Professional Documents
Culture Documents
Globetrotters TOS MOM240522
Globetrotters TOS MOM240522
Globetrotters TOS MOM240522
SNO NAME OF THE PERSON ORGANISATION TEAM START TIME END TIME
SL. NO COMMON POINTS DISCUSSED RESPONSIBILITY COMMITTED DATE FOLLOW UP ACTION TO BE TAKEN
Mr. Murtuza and Ms. Tasneem briefed Ar. Tahaer Zoyab about
the site and the existing conditions of the civil work as per their
knowledge, following which are listed below- 30+ yr old
1 - - -
construction, a ground floor 1BHK property opening to the
driveway, 1 living space, 1 kitchen, 1 common bathroom, 1
bedroom with attached bathroom
Mr. Murtuza and Ms. Tasneem expressed concern over the damp Ms. Tasneem confirmed that the
2 flooring and water seepage in the walls and changing the sintex - - flooding/ water seepage is not an Civil and damp proofing work to be done
doors. issue
LIVING AREA
The living space is to be transformed into a lobby area and work space for 3-4 employees
Ms. B mentioned that the motors, the cables and the drain pipes
3 - - -
need to be concealed through panelling.
CORRIDOR
BEDROOM
The bedroom to be transformed to the main cabin for Mr. Murtuza and Ms. Tasneem
Visual and physical connect between the living and the room by
3
puncturing the common wall with openings.
KITCHEN
The kitchen is to be transformed into a cabin for one
The water supply system over the loft needs to be verified if it is The same has been confirmed by
1 - - To be checked
the main water supply to the entire space Ms. Tasneem
Main civil changes that are required to be done are the removing
2 Triple O Studio - -
the kitchen counter and partitions.
Visual and physical connect between the living and the room by
3
puncturing the common wall with openings.
OTHERS
Following the visit, the clients communicated that the studio give
1 - - -
them 3 options for the interiors-
SITE PHOTOS