Roof of 4Th Floor Roof of 5Th Floor

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NO

(PART-01)
MATCH LINE (PART-02)

(PART-02)
MATCH LINE (PART-03)
A'

R
P1'

TH
15500 8400 8400 8400 8400 8400 8400 9700 10650 4850

JOINT

JOINT
15' 15 14 13 12 11 10 9 8 7' 7 6' 6

MATCH LINE EXP.

MATCH LINE EXP.


KEY PLAN:

MATCH LINE (PART-2)


MATCH LINE (PART-3)
MATCH LINE (PART-1)
MATCH LINE (PART-2)
PA' PA PB PC PD PE PF PG PH

P1' A'

EXP. JOINT

EXP. JOINT

EXP. JOINT
23' 23 22 21 20 19 18 17 16 15' 15 14 13 12 11 10 9 8 7' 7 6' 6 5 4 3 2 1 1' 2' 3' 4'

P1 A

P2
QIBLA

SMOKE
SHAFT SMOKE
SHAFT C

P3
SMOKE
SHAFT

C'

D
WASHING
WITHMACHINE
DRYER WASHING
WITH DRYER
MACHINE WASHING
WITHMACHINE
DRYER WASHING
WITHMACHINE
DRYER MACHINE
DRYER
WASHING
WITH WASHING
WITHMACHINE
DRYER

WASHING MACHINE

WITH DRYER

ENIHCAM GNIHSAW

REYRD HTIW
P4 WASHING
WITH DRYER
MACHINE
E

P5 F

WASHING MACHINE

WITH DRYER

WASHING MACHINE

WITH DRYER
WITH DRYER

WASHING MACHINE

WASHING
WITHMACHINE
DRYER WASHING
WITH DRYER
MACHINE WASHING
WITH DRYER
MACHINE WASHING
WITHMACHINE
DRYER WASHING
WITHMACHINE
DRYER
WASHING
WITH DRYER
MACHINE

SMOKE
G'
SHAFT

P6

SMOKE
SMOKE
H

P1
SHAFT SHAFT

A
P7

P8 K

P9 L

MATCH LINE (PART-2)


MATCH LINE (PART-3)
MATCH LINE (PART-1)
MATCH LINE (PART-2)
3700

FRESH AIR
SHAFT

B
·
2700

·
·

P2 ·

ROOF OF 4TH FLOOR


ROOF OF 5TH FLOOR
6300

SHEAR WALL CONT.AS/STRUCTURAL DET. SHEAR WALL CONT.AS/STRUCTURAL DET.

ELECT.
C
SMOKE
SHAFT
ELECT. ROOM WASTE
FCU-06
FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06
COLLECTION FCU-06 FCU-06
2700

878 CFM D2
BOU +3598 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM GARBAGE 878 CFM FCU-10 878 CFM
SHAFT
BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3600 BOU +3547 1231 CFM BOU +3547
BOU +3600
BED RM
P3 D2
BED RM BED RM
BED RM BED RM
BED RM
D6a BED RM
BED RM
BED RM
BED RM BED RM BED RM BED RM
MED VOLTAGE
ELECT.
FCU-03A BED RM
365 CFM
BOU +3777
C'
C
5300

D2 D2 D2 D2 D2 D2

SERVICE
D2

BED RM
ST1 ST-08 PNEUMATIC D2 D2 D2 D2 D2 D2 D2 ST1

D
WITH DRYER WITH DRYER

SHAFT
WITH DRYER

STAND STAND
WASHING MACHINE WASHING MACHINE
T
WASHING MACHINE

FHC
D4 D4 D4
D2
FLEXIBLE DUCT SIZES
D2 D2
MAX. FLOW RATE (Cfm) SIZE (in.)
WASHING MACHINE
WITH DRYER

D5 93 6
D4 D4 D4
SUPPORT 195 8

SHAFT SHAFT ROOM 360 10


3950

TOILET KITCHEN D5 582 12


D5 D4 D4 D4
D4 815 14
SHAFT TOILET
DRAWING+DIN. DRAWING+DIN. DRAWING+DIN. D2
FCU-03
D2 1065 16

365 CFM 1350 18

P4 D4
IDF
ROOM
D4 D4
BOU +3598
TOILET
D2
DRAWING+DIN. STORE FCU-08
E 1663

2000
20

22
D2 FCU-10 D2 FCU-10 D2 1019 CFM
D4 D4
D4 BOU +3346
FCU-08A 1231 CFM 1231 CFM
1019 CFM KITCHEN BOU +3647
KITCHEN BOU +4047 KITCHEN
BOU +3080 FCU-10 D1 D4 D1 D4 D1 D1 FCU-06
D4
1231 CFM
HVAC. 878 CFM
D2

BOU +3570 BOU +3547


8500

FCU-06
878 CFM
T
BOU +3398 FCU-10
D2
1231 CFM TOILET D2

PLUMBING
D1 D4 D4 D1 D1
D1
BOU +3820
FCU-10
KITCHEN KITCHEN KITCHEN
1231 CFM
FCU-10 D4 D4
H.K. D2 BOU +4020 D2 D2
1231 CFM HVAC. TOILET DESCRIPTION SYMBOL DESCRIPTION
RECREATION ABBREVIATIONS
P5 SUPPORT
ROOM D5
FCU-03
BOU +3520
D4 D4
DRAWING+DIN.
LOBBY FCU-03
365 CFM
BOU +3579
D2
DRAWING+DIN.
FCU-06 F AHU AIR HANDLING UNIT
365 CFM
TOILET DRAWING+DIN. TOILET D2 D2 878 CFM FCU FAN COIL UNIT
BOU +3547 SHAFT BOU +3680
DRAWING+DIN. D4 LOBBY D4 D4
KITCHEN
SQUARE AIR CEILING DIFFUSER
4350

SUPPORT FCU-06
SHAFT SHAFT SUPPORT RETURN AIR CEILING DIFFUSER
878 CFM
D4 D4 D4 ROOM WITH DRYER
BOU +3600 EXHAUST AIR GRILLE
WASHING MACHINE

FCU-04 SUPPLY AIR GRILLE


D2 D2 D2
T
583 CFM
BOU +3547
FHC

HAVC
STAND WASHING MACHINE
WITH DRYER
D4 WASHING MACHINE
WITH DRYER
D4
STAND WASHING MACHINE
WITH DRYER
D4
FCU-04
583 CFM
FCU-06
G RETURN AIR GRILLE
PERFORATED SUPPLY AIR CEILING
DIFFUSER
ST1
ST-09 BOU +3623 ST1
D2 D2 D2 D2 D2 D2 D2 SUPPLY SLOT LINEAR DIFFUSER
878 CFM
BOU +3900 RETURN SLOT LINEAR DIFFUSER

HVAC. D2 SUPPLY AIR DUCT


SUPPORT FCU-10
BED RM RETURN AIR DUCT
4900

D2 D2 D2 D2 D2
ROOM D2 1231 CFM

SUPPORT
BED RM BOU +3520 G' FRESH AIR DUCT
ROOM
EXHAUST AIR DUCT
BED RM BED RM BED RM
BED RM BED RM BED RM BED RM
SMOKE AIR DUCT

P6 BED RM BED RM BED RM BED RM


MOTORIZED FIRE SMOKE DAMPER
FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06 FCU-06
D6a FIRE DAMPER
2700

878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM 878 CFM GARBAGE FIRE MAN
FIREMAN BOU +3847 BOU +3900 BOU +3900 BOU +3547 BOU +3647 BOU +3900 BOU +3747 BOU +4000 BOU +3700 BOU +3847 BOU +3647 BOU +3747 SHAFT
SERVICE
ELE-26 VOLUME DAMPER
ELE-14
SMOKE
SHAFT
PLUMBING H FLEXIBLE DUCT CONNECTOR

ELECTRIC DUCT HEATER

EXHAUST FAN
EX.FAN
SHEAR WALL CONT.AS/STRUCTURAL DET.
SUPPLY AIR FAN
S.FAN
6300

ROOF OF 5TH FLOOR


Coordinated by

ROOF OF 4TH FLOOR


Discipline Company Date Representative Signature
ARCH. Dr. sulaiman al habib 21-02-2022 Eng.Safeer
HVAC Saudi Aircon 21-02-2022
PLUMBING Saudi Aircon 21-02-2022

P7 ELECTRICAL
LOW CURRENT
Saudi Aircon
Saudi Aircon
21-02-2022
21-02-2022
MED. SERV. FLOWMED 21-02-2022
2700

J
FRESH AIR
3650

SHAFT

PROJECT NAME :
K

MATCH LINE (PART-02)


MATCH LINE (PART-03)
P8 GARB JEDDAH HOSPITAL
ANDULUS JEDDAH, SAUDI ARABIA

NURSES ACCOMODATION TYPICAL FLOOR (12TH TO 15TH)


MATCH LINE (PART-01)
MATCH LINE (PART-02)

OWNER & ARCHITECTURE CONSULTANT :

P.O.BOX 91877 RIYADH 11643 TEL: 966(11)4622224 FAX: 966(11)4620096 SAUDI ARABIA

MEP CONSULTANT :

Mearaj City, Cairo Ring Road, Bldg No: 2075 To 2078


Tel: (202) 2520 4500 (10 lines) Fax: (202) 2520 4505
WWW.shakergroup.com

P9 L MEP CONTRACTOR :

HVAC & MEP PROJECTS & OPERATIONS

SHEET TITLE : SHOP DRAWING


LEVEL-12 TH TO 14 TH
HVAC DUCTING SYSTEM LAYOUT
PART-02

You might also like