Shutdown Cvs IRSHAD

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

CURRICULAM VITAE

IRSHAD ALAM
Mechanical Engineer
Vill+Po- Sabbait
Skype id- irshad.mallick21 Skype id- irshad.mallick21
Dist+PS- Nalanda Mob No:+918210408467,7542006970
State- Bihar er.irshadmallick@gmail.com

OBJECTIVE:
Willing to accept challenging career in MECHANICAL ENGINEERING organization and seeking for
position where I can utilize my technical skill and professional experience to provide best of
mine for the success and growth of the organization and then satisfaction.
Education &Technical Qualification:
Degree in Mechanical Engineering (2005-2009) with first class from Maulana Azad College
of Engineering & Technology. Magadha University, Bodh Gaya, Bihar.
.
Work Experience:
9 Years’ experience as a Mechanical Engineer in oil and gas & Maintenance project esteemed
organizations in India and Abroad.

1. Work Experience From 06th jan 2019 To 03th March 2019 In Alkhor Project,Doha
Qatar bydescon company, As A Site Supervisor For Short time Project.
2. Work Experience From 21th March 2018 To 06th October 2018 In H.P.C.L MAHUL
GAON chembur by H.C.C Company As A Mechanical Engineer For Short time
Project

3. Work Experience From 7th December 2016 To 04th March 2017 In Qatar Chemical
Company By Descon Company, Qatar As A Mechanical Site Engineer
4. Work Experience From 19th Mar 2016 To 29th May 2016 In Gasco, (Habshan-5) By
Doosan Babcock Co U.A.E, Abu Dhabi As A Mechanical Engineer For Shut Down
Project.
5. Work Experience From 08th July 2014 To 05th Jan2016
Project- Maintenance & Shut Down In Hindustan Petroleum Corporation. (Hpcl),
Chembur, Mumbai. By Aarvi Encon Co. Ltd. As A Mechanical Engineer For
Maintenance Works.
6. Work Experience from 18th May 2012 to 23rd April 2014 Project-Ruwais refinery
expansion project Abu Dhabi by Sinopec engineering as a piping engineer for
construction work
7. Work Experience 28th Jan 2011 To 5th March 2012 Sigma Construction Co. As A
Piping Engineer For Project Related Maintenance Of Oil& Gas, Organization Of
I.P.C.L Baroda, Gujarat.
8. Work Experience 04th Jan 2008 to 8th November 2010 I.O.C.L. Refinery Panipath,
Haryana. As A Piping Engineer For Project Related Maintenance Of Oil& Gas,
Organization Of I.P.C.L Process Control Technology.

Nature of Work

• Supervision monitoring and co-coordinating of all activities include maintenance


inspection and testing of gas plant.
• Coordinate with client for maintenance preparation and activities.
• Close supervision coordinating and erection of tube bundle of exchanger using
bundle puller.
• Inspection of tube bundle for corrosion and witness NDE examination where
required.
• Overall servicing and inspection of static equipment.
• Maintenance of all major static equipment like heat exchanger fin fan cooler
column and pressure vessel.
• Maintenance of high pressure shell and tube heat exchanger involving cleaning of
tube with the help of high pressure pump water jetting up to 20000 psi pressure
with the help of power lance.
• Hydro testing for high pressure vessels and shell and tube heat exchanger
• Column- removed and fixed back all types of trays (bubble cap, valve, sieve,
trays).
• Heat exchangers with its all types Shell and tube, Plate & Compact (fixed tube,
floating head, u-tube, and Breech lock....etc.) 
• Loading and unloading catalyst according to the safety material data sheet for
many types of Reactors and vessels.
• Pressure vessel (vertical, horizontal)
• Grouting and alignment of equipment
• Maintenance of valves (Valves like Gate Valve, Ball Valve, Butterfly Valve, Orbit
Valves, PSVs, Globe Valves, Control Valves, Cato fin Valve
• Review and check job pack including schedule of fabrication and erection
• Package review and arrange material in proper place.

• Material Checking and inspection with Quality Inspector in warehouse,

• Preparation of Maintenance of Heat Exchanger (Tube Bundle Pulling,


visual inspection, buffing, hydro jetting, hydro testing and erection)

• Vessel tank (Man way opening, visual inspection, buffing & testing,
collect box up certificate then Final Box-up)

• Review and check all the piping materials such as pipes, fittings, supports.

• Site visits with over site manager and client co-coordinator.


• Prepare and start fabrication and erection as per isometric drawing and site
location.

• Consult with delegates to get go ahead of start fabrication on sites.

• Maintaining documentation & quality procedures test package.


• Stage wise inspection Like Material Identification, Fit up, Final Dimension,
Inspection Clearance Note, Erection Fit up, Loop clearance& Insulation of Piping.
• Prepare necessary paper work for the completion of work and get it authorized by
the client after their inspection.

• Physical inspection as per piping GAD, P&ID, loop identification of above


ground & hydro Testing of loop.
• Develop a relationship with the Project Manager and prepare periodical reports on
the progress of work.
• Planning of daily / weekly / monthly erecting progress report, Inspection
Clearance Note, Erection Fit up, Loop clearance& Insulation of Piping.
• Maintaining documentation & quality procedures test package.
• Awareness of various inspection procedure used during the piping fabrication.
• Knowledge of piping codes and standards.

Personal Details:
 Fathers Name : Late Mohiuddin
 Date of Birth : 10th Jan 1989
 Sex : Male
 Nationality : Indian
 Marital status : Single

Passport Details:
 Passport Number : J-5031018
 New passport Number : U4829016
 Date of Issue : 19-10-2020
 Date of expiry : 18-10-2030
 Place of Issue : Patna

DECLARATION:
I hereby declare that the above furnished details are true to the best of my knowledge and belief

Place:
Date : IRSHAD ALAM

You might also like