Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 111

Material Order Date.

14/5/2022
SR.NO Metrials name QTY Recived Qty.
1 Pendent bulb holder 50 nos
2 10 Amp connector strip PVC 100 nos
3 15 KW Star Delta motor starter 01 nos
4 2.5 SQ.mm Copper U Type lug 500 nos
5 1.5 SQ.mm Copper U Type lug 500 nos
6 16SQ.mm Copper Ring Type lug [hole dia 8mm] 500 nos
7 16SQ.mm Copper Ring Type lug [hole dia 6mm] 200 nos
8 4 SQ.mm Copper Ring Type lug [hole dia 6mm] 200 nos
9 10 SQ.mm Copper Ring Type lug [hole dia 8mm] 200 nos
10 1.5 SQ.mm Copper PinType lug with sleeve 300 nos
11 2.5 SQ.mm Copper PinType lug with sleeve 300 nos
12 1Core 1.5 SQ.mm FR Wire[ gray colour] 400 mtr
13 1Core 2.5 SQ.mm FR Wire[ gray colour] 400 mtr
14 Trip indication lamp ( orange colour)230 volt AC 50 nos

05 Nos
15 Thermal Over load Relay. Make L&T model -MN-2,range 9 to 15 AMP
05 Nos
16 Thermal Over load Relay. Make L&T ,range 14 to 23 AMP Model MN 2
17 Star delta Timer 230 volt . Make EAPL 10 NOS
18 LED Bulb 230 volt ,12 watt 15 Nos Recived
19 PVC Sleave R,Y,B,Non Shrinkable 20MM Each one coil
20 PVC Sleave R,Y,B,Non Shrinkable 4 MM Each one coil
21 PVC Sleave R,Y,B,Non Shrinkable 14 MM Each one coil
22 Elmax connector for 35 SQ.mm cable Elmax DPBB 50 nos
23 Elmax connector C type 6 SQ.mm 100 nos
24 LDB TPN horizantal PPI D.B 12*2 way 08nos
25 Single phase power point ( metal clad) 20nos
single pole MCB 20 AMP Three phase metal clad power point box 3 10 NOS
26 pole 32 amp
27 combination plier 8 inch make tapariya (1621-8) 15nos
28 screw driver insulated model 903 IBT 15NOS
31 Line tester model 813 15 nos
32 wire striper ,make tapariya ,model WS 05 -130mm 05 nos
33 crimping tool 0.5 to 16 SQ .mm make jainson model samrat 02 nos
34 4 SQ.mm pin type lug copper 300 nos
35 10 SQ. mm pin type lug coppper 300 nos
36 16 SQ. mm pin type lug copper 300 nos
37 25 SQ. mm pin type lug copper 100 nos
38 35 SQ. mm pin type lug copper 100 nos
39 3 pole MCB 16 AMP 10 NOS
40 3 pole MCB 32 AMP 10 NOS
41 3 pole MCB 63 AMP 10 NOS
42 4 pole MCB 63 AMP 10 NOS
43 4 pole MCB 32 AMP 10 NOS
44 Key lock (high quality) heavy duty 05 nos
45 Champion set ,Make tapariya, model 821 10 nos
46 screw driver set (842) 05 nos
48 Champoin set make tapariya model (848) 02 nos
49 Magnetic screw driver cushion grip phillips 2-65-198 02 nos
50 magnetic screw driver cushion grip phillips 2-65-174 02 nos
51 copper busbar 25*2 mm 10 mtr Recived
Supply By
MCC-2 Panel-2A,2B,3A,3B Date.17/5/2022
Sr.No Material Name QTY Make Model No.

1 MCCB 800 AMP 3 POLE With extend revolves operates 2 Nos SCHNEIDER NS800N /3P 800A
the handle
2 AMP Meter Analog 6L2-A 800/5 (Meter Size width 6 Nos
75mm, hight 75 mm)
3 CT 800/5 6 Nos
4 MCCB 400 AMP 3 POLE 6 Nos SCHNEIDER EZD400M/3P 400A
5 MCCB 160 AMP 3 POLE 17 Nos SCHNEIDER EZD160M/3P 160A
6 Contactor (Coil voltage 240v) (With Add-on block 5 Nos SCHNEIDER LCI-D150M7C
(2No+2Nc)
7 AMP Meter Analog 6L2-A 200/5 (Meter Size width 6 Nos
75mm, hight 75 mm)
8 CT 200/5 6 Nos
9 Air vent fan filter for electrical panel ( Size 5 Nos
220*220mm)
10 6 Nos
Panel Cooling fan (150*150*50mm) AC 240V 38 Watt
11 Contactor (Coil voltage 240v) (With Add on block (2 3 Nos SCHNEIDER LCI-D95M7C
no+2nc)
AMP Meter Analog 6L2-A 150/5 (Meter Size width
12 75mm, hight 75 mm) 8 Nos

13 CT 150/5 8 Nos
14 Thermal overload relay (Range 30-50A) 6 Nos L&T MN5-30-50A
15 15 Nos OMRON MY4N-J
Auxiliary relay (Coil volt 220-240 AC) (4NO + 4NC)
15 Nos
16 Relay Base 14 pin (suitable for omron MY4N-J Relay)
17 MCCB 250 AMP 3 POLE 2 Nos SCHNEIDER EZD250M/3P 250A
18 Contactor MNX-50 ( Coil volt 240v ) (with Add on 18 Nos L&T MNX50
block (2No + 2Nc)
19 MCCB 630 AMP 3 POLE With extend revolves operates 2 Nos SCHNEIDER NS630N /3P 630A
the handle
20 AMP Meter Analog 6L2-A 600/5 (Meter Size width 6 Nos
75mm, hight 75 mm)
21 CT 600/5 6 Nos
22 MCCB 100 AMP 3 POLE 7 Nos SCHNEIDER EZD100M/3P 100A
23 MCB 10 A 3POLE With (No + Nc contact) 5 Nos SCHNEIDER C65N-D10/3P 10A
24 MCCB 200 AMP 3 POLE 1 Nos SCHNEIDER EZD250M/3P 200A
25 MCCB 125 AMP 3 POLE 3 Nos SCHNEIDER EZD160M/3P 125A
26 MCB 10 A 3POLE With (No + Nc contact) 2 Nos SCHNEIDER C65N-D10/3P 10A
27 MCB 6 A 3POLE 2 Nos SCHNEIDER C65N-C6/2P 6A
28 AMP Meter Analog 6L2-A 400/5 (Meter Size width 3 Nos
75mm, hight 75 mm)
29 CT 400/5 3 Nos
30 Contactor (Coil voltage 240v) (With Add on block (2No 8 Nos SCHNEIDER LCI-D09M7C
+ 2Nc)
31 Thermal overload relay (Range 0.4 -0.63A) 1 Nos SCHNEIDER LRD-04C
32 Thermal overload relay (Range 1 -1.6A) 6 Nos SCHNEIDER LRD-06C
33 Thermal overload relay (Range 1.6 -2.5A) 2 Nos SCHNEIDER LRD-07C
Recived Supply By
Qty.

HOLD
HOLD

HOLD
HOLD

HOLD
HOLD

Hold
Hold

Hold
Hold
MCC-2 Panel-2A,2B,3A,3B
PNL Wiring Material List Date.17/5/2022
Sr,No Material Name SIZE QTY Recived Qty.
1 1 Core 2.5 SQ.mm Wire ( green colour) 1*2.5 400mtr
2 1 Core 1.5 SQ.mm Wire (green colour) 1*1.5 400mtr
3 1 Core 2.5 SQ.mm Wire ( Black colour) 1*2.5 600mtr
4 1 Core 2.5 SQ.mm Wire ( Red colour) 1*2.5 600mtr
5 1 Core 1.5 SQ.mm Wire (Black colour) 1*1.5 600mtr
6 1 Core 1.5 SQ.mm Wire (Red colour) 1*1.5 600mtr
7 1 Core 1.5 SQ.mm FR Wire (Gray colour) 1*1.5 200mtr
8 1 Core 2.5 SQ.mm FR Wire (Gray colour) 1*2.5 200mtr
9 1 Core 4 SQ.mm FR Wire (Gray colour) 1*4 400mtr
10 1 Core 6 SQ.mm FR Wire (Gray colour) 1*6 200mtr
11 1 Core 10 SQ.mm FR Wire (Gray colour) 1*10 200mtr
12 1 Core 16 SQ.mm FR Wire (Gray colour) 1*16 100mtr
13 1 Core 25 SQ.mm FR Wire (Gray colour) 1*25 100mtr
14 1 Core 35 SQ.mm FR Wire (Gray colour) 1*35 100mtr
15 1 Core 50 SQ.mm FR Wire (Gray colour) 1*50 100mtr
16 1 Core 70 SQ.mm FR Wire (Gray colour) 1*70 200mtr
17 1.5 SQ.mm pin type copper lug with sleave 1.5 700 nos
18 2.5 SQ.mm pin type copper lug with sleave 2.5 700 nos
19 4 SQ.mm pin type copper lug with sleave 4 200 nos
20 6 SQ.mm pin type copper lug with sleave 6 500 nos
21 10 SQ.mm pin type copper lug with sleave 10 200 nos
22 4 SQ.mm Ring type copper lug (hole dia inner 6 mm outer 8mm) 4 300 nos
23 6 SQ.mm Ring type copper lug (hole dia inner 6 mm outer 8mm) 6 500 nos
24 10 SQ.mm Ring type copper lug (hole dia inner 8 mm outer 10mm) 10 300 nos
25 16 SQ.mm Ring type copper lug (hole dia inner 8 mm outer 10mm) 16 200 nos
26 25 SQ.mm Ring type copper lug (hole dia inner 8 mm outer 10mm) 25 500 nos
27 35 SQ.mm Ring type copper lug (hole dia inner 8 mm outer 10mm) 35 500 nos
28 70 SQ.mm Ring type copper lug (hole dia inner 8 mm outer 10mm) 70 500 nos
29 Cable Tie 100*2.5 100*2.5 25 pkt Local
30 Cable Tie 300*4.8 300*4.8 25 pkt Local
31 Cable Gland (19mm) 19mm 100 nos Local
32 Screw (35/8) 35/8 10 pkt Local
33 Wood plug (35/8) 35/8 10pkt Local
34 Celling rose 100 nos Local
35 PVC Junction 1 way (suitable for 1 inch pipe) 25 nos Local
36 PVC Junction 2 way (suitable for 1 inch pipe) 25 nos Local
37 PVC Junction 3 way (suitable for 1 inch pipe) 25 nos Local
38 PVC Junction 4 way (suitable for 1 inch pipe) 25 nos Local
39 PVC Black pipe (1 inch) 30 nos Local
40 PVC Insulation tape (Red, Yellow, blue, black ) 5 box Local
Supply By
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022
MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
Date.17/5/2022 Date.17/5/2022 Date.17/5/2022
-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B MCC-2 Panel-2A,2B,3A,3B
te.17/5/2022 Date.17/5/2022 Date.17/5/2022

You might also like