Technomech Electromechanical Works LLC Doc. Ref.

Revision 00
RISK ASSESSMENT Date

LOCATION / PROJECT MOVENPICK HOTEL & RESORT JOB NO. ASSESSMENT NO. 1
POTENTIAL HAZARDS / CONDITIONS TO BE CONSIDERED
Deep Excavations Work on or Over Water Fall from Height Fire Risk High Winds Young Persons
Demolition Confined Spaces Falls on Level Ground Noise / Dust / Vibration Adverse Weather Expectant Mothers
Plant / Machinery Working Platforms/Ladders Slips / Tripping Fumes Environmental Risk Other Workers
Lifting Operations Manual Handling Fuel Storage Traffic Training Required General Public
Buried / Overhead Services COSHH Storage / Lay Down Area Ground Conditions Health Surveillance Rail
TASK : INSTALLATION OF WATER SUPPLY SYSTEM
WHO OR EVALUATION RESIDUAL RISK
No. ACTIVITY POTENTIAL HAZARDS HAZARD EFFECT WHAT MIGHT OF RISK CONTROL MEASURES OR RECOVERY MEASURES LEVEL
BE HARMED S L R S L R
1 Unloading and Manual handling injury to personnel Workers 3 3 9 Ensure access & egress safe , assess the load, ensure 3 1 3
shifting of PPR pipe Engaged in competent person for the job, consider mechanical handling
accessories and the job as much as possible,ensure safe lifting methode shall be
material workers followed. 1) Position in front of the load with leg balance and
in that area. spread equal to the shoulder width, 2) Bend the knee to reach
the bottom of the load to get a grip,do not bent the spine. 3) lift
the load slowly by gradually straughtening the leg, 4) Do not
twist spine if you need to change direction,turn your whole
body intead. 5) Carry the load as close as to your body and
as high as your waist.PPE: safety shoe,safety helmet,gloves
Slip and trip Workers 4 3 12 Ensure access and egress safe and clear, ensure 4 1 4
Injury to personnel Engaged in competent person for the job,IITS(information,instruction
damage to property. the job,co training and proper supervision). PPE: safety shoe,safety
workers helmet, hand gloves etc.
2 Storage and stalcking fall of material, slip injury to personnel Workers 4 3 12 Ensure material are stacked in rack or firm ground level. 4 1 4
of PPR pipe. and trip. damge to property Engaged in Ensure the material are not over stacked (safe limit of
the job. Co stacking height is 1.5 meter). Ensure good housekeeping,
Workers Ensure adiquate Illumination in storage arae,Ensure safe
access and egress.

3 Work at height for Fall of personel Major injury/ damage to Workers 5 3 15 Ensure competent worker for the job, ensure 5 1 5
fixing drainage pipe due to collapse of property. Engaged in safe working platform with updated inspection tag,over head
Scaffold/ mobile the job protection by contractor, If using step ladder
scaffold/ ladder. co worker always ensure level ground and keep helper to hold the
fall of material ladder, in case of mobile scaffold ensure scaff tag inspected
and updated & obtain permission from project safety officer
Ensure IITS( information, instruction,training and proper
supervision).PPE to be used: Hand Gloives, eye google.
safety helmet, safety shoe,body harness.

4 Work in shaft/riser fall from height fatality Workers 5 4 20 Ensure competent person for the job. 5 1 5
over head material Enjury to personnel Engaged Ensure shaft entry permit before commencing work.
fall accident property damage in work Ensure safe access and egress and over head protection.
Ensure adiquate lighting arrangemnet
Ensure job roatation policy specialy in hot humid climate.
IITS,(information,instruction,training and supervision)
PPE: hand gloves eye google,helmet,safety shoe
Body harness with life line fitted with fall arrestor.
5 Use of portable Electrocution/ short Burn/ severe injury Workers 4 3 12 Ensure safe condition power tools, inspect power tools 4 1 4
power tools such circuit engaged on regular basis before use,ensure three wire connection
as drill machine in work routed to ELCB, ensure industrial socket for power
connection.
IITS,(information,instruction,training and supervision) ensure
ppe: hand gloves eye google,helmet,safety shoe etc.

FOLLOWING STEPS TO BE FOLLOWED WHILE EVALUATING THE HAZARDS AND RISK FOR EACH ACTIVITY.
SEVERITY LIKELIHOOD / PROBABILITY MATRIX
CONSEQUENCES SCALE LIKELIHOOD / PROBABILITY SCALE If the severity rating lies between 12 to 25, then corrective actions needs to be
FATALITY 5 CERTAIN 5 taken by concerned persons with documentary evidence

MAJOR INJURY / DAMAGE , DISABLING ILLNESS 4 VERY LIKELY 0 LIKELIHOOD / PROBABILITY (L)
LTA, ILLNESS OR DAMAGE 3 LIKELY 3 1 2 3 4 5
MINOR INJURY OR MINOR DAMAGE 2 UNLIKELY 2 1 1 2 3 4 5

SEVERITY (S)
DELAY ONLY 1 VERY UNLIKELY 1 2 2 4 6 8 10
3 3 6 9 12 15
COLOUR CODE RISK LEVEL MEASURES TO BE TAKEN 4 4 8 12 16 20
RED VERY HIGH WORK CAN NOT PROCEED, ENGINEERING MEASURES REQUIRED 5 5 10 15 20 25
YELLOW HIGH IMMEDIATE CORRECTION MEASURES REQUIRED R=SXL WHERE: R = RISK RATING
ORANGE MEDIUM REVIEW REQUIRED FOR ADDITIONAL MEASURES S = SEVERITY
WHITE LOW NO ACTION REQUIRED L = LIKELIHOOD / PROBABILITY
Final Assessment: Provided that there are no deviations from control measures, the residual risk assumed is low.Supplementary measures should include using the
correct PPE and safety Tool Box Talk to ensure that all workers are fully aware of the control measures.

Assessed By: (Projects safety Officer) Verified By (PROJECT MANAGER) Approved By (CLIENT / CONSULTANT)
Name Name Name
Signature Signature Signature
Date/Time Date/Time Date/Time