| Dig First Layer Of The Soil In The | Continue and | Dig Pit for the Column

Slab Outline | Spread The Gravel | Install Rebar on the Footage | Spread The
Poor Concrete Setting Bed - Wait 3 rebar from the Gravel | Poor Concrete
hours To Cure | Install Form Work | Foundations | Setting Bed - Wait 3
Install Rebar On Raisers | Poor Install Form Work | hours To Cure | Place
Concrete | Take Off The Form Work Poor Concrete | Rebar on Raisers |
After 72 Hours | While Concrete Take off Form Install Form Work | Poor
Slab Is Curing - Sprinkle Her For 3 Work After 72 Concrete | Take Off
Days To Prevent Cracking | hours | After Taking Form Work After 72
Off The Form Work hours |
- Fill Footage's Pits
With Soil |

4.1 Column Footage 1.1 Column Footage


4. Column 1. Column

Ground Floor Slab


3.1 Column Footage 2.1 Column Footage
3. Column 2. Column

Roof Slab

| Install Form Work


| Install Rebar On
Raisers | Poor
Concrete | Take Off
The Form Work
After 72 Hours |
While Concrete
Slab Is Curing -
Sprinkle Her For 3
Days To Prevent
Cracking |

You might also like