Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

ANIRUDDHA GANGULY

Nimcha Colliery  PO- BIDHANBAG , 713337  +91-8436999717  aniruddhaganguly56@gmail.com

OBJECTIVE
To secure a challenging position in a reputable organization to expand my learning , knowledge and skills.

EDUCATION
NATIONAL POWER TRAINING INSTITUTE - Durgapur May 2019
B.Tech , Mechanical Engineering (Power Plant)

RELATED PROJECTS
JUNE 2018
Boiler Efficiency at HINDALCO INDUSTRIES LIMITED
– At Renusagar , Aditya Birla Group

EXPERIENCES
 Engineer – C.P.P (Mechanical Maintenance)
Super Smelter Limited , Jamuria
Area - 18 MW & 35 MW 2020 – Present

Job Responsibility-

Participate in Production system efficiency and Quality system efficiency for continuous improvement.

Overhauling of Mechanical Equipment such as Centrifugal Fan , Centrifugal Pump , Reciprocating Pump ,
Multi Stage Pump , Gearbox , Heat Exchanger , Blower , Agitator , Screw Conveyor , PCV , DCV ,
Bag Filter , Belt Conveyor , Vibrating Screen , Crusher etc.

Welding and Fabrication Projects including- Rehabilitation of heat exchanger , Repairing of pressure vessel
In-house manufacturing and developing of miscellaneous equipment/spare to save high original equipment
manufacturer O & M Cost.

Implementing of IMS Policy- Developing and Implementing :- SOPs , Work Instruction , HIRA , Aspect & Impact

 Execution of all TBM activities –


 Developing the check sheet of Preventive Inspection and Preventive Maintenance.

 Modification of the schedule of PI and PM in the basis of the Equipment Health Condition & FMEA
So that Manpower can be utilize properly.

 Condition Based Maintenance activities by scheduled analysis of Vibration , Temperature and thickness.

 Optimizing the Lubrication consumption by arresting the leakages and remodeling the schedule of
lubrication according the running hours of the equipments.
 RELIABILITY CENTERED MAINTENANCE (R.C.M) Activities –
Analyzing the Availability and Reliability of the equipment by Previous Running Hours , Repairing Time ,
Numbers of Failure , Frequency of Failure , MTBF & MTTR.

WHY-WHY analysis of all the delays and Breakdown of the plant.

Budget Preparation - Manpower Cost , Spare Cost (Insurance & General) , Modification Cost , Running Consumable items ,
Steel Cost , Structure Painting Cost and Stationary Cost.

Act as a team leader of Jishu Hozen.


Maintaining 23 Model Areas in Step 3 – Monthly Housekeeping Audits 23 areas , Maintaining C.L.I.T Schedule , Visualization
Of SOPs , One Point Lesson and other Details.

FMEA Analysis

 Work as a Divisional Safety Team member

 Graduate Engineer Trainee - Mechanical Maintenance - Power Plant Division 2019 – 2020
Orissa Metaliks Private Limited , Rashmi Group, Kharagpur
Area - POWER PLANT – 45 MW

Job Responsibility-

 Overview of the Power Plant – Project Completed.

 Participate in Maintenance activities like PI and PM.

Inventory and Store consumption report preparation.

 Breakdown Analysis.

SEMINARS & PROJECTS

Advance Concepts of Communication Protocol in Cyber Security for Power Sector : N.P.T.I (Ministry Of Power)

 Cosmic Ray technology by Prof. M.S SINHA Colloquium : N.I.T (National Institute of Technology) – Dept. of Physics

COMPUTER SKILLS

Store Software: ERP and SAP


 MicrosoftOffice: Word, Excel, Spreadsheet and Power Point
General Software: Basic web design knowledge
PERSONAL DETAILS
 Date of Birth- 16/08/1995
Father’s Name: Malay Ganguly
 Address: Nimcha Colliery , Bidhanbag , 713337 , Paschim Burdwan

EDUCATIONAL DETAILS

SL NO QUALIFICATION BOARD/ UNIVERSITY SCORE


1 B.TECH M.A.K.A.U.T 8.24

2 DIPLOMA W.B.S.C.T.E 8.90

3 HIGHER SECONDARY EXAMINATION C.B.S.E 64.4 %

4 SECONDARY EDUCATION C.B.S.E 8.0

HOBBIES
Detective Friction
 Research in Reincarnation

DECLARATION
I hereby declare that the above mentioned information is correct to the best of my knowledge and I bear
Responsibilities for the correctness of the above mentioned particulars.

Date-
Aniruddha Ganguly

Place-

You might also like