Pump capacity as peak flow rate (Qp) Pump capacity (Qp) Qpump = Qp Roof Tank Capacity (TA) = 10 m3 = 15 m3/hour Pump On when 5 m3 roof tank capacity = 5 m3 = 250 lpm Water Filling Time = 0,5 hour ≈ 300 lpm Qpump = 10 m3/hour = 167 lpm 2 Pipe Diameter From Pressure loss graphic vs water flow velocity at galvanis pipe (Dwg. 3.62. Kerugian gesek dalam pipa baja karbon "Perancangan dan Pemeliharaan Sistem Plambing", Sofyan Morimura, 1991, page 72) - Flow rate (q) = 167 lpm - Pipe Diameter = 50 mm - Friction loss through pipe (f) = 0,07 m/m - Water Velocity in pipe = 1,25 m/m 3 Pump Head (Hpump) Hpump = Hs + Hf + Hr Where Hs = Pump Level in Shallow Well Depth 50m + Roof tank height from Ground = 35 + 17 m Hf = Friction head in pipe = Pipe length (P) x friction (f) P = Pipe length (PP) + Fitting equivalent length (Pe) PP = 70 m Pe = 7E + 2T + 3GV + 1BV + 1CV Pe = 7(2.1) + 2(3) + 3(0,81) + 1(8,4)+ 1(4) Pe = 35,53 m P = 105,53 m f = 0,07 m/m Hf = 7,39 m Hr = Additional pressure = 5m
Hpump = 47,39 m = 50 m
4 Pump Power (BHP)
BHP = HxQ 4.570 x Ep H = Pump head (m) = 50 m = Pump capacity (lpm) = 167 lpm per pompa Ep = Pump efficiency = 60% BHP = 3,04 HP Motor power input = 2,27 kW From Grundfos Brochure SP11-11 MS 402 = 2,2 kW, 3ph, 400v