Key Plan: H J K L M N P

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

METRIC

MEASUREMENTS SHOWN ON THESE PLANS


ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

SANITARY SCREEN
WWF SHAFT SHAFT

SCREEN BUILDING

KEY PLAN
NO SCALE
H J K L M N P

385
7050 6350 4950 6800 6800 6865
B
S-34-303
5655 8850 5760 4610

CL BAR SCREEN

CL BAR SCREEN

CL BAR SCREEN

CL BAR SCREEN
CL DUMPSTER
A C 685

CL DUMPSTER
MTI-NORTH

MTI-SOUTH

HLI-NORTH
HLI-SOUTH
S-34-304 S-34-604
A
S-34-202

34-C8 VERTICAL BRACE, TYP 34-C9 34-C10 34-C11 34-C12


4 CONC WALL,
34-BP1 34-BP1 34-BP3 34-BP1 34-BP1
34-PD1 34-PD1 34-PD3 34-PD1 34-PD1 EL 80.380 m
34-C31 TYP
DET ALUM CHKD
PL COVER
MATCHLINE - SEE DRAWING NO S-34-102

A A
4780

1 DET SIM
S-34-302
S-34-612
EL 80.380 m DET 2 S-34-302

S-34-612 UP
DET 2 STAIR 3
3353 623 DN S-34-612
36

34-PD7 34-PD7 34-C13


EL 80.380 m SIM 34-PD7 34-PD7
DET 1 34-BP2
3 S-34-612 34-PD2
1063

34-PD8 34-PD8 700

2653
34-PD9 34-PD9 34-PD9
2020
2101

2100
138 34-PD9
2103 3653

4915
1395
5076

34-PD10
4950

34-PD8 34-PD8 34-PD8 34-PD8 34-PD8 34-PD8 34-PD8


184 1914 3800 3804

2801
3900 4200 2613 700

683
B

1750
1912

34-PD8 34-PD9 34-PD9 34-PD9 34-PD9 318

1067
341 S-34-203
3653 193
EL 80.380 m 2653
2 34-C14
EX PRECAST SLAB EX PRECAST SLAB

162
UP EX PRECAST SLAB
COVER COVER 34-BP2
34-PD7 34-PD7 EX PRECAST SLAB COVER 34-PD7 34-PD7
COVER 34-PD2

3353 1588
4780

A A 317
S-34-301 S-34-301

TRENCH
GRATE, TYP
ELEV. TOC
SB1 EL 80.380 m
34-C20 34-C19 34-C18 34-C17 34-C16 34-C15
STAIR 2 ELECTRICAL
1 34-BP1 34-BP1
ROOM
34-BP3 34-BP1 34-BP1 34-BP3
34-PD1 34-PD1 34-PD3 34-PD1 34-PD1 34-PD3

NOTES :

A 1. FOR NOTES REFER TO DWG S-34-101 AND S-34-102.


B B C S-34-201
2. CURB WIDTH TO BE 10mm LESS THAN CMU BLOCK SIZE. OMIT CURB AT
S-34-303 S-34-402 S-34-304 DOOR OPNGS. REFER TO ARCH DWGS FOR LOCATION OF CMU WALLS
A AND DOOR OPNGS.
S-34-304

EQUIPMENT PEDESTAL PLAN AT EL 80.250m


BIM 360://192320 - ABTP IPS CC3/192320-34-Screen_Bldg_C3.rvt

1 : 75

METER 0 1 2 3 4 5 6 7 7.5METERS

SCALE 1:75

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. SIMON HOPTON, P. ENG.
SCREEN BUILDING - EQUIPEMENT PEDESTAL PLAN AT EL 80.250m
5/26/2022 3:28:03 PM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: D.K./J.C. DRAFTING: D.G./N.A. CHECK: D.T. CONTRACT No.
CONSTRUCTION SCALE: DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MARCH 2022 NUMBER: 1001-XXXX-X-XX S-34-116

You might also like