Project Identification Draft Report: Thalagad Lift Irrigation Project
Project Identification Draft Report: Thalagad Lift Irrigation Project
Submitted By Submitted To
Integrated Energy and Irrigation Special Programme
Department of Water Resource and Irrigation
Pulchowk, Lalitpur
Contents
LOCATION MAP.......................................................................................................................................2
SALIENT FEATURES OF PROJECT........................................................................................................3
PROJECT SUMMARY...............................................................................................................................5
PROJECT IDENTIFICATION QUESTIONNAIRE...................................................................................7
ANNEXES
PHOTOGRAPHS OF PROJECT
PROJECT DEMAND FORM
Page 1 of 15
LOCATION MAP
Page 2 of 15
Page 3 of 15
SALIENT FEATURES OF PROJECT
4 District : Darchula
6 ward : 1
8 Accessibility
9 Location
29.703237° N
a. Latitude :
8 80.640513° E
b. Longitude :
11 Elevation : 1350 m
Page 4 of 15
21 Design Discharge at intake : 4 lps
23 Hydrology
d. Hydrological Region :
24 Geology
25 Beneficiaries
a. Population : 250
b. Household : 40
The identification study suggests that given project
is to be considered for irrigation using none other
than Lift Irrigation. Thus, it is recommended that
26 Recommendation :
the project is to be considered for further feasibility
study. However, flood management is the main
issue at the intake
Page 5 of 15
PROJECT SUMMARY
LOCATION
Thalagad Lift Irrigation project is the first water lifting project in Thalagad. It is located in the
ward number 1 of Shailyashikhar Rural Municipality in Darchula district. The Project area is
accessible from a nearby road AT 1HR by WALKING which is Darchula local road which
connects to Mahakali highway at Gokuleswar.
SOURCE
Thalagad local stream is the source for the project from which the water is to be pumped for
irrigation purpose. The source is perennial and has optimum quantity of water in order to fulfill the
object of project. Catchment area is slightly covered with forest. There is enough discharge of
about 6 LPS or more in all seasons for both drinking purpose and irrigation purpose.
The proposed project area is partially dried up. The place is accessible to the road. There are more
than 30 families residing there. There is the provision of drinking water. However, irrigation is the
issue during the dry season.
Farmers have proper facility of canal. However, the water available is insufficient for irrigation.
The proposed pipe from the stream to the reservoir is new.
AGRICULTURE PRACTICES
Command Area is rain fed and the crops grown are Paddy, wheat and maize. Vegetables farming is
practiced in minor area with water facility but not succeed in region where there is lack of water.
The proposed project supports more vegetable farming as LIFT IRRIGATION is considered to
have given a fruitful outcome from vegetable farming. The production of the crop is very low and
if irrigation facility is made available, they can grow vegetables & have a market for products, thus
contributing to the country’s economy.
Page 6 of 15
COMMAND AREA
Terrace type of topography exists in the command area. The Gross Command Area (GCA) and Net
Command Area (NCA) of the proposed irrigation project is 13.1 Ha and 10 Ha respectively. The
proposed project is supposed to irrigate area through Lift Irrigation.
The Project area comprises of Chhetri (Dhami casted group) as ethnic group mostly. The project is
going to uplift the economy of the people living nearby. The people aware of that fact are more
than ready to co-operate. They are ready to do their part of work and contribute in labor-based
work volunteering.
Page 7 of 15
PROJECT IDENTIFICATION QUESTIONNAIRE
1 Project Location
a. Province : Sudur Paschim
b. Zone :
c. District : Darchula
d.Municipality : Mahakali
e. Topo sheet no. : -
f. Source
Latitude : 29.70667°N
Longitude : 80.63830°E
g. Reservoir
Latitude 29.70505°N
Longitude 80.63995°E
2 Project Status
(New/Improvements/Extensions) : New
3 History of Project (If Existing) : No
Built when : -
By whom : -
Is there a WUG (Y/N) : -
Are there any shallow Tube wells in
the project area : No
4 Type of Project
(Drip/Sprinkler/Surface/GW/Lift/Rain
water) : Lift Irrigation
5 Command Area :
GCA : 13.1 ha
NCA : 10 ha
Type (Tar, Terrace, Plain, Sloped, etc)
: Tar
6 Water Source :
Source Name (Gravity / piped or √ lift
schemes) : Stream
Flow at time of visit (m3/s or l/s) : 6 lps
Page 8 of 15
Estimated Minimum Discharge (m3/s
or l/s) 6 lps
Is there any groundwater potential
(shallow or deep tube wells dug Wells
or conjunctive us)? : No
There are no water right issues and they are
7 Prior water Rights : ready to contribute & use available water by
sharing according to land holding
12 Soil
Discuss texture and depth of soils with : Sandy Loam /clay
farmers and note general situation
note command area and any
problems:
13 Existing Land use within command
area
Irrigated Land : -
Rain fed crop land : 10 ha
Forest and household : 3.1 ha
Grazing Land : -
Page 9 of 15
Total : 13.1 ha
14 Existing Cropping Pattern and Yields :
Rainfeds crop Land
Crops
Wheat : 2 muri /Ropani
Paddy : 4 muri/ Ropani
lintel : 1 muri/ropani
Irrigated Land 0 ha
15 Food Situation
Is project in food surplus or deficit
area? : Average
If in deficit area, for how many
months is there enough food? Food supply is adequate only for 4 months
They are willing to increase their cash crop
production '
16 Land Tenure and Land Holdings
Tenure Type : Personal
Landless : 0
Are there any large landowners? : 10 ropani Landowners
Average Land Holding : 6-7 ropani
17 Accessibility
Nearest Road Head : Mahakali Highway Road
Distance from Road head to project
site (Km/Porter Days : 2 HR porter
18 Marketing
Nearest Market : Gokuleswar
Distance (Km or Hour) : 12 km
19 Agricultural Inputs
Fertilizers Urea, Organic
DAP/Potash, minimally applied
Pesticides
Improved Seeds
Page 10 of 15
20 Existing Cropping Pattern and Yields
Nearest Agricultural Services Centre: : Galfai
Distance (Km or hrs) : 2 hr
21 Number of Beneficiaries in the
Command Area (Identification teams’
Own estimate)
Ethnic Group Households
Brahmin :
Chhetri : 80%
Dalit : 10%
Magar : 10%
Others :
Total 100%
People (population in project area) : 250
Nos. in the request form :
22 Give a brief description on availability The national electricity line is an electric
of the nearest electricity outlet and the source located near the tentative delivery
inlet point of tentative delivery pump pump location of the project. People are
location? easily getting access to electricity with the
same source. Suitable lengths of wires can
be used as a transmission line.
23 Location of Electric Transformer
a Latitude 29.689120°N
b Longitude 80.628811°E
Page 11 of 15
PHOTOGRAPHS OF PROJECT
Page 12 of 15
Page 13 of 15
PROJECT DEMAND FORM
Page 14 of 15