Firman Diva Kasta Setta

5111419089
Rombel 2

Jawab :
Perhitungan LHR
LHR 2021 (kend./4 LHR (kendaraan/hari/2jurusan)
Kendaraan
jam/2 jurusan LHR 2021 LHR 2023
kend. Ringan 2T 2196 13176 14251.1616
Bus 8T 452 2712 2933.2992
Truk 2 as 13T 491 2946 3186.3936
Truk 3 as 20T 188 1128 1220.0448
Truk 5 as 30T 199 1194 1291.4304

I sebelum oprasional 0.04


I sesudah operasional 0.04

Lama Perencanaan ke operasi 2


Umur Rencana Jalan 15

Perhitungan LEP
Kendaraan LHR 2025 E C
kend. Ringan 2T 14251.1616 0.0004 0.3
Bus 8T 2933.2992 0.1593 0.45
Truk 2 as 13T 3186.3936 1.0648 0.45
Truk 3 as 20T 1220.0448 1.0375 0.45
Truk 5 as 30T 1291.4304 1.3195 0.45
TOTAL
Perhitungan LEA
Kendaraan LHR 2032 E C
kend. Ringan 2T 25665.5369294496 0.0004 0.3
Bus 8T 5282.70614394864 0.1593 0.45
Truk 2 as 13T 5738.51485990881 1.0648 0.45
Truk 3 as 20T 2197.23175898749 1.0375 0.45
Truk 5 as 30T 2325.7931916942 1.3195 0.45
TOTAL

Perhitungan LER
LEP = 3075.20355168
LEA = 5538.2678645099
LET = 4306.73570809495
LER = 6460.10356214243

CBR (%) >= Persentase


2 2 100
3 8 93.548387096774
4 6 67.741935483871
5 11 48.387096774194
6 4 12.903225806452

CBR
120

100 f(x) = − 21.7511520737327 x + 151.643625192012


R² = 0.973479375436961
80

60

40

20

0
1 2 3 4 5 6 7 8

Cara Analitik

Nilai rata-rata = #REF!


Nilai maksimum = 6%
Nilai minimum = 2%
R = 3.18

CBR Segmen = CBR rata - ((CBR maks-CBR min)/R)


= #REF!

Menentukan data yang idak tersedia

Data Input
CBR :
DDT :
FR :
IPO :
IPT :
LER :
Tipe jalan :
1. Menghitung ITP

Proses Perhitungan
ITP1 16.876334153173
LOG LER 7.372532345
C 0.2
B 9.36
Gt 0.285235728
D 0.449563956872133
LOG FR -0.301029996
DDT* 0.240032489
A 8.268001819
ITP2 16.876334454414

CEK 1.00000

2. Menghitung ITP Sisa


Data ket Bahan
Surface Couse (a1) 0.2 Lapen manual
Tebal Surface Couse 5 cm
x1 60% 100% - 40%
Base Course (a2) 0.13 Batu pecah kelas B
Tebal Base Course (D 20 cm
x2 75% 100% - 25%
Sub Base Course (a3) 0.12 Batu pecah kelas B
Tebal Sub Base Cours 35 cm
x3 95% 100% - 5%
ITP Sisa 6.54

3. Menghitung ITP Pasang

ITP Rencana : 16.87633446


ITP Sisa : 6.54
ITP Pasang : 10.33633446

4. Menentukan Lapisan Perkerasan Jalan

Data ket Bahan


Surface Couse (a1) 0.25 Lapen (mekanik)
Tebal Surface Couse 10 min 5 cm
Base Course (a2) 0.23 LAPEN (mekanik)
Tebal Base Course (D 40 min 25 cm
Sub Base Course (a3) 0.12 Sirtu (Kelas B)
Tebal Sub Base Cours 60 min 10 cm
ITP perkerasan jalan 18.9
ITP Rencana 0
ITP Sisa 0
ITP Pasang 0

Cek ITP Perkerasan jalan rencana sesuai degan ITP Rencana


CEK 0 <1 OKE
Cek ITP Sub Base Couse lebih besar dari ITP Sisa
CEK 0 <1 OKE
Cek ITP Pasang lebih besar dari Base Course dan Surface Course
CEK 0 <1 OKE
san)
LHR 2038
25665.5369294
5282.70614395
5738.51485991
2197.23175899
2325.79319169

LEP
1.710139392
210.273553152
1526.79235738
569.608416
766.81908576
3075.20355168
LEA
3.07986443153
378.690789929
2749.66678027
1025.83257748
1380.9978524
5538.26786451
2.822892695
3.645248672
2
3.4
2
6460.10356214
Kolektor