Breakdown LC
Breakdown LC
PT. Baratama Inti Energi (Kontraktor PT. Mutiara Bara Sakti (Trading, IUP PT. Batu Ampar Jaya (Trading, IUP OP PT. Saijaan Prima Coal
IUP OP PT. Indokal Prima Jaya) OP PT. Koperasi Mupakat Taka) PT. Sumber Arum energi)
20 Km from Site
20 Km from Site 15 Km from Site 20 Km from Site to stockpile
to stockpile to stockpile to stockpile
Stockpile
Stockpile Stockpile Stockpile
Crusher 1000
Crusher 400 MT/ Crusher 400 MT/ Crusher 400 MT/ MT/ Days, 500
Hours, 5 Km Hours, 5 Km Hours, 5 Km metre hauling to
hauling to Jetty hauling to Jetty hauling to Jetty Jetty with DT 12
with DT 12 with DT 12 with DT 10
Jetty SPA (10.000 MT)
Jetty KYMCO (15.000 MT) Jetty Maducon (20.000 MT) Jetty SBT (10.000 MT)
3 Days to loading barge
3 Days to loading barge 2 Days to loading barge 3 Days to loading 300 ft manual and
300 ft with Conveyor 270 ft with Conveyor manual and complete document
and complete document and complete complete barge
barge document barge document barge
Barge Loading at SPA
Barge Loading at KYMCO Barge Loading at Maducon Barge Loading at SBT
3 night and 2 day
1 night and 1 day 2 night and 1 day 3 night and 2 day for transhipment
for transhipment for transhipment for transhipment to MV
to MV to MV to MV
Mother Vessel
Mother Vessel Mother Vessel Mother Vessel
Cost Breakdown Per MT
1 USD = 14.200
Harga Harga Quantity Sub Total Sub Total
Description
Rupiah USD (MT) (Rp) (USD)
Price LC FOB MV
2.475.770 174,35 55.000 136.167.350.000 9.589.250
DISKON - - - -
CONTRACT VALUE
174,35
Export Tax PPH 23 1,5% & PNBP 42.088 2,96 55.000 2.314.844.950 163.017
Purchase coal incl. PPN 11% & PPH 21 1.800.000 126,76 55.000 99.000.000.000 6.971.831
PPJK & Pengurusan ijin ekspor all in 15.000 1,06 55.000 825.000.000 58.099
Koordinasi - - 55.000 - -