Process Control Analysis - New Plant... 15.11.21
Process Control Analysis - New Plant... 15.11.21
21 )
DATE DEFECT REASON ACTIONS STATUS REMARKS
A-L&T-03 undermaintenance due to step problem. 1-Alignment done to remove the step. Frequent Alignment out &
09.09.21 OPEN SPLICE Corrected
B- 12.00-24 production loss due to hydroulic pipe leackage 2- Knife-cleaning was done Knife-cleaning neglected
L&T-03 stepping problem due to mis-alignment corrected by adjustment and 1-Alignment done to remove the step. Frequent Alignment out &
09.09.21 OPEN SPLICE Corrected
Knife was found not clean 2- Knife-cleaning was done Knife-cleaning neglected
Low gauge due to low weight thus pressure of the clamp was making the the
1- extra paint application Frequent guage variation to be
10.09.21 OPEN SPLICE tube slipped causing the defect , extensive oil application showed Corrected
2-Die & Mendrel were got machined controlled
improvements and die-mendrel send for machining to mitigate guage variation
L&T-05stepping problem due to mis-alignment corrected by adjustment and 1-Alignment done to remove the step Frequent Alignment out &
14.09.21 OPEN SPLICE Corrected
Knife was found not clean 2- Knife cleaning was done. Knife-cleaning neglected
Solders surfaces were contaminated by burnt rubber as Knife-cleaning was not 1-Knife-cleaning was done Knife & Solder cleaning to be
11.09.21 SPLICE CRACK Corrected
done & solder too found not clean 2-Solders were cleaned by emary paper focussed
L&T-05 operator was not performing the soldring adequately and hot surface & 1-Knife-cleaning was done Knife & Solder cleaning to be
13.09.21 SPLICE CRACK Corrected
Knife were not clean. 2-Solders were cleaned by emary paper focussed
L&T-05 operator was not performing the soldring adequately and hot surface & 1-Knife-cleaning was done Knife & Solder cleaning to be
14.09.21 SPLICE CRACK Corrected
Knife were not clean. 2-Solders were cleaned by emary paper focussed
L&T-05 operator was not performing the soldring adequately and hot surface & 1-Knife-cleaning was done Knife & Solder cleaning to be
15.09.21 SPLICE CRACK Corrected
Knife were not clean. 2-Solders were cleaned by emary paper focussed
L&T-05 operator was not performing the soldring adequately and hot surface & 1-Knife-cleaning was done Knife & Solder cleaning to be
16.09.21 SPLICE CRACK Corrected
Knife were not clean. 2-Solders were cleaned by emary paper focussed
L&T-05 operator was not performing the soldring adequately and hot surface & 1-Knife-cleaning was done Knife & Solder cleaning to be
18.09.21 SPLICE CRACK Corrected
Knife were not clean. 2-Solders were cleaned by emary paper focussed
L&T-05 operator was not performing the soldring adequately and hot surface & 1-Knife-cleaning was done Knife & Solder cleaning to be
19.09.21 SPLICE CRACK Corrected
Knife were not clean. 2-Solders were cleaned by emary paper focussed
10.09.21 WEAK SPLICE L&T-04 tube was getting slipped alignment done to remove the step Corrected First sample to be checked
W/s & O/s - fab o mech problem,high heat of knife before 1'' of appoach and 1-put under electrical maintenance 1-Fine-tuning was needed
10.09.21 WEAK SPLICE Corrected
knife high speed problem and Knife was found not clean 2-Knife-cleaning was done 2-Knife-cleaning neglected
13.09.21 THIN SIDE 175/65 R 14,5.00-12 mould gap adjust - corrected Gap was adjusted Corrected FTC needs to be filled
operator was not inflating the tube on shaper upto the limit, the tube was loaded Operator was instructed to shape the tube Operator negligence
14.09.21 THIN SIDE upto Limit set. Corrected
loosely.
operator was not inflating the tube on shaper upto the limit, the tube was loaded Operator was instructed to shape the tube
15.09.21 THIN SIDE upto Limit set. Corrected Operator negligence
loosely.
16.09.21 THIN SIDE 12.5/80-18 Mould inherent complexities green tubes were re-extruded Corrected FTC needs to be filled
18.09.21 THIN SIDE condenset problem Put under maintenance Corrected ----
185/70 R 14 gauge problem top - bottom difference required was 0.8 mm but
found 1.00 mm thus bottom guage was less then reqiired and top guage was bit Frequent guage variation to be
11.09.21 THIN SPOT Tube was re-extruded Corrected
more then required - another tube was extruded and cured, problem corrected - controlled
operator problem
14.09.21 BUCKLE Operator lapse, he was loading the tube 7.50-16 correctly Operator was counselleds and CB were put --- Operator negligence
for curing
F78-15 buckle problem due to elongated lengthso 05 mm splice length
18.09.21 BUCKLE Green-tube length was reduced by 05 mm Corrected ----
reduce………corrected
A-7.50-16 tubes found with Width-buckle due to Flat-widthin excessso tube
19.09.21 BUCKLE Corrected Operator negligence
segregation------corrected Tubes were seggregated for correct F-width
15.09.21 BODY BILISTER Material comosition fine-tunning green tubes were re-extruded Corrected FTC needs to be filled
16.09.21 BODY BILISTER Material comosition fine-tunning green tubes were re-extruded Corrected FTC needs to be filled
18.09.21 BODY BILISTER Material comosition fine-tunning green tubes were re-extruded Corrected FTC needs to be filled
19.09.21 BODY BILISTER Material comosition fine-tunning green tubes were re-extruded Corrected FTC needs to be filled
12.5/80-18 operator was inflating excess air thus tube was getting sandwitched Tube inflation was made limited upto limit
15.09.21 MOULD PINCH Corrected Operator Lack of awareness
between mould-parts and applied with powder.
19.09.21 MOULD PINCH Shaping was not being done correctly. Operator was counselleds and shaping was Corrected Operator negligence
corrected.
15.09.21 NO INTERNAL mould nozzle was found disturbed. Nozzle of the Mould was re-aligned Corrected FTC needs to be filled
2.5 6
2 4
1.5
2
1
0
0.5
08/09
09/09
10/09
11/09
13/09
14/09
15/09
16/09
18/09
19/09
0
08/09 09/09 10/09 11/09 13/09 14/09 15/09 16/09 18/09 19/09
Comments
1 Scrap & Repair exhibit consistency in B-shift indicating process in control in preceeding shift.
2 Scrap trends abruption in A-shift indicating weaker process control in B-shift.
3 Repair trends major abruption in A-shift again indicates weaker process control in B-shift.
PREPARED BY APPROVED BY
Operatore negligence particularly fake reporting pertaining to Knife & solder monitoring
3 needs to be cared.
HR / PROD
4 When a new size gets started first tube check -- FTC needs to be performed. PROD / QA
5 Salvage valves painting needs to be strengthen PROD
Operators awareness needs to be improved pertaining to Bulge / Mould pinch for
6 defect-minimization. PROD / QA
Embosed patches supply planning needs improvements and patches of right size to be
8 supplied on right time.
STORES
REPAIR ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
REPAIR ( %)
DATE REASONS RESPONSIBLE PERSONS REMARKS ACTION PLANS
NAME Nos
27.09.21 Splice crack 21 Solder temperature problem Electrical maintenance Corrected Solder checking on Plant/off
The repair has been figured as 4.6% , accomodating the Blister effects
% 1.02 4.6 ---- which may be caused due to sesonal-material effects .If the same is
excluded the repair occurance is 3.25 % .
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %)
DATE REASONS RESPONSIBLE PERSONS REMARKS ACTION PLANS
NAME Nos
Splice crack 15 LT-3 Wrinkle problem Electrical maintenance Corrected Damaged clamp needs to be
28.09.21 changed
FM 09 Seasonal effects & Insects ---- Run under supervision ----
% 1.98 5.1 ---- The repair contains 15 no of valve-cracks on account of Old-valves usage
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
REPAIR ( %)
DATE REASONS RESPONSIBLE PERSONS REMARKS ACTION PLANS
NAME Nos
Compound behaviour may be one
Body blister 29 Technical / QA --- Fine tuning to be done
of the reasons
29.09.21 Splice crack 25 LT-3 Rubber-jaw problem Electrical maintenance to be corrected Diagnostic replacement
FM 20 Seasonal effects & Insects ---- Run under supervision ----
Valve crack 19 Old painted valve used ---- ---- ----
% 1.46 6.16 ---- The repair contain Body Blister / FM constituting major part of repair.
RPAIR ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %)
DATE REASONS RESPONSIBLE PERSONS REMARKS ACTION PLANS
NAME Nos
%
0.917431
4.370761
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %)
DATE REASONS RESPONSIBLE PERSONS REMARKS ACTION PLANS
NAME Nos
1- Nozzle alignment corrected
1- Nozzle mis-alignment 2- Powder application to be focussed before 1- Nozzle inspection in start of shift
13.10.21 Buckle 24 PROD / QA / MAINT
2- Operation Lapse loading the tube in press as wt running is at lower 2-Powder application
side as per CSR
% 3.47
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %)
DATE REASONS RESPONSIBLE PERSONS REMARKS ACTION PLANS
NAME Nos
Open splice 10 Step problem in LT- 3 & 5 Maintenance Clamp alignment was got corrected Sample inspection- in practice
14.10.21
Buckle 06 Operator loading problem PROD / QA Operator counselling and vigilance Followup with Inspection & correction
Open mould 13 Moulds change and set-up Maintenance --- Moulds were reloaded after Lapping
1-Seasonal effects due to ambient temperature change 1-Followup with Inspection & correction
Buckles 20 2-Shaping problem made by operator PROD / QA --- 2- Shaping under supervision
1-Solinoid valve of Curing press-05 was malfunctioning 1-MAINTENANCE 1-Solinod-valve was rectified.
21.10.2021 No Internal 07 ---
2-Operation Lapse as valve was not properly into nozzle 2-OPERATIONAL LAPSE 2-Followup with Inspection & loading
Open splice 12 L&T-3 : Fluctuation in High-heat causing the defect ELECTRICAL --- Electrical problem was rectified.
Splice open 16 Stepping problem in LT-2 due to end-block mis-alignment Maintenance Corrected ----
N/Body blister 15 Seasonal effects and Feed- width not fine-tuned. Tech / QA --- Feed-width to be reviewed
25.10.2021
Maintenance has been working on the fine-matching of
open mould 12 In 2.75-18 due to mis-match of mould parting lines Maintenance Under rectification moulds
Buckle 15 Erratic loading by operators Operational lapse --- Followup with Inspection & correction
Nos 83 55 1839 Production was hindered at 5 am in morning as the Conveyor belt was
Kg 36.5 --- 792 broken , resumed at 12 pm noon
% 4.61 --- ---
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %) RESPONSIBLE
DATE REASONS REMARKS ACTION PLANS
NAME Nos PERSONS
Open splice 08 New man-power deployment on LT-4 & 5 Absentism
1- Skilled manpower to be deployed
27.10.21 --- 2-Followup with Inspection & correction
1-Late loading made by operator
Thinside 11 Operation lapse
2-Erratic loading in 9.00-15 in radial mould
Nos 99 45 2568
---
Kg 44.6 --- 1166
% 3.82 --- ---
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %) RESPONSIBLE
DATE REASONS REMARKS ACTION PLANS
NAME Nos PERSONS
buckle 10 Operator was not loading the tube properly Operation lapse
28.10.21 --- Followup with Inspection & correction
1-Late loading made by operator
Thinside 16 Operation lapse
buckle 16 Operator was not loading the tube properly Operation lapse --- Followup with Inspection & correction
28.10.21
Open splice 13 Stepping problem in L & T-2 due to mis-alignment Maintenance --- End-block alignment was streamlined
Nos 84 73 3038
---
Kg 40.1 --- 1345
% 2.9 --- ---
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %) RESPONSIBLE
DATE REASONS REMARKS ACTION PLANS
NAME Nos PERSONS
Thin side 23
New operator deployment causing eratic loading Operation lapse Lack of awareness Followup with Inspection & correction
Buckle 21
29.10.21 In splicers there are wide openings on body and at operator
Open splice 07 side at the exit of the knife- current variation or some Electrical dept --- Electrical reasons yet to be fixed
irregularity may be probable cause
Splice-open 13 Stepping problem in LT 1 & 2 due to new operator deployment Operation lapse --- Followup with Inspection & correction
Valve blister 9 Contamination by steam-water particles in new painting-room --- --- ---
Nos 80 32 3000
---
Kg 34.4 --- 1314
% 2.62 --- ---
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %) RESPONSIBLE
DATE REASONS REMARKS ACTION PLANS
NAME Nos PERSONS
Valve buckle 09
Newly recruited operator deployment causing eratic loading Operation lapse Lack of awareness Followup with Inspection & correction
30.10.21 Mould pinch 06
-- -- -- -- --- --
Nos 73 38 2920
---
Kg 29.5 --- 1243
% 2.37 --- ---
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %) RESPONSIBLE
DATE REASONS REMARKS ACTION PLANS
NAME Nos PERSONS
Buckle 09
Newly recruited operator deployment causing eratic loading Operation lapse Lack of awareness Followup with Inspection & correction
Thin side 06
31.10.21
Operation lapse due to
Valve blister 06 Wrong method of valve-painting on reused valves --- One more operator/ Helper needs to be developed
Absentism
Nos 78 40 3270
---
Kg 36.2 --- 1420
% 2.55 --- ---
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %) RESPONSIBLE
DATE REASONS REMARKS ACTION PLANS
NAME Nos PERSONS
Buckle 26 1-Followup with Inspection & correction
Operation lapse as operators were not performing the loading properly Operation lapse Lack of awareness
01.11.21 Thin side 17 2-More of operator/ Helper needs to be developed
--- -- -- -- --- ---
Nos 99 53 4100
---
Kg 48.2 --- 1811
% 2.66 --- ---
SCRAP ANALYSIS FOR TODAY : NEW PLANT (Shift-A)
SCRAP ( %) RESPONSIBLE
DATE REASONS REMARKS ACTION PLANS
NAME Nos PERSONS
02.11.21
1-Followup with Inspection & correction
Buckles 28 Erratic seating of the tube in the mould Operation lapse ---
2-More of operator/ Helper needs to be developed
Thin side 08 Operation lapse as operators were making erratic seating of the tube 1-Followup with Inspection & correction
03.11.21 in the mould. Operation lapse Lack of awareness 2-More of operator/ Helper needs to be developed
Buckle 09
03.11.21
1-Followup with Inspection & correction
Buckles 23 Erratic seating of the tube in the mould Operation lapse --- 2-More of operator/ Helper needs to be developed
It was persisting in Cavity 247/7.50-16 due to The green-tube was extruded with Flat-width
Thin side 09 Mould fabrication ---
specific mould geometry increased by 2 mm, corrected.
15.11.21 Buckle 40 Difficulty in Shaping due to cold weather --- --- Followup with Inspection & correction
Thin side 16 Operators donot not load the tubes correctly Operation lapse --- Followup with Inspection & correction
16.11.21 Buckle 40 Difficulty in Shaping due to cold weather --- --- Followup with Inspection & correction
Thin side 16 Operators donot not load the tubes correctly Operation lapse --- Followup with Inspection & correction