APARNA SAROVAR ZENITH PROJECT

RELEASED FOR PAINTING CHECK LIST

Project Date:

Job No. Structure

Contractor Reference Drawing No.

Surface
Sr No Primer Primer Paint Paint Remarks /Final Finish touch up Coat
Description of items Released for painting Preparation: Coat Coat Coat Coat
Manual / Blast
1st 2nd 1st 2nd

10

11

12

13

14

15

16

17

18

APARNA PM -Execution APARNA QC JLL /QA

REMARKS :
APARNA SAROVAR ZENITH PROJECT

ALIGNMENT REPORT FOR STRUCTURAL STEEL CHECK LIST

Project Date:

Job No. Structure

Contractor Reference Drawing No.

Required Weight
Sr No Erection Alignment Remarks
Fabrication Drawing No. Quantity /Erection
Marks Mark Mark
X Y

10

11

APARNA PM -Execution APARNA QC JLL /QA

REMARKS :