Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

W

79.67 14.99
10.18

S N
PT. KINGSWAY PROJECT
JOMBANG - KABUH
E
19.70

Gedung B Gedung E
118.58

sc: .905115

102.26

171.28

R. contomer R. contomer
29.70 Inspection Inspection 3.25
+0.56 +0.56 Highway

Pintu keluar

R. contomer
Inspection 3.25
+0.56

R. contomer
Inspection 3.25
+0.56

57.45

Pintu keluar

N
Emergency
Gedung D

exit

31.05
Finish
good
space
ke R.Ware
house
-0.90

A
TFIL

75.19 2 1
ware house
N

3
4
+0.50 5
6
7
8
9

19.24

Ruang QC
Gedung A Emergency
exit
+0.56

HRD
+0.57

lantai 1 Highway
+0.57 +0.50
3.04
90.57
shaff
ta
m
an

5.51
+0
.4
0

5.09 39.63
R. Assembly
±0.00
4.10 out to highway
Ruang loby
Pintu ke R. injection
+0.57
2.51 Assembly Office
-0.05
Toilet

Toilet
-0.05
te
+0 ras ± 0.00
.5 Naik
-0.05
Toilet

5
Toilet
-0.05

5.77
-0.05
Toilet

Toilet
-0.05

160T
R. pompa 250T
-0.05
Toilet

Toilet
-0.05

Permukiman
4.05
-0.05
Toilet

160T
-0.05
Toilet

250T
-0.05
Toilet

-0.05
Toilet

4.52
160T
Toilet
-0.05

shaff
250T
out to highway Toilet Toilet Toilet
Toilet
-0.05

-0.05 -0.05 -0.05


3.00
160T
250T
32.25 Compress
air room
160T ±0.00
250T

160T injection Office


250T
±0.00 P52

Highway
11.63
80T 120T 160T

80T 120T 160T

80T 120T
Pintu ke luar 250T 24.35 22.20
80T
250T

300T
80T
250T

300T 160T
250T
13.60
Emergency
exit 450T R. injection
160T
±0.00 250T
9.89
2

mold 160T
200T
1

R. Cooling MC +0.50
450T
0.2041
10.18
61.08 0.35
160T
200T
0.35 3.50
0.30 Ke R.MDP
2

450T 0.40
160T
200T 13.45
display produk

Post security
+0.55 2.85
custom room 2.00
2.73
ac

+3.50
icle
ac
R. cub 30
+0.
PLN
R.MDP
ac

mixing bahan
crusser MC ac

+0.50 +0.50
KA
ac

H PJ
jalur power
+0.29
teras
GSB

Toile
t Toilet
+0.45
Toile
t
+0.45
janito
ry
TANA
Toilet +0.45
GSP

R. meeting +0.45
staff

A
GAR
+3.50
: 22.5

entrance

H NE
TANA
:16.50

0m
m

83.05
LAN ESA
A JL. D
AS J

KONSEP ZONING TAPAK


SKALA 1: 1100

You might also like