Professional Documents
Culture Documents
Post Tension Stressing Log
Post Tension Stressing Log
PAGE 1 OF 8
PROJECT NAME: Spring St Mixed Use PROJECT NO.: 04865-03
DATE: 6/1/2022 LOCATION: Level 10 Pour 10B
STRESSED BY: Tendon Systems/Anasteel RAM NO.:
POUR #: Level 10 Pour 10B GAUGE NO.:
VERIFIED BY: Palencia Charles JACKING FORCE: 33 KIPS
SPECIAL REMARKS:
82.01 UNIFORM 4 4 4 0%
83.01 UNIFORM 4 3 3/4 3 3/4 -6%
84.01 UNIFORM 4 4 4 0%
85.01 UNIFORM 6 1/8 6 1/4 6 1/4 2%
85.02 UNIFORM 6 1/8 6 3/8 6 3/8 4%
Post Tension Stressing Log
PAGE 3 OF 8
PROJECT NAME: Spring St Mixed Use PROJECT NO.: 04865-03
DATE: 6/1/2022 LOCATION: Level 10 Pour 10B
STRESSED BY: Tendon Systems/Anasteel RAM NO.:
POUR #: Level 10 Pour 10B GAUGE NO.:
VERIFIED BY: Palencia Charles JACKING FORCE: 33 KIPS
SPECIAL REMARKS: