Data:
Luas Catchment areal 53.8 Km2 α = 1.4640389 ~2
(A):
Panjang Sungai (L): 27.40 Km2 R0 = 1 mm
tg 1.989 Jam t = 5
Tr 1.492 Jam
tp 3.183 Jam
t0.3 3.978 Jam
Qp 3.029 m3/det
Perhitungan
Durasi Hujan I
Rt (mm) Rasio (%)
(Jam) (mm/jam)
Rekapitulasi
Debit Remcna
Metoda Q2 Q5 Q10 Q25 Q50 100
HSS Nakayasu 300.173 391.301 439.034 485.683 522.568 552.944
tabel hujan rencana
No T XT
1 2 137.90
2 5 179.76
3 10 201.69
4 25 223.12
5 50 240.07
6 100 254.02
500
GRAFIK HSS N
300.173
193.640 600
175.082
143.094 500
10 15 20 25 30
t (Jam)
Metode Hasper
Data:
Luas Catchment Areal (A): 53.8 km2
Panjang Sungai Eff (L): 27.40 km 27400 m
Kemiringan Sungai Rata-rata (i): 0.0445 m2
Elevasi Tertinggi 1226.25 m
Elevasi Terendah 7.71 m
No T α tc 1/β β Xi
1 2 0.538 3.596 1.221 0.819 130.735
2 5 0.538 3.596 1.221 0.819 173.477
3 10 0.538 3.596 1.221 0.819 201.184
4 25 0.538 3.596 1.221 0.819 232.375
5 50 0.538 3.596 1.221 0.819 260.739
6 100 0.538 3.596 1.221 0.819 286.521
r I Q tabel hujan rencana
102.287 7.902 187.396 No T XT
135.729 10.486 248.663 1 2 137.90
157.407 12.160 288.378 2 5 179.76
181.811 14.046 333.088 3 10 201.69
204.003 15.760 373.745 4 25 223.12
224.174 17.318 410.701 5 50 240.07
6 100 254.02
Metode Mononobe
DATA SUNGAI
A = 53.8 Km2
L = 27.40 Km 27400 m
α = 0.54
∆H = 1.21854 Km 1218.54 m
S = 0.0445
V = 11.122 km/jam
t = 2.464 jam
Qn (M³/dt)
199.871
265.216
307.575
355.261
398.624
438.040
Cara weduwen untuk banjir batang jalamu
Data
A 53.8
S 0.044472
tabel menghitung t dengan coba coba sehingga t1=t
t₁ t+1 t+9 (t+1)/(t+9) 120+A {(t+1)/(t+9)}xA β I α
1 2 3 4 5 6 7 8 9
3 4 12 0.333333 173.8 17.933333333 0.79363252781 15.20225 0.815334
3.1 4.1 12.1 0.338843 174.463 18.454404959 0.79360325661 14.86813 0.812513
3.2 4.2 12.2 0.344262 174.463 18.749557377 0.7952950332 14.54839 0.809731
3.3 4.3 12.3 0.349593 174.463 19.039910569 0.79695930122 14.24211 0.806987
3.35 4.35 12.35 0.352227 174.463 19.183323887 0.79778132834 14.09375 0.80563
3.39 4.39 12.39 0.354318 174.463 19.297221146 0.79843417313 13.97727 0.80455
Qn Qjalamu Rn mn mi Ri Qmax
1 2 3 4 5 6 = (5/4)x3 7 = 2x(6/240)
Q2 483.06 130.735 0.4 55.046333174 110.793486226
Q5 483.06 173.4774 0.6 109.56467955 220.524276821
Q10 483.06 201.184 0.7 148.2408321 298.368985594
0.95
Q25 483.06 232.3747 0.85 207.91422237 418.475495164
Q50 483.06 260.7395 0.95 260.73945424 524.798500929
Q100 483.06 286.5214 1 301.60146957 607.042764484
A^3/8 (α.β.I)^1/8 S^¼ t Qmax
10 11 12 13
4.477526 1.33078485843377 0.459222 3.487505 529.2308
4.477526 1.32651217773919 0.468806 3.362406 515.7892
4.477526 1.32269726229977 0.468806 3.372104 504.0411
4.477526 1.31896908696416 0.468806 3.381636 492.787
4.477526 1.31713634161647 0.468806 3.386341 487.3356
4.477526 1.31568477762356 0.468806 3.390077 483.0555
nakayasu
hasper
monobe
weduwen
10 20 30 40 50 60
Data Lapangan
b 45 BEDA TINGGI 0.1
h 2 jarak 100
m 1 k 35
A 94 0.5
P 50.65685 i 0.001
R 1.855623
v 1.671326
Q lapangan 157.1046
1 Perhitungan rata-rata hujan (Rt) sampai jam ke t adalah :
Rt₁ =
= 0.585 x R₂₄
(𝑅₂₄)/6{6/1 }
^(2/3)
Rt₂ =
= 0.368 x R₂₄
(𝑅₂₄)/6{6/2 }
^(2/3)
Rt₃ =
= 0.281 x R₂₄
(𝑅₂₄)/6{6/3 }
^(2/3)
Rt₄ =
= 0.232 x R₂₄
(𝑅₂₄)/6{6/4 }
^(2/3)
Rt₅ =
= 0.200 x R₂₄
(𝑅₂₄)/6{6/5 }
^(2/3)distribusi tinggi hujan (RT) pada jam ke t :
2 Perhitungan
RT₁ = 1 x R₁ = 0.585 x R₂₄
RT₂ = 2 x R₂ - 1 x R₁ = 0.152 x R₂₄
RT₃ = 3 x R₃ - 2 x R₂ = 0.107 x R₂₄
RT₄ = 4 x R₄ - 3 x R₃ = 0.085 x R₂₄
RT₅ = 5 x R₅ - 4 x R₄ = 0.072 x R₂₄
3
Waktu (jam)
Kala Hujan Koefisie Hujan
n 1 2 3 4 5
Ulang Rencana Netto
Pengalir Rasio RT
(tahun) (mm) an (mm) 58.48% 15.20% 10.66% 8.49% 7.17%
Sumber: Perhitungan
Volume UH 36,574.70 m3
Luas DAS 53.84 km2
R netto = Volume
0.68 mm
UH/Luas DAS
R netto dibulatkan 1.00 mm
kurva naik
kurva naik Hidrograf Satuan Sintetis
kurva naik
2.0
kurva naik
kurva turun 1 1.8
kurva turun 1 1.6
Hidrograf Satuan (m3/dt/mm)
kurva turun 1
1.4
kurva turun 1
kurva turun 2 1.2
kurva turun 2 1.0
kurva turun 2
0.8
kurva turun 2
kurva turun 2 0.6
kurva turun 2
0.4
kurva turun 3
kurva turun 3 0.2
300.000
→ OK
250.000
Q 200.000
(m3/det)
11
11.638
T (JAM)
150.000
19.116
53.049
127.696
140.586
130.705
117.654 100.000
101.545
82.540
67.032
55.568
46.973 50.000
40.452
35.181
31.289
28.202
25.694 0.000
23.640 0 5 10
21.946
20.497
19.251
18.181
17.261
16.471
15.791
140.586
(m3/det)
11
11.638
21.386
65.620
162.929
179.733
166.852
149.839
128.840
104.065
83.848
68.904
57.700
49.200
42.329
37.255
33.230
29.961
27.284
25.076
23.186
21.563
20.167
18.968
17.938
17.052
179.733
Q
(m3/det)
11
11.638
21.386
65.929
164.778
185.366
174.802
158.585
137.145
110.519
88.718
72.671
60.689
51.633
44.317
38.879
34.574
31.088
28.240
25.896
23.892
22.169
20.688
19.416
18.322
17.383
185.366
Q
(m3/det)
11
11.638
23.737
78.641
199.421
220.277
204.290
183.173
157.109
126.359
101.266
82.717
68.810
58.259
49.731
43.433
38.438
34.381
31.057
28.317
25.972
23.956
22.225
20.736
19.457
18.358
220.277
(m3/det)
11
11.638
24.656
83.729
213.682
236.122
218.921
196.200
168.156
135.071
108.072
88.115
73.152
61.800
52.624
45.848
40.473
36.108
32.532
29.583
27.060
24.892
23.028
21.427
20.051
18.868
236.122
(m3/det)
11
11.638
25.413
87.920
225.427
249.171
230.970
206.928
177.255
142.246
113.678
92.560
76.728
64.716
55.006
47.837
42.149
37.531
33.747
30.626
27.957
25.662
23.691
21.996
20.540
19.288
249.171
ograf Satuan Sintetis (HSS) Nakayasu
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Waktu (jam)
10 15 20 25
DEBIT (m3/dt)
23 24
25 30
Perhitungan Hidrolis Bendung Batang Jalamu
Untuk sungai yang lebarnya kurang dari 100 meter, maka untuk lebar
pintu penguras ditambah dengan lebar pilar sebaiknya sama dengan 1/6
sampai dengan 1/10 dari lebar bersih bendung (jarak antara pangkal ke
pangkalnya) maka:
𝐵𝑝=1/6 𝑥 45=
7.5 m
𝐵𝑝=1/█(10@@) 𝑥 45=
4.5 m
Karena pengaliran air di atas pintu penguras lebih sulit dari pada
pengaliran di atas mercu bendung, maka kemampuan pintu penguras
untuk mengalirkan air sewaktu banjir dianggap hanya 80% saja atau
dengan rumus: Be = Bb – 𝛴b – Σt + 0,80Σb
Be = Bb – 0,20 𝛴b – Σt
(Soenarno., 1980)
Be = 45 - 0,20 x 4,5 - 2
Be = 42.1
h B Q i k m A P
No.
m m m3/dt m m
1 1 3 4 5 6 7 8 9
1 0.5 45 249.1712 0.001 35 1 22.75 46.41421
2 1 45 185.3662 0.001 35 1 46 47.82843
3 1.5 45 185.3662 0.001 35 1 69.75 49.24264
4 2 45 185.3662 0.001 35 1 94 50.65685
5 2.21 45 185.3662 0.001 35 1 104.3341 51.25082
perhitungan tinggi muka air di hulu bendung
𝑄=𝐴 𝑋 𝑉
𝑄=𝐴. 𝐾. 𝑅^(2/3)
𝑄/(𝐾.𝐼^(1/2) )=𝐴.𝑅^(2/3)
𝑄/
(𝐾.𝐼^(1/2)
)=𝐴.𝐴^(2/3)/𝑃^(2/3)
𝑄/(𝐾.𝐼^(1/2) )=𝐴^(5/3)/𝑃^(2/3)
Q = 249.1712 m3 /dt
Be = 38.50 m
P = 1.75 m
g = 9.81 m/dt2