KEY PLAN

)
INT
PO
N

H
RT
(NO
L.O.W

L.O.W

L.O.W
L.O.W
C
L.O.W L.O.W QDV
IN
, NOT
ERS

L.O.W
OTH
PE)
L.O.W (BY
SCO

BUS STOP
L.O.W L.O.W

L.O.W
BUS STOP BUS STOP BUS STOP BUS STOP BUS STOP

L.O.W

L.O.W
STOP
BUS

L.O.W

L.O.W

L.O.W

GATE

SOUT

EXISTI
PARKI
NG
-03

CAR
L.O.W
L.O.W

EXISTI
NG
PARKI
NG
L.O.W BUS STOP

BENDING SCHEDULE

GATE
SOUT
BUS STOP

-04
H

L.O.W
L.O.W
P
STO
BUS

BUS
STO
P

L.O.W
L.O.W

GATE-0

SOUTH
BUS STOP

5
BUS STOP

L.O.W
L.O.W

L.O.W
PARKING 9 NOS.
PARKING 9 NOS.

YARD
)

CHILLER
(400Sqm

N
249

PRESSURISATIO
Q-RAIL

AREA
INDICATIVE
MUSTER
EMERGENCY

PLANT
STAIR

MP
FP
249

EXIT
249
249 253 259 1550

220
258 NOTES:
272
249 277
-ELEMENT NAME = STF-1
266
-CONCRETE GRADE = M40 CUBE
249
267 -REINF. GRADE = FY 500
-STRIPPING STRANTH = M20
249
265 -ELEMENT VOLUME = 0.92 CUM
249 264
6 -ELEMENT WEIGHT = 2.21 Ton
249 260 263
-MINIMUM COVER = 30MM
262 -QUANTITY TO BE CAST =

-MAXIMUM POST DRILLED CORING SIZE TO BE DONE THROUGH PRECAST


261
ELEMENTS WITHOUT DESIGN RE CHECK IS 250MM.
SECTION- A
-ALL DIMENSION ARE IN MM U.N.O.

TOLERANCES
-HEIGHT : ±6MM -LENGTH : ±12MM

-WIDTH : ±6MM
-PENING SIZE : ±6MM -LOCATION : ±12MM
259

6 LEGENDS
260
220 6 MOULD FACE C = 15 x15 MM. CHAMFER
258
rf ROUGH FACE
261

263
REFERENCE DRAWING:
249 1. C-110-01-D-STR-DWG-1550-UPF-840506-840507-B2
265
2. C-110-01-D-STR-DWG-1550-UPF-840508-840509-B1
249 272
3. C-110-01-D-STR-CLN-1550-UPF-840700-A1
267 4. C-110-01-W-STR-SHD-1550-UPF-854058-A1
249

268
271

262 269
266
274 277 270
264 276
274 A 1 ISSUED FOR APPROVAL 30.09.2021 GP DKP QH
273 REV VER Description Date Drawn Checked Authorised
275

P
SHOP DRAWING
Employer: Engineer:

QATAR EMIRI CORPS OF


QATAR ARMED FORCES
ENGINEERS

End User: Contractor:

QDVC P.Q.S.C.
QATAR EMIRI AIR FORCE
P.O.Box: 19389, Doha, Qatar
Phone: (+974) 4453 8400
Fax: (+974) 4463 7479
e-mail: info@qdvc.com

DEVELOPMENT OF DOHA AIR BASE

Originator: Document Review Status

U P F
Document Title: 1550 WATCH TOWER
(TYPICAL TO 1552, 1553, 1555, 1557,1559)
PRECAST ELEMENT: STF-1
REINFORCEMENT DETAIL
Contractor's Verification Stamp:
This document is considered ready for review and approval in accordance with Sub-Clause 5.2 of the General/Particular Conditions
of Contract and ready for use. This document complies with the Contract.
This document does not comply with the Contract to the following extent:______________________________________________________.

Original Scale Drawn MS Checked DKP Authorised QH Size

AS SHOWN Date: 30.09.2021 Date: 30.09.2021 Date: 30.09.2021


A1
Drawing Number Rev Ver
C-110-01-W-RFT-SHD-550-UPF-854059 A 1
THIS DOCUMENT IS UNCONTROLLED ONCE DOWNLOADED OR PRINTED DDAB-TEC-TMP-6018 Rev. F DATE : 2021-01-16