A. TESTS TO BE PERFORMED
APPROVED:
Name of Project :
Contractor :
We hereby certify that we have conducted an inspection and verification of work accomplished on the above
mentioned project for the period ; we further certify that
we have found the quality of materials in the following items of work corresponding to the special provision of the
contract viz.
STATUS OF TEST
Name of Project : Construction of Road, Sitio Macabal - ong, Brgy. Magsaysay, Cadiz City, Negros Occidental Sta. 0+000 - Sta. 0+130 For the Period Ending: May 22, 2017
BALANCE OF
NO. OF TESTS NO. OF TESTS
ITEM NO. DESCRIPTION QUANTITY TESTS REMARKS
REQUIRED ON FILE
REQUIRED
Embankment from Roadway Excavation
104 (1) a1 72.90 m² I.R. I.R.
(Common Material)
Embankment from borrow (Common
104 (1) b1 9.72 m³ I.R. I.R.
Material)
105 (1) a Subgrade Preparation (Common Material 850.50 m² GPC -1 ; FDT -2 GPC - 1; FDT - 2 None
Q -1 ; CBR -1 ; G/P -1 ; Q -1; CBR - 1; G/P -
200 (1) Aggregate Subbase Course 257.34 m³ FDT - 3
FDT - 6 1; FDT - 3
311 (1) c1 PCC Pavement (Unreinforced) 0.23 m thk 607.50 m² DM w/ TM DM w/ TM
a.) Reinforcing Steel Bar 261.22 kg. Q -2 (U.W) Q - 2 (U.W.) None
b.) Fine Aggregates 77 m³ Q -1 ; G -2 Q -1; G - 1 G-1
c.) Coarse Aggregates 140 m³ Q -1 ; G -2 Q -1; G - 1 G-1
d.) Portland Cement 1,331 bags Q -1 ; FT -7 Q - 1; FT - 5 FT - 2
1 -Set of 3 Cylinder
e.) Concrete 139.72 m³
Sample / Day of Pouring
607.50 m²
Thickness Determination
f. Completed Pavement 607.50 m²
5 hole / km / lane
B.5 Project Billboard / Signboard 2.00 each I.R. I.R.
B.7 Occupational Safety & Health Program 1.20 month I.R. I.R.
B.8 Traffic Management 1.20 month I.R. I.R.
B.9 Mobilization / Demobilization 1.00 L.s. I.R. I.R.
Name of Project and Location : Concreting of Brgy. Road Brgy. Jerusalem Sta. 0+000 - Sta. 0+130.50 Cadiz City, Neg. Occ. (15GK0146)
Implementing Office : DPWH -Neg. Occ. 1st. Dist. Eng'g. Office Name of Contractor : Redson Construction and Supplies
Project Duration : DPWH Project Inspector :
a. Date Started : Project Accomplishment :
b. Target Completion Date : Project cost : ₱ 2,000,000.00
Note: 1. Indicate the Name of batching plant as source of ready-mix concrete and hot -bituminuos mix to column (4).
2. Indicate the name of testing laboratories on the sample tested to column (11).
Name of Project and Location : Construction of Brgy. Road Brgy. Cadiz Viejo Sta. 0+000 - Sta. 0+130.50 Cadiz City, Neg. Occ. (15GK146)
Implementing Office : DPWH -Neg. Occ. 1st. Dist. Eng'g. Office Name of Contractor : Redson Construction and Supplies
Project Duration : DPWH Project Inspector :
a. Date Started : Project Accomplishment : 45 %
b. Target Completion Date : Project cost : ₱ 1,720,636.63
Note: 1. Indicate the Name of batching plant as source of ready-mix concrete and hot -bituminuos mix to column (4).
2. Indicate the name of testing laboratories on the sample tested to column (11).
PROJECT : Construction of Brgy. Road Brgy. Cadiz Viejo Sta. 0+000 - Sta. 0+130.50 Cadiz City, Neg. Occ. (15GK146)
CONTRACTOR : Redson Construction & Supplies DATE: March 28, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above
mentioned project for the period Feb. 2, 2016 - March 28, 2016 ; We further certify that we have found the quality
of materials in the following items of work corresponding to the quantity accomplished conforms with the
STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
TOTAL ACCOMPLISHEMENT
THIS WEEK
TO DATE
Spl. -2 Provide & Maintain Traffic Control 1.00 L.s. 1.00 1.00 1.25 %
Spl. -3 Provide Project Sign Board 1.00 each 1.00 1.00 0.23 %
Spl. -4 Construction Safety & Health 1.00 L.s 1.00 1.00 1.23 %
PROJECT : Construction of Brgy. Road Brgy. Cadiz Viejo Sta. 0+000 - Sta. 0+130.50 Cadiz City, Neg. Occ. (15GK146)
CONTRACTOR : GKMM Construction & Supplies DATE: December 8, 2015
We hereby certify that we have conducted an inspection and verification of work accomplished on the above
mentioned project for the period December 1 - 7, 2015 ; We further certify that we have found the quality of
materials in the following items of work corresponding to the quantity accomplished conforms with the STANDARD
SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
TOTAL ACCOMPLISHEMENT
THIS WEEK
TO DATE
PROJECT : Construction of Brgy. Road Brgy. Cadiz Viejo Sta. 0+000 - Sta. 0+130.50 Cadiz City, Neg. Occ. (15GK146)
CONTRACTOR : GKMM Construction & Supplies DATE: December 16, 2015
We hereby certify that we have conducted an inspection and verification of work accomplished on the above
mentioned project for the period December 8 - 15, 2015 ; We further certify that we have found the quality of
materials in the following items of work corresponding to the quantity accomplished conforms with the STANDARD
SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
TOTAL ACCOMPLISHEMENT
THIS WEEK
TO DATE
PROJECT : Construction of Brgy. Road Brgy. Cadiz Viejo Sta. 0+000 - Sta. 0+130.50 Cadiz City, Neg. Occ. (15GK146)
CONTRACTOR : GKMM Construction & Supplies DATE: December 23, 2015
We hereby certify that we have conducted an inspection and verification of work accomplished on the above
mentioned project for the period December 16 - 22, 2015 ; We further certify that we have found the quality of
materials in the following items of work corresponding to the quantity accomplished conforms with the STANDARD
SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units TOTAL
THIS WEEK ACCOMPLISHEMENT
TO DATE
I. Excavation & Backfill 56.42 m³ 32.14 57 %
PROJECT : Construction of Road, Sitio Macabal - ong, Brgy. Magsaysay, Cadiz City, Negros Occidental Sta. 0+000 - Sta. 0+130
CONTRACTOR : Silvergraces Const. & Const. Supply DATE: May 01, 2017
We hereby certify that we have conducted an inspection and verification of work accomplished on the above
mentioned project for the period April 25 - April 30, 2017 ; We further certify that we have found the quality of
materials in the following items of work corresponding to the quantity accomplished conforms with the STANDARD
SPECIFICATIONS and Special provisions of the contract viz.:
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
TOTAL ACCOMPLISHEMENT
THIS WEEK
TO DATE
Embankment from Roadway Excavation
104 (1) a1 72.90 m²
(Common Material)
Embankment from borrow (Common
104 (1) b1 9.72 m³
Material)
105 (1) a Subgrade Preparation (Common Material) 850.50 m²
200 (1) Aggregate Subbase Course 257.34 m³
311 (1) c1 PCC Pavement (Unreinforced) 0.23 m thk. 607.50 m²
B.5 Project Billboard / Signboard 2 each 2.00 2.00 100.00%
B.7 Occupational Safety & Health Program 1.20 month 0.60 0.60 50.00%
B.8 Traffic Management 1.20 month 0.60 0.60 50.00%
B.9 Mobilization / Demobilization 1.00 L.s. 1.00 1.00 100.00%
PROJECT : Construction of Road, Sitio Macabal - ong, Brgy. Magsaysay, Cadiz City, Negros Occidental Sta. 0+000 - Sta. 0+130
CONTRACTOR Redson Construction & Supplies DATE: February 16, 2016
QUANTITY ACCOMPLISHED
%
ITEM NO. PROGRAMMED units
TOTAL ACCOMPLISHEMENT
THIS WEEK
TO DATE
PROJECT : Construction of Road, Sitio Macabal - ong, Brgy. Magsaysay, Cadiz City, Negros Occidental Sta. 0+000 - Sta. 0+130
CONTRACTOR Redson Construction & Supplies DATE: February 23, 2016
QUANTITY ACCOMPLISHED
%
ITEM NO. PROGRAMMED units
TOTAL ACCOMPLISHEMENT
THIS WEEK
TO DATE
PROJECT : Construction of Road, Sitio Macabal - ong, Brgy. Magsaysay, Cadiz City, Negros Occidental Sta. 0+000 - Sta. 0+130
CONTRACTOR Redson Construction & Supplies DATE:
QUANTITY ACCOMPLISHED
%
ITEM NO. PROGRAMMED units TOTAL
THIS WEEK ACCOMPLISHEMENT
TO DATE
INSPECTION REPORT
Name of Project : Concreting of Brgy. Road Brgy. Jerusalem Sta. 0+000 - Sta. 0+130.50 Cadiz City, Neg. Occ. (15GK0146)
QUANTITY
ITEM NO. DESCRIPTION REMARKS
Planned Actual
SPL -1 Mobilization & Demobilization 1.00 L.s. 1.00 L.s. The indicated item of works have been
accomplished in accordance with the plans,
specifications and program of works.
SPL -2 Provide & Maintain Traffic Control 1.00 L.s. 1.00 L.s.
Inspected by:
RICKY M. BUSTILLO
Project Engineer-DPWH Neg. Occ. 1st Eng'g. Dist.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MATERIALS AND QUALITY CONTROL SECTION
Negros Occidental 1st District Engineering Office
Matab-ang, Talisay City, Negros Occidental
Name of Project Rehabilitation / Improvement of Multi -Purpose Bldg. at Brgy. 5, Silay City, Negros Occidental
:
Contractor /
Administration : Administration
Date
Item No. Kind of Test No. of Tests Cost per Test Total Cost Cost of rental Remarks
Conducted
II FT 5 9/11/2012 P 90.00 P 450.00
G 2 9/11/2012 370.00 740.00
U.W 3 9/17/2012 90.00 270.00
COMP. 3 9/20/2012 120.00 360.00
TOTAL P 1,820.00
NOTED:
BILL NO. :
DATE :
Redson Construction & Supplies
(Name of Contractor/Supplier)
Bacolod City
(Address)
Note:
Concreting of Brgy. Road in Brgy. Cadiz Viejo Sta. 0+000 -
Sta. 0+130.50 Cadiz City, Negros Occidental
ARNEL P. TORREFRANCA
Engineer III
APPROVED:
TOTAL AMOUNT
1,000.00
1,680.00
2,680.00
and materials furnished,
L P. TORREFRANCA
Engineer III