Personal Protective Equipment (PPE) Matrix

Rubber Voltage Cut Face Shin


Protective Cotton Leather Chemical Chemical Sleeve pads/ Fluoresce Dosimeter/ Film
Sl Safety Safety Gum Safety Safety Ear Ear Nose Catridge resistant resistant Welding
Apron Disposable
PPE clothing/ hand hand hand resistant resistant shield/ Survey coveralls, Remarks
No Activity Coveralls helmet shoes boots Goggles Harness Plugs defender mask
type
respirator gloves gloves gloves hand
gloves
hand
gloves suit gloves visor
shield pads shoe nt Jacket meter badges shoe cover
cover
Manual excavation &
1 Excavation earth removal;
Insulated tools & tackels
RCC/
2 masonry work
Safety harness if height
>2m on a proper working platform

Form work/
3 bar bending
Safety harness if height
>2m on a proper working platform
Unloading of cement bags,
4 Cement handling concrete mixing, concreting,
plastering

The helper should wear


5 Welding welding goggles

Oxy-fuel Flashback arrestor at both


6 gas cutting cylinder and torch end
Abrasive wheel
7 cutting
Hand gloves not required
8 Grinding on the hand with which
job piece is adjusted.
The metal chips shall be
9 Drilling cleaned using metal brush.
Face shield to be
10 Chipping used for overhead jobs
In line respirator required
11 Blasting for shot blasting

12 Jack hammering
13 Battery maintenance
Voltage rated gloves,
14 Electrical rubber mat to be used
during maintenance works
Electrical - testing & Hood, coverall to be used during
15 commissioning energisation/ de- energisation

In-line respirator, hood to be used for


16 Painting spray painting/ confined space

17 Structural Panel erection, cable tray support


& cable tray erection, etc
Work
Rigger foreman to be identified
18 Heavy erections with coloured jacket
Confined space Rescue arrangements like lifeline,
19 work tripod, safety harness to be ensured

All instruments to be checked


20 Radiography for BARC approval & certificates

Stores,Yard
21 Loading/Unloading
Fall arrestor, lifeline,
Works carried out at 2 m
22 height or above
safety net, etc to be
used appropriately
Dust generation Sweeping, blasting,
23 activities wall breaking etc
GI sheet handling,
24 Sharp objects ducting works, glass
works etc
Noise generation
25 activities

Note: The PPE guide shall be used for PPE selection for the corresponding activity. Additional PPEs shall be required based on the criticality of the job.