with detention tank systems, please also (Please indicate size
fill out section 6 (c) in the form* < width (m) x length (m) x
effective depth (m) >)

(ii) Retention/ sedimentation ponds Select

(iii) Green roofs Select

(iv) Planter boxes Select

(v) Porous pavements Select

(vi) ABC Waters Design Features


(to be endorsed by an ABC Waters
Professional - please fill out
Section 7 in the form)

Constructed Wetlands Select

78
Bioretention Swales/Basins Select

Rain Gardens Select

(vii) Others
(Please indicate if any)

(c) For developments with detention


tank systems

(i) Detention tank incorporates rainwater Select


harvesting feature

Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5 (Please indicate volume
of the latest edition of Code of Practice on Surface Water Drainage in cubic metre)
(Detention V)

Volume set aside for rainwater harvesting


storage (Rainwater Harvesting V) (Please indicate volume
in cubic metre)

Total volume of tank (Total V) 0


Total V = Detention V + Rainwater Harvesting V

(ii) Proposed drainage plan indicating Select


catchment and sub-catchment
boundaries, and the specific subcatchment
of each tank including the outlet discharge
point of the internal drainage system to the
public drain is attached with the submission.

(iii) Proposed site plan with runoff Select


coefficients and area of development
with varying characteristics of catchment/
sub-catchment clearly indicated.

(iv) Proposed site plan with features, and Select


catchment/sub-catchment of each feature,
to attenuate stormwater runoff to comply
with COP requirements clearly indicated.

(v) PE (Civil) -endorsed design calculations Select


or modelling results as per the design
calculations templates or equivalent, are
included in the submission. If there is any
pumped drainage system involved, the civil
and structural components shall be
endorsed by a PE (Civil) while the
mechanical and electrical components shall
be endorsed by a PE (Mechanical/Electrical).

(vi) Proposed site layout plans indicating Select


the location and footprint of the detention
tank(s), pumping facilities (if applicable),
the effective depth of the detention tank(s)
and the connection point to the internal
drainage system are attached in the
submission.

79
7. ABC Waters design features are incorporated Select
within the development. *If yes, please also respond
to 7(a), 7(b)*

(a) Names & Registration No. of ABC


Waters Professional (Please indicate name & registration
no. of ABC professional)

(b) Concept design and design calculations


(e.g. catchment area, treatment area and
detainment volume etc for the ABC Waters
design feature), endorsed by the ABC
Waters Professional are submitted to PUB.

(c ) Hydraulic calculation for the overflow


system, endorsed by ABC Waters
Professional (PE) are submitted to PUB.

8. If the proposed development site area


exceeds 0.4 ha, hydraulic calculations
for the proposed internal drainage facilities,
including sub-catchment plans for the
proposed development site endorsed by a
Professional Engineer (Civil) to be submitted
for PUB record.

9. There is upstream drainage connection


from the neighbouring lots into the
development site.

(B) DRAINAGE RESERVE

10. Drainage Reserve lines and lot boundaries


are indicated, dimensioned and highlighted.

11. All embankments and structures are set


outside the Drainage Reserve

12. Drainage Reserve are free from encumbrances

13. Design of embankment and structures


near a drain or Drainage Reserve (within 2m)
must not take into consideration the passive
resistance offered by the existing or
proposed drainage structures.
(Note clause 5.3 of the latest edition of
Code of Practice on Surface Water
Drainage). The structural and stability
calculations for an embankment or a structure
within 2 m from the edge of Drainage Reserve
shall be endorsed by a Professional Engineer
and submitted to the Board for record at
Detailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)

14. MPL of development mRL

15. All proposed/existing platform levels Select


are clearly indicated on plan

80
16. The proposed platform levels and
road/ground levels adjacent to the
internal drain outlet discharge point are
clearly indicated

17. For addition and alteration works


submission, the existing platform levels
are indicate

18. Linkages (direct/indirect) to special Select


underground facilities and basements,
if any, are indicated and complied with
the latest Code of Practice on Surface
Water Drainage

19. Flood barrier (as stipulated in Section 2.4 of Select


the latest Code of Practice on Surface *If Yes, please also respond
Water Drainage), if any, is incorporated into to 19(a)*
the development site.

(a) Proposed plans indicating the crest Select


levels and/or platform levels with and
without flood barrier at various entrance
and exit points are attached together
with the submission

For developments where flood barriers are automated and/or with more than 2
points of entry/exit, the following document shall be submitted at Detailed Planning
stage.
-- Details on the Standard Operating Procedure (SOP) including the operation and
maintenance of the flood barrier to be endorsed by Mechanical and/ or Electrical
QP or PE, and the developer/ building owner.
-- Details on the size, type and design of the flood barrier.

81
(D) PROPOSED DRAINAGE WORKS

20. Proposed/ existing drains and drains to be Select


deleted are clearly indicated using
different colour

21. Alignment, summit point, flow direction, type Select


& size and outlet discharge points of the
proposed internal surface drains are clearly
indicated.

22. Connection point to existing drain is indicated Select

23. Proposed internal surface drains are able to


discharge into roadside/ outlet drain as
shown on plan.

24. Sump size is indicated Select

25. Vertical grating at internal drain outlet Select


discharge point is provided

26. External drainage works (including culvert Select


details) to be submitted separately during
Detailed Planning stage. This shall be clearly
annotated on plan

(E) OPENING LEADING TO BASEMENT LEVEL

27. Crest level of access ways and openings Select


leading into the basement is indicated and
complied with the latest Code of Practice
on Surface Water Drainage

28. Proposed sizes and flow direction of cut off Select


drains are indicated

(F) COMMON DRAIN

29. Alignment, size and flow of existing Select


common drain within the development
lot are indicated.

30. If there is common drain within the Select


development site, the following shall be
endorsed on the plan:
"Surface runoff from the site and all
neighbouring lots shall continue to be
allowed to discharge through the common
drain within the site."

31. There is no permanent structure erected Select


above and over the common drain

32. If the proposal involves the reconstruction Select


of common drain, the proposed common
drain shall be at least 450mm wide as
stipulated in Section 4.5 of Code of
Practice on Surface Water Drainage or
82
any other sizes as directed by PUB

33. Details of the proposed common drain to Select


be submitted by Professional Engineer
(Civil) separately to PUB for approval
during Detailed Planning/ Building Plan
stage. This is to be annotated on the plan

34. The position of the existing/proposed Select


boundary wall/fence is clearly indicated

83
(G) PUMPED DRAINAGE SYSTEM

35. Pumped drainage system complies with the Select


latest Code of Practice on Surface Water
Drainage. Details of pumped drainage
system and design computations duly
endorsed by PE shall be submitted
separately to PUB for record during Detailed
Planning stage

36. Source catchment area with surface runoff Select


leading into the pumped drainage system is
clearly indicated

37. The location, size, inlet and outlet Select


connections of the rainwater pump sump
for the proposed pumped drainage system
are clearly indicated

(H) RETAINING WALL

38. If a retaining wall is erected to raise the Select


ground level of the development site above
adjacent premises, adequate internal
drainage system provided to effectively
intercept and drain away runoff including the
sub-soil flow from the development site

39. If a retaining wall is erected to lower the Select


ground level of the development site,
adequate internal drainage system provided
to effectively intercept and drain away
existing sub-soil and overland flows
discharging through the development site
from the adjacent premises

(I) DRAINAGE AFFECTING OTHER PREMISES

40. Minimum 600mm high solid boundary wall Select


around development site is erected to
prevent surface runoff from overflowing into
adjacent premises on lower ground

I hereby confirm that the above items have been complied with and endorsed on
the plans.
I hereby certify that the standard endorsement below will also be certified on the
plans:-
(a) The planning, design, construction activities and procedures for plan
submission shall comply fully with the requirements as stipulated in the
latest edition of the Code of Practice on Surface Water Drainage and the
Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge
all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas
outside the lot.
(d) There is no direct connection from the internal drains within the basement or

84
sub-basement to the external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of
information to the relevant professional bodies for action in accordance to the
Act/ethnics governing all the Qualified Professional.*

85
PUB-DD-CHECKLIST
PUBLIC UTILITIES BOARD (PUB)
CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is less than 0.2 Ha*
(A) General

1. Date of Drainage Interpretation Plan (DIP) issuance

2. Site boundary lines are clearly indicated on plan Select

3. Existing drains alignment, drain size, drain type, Select

summit point, flow direction and discharge


points of internal surface drain system are
clearly indicated on plan

4. All addition and alteration works are highlighted Select

5. For JTC, HDB, URA developments, the drainage Select

masterplan of the development site is attached


together with the submission.

6. ABC Waters design features are incorporated within Select

the development.
(a) Names & Registration No. of ABC Waters
Professional
(b) Concept design and design calculations, Select

endorsed by the ABC Waters Professional


are submitted to PUB.
(c ) Hydraulic calculation for the overflow Select

system, endorsed by ABC Waters


Professional (PE) are submitted to PUB.

7. If the proposed development site area exceeds Select

0.4 ha, hydraulic calculations for the proposed


internal drainage facilities, including
sub-catchment plans for the proposed development
site endorsed by a Professional Engineer (Civil) to
be submitted for PUB record.

8. There is upstream drainage connection from the Select

neighbouring lots into the development site.

86
PUB-DD-CHECKLIST
(B) DRAINAGE RESERVE

9. Drainage Reserve lines and lot boundaries Select

are indicated, dimensioned and highlighted.

10. All embankments and structures are set outside Select

the Drainage Reserve

11. Drainage Reserve are free from encumbrances Select

12. Design of embankment and structures near a drain Select

or Drainage Reserve (within 2m) must not take into


consideration the passive resistance offered by the
existing or proposed drainage structures. (Note
clause 5.3 of the latest edition of Code of Practice
on Surface Water Drainage). The structural and
stability calculations for an embankment or a
structure within 2 m from the edge of Drainage
Reserve shall be endorsed by a Professional
Engineer and submitted to the Board for record at
Detailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)

13. MPL of development mRL

14. All proposed/existing platform levels are clearly Select

indicated on plan

15. The proposed platform levels and road/ground Select

levels adjacent to the internal drain outlet


discharge point are clearly indicated

16. For addition and alteration works submission, the Select

existing platform levels are indicated

17. Linkages (direct/indirect) to special underground Select

facilities and basements, if any, are indicated and


complied with the latest Code of Practice on
Surface Water Drainage

18. Flood barrier (as stipulated in Section 2.4 of the Select

latest Code of Practice on Surface Water


Drainage), if any, is incorporated into the
development site.

(a) Proposed plans indicating the crest levels Select

and/or platform levels with and without


flood barrier at various entrance and exit
points are attached together with the
submission

For developments where flood barriers are automated and/or with more than 2 points of
entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.
-- Details on the standard operating procedure (SOP) including the proposed maintenance
plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person,
and the developer/owner.
-- Details on the size, type and design of the flood barrier.

(D) PROPOSED DRAINAGE WORKS

87
19. Proposed/ existing drains and drains to be deleted Select
are clearly indicated using different colour

20. Alignment, summit point, flow direction, type & size Select
and outlet discharge points of the proposed
internal surface drains are clearly indicated

21. Connection point to existing drain is indicated Select

22. Proposed internal surface drains are able to Select


discharge into roadside/ outlet drain as
shown on plan

23. Sump size is indicated Select

24. Vertical grating at internal drain outlet discharge Select


point is provided

25. External drainage works to be submitted separately Select


during Detailed Planning/ Building Plan stage. This
shall be clearly annotated on plan

(E) OPENING LEADING TO BASEMENT LEVEL


26. Crest level of access ways and openings leading Select
into the basement is indicated and complied with
the latest Code of Practice on Surface Water
Drainage

27. Proposed sizes and flow direction of cut off drains Select
are indicated

88
PUB-DD-CHECKLIST
(F) COMMON DRAIN
28. Alignment, size and flow of existing common drain Select
within the development lot are indicated

29. If there is common drain within the development Select


site, the following shall be endorsed on the plan:

“Surface runoff from the site and all


neighbouring lots shall continue to be
allowed to discharge through the
common drain within the site.”

30. There is no permanent structure erected above Select


and over the common drain

31. If the proposal involves the reconstruction of Select


common drain, the proposed common drain
shall be at least 450mm wide as stipulated in
Section 4.5 of Code of Practice on Surface Water
Drainage or any other sizes as directed by PUB

32. Details of the proposed common drain to be Select


submitted by Professional Engineer (Civil)
separately to PUB for approval during Detailed
Planning/ Building Plan stage. This is to be
annotated on the plan

33. The position of the existing/proposed boundary Select


wall / fence is clearly indicated

(G) PUMPED DRAINAGE SYSTEM


34. Pumped drainage system complies with the latest Select
Code of Practice on Surface Water Drainage.
Details of pumped drainage system and design
computations duly endorsed by PE shall be
submitted separately to PUB for record during
Detailed Planning / Building Plan stage

35. Source catchment area with surface runoff leading Select


into the pumped drainage system is clearly
indicated

36. The location, size, inlet and outlet connections of Select


the rainwater pump sump for the proposed
pumped drainage system are clearly indicated

(H) RETAINING WALL


37. If a retaining wall is erected to raise the ground Select
level of the development site above adjacent
premises, adequate internal drainage system
provided to effectively intercept and drain away
runoff including the sub-soil flow from the
development site

38. If a retaining wall is erected to lower the ground Select


level of the development site, adequate internal
drainage system provided to effectively intercept
and drain away existing sub-soil and overland flows
discharging through the development site from the
adjacent premises

(I) DRAINAGE AFFECTING OTHER PREMISES


39. Minimum 600mm high solid boundary wall around Select
development site is erected to prevent surface
runoff from overflowing into adjacent premises on
lower ground

I hereby confirm that the above items have been complied with and endorsed on the plans.
I hereby certify that the standard endorsement below will also be certified on the plans:-
89
(a) The planning, design, construction activities and procedures for plan submission shall comply fully
with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the
development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained
away without causing flooding within the lot or in areas outside the lot.
(d) There is no direct connection from the internal drains within the basement or sub-basement to the
external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professional
bodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *

90
Appendix 3 PUB-BPU-CLRDP01

APPLICATION FOR CLEARANCE CERTIFICATE FOR


DETAILED PLAN ON DRAINAGE AND SEWERAGE
(SANITARY/SEWER) WORKS

[UNDER SECTION 33(1) OF THE SEWERAGE AND DRAINAGE


ACT (SDA), CHAPTER 294]
This form may take you 10 minutes to fill in. You will need the
following information to fill in the form:-
- Particulars of Project
- Particulars of Qualified Person

Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency
40, Scotts Road, #13-00
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.
2. This form is to be accompanied by the relevant attachments.
Information
1. For enquiries on application of status for :
a) Industrial development,please call 67319637
b) Non-industrial development,please call 67319628 / 67319653
Particulars of Project
Project Reference Number

Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]

Project Address

Plan Type Please Select 001

91
Particulars of Application

Application for Please Select


Clearance Certificate
for Detailed Plan on
Sewerage

Submission Type Please Select

Development Proposal Please Select


Application
File Ref. No. / Dated
NA
Case ID

SIP Reference Number


from CBPU (if applicable)

DC Clearance Reference
Number from CBPU
(if applicable)

Department File Reference


No (if applicable)

92
PUB-BPU-CLRDP01

(Tick if applicable) SECTION A1: SANITARY WORK

Attachments:
1. Detail Sanitary Plan
2. Detail of Holding Tank/STP/Retention tank (if applicable)
Arch / PE
Declaration Name Role Phone Email Firm
Reg. No

I hereby certify that these Select


plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act
(Chapter 294), the Sewerage
and Drainage (Sanitary
Works) Regulations and the
current Code of Practice
on the Sewerage
and Sanitary Works.

Please state if any deviance


from the COP

Particulars of Plumber/Contractor
Name Please select

Firm Details

Contact No

Email

Please indicate your SPS registered


Registration / License
Number PUB LP

N.A
Date of Commencement Date of Completion

3. Details of M&E Works (Used Water) Yes No


Arch / PE
Declaration Name Role Phone Email Firm
Reg. No

I, being a Professional Select


Engineer hereby certify
that the proposed
mechanical and electrical
(M&E) works of the above
mentioned project are in
accordance with the current
Code of Practice on
Sewerage and Sanitary
Works, Sewerage and
Drainage Act (Chapter 294)
and other sewerage
requirements as stipulated
by Water Reclamation
(Network) Department and
have been fully and
accurately reflected in the
submitted detail plan
drawings.

Attachments
93
1. Detail plan drawings of used water pumping system(s)

2. Attached Form D2/QP if an alternate power source is not available

3. Design calculations

4. Pump and system curves

5. Relevant equipment catalogues

Please state if any


deviation from the
COP

Pump Design Brand Model Estimated Pump Pump Solids Motor


Condition Inflow operating operating free Rating (kw)
(l/s) capacity (l/s) head (m) passage
Pump Application Size (mm)

Select

Add Delete

94
PUB-BPU-CLRDP01
(Tick if applicable) SECTION A2: SEWERAGE WORK, RC Trench
Attachments:
1. Detail Sewerage Plan (to indicate: diameter, pipe material, gradient, manhole detail, and
longitudinal section)

2. Design & Calculation of RC Trench (if structure is proposed over sewer). PE to endorse in drawing
Arch / PE
Declaration Name Role Contact Email Firm
Reg. No

by PE (Civil): Select
I hereby certify that the
sewerage plans and the
works shown therein
comply with the provisions
of the Sewerage and
Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.

I also declare that I have


carried out a thorough
investigation of the
existing sewerage system
within the site and will
take every practical
measure to ensure that
the proposed development
will not disrupt or affect any
existing sewer/drain-line
that serves other
properties/premises.

Please state if any


deviation from the COP

Date of Commencement Date of Completion

Particulars of Plumber/Contractor
Name Please select

Firm Details

Contact No

Email

Please indicate your SPS registered


Registration / License
Number PUB LP

N.A

95
PUB-BPU-CLRDP01

(Tick if applicable) SECTION B: DRAINAGE WORK


Please tick if this submission pertains to:
Internal drainage works

External drainage works (entrance culvert/ roadside drain)

Attachments:
1. Detail Plan on Drainage Works as required under Section 33(3) and 33(4) of the SDA, Chapter 294

2. As built drawings for drainage works and piling records

3. Leak Test Certificates on installed flood barriers

4. As built survey plans for detention tank system


Arch / PE
Declaration Name Role Contact Email Firm
Reg. No

I hereby certify that the Select


drainage work shown
on the detailed plans
have been designed in
accordance with the
provisions of the SDA,
Chapter 294, Sewerage
and Drainage (Surface
Water Drainage)
Regulations, current Code
of Practice on Surface
Water Drainage and the
drainage requirements
stipulated during planning
stage (if applicable) except
for those provisions where
waivers have been obtained
from the Public Utilities
Board in writing.

Please state if any


deviation from the COP

96
Appendix 4 PUB-BPU-COMPOFWORK

CERTIFICATE OF COMPLETION AND INSPECTION OF


SANITARY, SEWERAGE AND DRAINAGE WORKS

[UNDER SECTION 35(1)(e) AND (f) OF THE SEWERAGE AND


DRAINAGE ACT (CHAPTER 294)]
Date: 28/08/2012
To: PUB

Building Plan Unit


PUB
40 Scotts Road #15-01
Environment Building
Singapore 228231

Instructions

1. The form shall be digitally signed by the appropriate QP/PE


2. The form is to be submitted by the QP/PE appointed under
section 8,9 & 11 of Building Control Act.
Particulars of Project

Project Ref No

Project Title

MK-LOT( ie, MK03-12345)

Project Address

Please Select Your Completion of Sewerage Work only


Application:
Application for PUB Clearance for Temporary
Occupation Permit (TOP)
Application for PUB Clearance for
Certificate of Statutory Completion (CSC)
Application for PUB Clearance for both
Temporary Occupation Permit (TOP) &
Certificate of Statutory Completion (CSC)
(this option is applicable if
the QP could confirm that there is no
outstanding matters related to PUB (sewerage
and drainage)

97
SECTION A1: SEWERAGE WORK
Attachments
1. Site plan and first storey plan

2. As built sewerage plan


To Show:
2.1 Length, diameter, gradient, material of the sewer pipe, top & invert level
of the manhole
2.2 Position of manholes shall follow SVY21 coordinate cadastral base
established by SLA

3. CCTV for the newly constructed sewer (applicable for sewer with
diameter 600mm or larger) to be sent to: 82 Toh Guan Road East
#C2-14, Singapore 608575

4 As built pumping installation plan (if applicable)

5 Others (Eg: Sewage Treatment Plant (STP), holding tank)

Declaration (PE Civil)

PE Name Select

PE Reg no

Role

Ph No

Email

Firm

Declaration (PE Mech.)

PE Name Select

PE Reg no

Role

Ph No

Email

Firm

Declaration (PE Elec. )

PE Name Select

PE Reg no

Role

Ph No

Email

Firm

98
I/We, the above name, hereby certify that to the best of my knowledge and
belief, the works were carried out in accordance with the above building
plans and detailed plans, the current Code of Practice on Sewerage and
Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the
Sewerage and Drainage (Sanitary Works) Regulations and any other
conditions under which the plans and amendments thereto were approved
by PUB.

I certify that the hydrostatic test has been conducted for


sewers and manholes and the test results have met the requirements
stipulated in Code of Practice on Sewerage and Sanitary Works.

I confirm that I have received the below plumber/ contractor


has executed the sewerage works in accordance with the plans as
supplied by the QP/PE and in accordance with the current Code
of Practice on Sewerage and Sanitary Works.

Plumber's/Contractor's name Select

NRIC No. or Passport No.

Firm Name

Email address

Registration/license type SPS registered


PUB LP
NA

99
Tick if applicable Application for PUB Clearance for TOP
SECTION A2: SANITARY WORK
Attachments:

1. As built sanitary plan (to be endorsed by QP)

2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,
Singapore 228231, PUB Water Reclamation (Network) Department

3. As built plans for used-water pumping system(s)

Declaration Name Role Phone Email Firm Arch/PE


Reg No
I hereby certify that to the best Select
of my knowledge and belief,
the works were carried out in
accordance with the above
building plans and detailed
plans, the current Code of
Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and the Sewerage and
Drainage (Sanitary Works)
Regulations and any other
conditions under which the
plans and amendments
thereto were approved.

I have checked and certified Select


that there is no change in the
condition of the existing
sewer(s) and manhole(s)
between the pre and post
constrcution CCTV inspection
report.

I confirm that I have received Select


the plumber's confirmation
that the below plumber/
contractor has executed the
sanitary plumbing works in
accordance with the plans
as supplied by the QP and in
accordance with the current
Code of Practice on
Sewerage and Sanitary
Works

I, being a Professional Select


Engineer (M/E) hereby certify
that to the best of my
knowledge and belief,
the completed mechanical
and electrical (M&E) works
of the above mentioned
project are in accordance
100
with the current Code of
Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and other sewerage
requirements as stipulated
by Water Reclamation
(Network) Department and
have been fully and
accurately reflected in the
submitted "As built" plans.

I also confirm that the installed


M&E equipment are safe for
operation

Plumber's/Contractor's name Select

NRIC No. or Passport No.

Firm Name

Email address

Registration/license type SPS registered


PUB LP
NA

3. Declaration of Chargeable Sanitary Appliances Installed.


There is Select to the original number of chargeable sanitary appliances in the premises

4. Details of Chargeable Sanitary Appliances

4a. Type of Submission For "New Erections", the existing buildings are unaffected. Select

Attachments:

4b. The allotment of address from the comptroller of property tax

4c. Floor layout plan showing the location of the appliances

4d. SP Services' Ltd Utilities Bill

The number of chargeable sanitary appliances in the premises upon completion of this project are
as follows:

House No. or Unit Previous quantites of chargeable Quantities of chargeable sanitary


No. (Eg. #01-01) sanitary appliances at the affected appliances after completion of
area before commencement of project project
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink

Add Delete (Add or Delete row for house no. or unit no.)

#Common Area Previous quantites of chargeable Quantities of chargeable sanitary


sanitary appliances before appliances after commencement of
commencement of project project
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink
101
If Applicable SECTION A3: RC TRENCH COMPLETION
(RC TRENCH shall not be backfilled before inspection)

Declaration Name Role Phone Email Firm Arch/PE


Reg No

I herby certify that the Select


RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the
trench.
I herby certify that the
RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the trench.

I or my authorised
representative (with
letter of authorisation to
be provided) will be
present during PUB
(WRN)'s inspection.
After the inspection I will
submit the photographs
of the RC trench.

[Note: The photographs


taken in sequence
showing the process of
constructing, backfilling
and covering up the RC
trench shall show clearly,
among other things, the
width, depth, base of the
trench, the fill materials
and the condition of the
sewer pipe. Adequate
number of photographs
taken to capture all
details above and
pasted on A4 papers
and clearly labelled.]

Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench
and position of the existing sewer.

If Applicable

102
SECTION B: DRAINAGE WORK

External drainage work has not yet completed

Site Area: ha

Attachment:

1. As constructed drainage plan


(to show as built platform level, crest level and flood
protection levels)

2. Internal drainage Hydraulic calculations submissions


(for developments more than 0.4 Ha)

Declaration Name Role Phone Email Firm Arch/PE


Reg No
I certify that the drainage Select
work are designed in full
compliance with PUB
requirement including
Sewerage and Drainage
(Chapter 294) Act
and COP on Surface Water
Drainage

Tick if applicable SECTION C: Infrastructure works affecting Sewer & Drainage


(eg. Covered link way, bus stop)
Declaration by PE(Civil)

Name Select

PE Reg No

Role

Ph No

Email

Firm

Declaration
I hereby certify that the work has been completed in compliance with the approved drawing,
Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.

Attachment:

1. Post Construction CCTV to the public sewer (when required in DC Clearance).


Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,
PUB Water Reclamation (Network) Department

2. As constructed drawing showing the sewer setback

3. As built topographical survey plan

103
Section D: Application for PUB Clearance for CSC

Attachments:

1. As constructed drainage plan (to show as built platform level, crest level
and flood protection levels)

2. Post rectification CCTV to the public sewer or drainline


(when required). To be sent to: 40 Scotts Rd #15-01, Singapore
228231, PUB Water Reclamation (Network) Department

3. As built topographical survey plan

Declaration Name Role Phone Email Firm Arch/PE


Reg No
by PE (Civil):
I certify that the drainage work Select
are designed in full compliance
with PUB requirement including
Sewerage and Drainage Act
(Chapter 294) and COP on
Surface Water Drainage.

I am requesting for PUB Select


Clearance for CSC and
confirms there is no further
outstanding work.

104
Tick if applicable Application for PUB Clearance for TOP
SECTION A2: SANITARY WORK
Attachments:

1. As built sanitary plan (to be endorsed by QP)

2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,
Singapore 228231, PUB Water Reclamation (Network) Department

3. As built plans for used-water pumping system(s)

Declaration Name Role Phone Email Firm Arch/PE


Reg No
I hereby certify that to the best Select
of my knowledge and belief,
the works were carried out in
accordance with the above
building plans and detailed
plans, the current Code of
Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and the Sewerage and
Drainage (Sanitary Works)
Regulations and any other
conditions under which the
plans and amendments
thereto were approved.

I have checked and certified Select


that there is no change in the
condition of the existing
sewer(s) and manhole(s)
between the pre and post
constrcution CCTV inspection
report.

I confirm that I have received Select


the plumber's confirmation
that the below plumber/
contractor has executed the
sanitary plumbing works in
accordance with the plans
as supplied by the QP and in
accordance with the current
Code of Practice on
Sewerage and Sanitary
Works

by PE (M/E) Select
I, being a Professional
Engineer hereby certify
that to the best of my
knowledge and belief,
the completed mechanical
and electrical (M&E) works
of the above mentioned
105
project are in accordance
with the current Code of
Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and other sewerage
requirements as stipulated
by Water Reclamation
(Network) Department and
have been fully and
accurately reflected in the
submitted "As built" plans.

I also confirm that the installed


M&E equipment are safe for
operation

Plumber's/Contractor's name Select

NRIC No. or Passport No.

Firm Name

Email address

Registration/license type SPS registered


PUB LP
NA

3. Declaration of Chargeable Sanitary Appliances Installed.


There is Select to the original number of chargeable sanitary appliances in the premises

4. Details of Chargeable Sanitary Appliances

4a. Type of Submission For "New Erections", the existing buildings are unaffected Select

Attachments:

4b. The allotment of address from the comptroller of property tax

4c. Floor layout plan showing the location of the appliances

4d. SP Services' Ltd Utilities Bill

The number of chargeable sanitary appliances in the premises upon completion of this project are
as follows:

House No. or Unit Previous quantites of chargeable Quantities of chargeable sanitary


No. (Eg. #01-01) sanitary appliances at the affected appliances after completion of
area before commencement of project project
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink

Add Delete (Add or Delete row for house no. or unit no.)

#Common Area Previous quantites of chargeable Quantities of chargeable sanitary


sanitary appliances before appliances after commencement of
commencement of project project

106
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink

If Applicable SECTION A3: RC TRENCH COMPLETION


(RC TRENCH shall not be backfilled before inspection)

Declaration Name Role Phone Email Firm Arch/PE


Reg No

I herby certify that the Select


RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the
trench.
I herby certify that the
RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the trench.

I or my authorised
representative (with
letter of authorisation to
be provided) will be
present during PUB
(WRN)'s inspection.
After the inspection I will
submit the photographs
of the RC trench.

[Note: The photographs


taken in sequence
showing the process of
constructing, backfilling
and covering up the RC
trench shall show clearly,
among other things, the
width, depth, base of the
trench, the fill materials
and the condition of the
sewer pipe. Adequate
number of photographs
taken to capture all
details above and
pasted on A4 papers
and clearly labelled.]

Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench
and position of the existing sewer.

107
If Applicable
SECTION B: DRAINAGE WORK

External drainage work has not yet completed

Site Area: ha

Attachment:

1. As constructed drainage plan


(to show as built platform level, crest level and flood
protection levels)

2. Internal drainage Hydraulic calculations submissions


(for developments more than 0.4 Ha)

Declaration Name Role Phone Email Firm Arch/PE


Reg No
I certify that the drainage Select
work are designed in full
compliance with PUB
requirement including
Sewerage and Drainage
(Chapter 294) Act
and COP on Surface Water
Drainage

Tick if applicable SECTION C: Infrastructure works affecting Sewer & Drainage


(eg. Covered link way, bus stop)
Declaration by PE(Civil)

Name Select

PE Reg No

Role

Ph No

Email

Firm

Declaration
I hereby certify that the work has been completed in compliance with the approved drawing,
Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.

Attachment:

1. Post Construction CCTV to the public sewer (when required in DC Clearance).


Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,
PUB Water Reclamation (Network) Department

2. As constructed drawing showing the sewer setback

3. As built topographical survey plan

108
Section D: Application for PUB Clearance for CSC

Attachments:

1. As constructed drainage plan (to show as built platform level, crest level
and flood protection levels)

2. Post rectification CCTV to the public sewer or drainline


(when required). To be sent to: 40 Scotts Rd #15-01, Singapore
228231, PUB Water Reclamation (Network) Department

3. As built topographical survey plan

Declaration Name Role Phone Email Firm Arch/PE


Reg No
by PE (Civil):
I certify that the drainage work Select
are designed in full compliance
with PUB requirement including
Sewerage and Drainage Act
(Chapter 294) and COP on
Surface Water Drainage.

I am requesting for PUB Select


Clearance for CSC and
confirms there is no further
outstanding work.

109
Appendix 5 ENV-CBPU-CLRTOP01-NEW SUBMISSION
APPLICATION FOR CLEARANCE OF TEMPORARY
OCCUPATION PERMIT (TOP) - NEW SUBMISSION
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:-
- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.

Date: 19/03/2014
To: Central Building Plan Unit

National Environment Agency


40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).

2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard :
Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project

Project Reference Number

Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]

Plan Type Please Select 001

Add Delete

Particulars of Application
Development Proposal Please Select
Application

110
Date of CBPU
19/03/2014
DC Clearance

Application for Temporary Pollution Control Works


Occupation Permit
Sewerage Works
Drainage Works (for crest levels , platform
levels, flood protection levels based on
approved flood protection measures)
Environmental Health (Sanitary Facilities)

Remarks:
Application for
Partial TOP (if applicable)
File Ref. No. /
NA Dated
Case ID
Clearance Certificate for
Building Plan on Pollution
Control; for Industrial
Plant Works (if applicable)

Clearance Certificate for


Building Plan on
Environmental Health
(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (Sanitary Works)
(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (Sewer
Works)(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (M&E Works)
(if applicable)

Clearance Certificate for


Detailed Plan on
Drainage Works

Plan Submission for the


location of Mechanical
Equipment and its noise
abatement measures to
be incorporated at the
development premises

111
Particulars of Qualified Person
Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Declaration by Qualified Person


I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the


Building Control Act (Cap. 29) in respect of the works described which
include Pollution Control, Environmental Health (Sanitary Facilities)
Sewerage Works and Drainage Works (platform and crest protection levels
only); and my qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in


this form are correct;

The works have been carried out and completed.

The crest levels, platform levels, flood protection levels are in compliance
with COP on Surface Water Drainage and constructed according to
approved plans.

The maximum stormwater discharge from the development is in


compliance with the maximum allowable peak runoff stipulated in the
COP and constructed according to approved plans.

I have liaised with the Developer/ Owner to ensure that a


Maintenance/Managing Agent has been established to undertake the SOP
of the maintenance, operation and monitoring of the detention tank system.

If there are deviations from any of the above, please indicate in detail,
attachments and PUB approval if applicable

Development with Public Toilet


I have inspected the public toilets in this development and that they have
112
been completed in accordance with the provision of sanitary facilities
stipulated in the Code of Practice on Environmental Health, except for
those provisions where waivers have been obtainted from the National
Environment Agency

Development has no public toilet

Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for Sewerage


Works (PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for the


Mechanical and Electrical Works for
Sewerage Installation (PUB-BPU-COMPOFWORK)

Certificate of Inspection for Drainage Works

As built survey plans indicating crest levels, platform


levels, flood protection levels based on approved
flood protection measures

As built drawings for detention tank systems and final


design calculations, and factory test report for its
pumping system.

Standard Operating Procedure for pumped drainage


system(basement/ detention tank)

Standard Operating Procedure for flood barrier

Developer/Owner declaration on the following -


I shall inspect and declare that the crest levels are
constructed to approved plans annually/every 3
years upon obtaining the TOP

Developer/Owner declaration on the following -


I shall submit the following documents as required annually
upon obtaining the TOP.
- Certificate of inspection on flood barriers on site, including
leak test certificate.
- Amendments to SOP for flood barrier.
- Certificate of inspection on pumped drainage system
(basement/detention tank).
- Certificate of inspection on ABC Waters design features.

113
Appendix 6 ENV-CBPU-CLRTOP01-RESUBMISSION
APPLICATION FOR CLEARANCE OF TEMPORARY
OCCUPATION PERMIT (TOP) - RESUBMISSION
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:-
- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.

Date: 19/03/2014
To: Central Building Plan Unit

National Environment Agency


40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).

2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard :
Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project

Project Reference Number

Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]

Plan Type Please Select 001

Add Delete

Particulars of Application
Development Proposal Please Select
Application

114
Date of CBPU
19/03/2014
DC Clearance

Application for Temporary Pollution Control Works


Occupation Permit
Sewerage Works
Drainage Works (for crest levels ,
platform levels, flood protection levels
based on approved flood protection
measures)
Environmental Health (Sanitary Facilities)

Remarks:
Application for
Partial TOP (if applicable)

Previous TOP Advice from


CBPU (if applicable)

CBPU Processing Officer

File Ref. No. /


NA Dated
Case ID
Clearance Certificate for
Building Plan on Pollution
Control; for Industrial
Plant Works (if applicable)

Clearance Certificate for


Building Plan on
Environmental Health
(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (Sanitary Works)
(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (Sewer
Works)(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (M&E Works)
(if applicable)

Clearance Certificate for


Detailed Plan on
Drainage Works (if
applicable)

Plan Submission for the


location of Mechanical
Equipment and its noise
abatement measures to
be incorporated at the
115
development premises

116
Particulars of Qualified Person
Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Declaration by Qualified Person


I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the


Building Control Act (Cap. 29) in respect of the works described which
include Pollution Control, Environmental Health (Sanitary Facilities)
Sewerage Works and Drainage Works (platform and crest protection levels
only); and my qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in


this form are correct;

The works have been carried out and completed.

The crest levels, platform levels, flood protection levels are in compliance
with COP on Surface Water Drainage and constructed according to
approved plans.

The maximum stormwater discharge from the development is in compliance


with the maximum allowable peak runoff stipulated in the COP and
constructed according to approved plans.

I have liaised with the Developer/ Owner to ensure that a


Maintenance/Managing Agent has been established to undertake
the SOP of the maintenance, operation and monitoring of the
detention tank system.

If there are deviations from any of the above, please


indicate in detail, attachments and PUB approval if
applicable.

117
Development with Public Toilet
I have inspected the public toilets in this development and that they have
been completed in accordance with the provision of sanitary facilities
stipulated in the Code of Practice on Environmental Health, except for
those provisions where waivers have been obtainted from the National
Environment Agency

Development has no public toilet

Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for Sewerage


Works (PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for the


Mechanical and Electrical Works for
Sewerage Installation (PUB-BPU-COMPOFWORK)

Certificate of Inspection for Drainage Works

As built survey plans indicating crest levels, platform levels,


flood protection levels based on approved flood protection
measures

As built drawings for detention tank systems and final


design calculations, and factory test report for its
pumping system.

Standard Operating Procedure for pumped drainage


system (basement/ detention tank)

Standard Operating Procedure for flood barrier

Developer/Owner declaration on the following - I shall


inspect and declare that the crest levels are constructed
to approved plans annually/every 3 years upon obtaining
the TOP

Developer/Owner declaration on the following -


I shall submit the following documents as required annually
upon obtaining the TOP.
- Certificate of inspection on flood barriers on site, including
leak test certificate.
- Amendments to SOP for flood barrier.
- Certificate of inspection on pumped drainage system
(basement/detention tank).
- Certificate of inspection on ABC Waters design features.

118
Appendix 7 ENV-CBPU-CLRCSC01-NEW SUBMISSION

APPLICATION FOR COMPLIANCE CERTIFICATE -


NEW SUBMISSION
[UNDER SECTION 33(7) OF THE ENVIRONMENTAL
PROTECTION AND MANAGEMENT ACT (CHAPTER 94A)
AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)
OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:-
- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.

Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency
40, Scotts Road #13-00
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).

2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number

Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]

Plan Type Please Select 001

Add Delete
Particulars of Application
Development Proposal Please Select
119
Application

Date of CBPU
DC Clearance

Application for Compliance Environmental Health Works


Certificate and Clearance
Pollution Control Works
for Certificate of Statutory
Completion Sewerage Works
Drainage Works

File Ref. No. /


NA Dated
Case ID

Clearance Certificate for


Building Plan on Pollution
Control for Industrial Plant
Works (if applicable)

Clearance Certificate for


Building Plan on
Environmental Health
(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (Sanitary
Works) (if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (if applicable)

120
Particulars of Application (Continue)

NA File Ref. No. / Dated

Clearance Certificate for


Detailed Plan on
Sewerage (M&E Works)
(if applicable)

Clearance Certificate for


Detailed Plan on
Drainage Works
(if applicable)
Particulars of Qualified Person
Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address
Declaration by Qualified Person
I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the


Building Control Act (Cap. 29) in respect of the works described which
include
Environmental Health Works,
Pollution Control Works,
Sewerage Works,
Drainage Works; and my
qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in


this form are correct;

The works have been carried out and completed. For industrial plant works,
all related pollution control equipment and facilities have been installed/
completed according to the approved plans as listed in Particulars of Project
and Application
121
Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstruction
building projects.
Attachments
Dated
1. Certificate of Completion and Inspection for Building
Plan for Environmental Health

2. Certificate of Completion and Inspection for Sanitary


Works (PUB-BPU-COMPOFWORK)

3. Certificate of Completion and Inspection for Sewerage


Works (PUB-BPU-COMPOFWORK)

4. Certificate of Completion and Inspection for the


Mechanical and Electrical Works
for Sewerage Installation (PUB-BPU-COMPOFWORK)

5. Certificate of Inspection for Drainage Works

122
Attachments (Continue)

6. As Constructed drainage drawings in accordance to COP for


Surface Water Drainage Appendix 5

7. As-built survey plans indicating crest levels, platform levels


and flood protection levels in accordance to COP for
Surface Water Drainage Appendix 2

123
Appendix 8 ENV-CBPU-CLRCSC01-RESUBMISSION

APPLICATION FOR COMPLIANCE CERTIFICATE -


RESUBMISSION
[UNDER SECTION 33(7) OF THE ENVIRONMENTAL
PROTECTION AND MANAGEMENT ACT (CHAPTER 94A)
AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)
OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:-
- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.

Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency
40, Scotts Road #13-00
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).

2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number

Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]

Plan Type Please Select 001

Add Delete
Particulars of Application
Development Proposal Please Select
124
Application

Date of CBPU
DC Clearance

Application for Compliance Environmental Health Works


Certificate and Clearance
Pollution Control Works
for Certificate of Statutory
Completion Sewerage Works
Drainage Works

Previous CSC Advice from


CBPU (if applicable)

CBPU Processing Officer

File Ref. No. /


NA Dated
Case ID

Clearance Certificate for


Building Plan on Pollution
Control for Industrial Plant
Works (if applicable)

Clearance Certificate for


Building Plan on
Environmental Health
(if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (Sanitary
Works) (if applicable)

Clearance Certificate for


Detailed Plan on
Sewerage (if applicable)

125
Particulars of Application (Continue)

NA File Ref. No. / Dated

Clearance Certificate for


Detailed Plan on
Sewerage (M&E Works)
(if applicable)

Clearance Certificate for


Detailed Plan on
Drainage Works
(if applicable)
Particulars of Qualified Person
Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address
Declaration by Qualified Person
I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the


Building Control Act (Cap. 29) in respect of the works described which
include
Environmental Health Works,
Pollution Control Works,
Sewerage Works,
Drainage Works; and my
qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in


this form are correct;

The works have been carried out and completed. For industrial plant works,
all related pollution control equipment and facilities have been installed/
completed according to the approved plans as listed in Particulars of Project
and Application
126
Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstruction
building projects.
Attachments
Dated
1. Certificate of Completion and Inspection for Building
Plan for Environmental Health

2. Certificate of Completion and Inspection for Sanitary


Works (PUB-BPU-COMPOFWORK)

3. Certificate of Completion and Inspection for Sewerage


Works (PUB-BPU-COMPOFWORK)

4. Certificate of Completion and Inspection for the


Mechanical and Electrical Works
for Sewerage Installation (PUB-BPU-COMPOFWORK)

5. Certificate of Inspection for Drainage Works

127
Attachments (Continue)

6. As- Constructed drainage drawings in accordance to COP for


Surface Water Drainage Appendix 5

7. As-built survey plans indicating crest levels, platform levels


and flood protection levels in accordance to COP for
Surface Water Drainage Appendix 2

128
Appendix 9 PUBWTR-0-MCG01

FORM FOR MANUFACTURING CATEGORY


Date: 24/02/2014

Instructions

1. This form is to be digitally signed by the Licensed Water Service Plumber/


Professional Engineer.

Details of PUB Water / NEWater requirement

Nature of
manufacturing products

BAI (Business Activity


Indicator)
The measure of business activity that takes into account the core business
operations specific to the site. (e.g. No of wafers for wafer fab plant, no of
occupants in an office building, metric tonnes of wash load for a laundry etc)

Production rate BAI/mth

PUB Water NEWater

Manufacturing use m³/mth m³/mth

Please submit a copy of the water balance chart indicating the quantity of water
required at each manufacturing process. See Annex A.

Any water recycling Yes


No

If Yes, please complete the following.

Percentage of water %
recycling (See Annex B)

If No, please complete the following.

Reasons for not


recycling water

No of occupants

Any Canteen? Yes


No

Domestic use m³/mth

Toilet Flushing m³/mth m³/mth

No of staff that
take shower

Showering m³/mth

Cooling Usage
PUB Water NEWater

No of cooling tower
129
Refrigerating capacity
and operating hours
of individual cooling
towers:
Tons hr/mth

Add Delete

Total make-up water m³/mth m³/mth


required for cooling
towers

Reasons for not using


air-cooled/refrigerant-
cooled air con system

Other Usage
PUB Water NEWater

No of toilets

Toilets washing m³/mth m³/mth

Other usage (Please


specify) E.g. General
washing, etc
m³/mth m³/mth

Add Delete
Total 0 m³/mth 0 m³/mth

Total water 0 m³/mth 0 m³/mth


requirements

Other sources of water

Water usage areas Type of water Water required


m³/mth

Add Delete

Please indicate water


usage areas to be
installed with private
meters or submeters:

130
Appendix 10 PUBWTR-0-NMC01

FORM FOR NON-MANUFACTURING CATEGORY


Date: 24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.
Details of PUB Water / NEWater requirement
PUB Water NEWater

Project Description

BAI (Business Activity


Indicator)
The measure of business activity that takes into
account the core business operations specific to
the site. (e.g. No of wafers for wafer fab plant, no
of occupants in an office building, metric tonnes
of wash load for a laundry etc)

No of occupants

Any Canteen? Yes


No

Domestic use (m3/mth)

Toilet Flushing (m3/mth) (m3/mth)

No of occupants
that take shower

Showering (m3/mth)

Cooling usage
PUB Water NEWater

No of cooling towers

Refrigerating capacity
and operating hours of
individual cooling towers:
Tons hr/mth

Add Delete

Total make-up water (m3/mth) (m3/mth)


required for cooling
towers

Reasons for not using


air-cooled / refrigerant
cooled air con system

Other usage
PUB Water NEWater

131
No of toilets

Toilets washing (m3/mth) (m3/mth)

Other areas (Please


specify, eg: F&B, Shops,
Laundry, Fountain,
Swimming Pool, General
/Car park Washing,
Irrigation etc
(m3/mth) (m3/mth)

Add Delete
Total 0 (m3/mth) 0 (m3/mth)

Total water requirements 0 (m3/mth) 0 (m3/mth)

For Retails (if applicable)


No of shoppers

For Hotels (if applicable)


No of Hotel rooms

Other sources of water


Please indicate water
usage areas Type of water Water required

(m3/mth)

Add Delete

Please indicate water


usage areas to be
installed with private
meters or submeters

132
PUBWTR-0-RCG01 Appendix 11

FORM FOR RESIDENTIAL CATEGORY


Date: 24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service
Plumber/Professional Engineer.
Details of PUB Water / NEWater requirement

PUB Water NEWater

No of Units

Household usage m³/mth

Swimming Pool m³/mth


(make-up water)

Common Amenities
m³/mth m³/mth

Add Delete

General Washing m³/mth m³/mth

Gardening m³/mth m³/mth

Other usage
(Please specify)
m³/mth m³/mth

Add Delete

Total water requirements 0 m³/mth 0 m³/mth

Other sources of water

Please indicate water Type of water Water required


usage areas

m³/mth

Add Delete

133
Appendix 12 PUBWTR-0-TSP01

FORM FOR TEMPORARY CATEGORY


Date: 24/02/2014

Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.
Details of PUB Water / NEWater requirement

Construction Site (Staff / Workers use)

PUB Water NEWater

No of staff & construction workers

Domestic use (m3/mth)

Toilet Flushing (m3/mth) (m3/mth)

No of staff & construction workers


that take shower

Showering (m3/mth)

Any Canteen? Yes


No

Washing use

PUB Water NEWater

Washing vehicle (m3/mth) (m3/mth)

Washing Frameworks/Steel (m3/mth) (m3/mth)


bars/Moulds

Other washing (pl specify)

(m3/mth) (m3/mth)

Add Delete
Total 0 (m3/mth) 0 (m3/mth)

Concreting use (m3/mth) (m3/mth)

Recycling of wash water Yes


No

If Yes,please complete the following

Percentage of water recycling %

If No,please complete the following

Reasons for not recycling water

Other usage (Please specify)E .g.


Architectural works, Canteen Use

134
(m3/mth) (m3/mth)

Add Delete
Total 0 (m3/mth) 0 (m3/mth)

135
(Continue)
Workers dormitory

PUB Water NEWater

Any workers dormitory? Yes


No

If Yes, please specify the no. of


workers

Workers dormitory consumption (m3/mth)

Total water requirements 0 (m3/mth) 0 (m3/mth)

Other sources of water

Please indicate Type of water Water required


water usage areas

(m3/mth)

Add Delete

Type of Project

Construction Site Location

Total Built-Up Floor Area M2

Started from

136
Appendix 13 PUBWTR-0-PPC01

PRE-PLANNING CONSULTATION
Date: 24/02/2014
To: PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person.

2. Design of water service installation including the mode of supply shall comply
with the Public Utilities (Water Supply) Regulations and the Singapore
Standard CP 48 - Code of Practice for Water Services.

3. Water meter shall be located above ground near to the main entrance of the
above development and shall be easily accessible for maintenance and
reading.

4. There shall be no risk of contamination to PUB potable water supply system


through backflow.

5. Potable water storage cisterms should not be located below sanitary pipes
and other non-potable water pipes.

6. This form is to be accompanied by the relevant documents (refer to


Submission Checklists).
Particulars of Project
Project Reference Number

Development Type Please Select

Location Description
[Include Lot/lot, MK/TS,
Address/Road and
Building Name if any]
Project Description

Estimated PUB Water


Requirement (m³/mth)

Estimated NEWater
Requirement (m³/mth)
137
Platform Level of
Development (mRL)

Reduced Level of Highest


Direct Supply
Water Fitting (mRL)

Issue For Discussion

138
Particulars of the Qualified Person
Name Please Select

Name of Company

UEN
Submission Checklists
1 Site Plan

139
Appendix 14 PUBWTR-0-WLP01

NOTIFICATION OF WATER SERVICE WORK BY LICENSED


WATER SERVICE PLUMBER
Date: 24/02/2014
To: PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber.

2. This form is to be accompanied by the relevant documents


(refer to Submission Checklists).
Particulars of Project
Notification Number

Project Description

Location Description
[Include Lot/lot, MK/TS,
Address/Road
and Building Name if any]

Nature of Work Please Select

Estimated Water Requirements


PUB Water (m3/mth)

NEWater (m3/mth)

Commencement Date

Expected Completion Date

Platform Level of
Development (mRL)

Reduced Level of Highest


Direct Supply
Water Fitting (mRL)
Particulars of Customer
Name Please Select

Name of Company
140
UEN

Address

Telephone No.

Extension No.

Fax No.

Particulars of the Licensed Water Service Plumber


Name Please Select

Residential Address

141
Particulars of Licensed Water Service Plumber (Continue)
Mailing Address
(if different from above)

Telephone No. (O)

Telephone No. (H)

Extension No.

Fax No.

Pager No.

Handphone No.

Licence No.

I/C No.
Declaration by Licensed Water Service Plumber
1 I, , the undersigned, hereby certify
that the water service installation at the premises is designed in
full compliance with the Public Utilities Board's requirements
including the Public Utilities (Water Supply) Regulations,
Singapore Standard CP 48 - Code of Practice for Water
Services, Authorities' requirements and other statutory
requirements. I also confirm that potable water storage cisterns
shall not be located below sanitary pipes and other non-potable
water pipes. All the water fittings installed in the water service
installation are of types that comply with standards prescribed/
stipulated by PUB and all water conservation measures will
be adopted.

2 The site plan, the water schematic drawing/s and the breakdown
of water requirements, if any, of the above developments are
attached herewith.
Submission Checklists
1 Site Plan

2 Water Reticulation Schematic Drawing

142
Appendix 15 PUBWTR-0-WSW01

NOTIFICATION OF WATER SERVICE WORK BY


PROFESSIONAL ENGINEER
Date: 24/02/2014
To: PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Professional Engineer.

2. This form is to be accompanied by the relevant documents


(refer to Submission Checklists).

3. Please note that for "Particulars of Licensed Water Service Plumber", the
member role of "Licensed Water Service Plumber" is required when updating
the member's details.

Particulars of Project
Pre-Planning Consultation Yes
No

Date of Pre-Planning
Consultation with PUB

Type of Submission New Submission


Resubmission

PUB Ref WSN 92433 / / /

Project Reference Number

Development Type Please Select

Location Description
[Include Lot/lot, MK/TS,
Address/Road
and Building Name if any]

Project Description

Nature of Work Please Select

143
Estimated Water Requirement
PUB Water (m3/mth)

NEWater (m3/mth)

Commencement Date

Expected Completion Date


Particulars of the Professional Engineer
Name Please Select

Name of Company

UEN

Address

144
Particulars of the Professional Engineer (Continue)
Telephone No.

Extension No.

Fax No.
Particulars of the Owner/Developer
Name Please Select

Name of Company

UEN

Address

Telephone No.

Extension No.

Fax No.
Particulars of the Licensed Water Service Plumber
Name Please Select

Address

Telephone No.

Extension No.

Fax No.
Declaration by Professional Engineer
1 I, , the Professional Engineer-in-charge
hereby certify that the water service installation is designed in full
compliance with the Public Utilities Board's requirements including
the Public Utilities (Water Supply) Regulations, Singapore Standard
CP 48 - Code of Practice for Water Services, Authorities'
requirements and other statutory requirements. I also confirm that
potable water storage cisterns shall not be located below sanitary
pipes and other non-potable water pipes. All the water fittings
installed in the water service installation are of types that comply
with standards prescribed/stipulated by PUB and all water
conservation measures will be adopted.

2 The site plan, the water schematic drawing/s and the breakdown of
water requirements, if any, of the above developments are attached
herewith.
Submission Checklists
1 Site Plan
145
2 Water Reticulation Schematic Drawing

146
Appendix 16 PUBWTR-0-CSC01

CERTIFICATE OF SATISFACTORY COMPLETION OF WATER


SERVICE WORK BY PROFESSIONAL ENGINEER
Date: 19/03/2014
To: PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231
Instructions

1. This form is to be digitally signed by the Professional Engineer.

Particulars of Project
Project Reference Number

Development Type Please Select

Project Description

Development Address

Nature of Work Please Select

Water Utility Account


Number

Commencement Date

Expected Completion Date

Particulars of the Professional Engineer


Name Please Select

Name of Company

UEN

Particulars of the Licensed Water Service Plumber

Name Please Select

Telephone No.

Extension No.

Fax No.
147
Declaration by Professional Engineer
1 I, the Professional Engineer-in-charge
hereby certify that I have supervised the construction of the water
service installation of the above development and inspected the
completed water service installation. I confirm that to the best of my
knowledge and belief, the water service installation was carried out in
accordance with the Public Utilities Board's requirements including the
Public Utilities (Water Supply) regulations, Singapore Standard CP
48-Code of Practice for Water Services, Authorities' requirements and
other statutory requirements. I also confirm that potable water storage
cisterns have not been located below sanitary pipes and other
non-potable water pipes. All the water fittings installed in the water
service installation are of the types that comply with standards
prescribed / stipulated by PUB and all water conservation measures
have been adopted. I further certify that the said water service
installation and the associated electrical devices and equipment have
been tested and are safe and acceptable for operation.

148
Appendix 17 – Guideline on Corenet Form Submissions

Form Name Details Sections Who can submit?


ENV-CBPU-DCCLR_NEW Major Project Submission for DC Plan QP [Registered Architect / PE (Mechanical or Civil)]
ENV-CBPU-DCCLR_RESUB Section A: Sanitary /
Sewerage Work
Section B: Drainage QP [Registered Architect]
Work
Minor Project Submission for DC with Combined DC Plan and Detailed Plan
DP QP [Registered Architect / PE (Mechanical or Civil)]except:
Section A1: Sanitary, (a) Used water pumping systems shall be prepared and signed by
M&E Work (Used PE (Mechanical)
Water) (b) where the work is required to be endorsed by a PE (Civil) under
BCA’s Building Control Act/Regulations

DC plan without DP
QP [Registered Architect / PE(Mechanical or Civil)]
Section A2: Sewerage QP [Registered Architect / PE (Mechanical or Civil)] except where
Work, RC Trench the work is required to be endorsed by a PE (Civil) under BCA’s
Building Control Act/Regulations.
Section B: Drainage Without DP
Work QP [Registered Architect]
With DP
QP [PE (Civil)]
Section C: Infrastructure QP [PE(Civil)]
Work

149
Form Name Details Sections Who can submit?
PUB-BPU-CLRDP01 – Submission for DP Development involving used water pumping system and/or deep
Section A1: Sanitary excavation/trenching for sanitary drainline/sewer connection
Work works:
QP [Registered Architect / PE (Mechanical or Civil)]except:
(a) Used water pumping systems shall be prepared and signed by
PE (Mechanical).
(b) where the works is required to be endorsed by a PE(Civil) under
BCA’s Building Control Act/Regulations.

Development NOT involving used water pumping system or/and


deep excavation/trenching for sanitary drainline/sewer connection
works:
QP [Registered Architect / PE(Mechanical or Civil)]

– Section A2: Sewerage QP [PE (Civil)]for:


Work, RC Trench (a) Sewer works,
(b) design and calculations of RC Trench

– Section B: Drainage QP [PE (Civil)]


Work
– Submissions with more QP [Registered Architect] shall consolidate the forms and drawings
than one section with endorsement by the respective PEs before making
submissions to CBPD
PUB-SEW-CLRDEV-OVER- – – QP [PE (Civil)] except where the project does not require a PE
SEW under the BCA’s Building Control Act/Regulations, a QP [Registered
Architect] may submit.

149
Form Name Details Sections Who can submit?
Form B – – Development Projects via e-Corenet)
QP [Registered Architect or PE (Mechanical or Civil)] except where
the excavation/trenching/structure works is required to be
endorsed by a PE (Civil) under BCA’s Building Control
Act/Regulations.

Non-development Projects via PUB_Form_B@pub.gov.sg


PE (Civil) or Contractor
Form B1 – – QP [Registered Architect or PE(Mechanical or Civil)] who has
submitted the Form B
PUB-BPU-COMPOFWORK Option 1 Section A1: Sewerage QP [Registered Architect or PE (Mechanical or Civil)] who has
Completion of Sewerage Work Work submitted the DP for sewerage works.
only

To select this for certifying


completion of sewer work
PUB-BPU-COMPOFWORK Option 2 Section A2: Sanitary Sanitary works (with or w/o M&E works) related to the sanitary
Application for PUB Clearance Work system:
for TOP QP [Registered Architect or PE (Mechanical or Civil)] who has
(For project with several submitted the DP for sanitary works. Sanitary and M&E (if
phases and require multiple applicable) works should be submitted together under this form.
clearance for TOP) Section A3: RC Trench QP [Registered Architect or PE (Mechanical or Civil)] who has
Completion submitted the DP for RC trench.
Section B: Drainage Not in Use
Work
Section C: Infrastructure QP [Registered Architect or PE (Mechanical or Civil)] who has
Work submitted the DP for infrastructure works.

149
Form Name Details Sections Who can submit?
PUB-BPU-COMPOFWORK Option 3 Section D: Application QP [Registered Architect or PE (Mechanical or Civil)] who has
Application for PUB Clearance for PUB Clearance for submitted the DP for the respective works.
for CSC CSC This section is for SEW clearance only.
(For project which has earlier
obtained clearance for TOP) For Drainage clearance, please use Certificate of Inspection for
Drainage Works form (PUB-DD-CSIDRA) which is to be submitted
by PE (Civil).
PUB-BPU-COMPOFWORK Option 4 Section A1: Sewerage Please refer to Option 2 and Option 3
Application for PUB Clearance Work
for both TOP & CSC Section A2: Sanitary
(All other projects) Work
Section A3: RC Trench
Completion
Section B: Drainage
Work
Section C: Infrastructure
Work
Section D: Application
for PUB Clearance for
CSC

PUB-SEW-FORM_DLP – – QP [Registered Architect or PE (Mechanical or Civil)] who has


submitted the DP for the sewerage works.

149
Appendix 18 – Contact List

PUB Building Plan Unit (BPU)


Address
Building Plan Unit
PUB
40 Scotts Road #15-00
Environment Building
Singapore 228231

For further enquiries on Corenet form changes, please contact PUB BPU at:

Hotline: 67313512
Email: PUB_BPU@pub.gov.sg

153

You might also like