Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Ref: DWE-COS-HSE-TMP-00023

CONTROL OF EQUIPMENTS SKID STEER Rev: A.1


Pre-mobilization inspection checklist
DWE PROJECT
LOADER Date: 06.09.2021
Page 1 of 1
To be completed by the Owner or Supplier G B WARNING DEVICES G B MISCELLANIOUS G B CAB

Horn & Back-up alarm Fire extinguisher Seat

Owner/supplier name: Flashing light Seatbelt & mounting

Lights, turn signals, stop


Electronic devices
lamps, reversing lamps

G B ENGINE Signage / Pictograms

Site: Exhaust Handles

Engine cover / guard Pedals

Battery & Hold downs Steel protective mesh

Plant's Make:/Model Hydraulic hoses Mirrors


Engine coolant, oil and
Air condition
hydraulic oil level
No hydraulic oil leakage

Registration No G B CAB ACCESS


Handholds

Serial number: Step

G B MOTION MEANS G B LOADER

Inspection date: G B DOCUMENTATION G B HYDRAULIC SYSTEM Tires Boom

Maintenance note book Hydraulic cylinders Rims Bucket

Inspector name: RTA Registration Hydraulic hoses Lug nuts Bucket teeth

Third party certificate Hydraulic fittings Brakes Safety pins

Signature: Parking brakes

G : Good condition / Present B : Bad condition / Missing


Comments:
To be completed by DWE HSE Department

Received by:

Date:

Receiver Signature:

●The mobile plant must comply with manufacturer specifications and UAE regulation.
●The mobile plant operator must inspect visually his plant before use (on daily basis) and file these inspections reports to the Equipment manager every week.
●When required, the operator must wear necessary Personal Protective Equipments (Reflective vest, glasses, ear protections, safety shoes, gloves...)
●A maintenance note book registering all reparation and maintenance cares must be kept into the cab. It must be available in understandable language for the operator.
●The operator's employer must ensure that the operator has suitable medical fitness and technical competencies to drive the plant.

You might also like