Problem Reporting & Resolution (Notice) : Quality Head
Problem Reporting & Resolution (Notice) : Quality Head
PR&R#:
Supplier name:
Part name:
Recipient name:
PRR requirements :
1. Supplier shall complete containment actions immediately to ensure no outflow to MGI production line
2. Supplier shall submit intermediate corrective actions within 24 hours
3. Supplier shall submit permanent corrective actions within 7 working days
4. Corrective actions effectiveness shall be monitored for a period of one month and PRR shall be closed if found effective
5. Non conforming qty mentioned in this form subject to change based on segregation results
6. Contact respective SQE engineer for addtional information
7. Evidence of intermediate and permanent actions to be attched in evidence sheet1, sheet2 etc.
Problem Image :
Concern
Source: Severity :
Date:
Occurrence time:1
NG Material
Quantity :
Batch code : Over 2
First Second
times
Segregation Transfer
Production line SPS Kitting Area MGI Warehouse Supplier warehouse
Status warehouse
Conformity
Non conformity
Safety People Quality Responsiveness Cost Environment Others VS/SIP: ___ CARE: ___ Maintenance____ Production _____ Other_____
Shift: GCA _______ PR # __________________
Issue Number:
Mark Sections or Questions that do not apply "N/A" Yard Check: # of Vehicles Checked _____________ # Items Found _______
Problem Description: Sketch:
Vin No : Model :
Point Of Cause: (where problem is first occurring, not where first detected):
Start:
Finish:
Start:
Finish:
Start:
Finish:
Process/Part Check: (Quality Problems answer Detailed First 4 Diamond Questions.) Quality Diagnostic sheet available: ( optional )
Summarize results below Is there a Diagnostic Sheet available to support solving this problem?
Y N Y N Yes: No: ______
1 Is correct process followed? Do the parts support quality ?
4
If Yes for all 4 Diamonds proceed to Most Probable Cause Analysis: If answer to Diamond 1-4 is No, complete 5 Why Analysis on page 2.
Determine the Root Cause for the specific "No" answer in the Diamonds 1-4 Questions using the 5 Why Analysis:
Most Probable Cause Analysis:
MAN MACHINE
PROBLEM
DEFINATION
MATERIAL
METHOD
Why?
Why?
Why?
Why?
Why?
Root Cause:
Proposed Solution: Brainstorm possible solutions. Select the most efficient, effective solution.
Date: Name:
Name: Area: Signature:
Intermediate Action Plans (not containment) Who Due Date Break Point Status
Date/ Signature: Author (required for closure) Group Leader/Shift Leader (info only) Area Manager (info only)
Shift:
Shift:
Shift:
Shift:
Problem Tracking Database(MID) Information:
(Severity Code 1- No Build/Safety; 2 - Major Customer dissatisfier, labor or cost issue; 3 - Minor issue; 4 - Annoyance/Continuous Improvement)
Part#__________________________________________Part Name____________________________________________________Champion_____________________________________________
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
Total Checked
Qty Checked By :
Found OK Submited By :