S-34-116 (Column RF)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

METRIC

MEASUREMENTS SHOWN ON THESE PLANS


ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

SANITARY SCREEN
WWF SHAFT SHAFT

SCREEN BUILDING

KEY PLAN
NO SCALE
H J K L M N P

385
7050 6350 4950 6800 6800 6865
B
S-34-303
5655 8850 5760 4610

CL BAR SCREEN

CL BAR SCREEN

CL BAR SCREEN

CL BAR SCREEN
CL DUMPSTER
A C 685

CL DUMPSTER
MTI-NORTH

MTI-SOUTH

HLI-NORTH
HLI-SOUTH
S-34-304 S-34-604
A
S-34-202

34-C8 VERTICAL BRACE, TYP 34-C9 34-C10 34-C11 34-C12


4 CONC WALL,
34-BP1 34-BP1 34-BP3 34-BP1 34-BP1
34-PD1 34-PD1 34-PD3 34-PD1 34-PD1 EL 80.380 m
34-C31 TYP
DET ALUM CHKD
PL COVER
MATCHLINE - SEE DRAWING NO S-34-102

A A
4780

S-34-302 EL 80.380 m S-34-302


UP
3353 623 DN
STAIR 3
TOC EL 80.520 m
36

34-PD7 34-PD7 34-C13


EL 80.380 m 34-PD7 34-PD7
34-BP2
600

3 TOC EL 80.520 m 34-PD2


1063

400 250 34-PD8 34-PD8 700


1200

450 TOC EL 80.520 m TOC EL 80.750 m


2653
34-PD9 34-PD9 34-PD9
250

2020
2101

2100
34-PD9

700
138
2103 3653

4915
1395
5076

34-PD10
4950

34-PD8 34-PD8 34-PD8 34-PD8 34-PD8 34-PD8 34-PD8


184 1914 3800 3804 233

2801
3900 4200 2613 700

683
B

1750
1912

34-PD8 34-PD9 34-PD9 34-PD9 34-PD9 318

1067
193 S-34-203
3653
EL 80.380 m 2653
2 34-C14
EX PRECAST SLAB EX PRECAST SLAB

162
UP EX PRECAST SLAB
COVER COVER 34-BP2
34-PD7 34-PD7 EX PRECAST SLAB COVER 34-PD7 34-PD7
COVER 34-PD2

3353 1588
4780

A A 317
S-34-301 S-34-301

TRENCH
GRATE, TYP
ELEV. TOC
SB1 EL 80.380 m
34-C20 34-C19 34-C18 34-C17 34-C16 34-C15
STAIR 2 ELECTRICAL
1 34-BP1 34-BP1
ROOM
34-BP3 34-BP1 34-BP1 34-BP3
34-PD1 34-PD1 34-PD3 34-PD1 34-PD1 34-PD3

NOTES :

A 1. FOR NOTES REFER TO DWG S-34-101 AND S-34-102.


C S-34-201
2. CURB WIDTH TO BE 10mm LESS THAN CMU BLOCK SIZE. OMIT CURB AT
S-34-304 DOOR OPNGS. REFER TO ARCH DWGS FOR LOCATION OF CMU WALLS
B B A AND DOOR OPNGS.
S-34-303 S-34-402 S-34-304

EQUIPMENT PEDESTAL PLAN AT EL 80.250m


BIM 360://192320 - ABTP IPS CC3/192320-34-Screen_Bldg_C3.rvt

1 : 75

METER 0 1 2 3 4 5 6 7 7.5METERS

SCALE 1:75

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. SIMON HOPTON, P. ENG.
SCREEN BUILDING - EQUIPEMENT PEDESTAL PLAN AT EL 80.250m
5/25/2022 4:43:44 PM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: D.K./J.C. DRAFTING: D.G./N.A. CHECK: D.T. CONTRACT No.
CONSTRUCTION SCALE: DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MARCH 2022 NUMBER: 1001-XXXX-X-XX S-34-116
400

10M TIES @150c/c 450


10M TIES @150c/c at the support
HLI & MTI
Refer Snapshot 3
is valid for Post

1/2" BASE PLATE

2"
EL 85.25' EL 80.25'

3"
1'-3"
3'-7'' 1"⌀ HEX HEAD ASTM
600

2'-3"
1'-5'' F 1554 GR.36 1

250
12- 15M 10- 15M
#6 (20mm dia)
#4 TIES

For Post A,B,C #6 U BAR


#8 (25mm dia)

Bars to be bend like this if space is not


For Post D available to accommodate 3'-7'' U bar
length on grade slab

Cover 50mm Cover 50mm PD stirrups


10M @ 150

Typical RF for PD7 Typical RF for PD9

270
250

10-15M (Pedestal RF)


700 10M TIES @150c/c
10M TIES @150c/c

750
20M Ties

25M U bar
1200

16- 15M 18- 20M

700

Cover 50mm

Typical RF for PD8 Typical RF for PD10


BIM 360://192320 - ABTP IPS CC3/192320-34-Screen_Bldg_C3.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. SIMON HOPTON, P. ENG.
SCREEN BUILDING - EQUIPEMENT PEDESTAL PLAN AT EL 80.250m
5/25/2022 4:43:44 PM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: D.K./J.C. DRAFTING: D.G./N.A. CHECK: D.T. CONTRACT No.
CONSTRUCTION SCALE: DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MARCH 2022 NUMBER: 1001-XXXX-X-XX S-34-116