C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF

B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF


A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:

TITLE:
ACMV SERVICES
MECHANICAL DRAWING INDEX (BBCS + SI)

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-1A-XX-DR-M-0001 C
80% DETAIL DESIGN
AUGUST 2020
PHASE 3 PHASE 2

GSM DIGITAL BLOWDOWN METER C/W SPARE


MODBUS OUTPUT AND SWITCH SOCKET OUTLET
(TYPICAL FOR ALL BLOWDOWN METER SHOWN)

M M M M
TO NEAREST FT TO NEAREST FT TO NEAREST FT TO NEAREST FT OUTPUT AND SWITCH SOCKET OUTLET
(TYPICAL FOR ALL WATER METER SHOWN)

M
GSM DIGITAL WATER METER C/W SPARE MODBUS

Ø100 MAKE UP WATER PIPE

ROOF

DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU


GALLERY GALLERY GALLERY GALLERY GALLERY GALLERY GALLERY GALLERY
2.1B 2.1A 1.1B 1.1A 2.3B 2.3A 1.3B 1.3A

Ø100 IWP

Ø100 IWP
HB HB HB HB HB HB HB HB

RAW WATER STORAGE TANK 1 (G.R.P) MAKE-UP WATER TANK 1 (G.R.P) MAKE-UP WATER TANK 2 (G.R.P) RAW WATER STORAGE TANK 2 (G.R.P)
C/W TOP VALVE & ACCESSORIES C/W TOP VALVE & ACCESSORIES Ø25 IWP Ø50 IWP Ø50 IWP Ø25 IWP
C/W TOP VALVE & ACCESSORIES C/W TOP VALVE & ACCESSORIES

SIZE: 3m x 2m x 2m (H) C/W TOP SUMP SIZE: 21m x 5m x 5m (H) SIZE: 21m x 5m x 5m (H) SIZE: 3m x 2m x 2m (H) C/W TOP SUMP
COOLING CHILLER
EFF CAP: 11.0 cu.m EFF CAP: 477.0 cu.m TOWER PLANT EFF CAP: 477.0 cu.m EFF CAP: 11.0 cu.m
2 NOS Ø150 OVERFLOW PIPES 2 NOS Ø150 OVERFLOW PIPES HB HB HB HB HB HB HB HB 2 NOS Ø150 OVERFLOW PIPES 2 NOS Ø150 OVERFLOW PIPES
TO TERMINATE WITHIN ENCLOSURE TO TERMINATE WITHIN ENCLOSURE TO TERMINATE WITHIN ENCLOSURE TO TERMINATE WITHIN ENCLOSURE
Ø25 IWP Ø50 IWP
WATER PRESSURE SENSOR
RO SYSTEM (REFER TO PERFORMANCE SPEC) RO SYSTEM (REFER TO PERFORMANCE SPEC)
WITH BMS INTERFACING

ELECTRICAL CONDUCTIVITY METER GSM DIGITAL WATER METER C/W SPARE MODBUS
OUTPUT AND SWITCH SOCKET OUTLET
(TYPICAL FOR ALL WATER METER SHOWN) Ø50 IWP Ø50 IWP Ø50 IWP Ø50 IWP
ECM P M MAKE-UP WATER TRANSFER PUMPS MAKE-UP WATER TRANSFER PUMPS M P ECM
Ø80 IWP Ø80 IWP Ø80 IWP Ø80 IWP
MWP-G-1 & G-2 (1 DUTY, 1 STANDBY) MWP-1-03 & 1-04 (1 DUTY, 1 STANDBY)
WATER WATER WATER WATER FLOW RATE: 9.6L/s, HEAD: 25m EACH RO PUMP RO PUMP FLOW RATE: 9.6L/s, HEAD: 25m EACH WATER WATER WATER WATER
2500L

2500L
LEVEL LEVEL LEVEL LEVEL (PUMPS C/W BACK-UP POWER SUPPLY) SOFTENER ROP-G-1 (1 DUTY) ROP-G-2 (1 DUTY) SOFTENER (PUMPS C/W BACK-UP POWER SUPPLY) LEVEL LEVEL LEVEL LEVEL
SAND SAND SAND SAND
PV

PV
SENSOR SENSOR SENSOR SENSOR FLOW RATE: 3.6L/s, HEAD: 20m EACH FLOW RATE: 3.6L/s, HEAD: 20m EACH SENSOR SENSOR SENSOR SENSOR
FILTER FILTER FILTER FILTER
Ø80 IWP

Ø80 IWP
(PUMPS C/W BACK-UP POWER SUPPLY) RO UNIT RO UNIT (PUMPS C/W BACK-UP POWER SUPPLY)
RAW WATER PUMPS (C/W VSD) RAW WATER PUMPS (C/W VSD)
PFV PFV PFV PFV PFV PFV PFV PFV
RWP G-3 & G-4 P P P P RWP G-5 & G-6
(1 DUTY, 1 STANDBY) RO UNIT RO UNIT (1 DUTY, 1 STANDBY)
25,000 LPH

25,000 LPH

25,000 LPH

25,000 LPH
FLOW RATE: 6.0L/s, HEAD:15m EACH FLOW RATE: 6.0L/s, HEAD:15m EACH
(PUMPS C/W BACK-UP POWER SUPPLY) RO UNIT RO UNIT (PUMPS C/W BACK-UP POWER SUPPLY)
Ø100 IWP Ø100 IWP
P P P P
N/C N/C
SAMPLING SAMPLING P P SAMPLING SAMPLING RO UNIT RO UNIT SAMPLING SAMPLING P P SAMPLING SAMPLING
POINT POINT POINT POINT POINT POINT POINT POINT
Ø80 IWP Ø80 IWP
SALT FLOOR TRAP FLOOR TRAP SALT
N/C N/C
P P
N/C N/C
TANK TANK N/C N/C
P P
N/C N/C
BY CGK 063/064/065 Ø150 DRAIN ( DRAIN TO TERMINATE Ø150 DRAIN Ø150 DRAIN ( DRAIN TO TERMINATE Ø150 DRAIN BY CGK 063/064/065 HOT TAPPING
DRAIN DRAIN
CONTRACTOR WITHIN ENCLOSURE) WITHIN ENCLOSURE) CONTRACTOR BY CGK 063/064/065
Ø50 IWP Ø50 IWP
Ø80 IWP Ø80 IWP CONTRACTOR
N/C N/C
Ø80 IWP N/C N/C Ø80 IWP
GROUND FLOOR

TO NEW RAW WATER TANK AT


DOMESTIC WATER PLANTROOM
M
Ø150 IWP Ø100 IWP Ø150 IWP
EXISTING EXISTING
INCOMING PIPE AT
PIPE FROM ESTATE
SHELL 1 ROAD

PHASE 1

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

PROJECT:
CGK063

TITLE:
ACMV SERVICES
INDUSTRIAL WATER SCHEMATIC

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-1004 C
80% DETAIL DESIGN
ROOF ROOF ROOF ROOF

EF-GF-DWP-01 EF-GF-CH-01 SF-GF-CH-01 EF-GF-IWP-01


@3600 CMH @5100 CMH @5100 CMH @6300 CMH
EF-GF-FUA-01 EF-GF-FUB-01
EA @1100 CMH @1100 CMH EA EA EA FA EA

EA EA EA EA EA FA EA EA EA EA

SF-GF-DWP-01 EF-GF-CH-02 SF-GF-CH-02 SF-GF-IWP-01


@3600 CMH @5100 CMH @5100 CMH @6300 CMH
FA EA FA FA

AUGUST 2020
FA FA FA FA EA FA FA FA FA FA
EF-GF-CH-03 SF-GF-CH-03
@5100 CMH @5100 CMH
FA FA EA FA
LOURVE LOURVE
FUEL PUMP ROOM A FUEL PUMP ROOM B DOMESTIC WATER PLANT ROOM EA CHILLER PLANT ROOM FA INDUSTRIAL WATER PLANT ROOM
LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1

ROOF ROOF ROOF ROOF ROOF

EF-ER1.2-01 SF-ER1.2-01 EF-ER1.3-01 SF-ER1.3-01 EF-ER1.4-01 SF-ER1.4-01 EF-MER-01 SF-MER-01 EF-CORR-02 SF-CORR-02
@10200 CMH @10200 CMH @10200 CMH @10200 CMH @10200 CMH @10200 CMH @10800 CMH @10800 CMH @36000 CMH @36000 CMH
EA FA EA FA EA FA EA FA EA FA

EA FA EA FA EA FA EA FA EA FA

CORRIDOR
ELECTRICAL ROOM 1.2 ELECTRICAL ROOM 1.3 ELECTRICAL ROOM 1.4 MECH ER
LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 (BETWEEN POD 2 & 3)

ROOF ROOF ROOF ROOF

EF-1.2-01 SF-1.2-01 EF-1.3-01 SF-1.3-01 EF-1.4-01 SF-1.4-01 EF-CORR-01 SF-CORR-01


@36000 CMH @36000 CMH @36000 CMH @36000 CMH @36000 CMH @36000 CMH @3000 CMH @3000 CMH
EA FA EA FA EA FA EA FA

EA FA EA FA EA FA EA FA

CORRIDOR
DH POD 2 DH POD 3 DH POD 4 (NEXT TO MECH ER)
LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1

BBCS & SI

ROOF
EA
ROOF C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
ROOF EF-ER1.1-01 SF-ER1.1-01 B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
@10200 CMH @10200 CMH A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
FD FD FD FD FD FD FD
EF-STO-BAT-01 SF-STO-BAT-01 REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
EA FA
@1700 CMH @1700 CMH
EF-TLT-01 MEP ENGINEER:
@3300 CMH EA FA EA FA
EA EA EA EA EA EA EA EA EA EA EA EA EA
EA FA DSCO Group Pte Ltd
# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
SHOWER FEMALE MALE JANITOR WC JANITOR T +65 6561 4078 F +65 6561 5198
WC BATTERY STORAGE ROOM ELECTRICAL ROOM 1.1
LEVEL 1 TOILET TOILET LEVEL 1 LEVEL 1
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

OFFICE PHASE PHASE 1 Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

OTHER AREA MV SCHEMATIC PROJECT:


CGK063

TITLE:
ACMV SERVICES
OTHER AREA MV SCHEMATIC

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-1013 C
AAV

AAV
AAV
NOTES FOR GENERATOR SUPPLIER : NOTES FOR GENERAL CONTRACTOR PHASING
1. FUEL PIPE RUNNING ABOVE GROUND SHALL BE WITHIN A 1 HOUR FIRE RATED 1. FUEL PIPE RUNNING ABOVE GROUND SHALL BE WITHIN A 1 HOUR FIRE RATED
COMPARTMENT.CONTRACTOR TO PROVIDE DEDICATED FIRE RATED COMPARTMENT FOR COMPARTMENT.CONTRACTOR TO PROVIDE DEDICATED FIRE RATED COMPARTMENT FOR
EACH FUEL DISTRIBUTION SYSTEM. EACH FUEL DISTRIBUTION SYSTEM.

2. CONTRACTOR TO PROVIDE LAYER 3 RSTP OR EQUIVALENT ENABLED NETWORK DEVICE


BETWEEN CONTROL PANELS TO PREVENT SWITCHING LOOPS.
2. CONTRACTOR TO PROVIDE LAYER 3 RSTP OR EQUIVALENT ENABLED NETWORK DEVICE
BETWEEN CONTROL PANELS TO PREVENT SWITCHING LOOPS.
PHASE 1
3. CONTRACTOR PROVIDE FUEL LEAK SENSOR FOR EACH FUEL PIPE BRANCH OUT FROM 3. CONTRACTOR PROVIDE FUEL LEAK SENSOR FOR EACH FUEL PIPE BRANCH OUT FROM
UNDERGROUND. UNDERGROUND.

GV

M
4. OVERRFLOW PIPES TO LAID TO FALL FOR GRAVITY RETURN SYSTEM. 4. OVERRFLOW PIPES TO LAID TO FALL FOR GRAVITY RETURN SYSTEM.

GV
PHASE 2

M
5. GENERATOR SUPPLER SHALL PROVIDE ALL PIPES AND ALL OTHER AUXILIARIES WITHIN THE 5. MAIN CONTRACTOR SHALL PROVIDE 1 NUMBER OF 1 HRS FIRE RATED/HEAVY DUTY STREET
GENERATOR ENCLOSURE. COVER PER UNDERGROUND FUEL TANK.
AIR VENT LS LS 6. ALL FUEL LINES CONNECTION TO DAY TANKS SHALL BE FITTED WITH FLOW REGULATORS. 6. MAIN CONTRACTOR SHALL PROVIDE UNDERGROUND DIESEL TANK CONCRETE CHAMBER BACK
FILL-CRUSHED STONE/SAND SUBJECTED TO DIESEL TANK MANUFACTURER'S
7. BELLY TANK FILLING SYSTEM CONNECTION SHALL BE CONNECTION SHALL BE COMPATIBLE RECOMMENDATION.
HIGH HIGH
95% WITH TYPICAL TANKER TRUCK CONNECTION.
HIGH 90% 7. GENERATOR SUPPLER SHALL PROVIDE ALL PIPES AND ALL OTHER AUXILIARIES WITHIN THE
FUEL POLISHING UNIT WITH HIGH 80% 1.1MA 8. ALL FUEL OIL DISTRIBUTION PIPING WILL BE DOUBLE CONTAINMENT (PIPE-IN-PIPE). GENERATOR ENCLOSURE.
ASSOCIATED MOTORIZED
VALVE WITHIN THE
LOW 20%
9. LEAK DETECTION SYSTEM WITH WATER/FUEL DISTINGUISHING SENSORS AT LOWEST POINT OF 8. ALL FUEL LINES CONNECTION TO DAY TANKS SHALL BE FITTED WITH FLOW REGULATORS.
PHASE 3
LOW LOW
GENERATOR CLOSURE 10% FUEL PIPE AND EVERY FUEL LEAK INSPECTION CHAMBER, INCLUDING EVERY BRANCH OUT TO
BELLY TANKS, PUMP ROOMS, FUEL STORAGE TANK, AND CHAMBER FOR EARLY WARNING OF 9. FUEL FILLING SYSTEM CONNECTION AT FUEL FILLING POINT SHALL BE CONNECTION SHALL BE
16,000L BELLY TANK FUEL LEAKS. SIMILAR WATER/DIESEL FUEL SENSORS SYSTEM TO BE PROVIDED FOR COMPATIBLE WITH TYPICAL TANKER TRUCK CONNECTION.
LEAK SENSOR
GENERATOR CANOPY BY GENERATOR SUPPLIER FOR EARLY WARNING OF FUEL LEAKS.
10. ALL FUEL OIL DISTRIBUTION PIPING WILL BE DOUBLE CONTAINMENT (PIPE-IN-PIPE).
10. INCLUDE LINE TYPE HYDROCARBON LEAK DETECTOR AROUND THE BELLY TANK PERIMETER
11. LEAK DETECTION SYSTEM WITH WATER/FUEL DISTINGUISHING SENSORS AT LOWEST POINT OF
11. BELLY TANK CONTAINERS WHICH ACT AS SECONDARY CONTAINMENT; INTEGRITY TO BE FUEL PIPE, FUEL REFILLING AREA AND EVERY FUEL LEAK INSPECTION CHAMBER, INCLUDING PHASE 4
TESTED PRIOR TO USE. EVERY BRANCH OUT TO BELLY TANKS, PUMP ROOMS, FUEL STORAGE TANK, AND CHAMBER
FOR EARLY WARNING OF FUEL LEAKS.
12. VENDOR TO PROVIDE RACOR 3-PART FUEL FILTRATION (PART #791000FHV) AND FUEL
POLISHING 12. VENDOR TO PROVIDE RACOR 3-PART FUEL FILTRATION (PART #791000FHV) AND FUEL
POLISHING
13. FOLLOWING TO BE PROVIDED FOR STORAGE TANK / TANK CHAMBER / FUEL PIPE

GV

GV
M

M
13. FOLLOWING TO BE PROVIDED FOR STORAGE TANK / TANK CHAMBER / FUEL PIPE
· WATER/FUEL DISCRIMINATING INTERSTITIAL OPTICAL SENSOR USED PRIMARILY TO
MONITOR INTERSTITIAL AREA OF A DOUBLE WALL TANK · WATER/FUEL DISCRIMINATING INTERSTITIAL OPTICAL SENSOR USED PRIMARILY TO OFFICE

GV

GV
· THE USE OF SOLID-STATE OPTICAL PRISM SENSORS WHERE THE PRESENCE OF LIQUID MONITOR INTERSTITIAL AREA OF A DOUBLE WALL TANK

M
GV

GV
M

M
COULD INDICATE THAT LEAK OCCURRED · THE USE OF SOLID-STATE OPTICAL PRISM SENSORS WHERE THE PRESENCE OF LIQUID
· THESE SENSORS DISTINGUISH BETWEEN WATER AND HYDROCARBONS. COULD INDICATE THAT LEAK OCCURRED
LS LS AIR VENT LS LS AIR VENT · PERIODIC MAINTENANCE CHECK-YEARLY · THESE SENSORS DISTINGUISH BETWEEN WATER AND HYDROCARBONS.
GV

GV
· REMOVE SENSOR FROM THE BULK FUEL TANK INTERSTITIAL SPACE AND CONDUCT LEAK · PERIODIC MAINTENANCE CHECK-YEARLY
M

M
TEST TO ENSURE THE SENSOR IS IN GOOD WORKING CONDITION · REMOVE SENSOR FROM THE BULK FUEL TANK INTERSTITIAL SPACE AND CONDUCT LEAK
HIGH HIGH HIGH HIGH TEST TO ENSURE THE SENSOR IS IN GOOD WORKING CONDITION
AIR VENT AIR VENT 95% 95%
LS LS LS LS HIGH 90% HIGH 90% 16. FOLLOWING MONITORING TO BE PROVIDED FOR INTERFACE WITH EPMS
1.4A HIGH 80% FUEL POLISHING UNIT WITH 1.4B HIGH 80% FUEL POLISHING UNIT WITH
· RISER FUEL PIPE INTERSTITIAL FUEL LEAK ALARM
16. FOLLOWING MONITORING TO BE PROVIDED FOR INTERFACE WITH EPMS BBCS & SI
HIGH HIGH HIGH HIGH
LOW 20% ASSOCIATED MOTORIZED LOW 20% ASSOCIATED MOTORIZED
VALVE WITHIN THE VALVE WITHIN THE · GENERATOR CANOPY FUEL LEAK ALARM · RISER FUEL PIPE INTERSTITIAL FUEL LEAK ALARM
95% 95% LOW LOW LOW LOW
HIGH 90% HIGH 90% 10% GENERATOR CLOSURE 10% GENERATOR CLOSURE · VALVE POSITIONS · GENERATOR CANOPY FUEL LEAK ALARM
HIGH 80% HIGH 80% · CONTROLLER HOA STATUS · VALVE POSITIONS
FUEL POLISHING UNIT WITH 1.3B FUEL POLISHING UNIT WITH 1.3A 16,000L BELLY TANK 16,000L BELLY TANK · FUEL LEVELS · CONTROLLER HOA STATUS
ASSOCIATED MOTORIZED LOW 20% ASSOCIATED MOTORIZED LOW 20% LEAK SENSOR LEAK SENSOR
VALVE WITHIN THE LOW LOW VALVE WITHIN THE LOW LOW
· LEAK STATUS · FUEL LEVELS
GENERATOR CLOSURE 10% GENERATOR CLOSURE 10% · LEAK STATUS

LEAK SENSOR
16,000L BELLY TANK
LEAK SENSOR
16,000L BELLY TANK
17. FOLLOWING TO BE PROVIDED FOR DAY TANK
18. CONTROL SYSTEM TO HAVE SEPARATE POWER SOURCE FOR DIFFERENT CONTROL SYSTEM General Contractor / Others
· LEAK DETECTOR: LOCATE IN RUPTURE BASIN AND CONNECT TO PROVIDE AUDIBLE AND AND ASSOCIATED MODULATING VALVES.
VISUAL ALARM IN THE EVENT OF DAY TANK LEAK Vendor Scope of Work
· CRITICAL HIGH LEVEL 90% - CRITICAL HIGH LEVEL ALARM TO EPMS. 19. FUEL TRANSFER PIPE TO REMAIN EMPTY WHEN NOT TRANSFERRING FUEL.

18. CONTROL SYSTEM TO HAVE SEPARATE POWER SOURCE FOR DIFFERENT CONTROL SYSTEM 20. FUEL TRANSFER EQUIPMENT TO HAVE SEPARATE POWER SOURCE FOR EACH EQUIPMENT.
AND ASSOCIATED MODULATING VALVES.
21. GENERAL CONTRACTOR TO RUN SIMULATION ON PIPE PRESSURE FOR PIPE RUN FROM FUEL PUMP
19. GENSET CANOPY PROVIDED WITH HEAT DETECTOR TO SHUT OFF FUEL SUPPLY MOTORIZED VALVE ROOM TO FURTHEST STORAGE TANK. TO ENSURE THAT GENERAL CONTRACTOR TO COORDINATE WITH
TO DAY TANK / BELLY TANK INLET . GENERATOR SUPPLIER.

20. FUEL TRANSFER PIPE TO REMAIN EMPTY WHEN NOT TRANSFERRING FUEL. 22. ALL UNDERGROUND PIPES TO BE BURIED AND CONCRETE HAUNCHED.

GV

GV
M

M
21. FUEL TRANSFER EQUIPMENT TO HAVE SEPARATE POWER SOURCE FOR EACH EQUIPMENT. 23. UNDERGROUND STORAGE TANKS ARE DOUBLE WALL FRP WITH INTERSTITIAL ALARMS BETWEEN
THE SPACES AND THERE IS ABILITY TO MONITOR/ TEST ALARMS AND LEAK DETECTION IS INSTALLED.
22. GENERAL CONTRACTOR TO RUN SIMULATION ON PIPE PRESSURE FOR PIPE RUN FROM FUEL PUMP

GV

GV
M

M
GV

GV

ROOM TO FURTHEST STORAGE TANK. TO ENSURE THAT GENERATOR SUPPLIER TO COORDINATE


M

WITH GENERAL CONTRACTOR.

LS LS AIR VENT LS LS AIR VENT 23. FOR A SECONDARY CONTAINMENT FACILITY THAI IS FULLY ENCLOSED, A LEAK DETECTION SYSTEM
GV

GV
M

WITH AN ALARM DEVICE SHALL BE PROVIDED WITHIN THE SECONDARY CONTAINMENT FACILITY. A
LEAK TEST SHALL BE CONDUCTED BEFORE THE TANK IS PUT IN USE.
HIGH HIGH HIGH HIGH
AIR VENT AIR VENT 95% 95%
LS LS LS LS HIGH 90% HIGH 90% 24. GENSET VENDOR TO PROVIDE METERING AT DAY TANK TO TRACK THE CONSUMPTION OF THE
HIGH 80% HIGH 80% ENGINE.
1.2A FUEL POLISHING UNIT WITH 1.2B FUEL POLISHING UNIT WITH
HIGH HIGH HIGH HIGH
LOW 20% ASSOCIATED MOTORIZED LOW 20% ASSOCIATED MOTORIZED
95% 95% LOW LOW VALVE WITHIN THE LOW LOW VALVE WITHIN THE
HIGH 90% HIGH 90% 10% 10%
GENERATOR CLOSURE GENERATOR CLOSURE
FUEL POLISHING UNIT WITH HIGH 80% 1.1B FUEL POLISHING UNIT WITH HIGH 80% 1.1A 16,000L BELLY TANK 16,000L BELLY TANK
ASSOCIATED MOTORIZED LOW 20% ASSOCIATED MOTORIZED LOW 20% LEAK SENSOR LEAK SENSOR
VALVE WITHIN THE LOW LOW VALVE WITHIN THE LOW LOW
GENERATOR CLOSURE 10% GENERATOR CLOSURE 10%

16,000L BELLY TANK 16,000L BELLY TANK


LEAK SENSOR LEAK SENSOR

SYMBOL

PDS

GV
M

GV
M
GV

LS LS AIR VENT
GV

HIGH HIGH
95%
AIR VENT LS LS HIGH 90%

1.2C HIGH 80% FUEL POLISHING UNIT WITH


LOW 20% ASSOCIATED MOTORIZED
HIGH HIGH VALVE WITHIN THE
LOW LOW
95%
HIGH 90% 10% GENERATOR CLOSURE
FUEL POLISHING UNIT WITH HIGH 80% 16,000L BELLY TANK
1.1C
ASSOCIATED MOTORIZED LOW 20% LEAK SENSOR
VALVE WITHIN THE LOW LOW
GENERATOR CLOSURE 10%

16,000L BELLY TANK


LEAK SENSOR

PFWS

AAV

A
GV

B
B 31AUG2020 ISSUE FOR 80% REVIEW SNBN NWP MN LBK
GV

B 23JUL2020 ISSUE FOR 50% REVIEW SNBN NWP MN LBK


A 08JUN2020 ISSUE FOR 30% REVIEW SNBN NWP MN LBK
AIR VENT LS LS
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

HIGH HIGH MEP ENGINEER:


95%
HIGH 90%

FUEL POLISHING UNIT WITH HIGH 80% HS


PT. DSCO Indonesia
ASSOCIATED MOTORIZED LOW 20%
VALVE WITHIN THE LOW LOW
Kencana Tower, Level 2,
GENERATOR CLOSURE 10% Business Park Kebon Jeruk,
16,000L BELLY TANK
Jl Raya Meruya llir
LEAK SENSOR No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
GROUND CGK063
~

TITLE:
MECHANICAL SERVICES
FUEL DISTRIBUTION SCHEMATIC DIAGRAM

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-1030 C
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
20JUL2020
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

PROJECT:
CGK063

TITLE:
ACMV SERVICES
MECHANICAL EQUIPMENT SCHEDULE SHEET 1

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-1080 C
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
20JUL2020
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

PROJECT:
CGK063

TITLE:
ACMV SERVICES
MECHANICAL EQUIPMENT SCHEDULE SHEET 2

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-1081 C
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
20JUL2020
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

PROJECT:
CGK063

TITLE:
ACMV SERVICES
MECHANICAL EQUIPMENT SCHEDULE SHEET 3

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-1082 C
-
1 2 3 4 4.1 5
--- 6 7 8 9 10 11 12 13 14 14.8
15 15.4 16 16.6 17 18 19 19.1

B
LAYOUT 1 LAYOUT 3 LAYOUT 5
B.5

D.9
LAYOUT 2 LAYOUT 4 LAYOUT 6
E

F.3
F.5

F.8 C
B
31AUG2020 ISSUE FOR 80% REVIEW
21JUL2020 ISSUE FOR 50% REVIEW
ZLT CC
ZLT CC
YY
YY
BF
BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

G MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex

1 OVERALL GROUND FLOOR DUCTWORK LAYOUT (BBCS) 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:
scale1 : 300
ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

OVERALL GROUND FLOOR DUCTWORK LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 300 CGK063-DSCO-1A-01-DR-M-2000 C
1 2 3 4 4.1 5 6 7

2000x1800 WEATHERPROOF FRESH AIR LOUVER


200x200 WEATHERPROOF
FRESH AIR LOUVER 1000x1000 WEATHERPROOF 5000x2000 WEATHERPROOF FRESH AIR LOUVER
FRESH AIR LOUVER
800x1200 WEATHERPROOF 1600x2300
FRESH AIR LOUVER WEATHERPROOF
FRESH AIR LOUVER

A
EF
GF-FUA-01 EF
MER-01 EF
HP CORR-01
400x350 FAD
BOD: 3825 BSMDF-03

200ø FAD
BOD: 4400
HP

400x400 FRESHI AIR GRILLES


BSMDF-01
450x400 EAD
HP BOD: 4860
HP
BSMDF-04
CHP-039
HP 450x450 EXHAUST
EF
BSMDF-02 AIR GRILLE
1300x1300
GF-FUB-01 BOD: 7850
HP
700x700 EAD
BSMDF-05 BOD: 4850
HP
DHCORR-01
1500x1000
WEATHERPROOF
EXHAUST AIR LOUVER

EF 700x700 FAD
BOD: 4055 700x700 EAD B
GF-CH-01 BOD: 4055 SF
400x350 FAD 1.3-01
BOD: 4070
EF
WIRE MESH
GF-CH-02

MAU
MER-05
400x350 SUPPLY AIR GRILLE

CGK063-DSCO-1A-01-DR-M-2003 FOR
HP 400x350 SAD B.5
BOD: 4775 HP

REFER TO DWG NO:


CHP-040

CONTINUATION
MER1.1-021
1500x1000 600x300
WEATHERPROOF SUPPLY AIR
EXHAUST AIR LOUVER GRILLE
700X700 FAD
500x500 FAD BOD: 4850
BOD: 4500

400x350 FAD
BOD: 4825
WIRE MESH HP 1300x1300
SF MER1.1-022 BOD: 7325

GF-CH-01 400x350 SAD


(TYPICAL)
C
600x600 SUPPLY
1500x1000 AIR GRILLE
WEATHERPROOF
FRESH AIR LOUVER HP
FRESH AIR GRILLE
400x350 DHCORR-02 ZLT CC YY BF
C/W WIRE MESH
SUPPLY
AIR GRILLE
HP ZLT CC YY BF
700x700 EAD
MER1.1-023
BOD: 4850 REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


400x350 SUPPLY AIR GRILLE 200x200 FAD
HP BOD: 4900 Kencana Tower, Level 2,
Business Park Kebon Jeruk,
400x350 SAD MER1.1-029 Jl Raya Meruya llir
HP BOD: 4775 HP No.88 Jakarta Barat 11620, Indonesia
CHP-041 TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
MER1.1-024
CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
300x300 SUPPLY
AIR GRILLE # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
HP T +65 6561 4078 F +65 6561 5198
MER1.1-028 REFER TO DWG NO: Mechanical & Electrical (LEAD) Consultant:
HP CGK063-DSCO-1A-01-DR-M-2002 FOR
MER1.1-025 CONTINUATION D ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

1 PARTIAL GROUND FLOOR DUCTWORK LAYOUT 1 (BBCS) TITLE:

scale 1 : 100 PARTIAL GROUND FLOOR DUCTWORK LAYOUT 1

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-2001
1 2 3 44.1 5 6 7

400x350 SAD
BOD: 4325 200x200 FAD
REFER TO DWG NO:
BOD: 4900 CGK063-DSCO-1A-01-DR-M-2001 FOR
400x350 FAD
BOD: 4825 CONTINUATION

600x300 SUPPLY
EF AIR GRILLE HP
GF-CH-03
MER1.1-025 D
HP
MER1.1-027
850x1800 500x500 EAD
WEATHERPROOF BOD: 4500
EXHAUST AIR LOUVER HP
400x350 MER1.1-026
SUPPLY
AIR GRILLE

HP
HP DHCORR-03
400x350 SAD
CHP-042 BOD: 4775

WIRE MESH
650x450 EAD 650x450 FAD
SF BOD: 3785 BOD: 3785
GF-CH-02

SF
GF-CH-03
500x500 FAD
D.9
BOD: 4500
5NOS. 500x300
EXHAUST AIR
E
1500x1000 WEATHERPROOF

CGK063-DSCO-1A-01-DR-M-2004 FOR
FRESH AIR LOUVER GRILLE

5NOS. 500x300

REFER TO DWG NO:


FRESH AIR

CONTINUATION
GRILLE

HP
CHP-043

EF SF
GF-IWP-01 GF-IWP-01

HP
DHCORR-04 EXHAUST AIR GRILLE EXHAUST AIR GRILLE
C/W WIRE MESH C/W WIRE MESH

1600x1200 WEATHERPROOF 1600x1200


EXHAUST AIR LOUVER WEATHERPROOF
EXHAUST AIR LOUVER

1300x1300 1300x1300
F
BOD: 7850 BOD: 7850

EF EF F.3
1.4-01 1.3-01

450x400 FAD
BOD: 3900
F.5

450x450 FRESH
AIR GRILLE F.8
SF C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
CORR-01 B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

G PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
1000x1000
No.88 Jakarta Barat 11620, Indonesia
WEATHERPROOF
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
EXHAUST AIR LOUVER 5000x2000 WEATHERPROOF EXHAUST AIR LOUVER
CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

1 PARTIAL GROUND FLOOR DUCTWORK LAYOUT 2 (BBCS) AGILE No.: 000-000000-000


PROJECT:
scale 1 : 100 CGK063

TITLE:

PARTIAL GROUND FLOOR DUCTWORK LAYOUT 2

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-2002 C
8 9 10 11 12 13

5000x2000 WEATHERPROOF FRESH AIR LOUVER


5000x2000WEATHERPROOF FRESH AIR LOUVER

600x600 WEATHERPROOF
600x600 WEATHERPROOF
FRESH AIR LOUVER
EXHAUST AIR LOUVER

A
SF EF
UGPR-01 UGPR-01

400x400 EXHAUST
AIR GRILLE

300x300 EAD
BOD: 7360
1300x1300 1300x1300
BOD: 7850 BOD: 7850

HP
DHCORR-05

B
SF SF

CGK063-DSCO-1A-01-DR-M-2005 FOR
CGK063-DSCO-1A-01-DR-M-2001 FOR

1.2-01 1.1-01

REFER TO DWG NO:


REFER TO DWG NO:

CONTINUATION
CONTINUATION

300x300 FAD
BOD: 7360

400x400 SUPPLY
B.5
AIR GRILE

1300x1300 1300x1300
BOD: 7425 BOD: 7425

1300x1300
1300x1300
BOD: 7325
BOD: 7325

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
REFER TO DWG NO: Business Park Kebon Jeruk,
CGK063-DSCO-1A-01-DR-M-2004 FOR Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
CONTINUATION
D TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


1 PARTIAL GROUND FLOOR DUCTWORK LAYOUT 3 (BBCS) 11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
scale 1 : 100 Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR DUCTWORK LAYOUT 3

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-2003 C
8 9 10 11 12

REFER TO DWG NO:


CGK063-DSCO-1A-01-DR-M-2003 FOR
CONTINUATION

D
CGK063-DSCO-1A-01-DR-M-2002 FOR

CGK063-DSCO-1A-01-DR-M-2006 FOR
D.9
E
REFER TO DWG NO:

CONTINUATION

REFER TO DWG NO:

CONTINUATION
F
1300x1300
BOD: 7850

EF F.3
1.2-01

F.5

F.8
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
G PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
5000x2000 WEATHERPROOF Jl Raya Meruya llir
FRESH AIR LOUVER No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
1 PARTIAL GROUND FLOOR DUCTWORK LAYOUT 4 (BBCS)
scale 1 : 100 AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR DUCTWORK LAYOUT 4

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-2004 C
13 14 14.8 15 15.4 16 16.6 17 18 19
19.1

1200x800 WEATHERPROOF
FRESH AIR LOUVER

HP HP A
HLR-036 HLR-037

400x350 SAD MAU


BOD: 4325
CR-HL-06

CU
3NOS. 250x250 400x350 FAD HP-FCC-02
SUPPLY AIR GRILLE CU
BOD: 4825
400x350 HP-FCC-01
SUPPLY
AIR GRILLE

HP
FCC-01
HP HP
HLR-038 FCC-02

B
CGK063-DSCO-1A-01-DR-M-2003 FOR
REFER TO DWG NO:

CONTINUATION

B.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
REFER TO DWG NO: No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
CGK063-DSCO-1A-01-DR-M-2006 FOR
CONTINUATION CIVIL/ STRUCTURAL ENGINEER :
D VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

1 PARTIAL GROUND FLOOR DUCTWORK LAYOUT 5 (BBCS)


AGILE No.: 000-000000-000
scale 1 : 100
PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR DUCTWORK LAYOUT 5

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-2005 C
13 14 14.8 15 15.4 16 16.6 17 18 19 19.1

REFER TO DWG NO:


CGK063-DSCO-1A-01-DR-M-2005 FOR
CONTINUATION

D.9

E
CGK063-DSCO-1A-01-DR-M-2004 FOR
REFER TO DWG NO:

CONTINUATION

450x400 EAD
BOD: 4400

EF
GF-DWP-01 F.3
1000x1200
WEATHERPROOF
EXHAUST AIR LOUVER

F.5
1000x1200 WEATHERPROOF C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
FRESH AIR LOUVER B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

450x400 FAD
BOD: 4400
SF F.8 MEP ENGINEER:

PT. DSCO Indonesia


GF-DWP-01
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

G VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
1 PARTIAL GROUND FLOOR DUCTWORK LAYOUT 6 (BBCS) CGK063
scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR DUCTWORK LAYOUT 6

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-2006 C
1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 19 19.1

LAYOUT 1 LAYOUT 3 LAYOUT 5


B

B.5

D.9

LAYOUT 2 LAYOUT 4 LAYOUT 6 E

F.3
F.5

F.8 C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
G REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
1 OVERALL GROUND FLOOR MECHANICAL PIPEWORK LAYOUT (BBCS) CIVIL/ STRUCTURAL ENGINEER :

scale1 : 300 VB + E Pte Ltd


# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

OVERALL GROUND FLOOR MECHANICAL PIPEWORK


LAYOUT
SCALE: DRAWING NO.: REV.:
1 : 300 CGK063-DSCO-1A-01-DR-M-3000 C
1 2 3 44.1 5 6 7

20ø REF
BOP: 4520
A
REFRIGRENT PIPES
FROM ABOVE

HP HP
20ø REF
BSMDF-03 BOP: 4515 BSMDF-01

HP
20ø REF
CHP-039 BOP: 4515

20ø REF
HP HP
BOP: 4515
BSMDF-04 BSMDF-02

HP

CGK063-DSCO-1A-01-DR-M-3003 FOR
DHCORR-01
HP
BSMDF-05

REFER TO DWG NO:


20ø REF

CONTINUATION
BOP: 4515

B
20ø REF
BOP: 5570

20ø REF
BOP: 3110
20ø REF
BOP: 4370

20ø REF
MAU BOP: 4385
MER-05

HP
REFRIGRENT PIPES
FROM ABOVE B.5
CHP-040 HP
MER1.1-021
20ø REF
BOP: 4530

HP
MER1.1-022

20ø REF
BOP: 4530
C
HP
HP
MER1.1-023
DHCORR-02

HP
CHP-041 HP

20ø REF
MER1.1-029
BOP: 5610 HP
20ø REF C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
MER1.1-024 BOP: 3110 B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
20ø REF A - NOT ISSUED
BOP: 4670 REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
20ø REF
BOP: 4895 MEP ENGINEER:

HP PT. DSCO Indonesia


MER1.1-028 Kencana Tower, Level 2,
Business Park Kebon Jeruk,
HP Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
20ø REF MER1.1-025 TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
BOP: 4670 REFER TO DWG NO:
CGK063-DSCO-1A-01-DR-M-3002 FOR CIVIL/ STRUCTURAL ENGINEER :
CONTINUATION D VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL GROUND FLOOR MECHANICAL PIPEWORK LAYOUT 1 (BBCS) PROJECT:
CGK063
scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR MECHANICAL PIPEWORK


LAYOUT 1
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-3001 C
1 2 3 4 4.1 5 6 7

HP 20ø REF REFER TO DWG NO:


BOP: 4895
MER1.1-028 CGK063-DSCO-1A-01-DR-M-3001 FOR
HP CONTINUATION
MER1.1-025
20ø REF
BOP: 4515

REFRIGERANT
PIPES FROM ABOVE
D
HP
MER1.1-027 HP
MER1.1-026
20ø REF
BOP: 5610

20ø REF 20ø REF


HP BOP: 4715 BOP: 4515
CHP-042 20ø REF
BOP: 4515
HP
DHCORR-03

20ø REF
BOP: 5610

D.9
20ø REF
BOP: 5610

E
HP
CHP-043

CGK063-DSCO-1A-01-DR-M-3004 FOR
REFER TO DWG NO:
20ø REF

CONTINUATION
BOP: 3110

HP
DHCORR-04

F.3

F.5

F.8
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

G PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

1 PARTIAL GROUND FLOOR MECHANICAL PIPEWORK LAYOUT 2 (BBCS) Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
scale 1 : 100 Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR MECHANICAL PIPEWORK


LAYOUT 2
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-3002 C
8 9 10 11 12 13

REFRIGERANT PIPE
A
FROM ABOVE

20ø REF
BOP: 5570

HP
DHCORR-05

B
CGK063-DSCO-1A-01-DR-M-3001 FOR

CGK063-DSCO-1A-01-DR-M-3005 FOR
REFER TO DWG NO:

REFER TO DWG NO:


CONTINUATION

CONTINUATION
B.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :


REFER TO DWG NO:
CGK063-DSCO-1A-01-DR-M-3004 FOR VB + E Pte Ltd
# 05-09 Harbour Link Complex
CONTINUATION
D 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

1 PARTIAL GROUND FLOOR MECHANICAL PIPEWORK LAYOUT 3 (BBCS) AGILE No.: 000-000000-000
PROJECT:
scale 1 : 100 CGK063

TITLE:

PARTIAL GROUND FLOOR MECHANICAL PIPEWORK


LAYOUT 3
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-3003 C
8 9 10 11 12

REFER TO DWG NO:


CGK063-DSCO-1A-01-DR-M-3003 FOR
CONTINUATION

D.9
E

CGK063-DSCO-1A-01-DR-M-3006 FOR
CGK063-DSCO-1A-01-DR-M-3002 FOR

REFER TO DWG NO:


REFER TO DWG NO:

CONTINUATION
CONTINUATION

F.3

F.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF

F.8 B
A
21JUL2020 ISSUE FOR 50% REVIEW
- NOT ISSUED
ZLT CC YY BF

REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,

G Business Park Kebon Jeruk,


Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com

1 PARTIAL GROUND FLOOR MECHANICAL PIPEWORK LAYOUT 4 (BBCS) Singapore 138589 aedas.com

scale 1 : 100 AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR MECHANICAL PIPEWORK


LAYOUT 4
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-3004 C
13 14 14.8 15 15.4 16 16.6 17 18 19
19.1

REFRIGERANT PIPES
FROM ABOVE

20ø REF
BOP: 3980

A
20ø REF
20ø REF HP BOP: 5460
BOP: 3980
HLR-037

HP
HLR-036

MAU
CR-HL-06

CU
HP-FCC-02
20ø REF CU
BOP: 5275 HP-FCC-01

20ø REF
BOP: 2545
HP
20ø REF FCC-01
BOP: 2545
HP
HP
FCC-02
HLR-038
CGK063-DSCO-1A-01-DR-M-3003 FOR

B
REFER TO DWG NO:

CONTINUATION

B.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :


REFER TO DWG NO:
CGK063-DSCO-1A-01-DR-M-3006 FOR VB + E Pte Ltd
# 05-09 Harbour Link Complex
CONTINUATION
D 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 PARTIAL GROUND FLOOR MECHANICAL PIPEWORK LAYOUT 5 (BBCS)
scale 1 : 100 TITLE:

PARTIAL GROUND FLOOR MECHANICAL PIPEWORK


LAYOUT 5
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-3005 C
13 14 14.8 15 15.4 16 16.6 17 18 19 19.1

REFER TO DWG NO:


CGK063-DSCO-1A-01-DR-M-3005 FOR
CONTINUATION

D.9
E
CGK063-DSCO-1A-01-DR-M-3004 FOR
REFER TO DWG NO:

CONTINUATION

F.3

F.5

F.8 C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


G Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:

1 PARTIAL GROUND FLOOR MECHANICAL PIPEWORK LAYOUT 6 (BBCS) CGK063

scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR MECHANICAL PIPEWORK


LAYOUT 6
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-3006 C
1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 19 19.1

B
LAYOUT 1 LAYOUT 3 LAYOUT 5
B.5

D.9

LAYOUT 2 LAYOUT 4 LAYOUT 6 E

F.3
F.5

F.8 C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
G REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
1 OVERALL ROOF FLOOR MECHANICAL PIPEWORK LAYOUT (BBCS) # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
scale1 : 300 T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

OVERALL ROOF FLOOR MECHANICAL PIPEWORK


LAYOUT
SCALE: DRAWING NO.: REV.:
1 : 300 CGK063-DSCO-1A-RF-DR-M-3008 C
1 2 3 4 4.1 5 6 7

A
CU
HP-BSMDF-01

CU REFRIGERANT PIPE
TO BELOW
HP-BSMDF-01

CU
HP-BSMDF-01

CU
HP-BSMDF-01

CU
HP-BSMDF-01

CU
HP-CHP-039

20ø REF
BOP: 470

20ø REF
BOP: 470 B
CU

CGK063-DSCO-1A-RF-DR-M-3011 FOR
HP-CHP-040

CU

REFER TO DWG NO:

CONTINUATION
DHCORR-01

CU
MAU-MER-05

CU REFRIGERANT PIPE
TO BELOW
B.5
HP-MER1.1-021

CU
HP-MER1.1-022

CU
HP-MER1.1-023

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
CU A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
HP-MER1.1-024
MEP ENGINEER:
CU
PT. DSCO Indonesia
HP-MER1.1-025 Kencana Tower, Level 2,
REFRIGERANT PIPE Business Park Kebon Jeruk,
TO BELOW Jl Raya Meruya llir
CU No.88 Jakarta Barat 11620, Indonesia
HP-MER1.1-026 TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

REFER TO DWG NO: CIVIL/ STRUCTURAL ENGINEER :


CU
CGK063-DSCO-1A-RF-DR-M-3010 FOR VB + E Pte Ltd
HP-MER1.1-027 CONTINUATION
D # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
1 PARTIAL ROOF FLOOR MECHANICAL PIPEWORK LAYOUT 1 (BBCS) CGK063
scale 1 : 100
TITLE:

PARTIAL ROOF FLOOR MECHANICAL PIPEWORK


LAYOUT 1
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-RF-DR-M-3009 C
1 2 3 4 4.1 5 6 7

CU
HP-MER1.1-025
REFER TO DWG NO:
CU CGK063-DSCO-1A-RF-DR-M-3009 FOR
HP-MER1.1-026 CONTINUATION

CU
HP-MER1.1-027 REFRIGERANT PIPES
TO BELOW D
CU 20ø REF
HP-MER1.1-028 BOP: 470

CU
HP-MER1.1-029

CU 20ø REF
BOP: 470
HP-CHP-041

CU
HP-CHP-042
REFRIGERANT PIPES
CU TO BELOW

HP-CHP-043
D.9

CGK063-DSCO-1A-RF-DR-M-3012 FOR
REFER TO DWG NO:

CONTINUATION
F

F.3

F.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF

F.8 A
REV.
-
DATE
NOT ISSUED
DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
G No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
1 PARTIAL ROOF FLOOR MECHANICAL PIPEWORK LAYOUT 2 (BBCS)
scale 1 : 100 AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL ROOF FLOOR MECHANICAL PIPEWORK


LAYOUT 2
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-RF-DR-M-3010 C
8 9 10 11 12 13

REFRIGERANT PIPE
TO BELOW

A
20ø REF
BOP: -145 20ø REF
BOP: -140

CU CU
HP-DHCORR-05 HP-HLR-036

CGK063-DSCO-1A-RF-DR-M-3013 FOR
CGK063-DSCO-1A-RF-DR-M-3009 FOR

REFER TO DWG NO:

CONTINUATION
REFER TO DWG NO:

CONTINUATION

B.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
REFER TO DWG NO: Business Park Kebon Jeruk,
Jl Raya Meruya llir
CGK063-DSCO-1A-RF-DR-M-3012 FOR No.88 Jakarta Barat 11620, Indonesia
CONTINUATION
D TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com

1 PARTIAL ROOF FLOOR MECHANICAL PIPEWORK LAYOUT 3 (BBCS) Singapore 138589 aedas.com

scale 1 : 100 AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

PARTIAL ROOF FLOOR MECHANICAL PIPEWORK


LAYOUT 3
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-RF-DR-M-3011 C
8 9 10 11 12

REFER TO DWG NO:


CGK063-DSCO-1A-RF-DR-M-3011 FOR
CONTINUATION

D.9
E

CGK063-DSCO-1A-RF-DR-M-3014 FOR
CGK063-DSCO-1A-RF-DR-M-3010 FOR

REFER TO DWG NO:

CONTINUATION
REFER TO DWG NO:

CONTINUATION

F.3

F.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
F.8 A
REV.
-
DATE
NOT ISSUED
DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
G Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL ROOF FLOOR MECHANICAL PIPEWORK LAYOUT 4 (BBCS) PROJECT:
CGK063
scale 1 : 100
TITLE:

PARTIAL ROOF FLOOR MECHANICAL PIPEWORK


LAYOUT 4
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-RF-DR-M-3012 C
13 14 14.8 15 15.4 16 16.6 17 18 19
19.1

REFRIGERANT PIPE
TO BELOW
20ø REF
BOP: -140

CU CU CU CU
HP-HLR-036 HP-HLR-037 HP-HLR-038 MAU-CR-HL-06

B
CGK063-DSCO-1A-RF-DR-M-3011 FOR
REFER TO DWG NO:

CONTINUATION

B.5

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
REFER TO DWG NO: TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
CGK063-DSCO-1A-RF-DR-M-3014 FOR
CIVIL/ STRUCTURAL ENGINEER :
CONTINUATION
D VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

1 PARTIAL ROOF FLOOR MECHANICAL PIPEWORK LAYOUT 5 (BBCS) AGILE No.: 000-000000-000
scale 1 : 100 PROJECT:
CGK063

TITLE:

PARTIAL ROOF FLOOR MECHANICAL PIPEWORK


LAYOUT 5
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-RF-DR-M-3013 C
13 14 14.8 15 15.4 16 16.6 17 18 19
19.1

REFER TO DWG NO:


CGK063-DSCO-1A-RF-DR-M-3013 FOR
CONTINUATION

D.9
E
CGK063-DSCO-1A-RF-DR-M-3012 FOR
REFER TO DWG NO:

CONTINUATION

F.3

F.5

F.8
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
G PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
1 PARTIAL ROOF FLOOR MECHANICAL PIPEWORK LAYOUT 6 (BBCS)
scale 1 : 100
AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL ROOF FLOOR MECHANICAL PIPEWORK


LAYOUT 6
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-RF-DR-M-3014 C
PLUMBING NOTE:
1. All domestic water supply installation work shall comply with latest edition of SNI 8153:2015 sistem plambing pada bangunan gedung. FLUSH VALVE & FLUSHING CISTERN INSTALLATION
2. All pipe sizes shown are in millimeters. 1. Flush valves for water closets & urinals shall be incorporated with vacuum breakers that comply with American society of sanitary engineering standard
3. All pipes installed shall be out of sight / concealed where possible. Exposed pipes shall be painted. no. 1001 and stop-valve to SS 75 : 1978.
4. Contractor shall refer to the latest architectural drawing for sanitation fitting layout. 2. Flush valves for water closets shall be incorporated with check valves that comply with BS 5154 : 1974
5. All materials used shall comply with the standards stipulated by PDAM. 3. Vacuum breaker of the flush valve shall be installed at least 700mm above the floor level for oriental water closet and at least 300mm above the rim of
6. All floors or walls openinig shall be sealed up properly after installation. other types of water closet.
7. All pipe penetrations through walls and floors shall be isolated from direct contact with the structure, with class 'c' galvanised iron pipe sleeve, 4. The water supply pipes shall be sized to give the minimum dynamic pressure of 1.0 bar (or higher depending on the make of flush valve and type of
caulked with a non-setting resilient compound (non-combustible) on both side of the penetration. sanitary appliance) at the inlet end of the flush valve.
8. Pipes and fittings shall comply to standard stipulated by PDAM. 5. Flush valves shall not be directly connected to the services pipes at a height exceeding 115m reduced level (r.L.). The plumber shall check and ensure
9. All level switches monitoring the overflow of the domestic water tank, cooling tower, make up water tank and sprinkler water tank shall be that there is sufficient head for effective operation of the flush valves.
connected to the BAS panel c/w the alarm bell/buzzer and indicator status light. 6. The minimum internal diameter of the flush pipe shall be 25mm for WC and 20mm for urinal.
10. All pipes below the driveway/encased in concrete shall be of heavy duty type.
11. All pipes crossing drains shall be 500mm minimum below the bottom most of the drains.
PLUMBING SYSTEM LEGEND
12. All underground piping shall be laid and properly bedded to prevent sinking and/or movement of the pipe.
13. All drain and overflow pipes from water tank shall be terminated at the nearest scupper drain/floor waste outlet or otherwise specified.
14. Rubber diaphragm of the pressure vessel shall comply with SS 375 requirements.
15. All pipe fitting to kitchen equipments, water coolers, refuse chutes, hosereel tanks, cooling tower make up water tanks, expansion tanks, LEGEND DESCRIPTION
swimming pool balancing tanks shall be individually controlled by gate and double check valves.
16. The number of pressure vessels shall be size such that number of start/stop per pump shall not exceed 14 times per hour. Domestic Coldwater pipe
18. For gunmetal or bronze fittings, they shall comply with BS EN 1982: 2008. Those which are of Dezincification resistant type (DZR) shall comply
NEWater pipe
with the tests on 'Composition' and 'Resistance to dezincification' of BS EN 12163 : 1998 or BS EN 12165 : 1998 or BS EN 12420 : 1999.
19. Pressure reducing/regulating valves shall be installed so that water pressure will not exceed 35m at all points in the system. Gate valve
20. Unless otherwise specificed branch pipe used all shall be :
Check valve

MINIMUM INTERNAL DIA (mm) Bib Tap


TYPE OF APPLIANCE
OF WATER PIPE
Test Cock
SINK 20

TAP/HOSEBIB 15 T/B To below

WASH BASIN 15 F/A From above

WC (FV) 25
H/L High level
UR (FV) 15
F/B From below
UNDERGROUND ABOVEGROUND
COLD WATER PIPE
INTERNAL DIAMETER (D) BT Bib tap
MATERIAL STANDARD TYPE OF JOINTS MATERIAL STANDARD TYPE OF JOINTS

COPPER PRESS/FITTING WC Water closet


(FIRE PROTECTED AREA) BS EN 1057 JOINTS
DIN 8077 WB Wash basin
15mm TO 67mm COPPER BS EN 1057 CAPILLARY CROSS-LINKED
JOINTS POLYETHYLENE PIPE COMPRESSION
(PEX) DIN 8078 SK
SLEEVE JOINTS Sink
DIN 16962
SH Shower
FLANGE
80mm AND ABOVE DICLP BS EN 545 DICLP BS EN 545 FLANGE JOINTS
JOINTS
UR Urinal bowl

T Tap
21. All penetrations for external pipes to building to be treated with sealant "hydrofix" for fresh water aresd or "hydroseal" for sea water areas.
22. No compression joint shall be allowed. Type of joint: DWP Domestic Coldwater pipe
a. Copper pipe : Brazing
b. DICLP : Flanged U/G Underground

23. A vertical air gap of at least 150mm should be provided between the water supply point and the top edge of any water holding receptacle so as to prevent Digital Submetering (Private Water Meter)
M
contamination to the potable water supply through backflow. (connected to BMS)

24. Material of PFV Float valve


Pump Casing : Stainless Steel
Impellar : Stainless Steel VB Vacuum breaker

25. Hosebib and water taps in public areas shall be enclosed in padlocked corrosion resistant metal box.
HB Hose Bib
26. Flow rates at various fittings shall meet the following minimum flow requirement unless otherwise required to achieve the project BCA Green mark
requirement: Fittings Rate Of Flow (L/min) Wash Basin 2 Sink 4 Bibtap 4 Shower 5 Spool piece
27. Shop drawings showing locations of pipe sleeves shall be submitted before construction.
BLV Balancing Valve
28. Furring-in and ceilings will be in accordance with the architect's details. Access panels shall be provided by the builder to ensure adequate maintenance
access to all equipment. The contractor shall laise with main contractor on actual location of access panel.
29. All support hangers, bolts & etc. for ductwork & pipes shall be of appropriate material to resist corrosion and taking into account any expansion & contraction
movement. All major pipeworks shall be suitably mounted in accordance to Landlord's requirements whichever is more stringent.
30. Support interval must be designed in association with the design pressure and flow rate.
31. Water float valve for underground tank - NEWater should be lower than domestic water.
32. All metering shall be in compliance to Green Mark requirement.
33. Digital Submetering (Private metering) shall be provided and connected to BMS for monitoring.
34. All water appliances shall comply to Green Mark requirement.

TANK:
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
1. All level switches monitoring the overflow level, high level alarm and status of all pumps at local control panel of the potable water tank, cooling tower B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
make up water tank and sprinkler water tank shall be connected to the local monitoring alarm panel at fcc. A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
2. Extra low voltage shall be used for the water level control circuits.
MEP ENGINEER:
3. All drain and overflow pipes from water tanks shall terminated within the enclosure/housing.

4. Every isolated compartment of a storage tank shall be fitted with a tap for sampling purposes located anywhere between the top water level and the
outlet pipe level or on the outlet pipe from the compartment of the storage tanks. The tap located on the tank should be made accessible for sampling
DSCO Group Pte Ltd
purpose. Such a tap shall be under lock and key and accessible only to authorized persons. # 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
5. A warning alarm shall be provided to effectively indicate when the water reaches a level not less than 50 mm below the invert of the overflow pipe. A T +65 6216 0022 F +65 6216 0020
warming alarm shall also be provided to indicate when the water level in the water tank reaches its predetermined low level.

6. All plumbing works carried out shall comply with PDAM regulations, and SNI 8153:2015. CIVIL/ STRUCTURAL ENGINEER :

7. All potable water tank covers shall be properly secured by bolting or fastening. The room / enclosure housing the water tanks, access to the water VB + E Pte Ltd
tanks (eg. Rooftop access) and water tank inspection covers shall also be secured with high quality, strong and durable hinges, latches and locks with
non-duplicable keys. Pilot float-operated valves which require openings on the top or side of water tanks shall not be used in potable water tanks. # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
8. The water tanks and their ancillary equipment shall be housed in an adequately secured and locked dedicated tank/pump room or located within an T +65 6561 4078 F +65 6561 5198
adequately secured and locked enclosure. The room/enclosure housing the water tanks and their ancillary equipment shall be segregated from other Mechanical & Electrical (LEAD) Consultant:
services such as equipment for telecommunication, lifts, firefighting or ACMV. The enclosure for water storage tanks shall not be used for storage of
items such as flammable liquids or chemicals.
ARCHITECT:
9. Where a fencing enclosure is used to house the water tanks and/or its ancillary equipment, the material for the fencing enclosure shall be of
welded-mesh or expanded-mesh with mesh openings no larger than 75mm (height) x 25mm (width). When there is no ceiling, the height of the fencing Aedas Pte Ltd
enclosure shall not be less than 2.5m above the highest ground level and shall be reinforced with 300 mm outriggers. Where a ceiling exists over the
enclosure, the enclosure may extend from floor to ceiling without any outriggers. 11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:

TITLE:
DOMESTIC WATER & DRAINAGE SERVICES
PLUMBING GENERAL NOTES, LEGENDS AND SYMBOLS

SCALE: DRAWING NO.: REV.:

N.T.S CGK063-DSCO-ZZ-XX-DR-M-4000 C
80% DETAIL DESIGN
AUGUST 2020
ROOF

Ø80 DWP Ø65 DWP Ø50 DWP


A

Ø25 DWP Ø50 DWP Ø50 DWP Ø50 DWP


Ø25 DWP Ø50 DWP Ø25 DWP
Ø25 DWP

WH WH WH
50L 50L 35L
Ø25 DWP
Ø25 DWP
Ø25 DWP Ø25 DWP DF DF DF DF
SH SH SH

SK WB WB WB WB BT UR UR WC HB WCHB TMX WB WB WB BT TMX WCHB WCHBWCHB HB HB HB HB HB HB TMX WB WB BT WCHB WCHB WB WB WB WCHB WB WB

Ø15 HWP Ø15 HWP Ø15 HWP


BREAK ROOM MALE TOILET FEMALE TOILET ABLUTION ABLUTION SECURITY VESTIBULE QUIET ROOM SECURITY ROOM JANITOR
GROUND FLOOR

OFFICE PHASE

ROOF
Ø80 DWP
A
GSM DIGITAL WATER METER C/W SPARE MODBUS
OUTPUT AND SWITCH SOCKET OUTLET
(TYPICAL FOR ALL WATER METER SHOWN)

M
Ø100 IWP Ø80 DWP Ø80 DWP
WATER WATER 1 NO.
WATER WATER PRESSURE
LEVEL LEVEL LEVEL LEVEL
SAND SAND CARBON CARBON VESSEL
SENSOR SENSOR SENSOR SENSOR
FILTER FILTER FILTER FILTER (1000L)
RAW WATER PUMPS (C/W VSD) CLEAN WATER PUMPS (C/W VSD)
PFV PFV PFV PFV
RWP G-1 & G-2 CLWP G-1 & G-2
(1 DUTY, 1 STANDBY) (1 DUTY, 1 STANDBY)
FLOW RATE: 3.5L/s, HEAD:10m EACH FLOW RATE: 3.5L/s, HEAD:20m EACH
(PUMPS C/W BACK-UP POWER SUPPLY) (PUMPS C/W BACK-UP POWER SUPPLY)
PV UV
EXTERNAL
SAMPLING SAMPLING P P SAMPLING SAMPLING P P
POINT POINT POINT POINT

HB HB HB HB HB HB HB HB
P P P P
N/C N/C N/C N/C
Ø150 DRAIN ( DRAIN TO TERMINATE Ø150 DRAIN ( DRAIN TO TERMINATE M
WITHIN ENCLOSURE) WITHIN ENCLOSURE)
N/C Ø80 DWP Ø80 DWP
Ø100 DWP Ø80 DWP N/C
N/C N/C
GROUND FLOOR C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
FROM NEW INCOMING PIPE Ø25 DWP A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
Ø100 IWP
REFER TO DWG M-1005 REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

RAW WATER STORAGE TANK 3 (G.R.P) CLEAN WATER STORAGE TANK (G.R.P) DSCO Group Pte Ltd
# 04-02 HarbourFront Tower 2
C/W TOP VALVE & ACCESSORIES C/W TOP VALVE & ACCESSORIES 3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020
SIZE: 3m x 2m x 1m (H) SIZE: 3m x 2m x 2m (H)
EFF CAP: 3.6 cu.m EFF CAP: 8.5 cu.m CIVIL/ STRUCTURAL ENGINEER :

2 NOS Ø150 OVERFLOW PIPES 2 NOS Ø150 OVERFLOW PIPES VB + E Pte Ltd
TO TERMINATE WITHIN ENCLOSURE TO TERMINATE WITHIN ENCLOSURE # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
BBCS & SI T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

PROJECT:
CGK063

TITLE:
ACMV SERVICES
DOMESTIC WATER SUPPLY SCHEMATIC

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-4001 C
WCP WCP

FCU FCU FCU FCU FCU FCU FCU FCU


w w w w w w w w

POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR
TO BMS ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY TO BMS
CHILLER PLANT CHILLER PLANT CHILLER PLANT CHILLER PLANT CHILLER PLANT MECH ER ROOM 1.1 MECH ER ROOM 1.1 MECH ER ROOM 1.1

WCP WCP

FCU FCU FCU FCU FCU FCU FCU FCU FCU


w w w w w w w w w

POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR
TO BMS ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY TO BMS
MECH ER ROOM 1.1 MECH ER ROOM 1.1 MECH ER ROOM 1.1 MECH ER ROOM 1.1 MECH ER ROOM 1.1 MECH ER ROOM 1.1 CATCHER ROOM 2 CATCHER ROOM 2 CATCHER ROOM 2

WCP WCP

FCU FCU FCU FCU FCU FCU FCU FCU FCU


w w w w w w w w w

POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR
TO BMS ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY TO BMS
ER ROOM 1.4 ER ROOM 1.4 ER ROOM 1.4 ER ROOM 1.4 ER ROOM 1.4 ER ROOM 1.4 CATCHER ROOM 1 CATCHER ROOM 1 CATCHER ROOM 1

WCP WCP

FCU FCU FCU FCU FCU FCU FCU FCU FCU


w w w w w w w w w

POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR
TO BMS ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY TO BMS
ER ROOM 1.3 ER ROOM 1.3 ER ROOM 1.3 ER ROOM 1.3 ER ROOM 1.3 ER ROOM 1.3 HOUSE LOAD ROOM HOUSE LOAD ROOM HOUSE LOAD ROOM

WCP

FCU FCU FCU FCU FCU FCU DISTANCE TYPE SENSING CABLE

w w w w w w
WCP
POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR
TO BMS ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY DOMESTIC WATER
PLANTROOM
ER ROOM 1.2 ER ROOM 1.2 ER ROOM 1.2 ER ROOM 1.2 ER ROOM 1.2 ER ROOM 1.2

WCP TO BMS

FCU FCU FCU FCU FCU FCU


w w w w w w

POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR
TO BMS ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY

ER ROOM 1.1 ER ROOM 1.1 ER ROOM 1.1 ER ROOM 1.1 ER ROOM 1.1 ER ROOM 1.1 C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
DISTANCE TYPE SENSING CABLE

B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF


A 08JUN2020
- ISSUE FOR 30% REVIEW ZLT CC YY BF
WCP REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

INDUSTRIAL WATER MEP ENGINEER:


WCP
PLANTROOM
DSCO Group Pte Ltd
PAHU PAHU PAHU PAHU PFCU PFCU # 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
w w w w w w
T +65 6216 0022 F +65 6216 0020
TO BMS
POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR POINT TYPE WATER LEAK SENSOR
ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY ON SECONDARY DRIP TRAY CIVIL/ STRUCTURAL ENGINEER :
TO BMS
ER ROOM 1 ER ROOM 2 ER ROOM 3 ER ROOM 4 MECH ER ROOM 1.1 MECH ER ROOM 1.1 VB + E Pte Ltd
# 05-09 Harbour Link Complex
HOUSE LOAD ROOM
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

WATER LEAK DETECTION CONTROL PANEL SCHEMATIC DIAGRAM Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
ACMV SERVICES
WATER LEAK DETECTION SYSTEM SCHEMATIC

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-4002 C
DN
DN DN

UP
UP DN
DN DN

UP UP
DN DN

DN

DN

20

DN DN
16.6

UP UP UP UP UP UP UP

UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP

LAYOUT 1 LAYOUT 3 LAYOUT 5 C

D C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF


B - NOT ISSUED
A - NOT ISSUED

LAYOUT 2 LAYOUT 4 LAYOUT 6


REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

E MEP ENGINEER:

DSCO Group Pte Ltd


E7 # 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
F T +65 6216 0022 F +65 6216 0020

F.3
F.5 CIVIL/ STRUCTURAL ENGINEER :

F.8 VB + E Pte Ltd


G # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

7 8 9 10 11 12 ARCHITECT:

1 2 3 4.1
4 5 6 13 14 15 16 17 18 19 Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
1 OVERALL GROUND FLOOR WATER SERVICES LAYOUT (BBCS) CGK063
scale 1 : 500
TITLE:

OVERALL GROUND FLOOR WATER SERVICES LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 500 CGK063-DSCO-1A-01-DR-M-4080 C
TO OFFICE

80ø DWS 80ø DWS RAW WATER


(BOP : -974) (BOP : 1955) STORAGE TANK 3
CLEAN WATER STORAGE TANK
100ø DWS
(BOP : 401)
F.3
CLWP-G-1 RWP-G-1 152ø DWS
152ø DWS (BOP : 888)
(BOP : 888) UV 100ø DWS
(BOP : 401)

100ø DWS
CLWP-G-2 RWP-G-2 (BOP : 1945)
80ø DWS
(BOP : 2457) 80ø DWS F.5
(BOP : 898) 80ø DWS
(BOP : 957)
100ø DWS
(BOP : 95)
PV

152ø DWS
SAND FILTER (BOP : 16)
100ø DWS
(BOP : -987)

TO DRAIN
F.8
80ø DWS
TO DRAIN (BOP : 1855)
80ø DWS
100ø DWS FROM (BOP : 2457) TO EXTERNAL
80ø DWS
INCOMING MAIN PIPE (GENSET AREA)
(BOP : -845)
CARBON FILTER

15 16 16.6 C 31AUG2020
B -
ISSUE FOR 80% REVIEW
NOT ISSUED
ZLT YY YY BF

A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


1 WATER SERVICES GROUND FLOOR LAYOUT - DOMESTIC WATER PLANTROOM AREA (BBCS) # 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
scale 1 : 50 T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

WATER SERVICES GROUND FLOOR LAYOUT -


DOMESTIC WATER PLANTROOM AREA
SCALE: DRAWING NO.: REV.:
1 : 50 CGK063-DSCO-1A-01-DR-M-4082 C
LEGEND:

DISTANCE TYPE
SENSING CABLE

W POINT TYPE
SENSING CABLE

WATER LEAK DETECTION


CONTROL PANEL

1 2 3 4.1
4 5 6 7 8 9 10 11 12 13 14 14.8
15 15.4 16 16.6 17 18 19.1
19

HP HP HP HP
HP HP HP HP

A
ER1.4-019 ER1.4-018 ER1.2-009 ER1.2-008
HP ER1.1-002 ER1.1-001 CR2-033 CR2-034
BSMDF-03 HP
W W W W W ER1.3-015 W W W
W W
W W W W W W W W W W W W W W W W
W
HP HP HP HP HP HP HP HP
W
HP ER1.4-020 HP HP HP HP HP HP HP HP CU
W HP ER1.3-012 ER1.3-011 ER1.2-010 ER1.1-005 HLR-036 HLR-037 CR1-030 CR1-031
BSMDF-04 ER1.4-017 ER1.4-016 ER1.3-014 ER1.3-013 ER1.2-007 ER1.2-006 ER1.1-004 ER1.1-003 MAU HP-FCC-02
HP CR-HL-06 CU
W BSMDF-01 WDCP
HP-FCC-01
W WDCP WDCP
W W W
W W

HP HP
W
BSMDF-02 HP HP HP
CHP-039 W HP W
W MAU MAU MAU MAU HLR-038 CR1-032 FCC-01
HP DH-ER-1.4-04 DH-ER-1.3-03 DH-ER-1.2-02 DH-ER-1.1-01 CR2-035
BSMDF-05
HP W
W
W
HP DHCORR-05 HP
B
W
DHCORR-01 FCC-02

WDCP WDCP WDCP

DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU
MAU 1.4-035 1.4-033 1.4-031 1.4-029 1.3-027 1.3-025 1.3-023 1.3-021 1.3-019 1.2-017 1.2-015 1.2-013 1.2-011 1.1-009 1.1-007 1.1-005 1.1-003 1.1-001
W
MER-05

HP
W
WDCP

WDCP
HP
CORR-01
HP
OPOFF-01
HP
OPOFF-03
W
HP
OPOFF-05
W HP
W
B.5
W
W SCO-01
W MER1.1-021
W
W
HP WDCP HP MAU
W OFF-01
CHP-040 EL-01
HP
MER1.1-022
W

W
C
W
HP HP
HP HP HP EL-02 HP
DHCORR-02 OPOFF-02 OPOFF-04 OPOFF-06
HP SCO-02
MER1.1-023 W
W W W W HP
W OFF-05 W
W
HP HP HP
HP MER1.1-029 HP HP HP CONF-02 STO-01
CHP-041 HP OFF-01 OFF-02 OFF-03 HP
MER1.1-024 W W W OFF-04 WDCP
W
W
WDCP
W W
HP W W HP HP
MER1.1-028

W
HP
MER1.1-025
HP
W

W
W HP
CONF-03
CONF-01
W
HP
W
STO-02
D
HP MER1.1-026 W EROFF-01
MER1.1-027 HP W W HP W
W CORR-02 FLEX-01
HP
W
W W HP HP STR-02
W
HP HP EROFF-04 EROFF-02
HP W
CHP-042 DHCORR-03 HP HP W HP
CONF-04
CONF-05 QT-01 CORR-05 HP
W
CORR-06
W HP HP
W
HP HP EROFF-03
WDCP CORR-03 CORR-04 LOG-01

HP
W
D.9
E
SMDF-01
HP W W
W
CICO-01 HP HP
HP SMDF-02 W SMDF-04
HP BRK-01 W W
CHP-043 W
HP HP
HP DISK-01
STR-03 SMDF-03
W HP W
STR-03 HP
W STR-01
W
HP W
HP W
HP HP HP
DHCORR-04 RZ-01 RZ-02 RZ-03 W
RZ-04

DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU HP
W W
HP
HP
CORR-09 CU CU
W
HP
CORR-10
F
1.4-036 1.4-034 1.4-032 1.4-030 1.3-028 1.3-026 1.3-024 1.3-022 1.3-020 1.2-018 1.2-016 1.2-014 1.2-012 1.1-010 1.1-008 1.1-006 1.1-004 1.1-002 CORR-07 WDCP CORR-08 OFFICE-03 OFFICE-04 CU

F.3
W
OFFICE-05
CU
OFFICE-06

CU CU
OFFICE-02 OFFICE-01
F.5
DHUM
1.4-03
DHUM
1.4-02
DHUM DHUM
1.3-03
DHUM
1.3-02
DHUM DHUM
1.2-03
DHUM
1.2-02
DHUM DHUM
1.1-03
DHUM
1.1-02
DHUM
F.8 C 31AUG2020 ISSUE FOR 80% REVIEW SNBN
ZLT NWP
CC MN
YY LBK
BF
1.4-01 1.3-01 1.2-01 1.1-01 B - NOT ISSUED SNBN NWP MN LBK

G A -
REV. DATE
NOT ISSUED
DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
ACMV SERVICES
WATER LEAK DETECTION SYSTEM GROUND FLOOR LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 300 CGK063-DSCO-ZZ-01-DR-M-4084 C
SANITARY NOTE:
1. Contractor/Licensed plumber shall liaise with the building contractor to ensure that necessary pipe opening in slab, beam, 21. All suspended inspection chambers, hatchboxes, sumps, underground sanitary pipes, etc at basement or driveway
wall,etc. are provided for their installation. area shall be integrated with structural elements.
2. Material For Piping 22. All drawings are to be read in conjunction with Architectural/Structural plans and other related drawings.The
Unless otherwise stated in drawings all piping shall comply with the following:- Contractor must verify all dimensions and levels on site before the commencement of works. Any discrepancy must
TYPE OF SYSTEM SIZE MATERIAL be brought to the attention of the Consulting Engineer.
DRAINLINES ALL SIZES DUCTILE IRON CEMENT INTERNAL LINING TO
(BELOW ROADS AND EN 598 : 1995 23. Flush valve and water cistern shall be provided in accordance with ENV circular date 1-3-96 as flow :-
UNDERNEATH THE
BUILDINGS) i). Low capacity flushing cisterns / wc suites. All building plan submissions for new premises and for premises
SOIL WASTE ALL SIZES
CAST IRON WITH INTERNAL LINING C/W HUBLESS JOINTS undergoing renovations which involve replacement of water closets must incorporate the use of low capacity
STACK/PIPE
flushing cisterns / water saving wc suites. This mandatory requirement will also apply to non-domestic
SULLAGE WATER ALL SIZES
DISCHARGE STACK CAST IRON WITH INTERNAL LINING C/W HUBLESS JOINTS sector specifically hotels, commercial buildings and industrial establishments.
/ PIPE
VENT STACK/ 150MM TO uPVC TO SS213: 1998 ii). 4.5 litres wc flush valves (manual and sensor-operated) for toilets. In line with the water conservation
PIPE 75MM CAST IRON WITH INTERNAL LINING C/W HUBLESS JOINTS policy, all manual and sensor operated flush valves used in the public toilets shall give a flush of not less
VENT PIPE 50MM AND uPVC TO SS213: 1998 than 1.5 litres and not more than 2.5 litres of water for individual urinal and not more than 6 litres of water
BELOW
WASTE PIPE FOR
for wc pan.
50MM AND uPVC TO SS213: 1998
CONNECTION FROM BELOW
FITMENT iii). Wall hung wc pan for public toilets. All building plan submissions for new premises and for premises undergoing
(BASIN, ETC.) renovations which involve replacement of water closets shall use wall hung wc pan in public toilets.
TO FLOOR-TRAPS
24. The proposed minor sewer works will be submitted separately by the structural & civil engineer.
3. Access openings shall be provided for the sanitary plumbing system which is enclosed in the void/ duct.
4. The sewer installation shall be installed in accordance to the requirements of the Estate, SNI 8153: Sistem
plambing pada bangunan gedung, SNI 03-2398-2002: Tata cara perencanaan tangki septic dengan sistem resapan
5. The table below shows the minimum diameter of waste pipe for the various waste sanitary appliances contractor shall
comply with the latest env's requirements.
a.
MINIMUM INTERNAL
TYPE OF APPLIANCE DIAMETER OF
WASTE PIPE ( mm )
Wash basin 32
Sink (single or double sink ) 40
Wash tub 50
Wash trough / custom- made sink 50
Drinking fountain 32
H.D.D.I. MAIN DRAIN LINE SWP SANITARY WASTE PIPE
b.
Maximum number of waste NEW VENTILATION PIPE (UPVC) SWVP SANITARY WASTE VENT PIPE
Sanitary appliances allowed
Type of waste sanitary On common waste pipe
Appliance connected Minimum internal diameter of
In series IC INSPECTION CHAMBER H.D.D.I. HEAVY DUTY DUCTILE IRON
Common waste pipe in mm
50 75
WS WASTE SUMP VCP VITRIFIED CLAY PIPE
Wash basin 3 10
Sink (single or double sink ) 2 6
CIGT CAST IRON GULLY TRAP UPVC UNPLASTICIZED POLYVINYL CHORIDE
Where a group of urinals and basin are connected in series loop venting are required.
The loop venting requirement & the minimum diameter of common urinal & basin waste pipe
for urinals & basin connected in series shall be as follows : FT FLOOR TRAP WM WASHING MACHINE
6.
MINIMUM INTERNAL Ø DIAMETER OF LOOP
NUMBER OF URINALS
CONNECTED IN SERIES
OF COMMON URINAL VENTING PIPE REMARKS FW FLOOR WASTE H/L HIGH LEVEL
WASTE PIPE IN mm IN mm
Not more than 2 50 Loop venting not req. -
50 25
UT URINAL TRAP T/A TO ABOVE
3 to 5 urinals / 3 basin See typical detail of group of
Wash basin connected in series
6 to 10 urinals / 4 to & typical detail of group of
10 basins 75 25 WC WATER CLOSET T/B TO BELOW
Urinals connected in series.

7. Drain lines under driveway/building shall be of ductile iron cement lined pipe.( BSEN 598 : 1995 )
WB WASH BASIN F/A FROM ABOVE
8. The following endorsement has been made :
The design & construction of the sanitary plumbing & drainage system shall comply with : the sanitary plumbing
& drainage system regulation, 1976" and "Latest edition of the code of practice on sewerage and sanitary works". SK SINK F/B FROM BELOW
9. All Bends, Turns, Elbows or any other appropriate location shall be fixed with cleaning eye for the proper cleaning of pipe.
10. Hatchboxes / Sumps shall be 600mm x 600mm except for those exceeding 600mm deep shall be 700mm x 900mm. URINAL T.L TOP LEVEL
UR
11. Relief vent shall be provide for discharge stack which is offset for more than 45° vertically.
12. Cross ventilating pipes shall be provided between the soil-waste discharge stack & ventilating stack, see Dwg 3-16,
3-18 & 3-21 of COPSSW for cross venting arrangement. VP VENT PIPE I.L INVERT LEVEL
13. Sensors type of concealed flush valve for all w.c & urinals shall be provided for all public toilet & shall comply with PUB
and ENV. regulation for installation.
D DEPTH MH MANHOLE

MINIMUM PIPE
TYPE OF APPLIANCE
DIAMETER IN mm

a) Branch pipe from floor trap (FT) to


horizontal SWP/WP or to vertical SWP/WP 100 Ø

b) Water closet ( WC) /urinal (UR) /Bidet (BI) to stacks /inspection


chamber (IC) less than 1500mm depth or gully trap (GT) TO 100 Ø
inspection chamber (IC) less than 1500mm depth.

c) Branch pipe from floor waste (FW) to floor trap (FT)


75 Ø
or floor waste (FW) AT LIFT LOBBY TO WASTE STACK.

d) Anti-siphonage pipe (ASP) from water closet (Wc)/floor trap (FT) /


50 Ø
urinal trap (UT) to vent stack

14. All inspection chambers shall be minimum size 900mm x 700mm. All inspection Chamber at driveway shall be heavy duty type.
15. All inspection chambers construction shall be brickwall/reinforced concrete whichever is applicable. If reinforced
concrete is installed, it shall be integrated with structural elements.
16. Construction of all inspection chambers, backdrops, and tumling bays shall conform to the PUB'S standards.

17. All penetrations for external pipes to building to be treated with the sealant "HYDROFIX"for fresh water areas or
"hydroseal" for sea water area.
18. The Plumbing Sub-Contractor shall verify the top/invert levels of all existing/new manholes / IC's prior to preparation of shop drawings and
and Construction.
19. Floor trap/gully trap fixed with perforated cover shall be provided with a NEA approved floatable ball-type anti-mosquito.

20. Unless otherwise stated. All Inspection chambers shall be constructed as follows:-

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


Depth of Minimum internal Cover size Type of Construction B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
Inspection I.C. Size Cover & Method & Remarks
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
Chamber Frame Material used
( length mm x ( length mm x REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
( i.C. ) Width mm ) Width mm )
MEP ENGINEER:
1500mm depth Complying Light duty Brickwall The minimum
900 x 700 Internal i.C.
& below To NEA's Cast iron Construction
Requirements Size serves as DSCO Group Pte Ltd
Exceeds 1500mm (PUB/WRN/STD/017) A guide only.
Light duty Reinforced # 04-02 HarbourFront Tower 2
Depth to less 1000 x 900 (PUB/WRN/STD/018) Sanitation contractor
Cast iron Concrete (r.C.)
Than 2500mm Shall increase the 3 HarbourFront Place, Singapore 099254
Construction
Internal size of the T +65 6216 0022 F +65 6216 0020
Complying to NEA's
I.C. Accordingly to
Requirement
The number of branch
(PUB/WRN/STD/002)
Pipe connection to
(PUB/WRN/STD/003) CIVIL/ STRUCTURAL ENGINEER :
Each i.C. Maximum
(PUB/WRN/STD/004)
Internal i.C. Size
(PUB/WRN/STD/005)
1350l x 1350w VB + E Pte Ltd
1. The coarse
# 05-09 Harbour Link Complex
Minimum 1500mm (PUB/WRN/STD/015) Heavy duty Complying
1000 x 900 Aggregate for grade 61 Alexandra Terrace, Singapore 119936
Depth to maximum Cast iron To NEA's
Less than 6000mm Requirements 25a & 30a concrete T +65 6561 4078 F +65 6561 5198
Depth. (inspection (PUB/WRN/STD/016) Medium duty (PUB/WRN/STD/002) Should be graded
From 5mm to 20mm.
Mechanical & Electrical (LEAD) Consultant:
Chamber with Cast iron (PUB/WRN/STD/003)
Manhole instruction) (PUB/WRN/STD/004) 2. All bolts & nuts
Note : (PUB/WRN/STD/005) Shall be of stainless ARCHITECT:
Any I.C. that exceeds Steel.
2500mm must be of
manhole construction. Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:

TITLE:
WASTE WATER & DRAINAGE SERVICES
WASTE WATER SERVICES LEGEND OF SYMBOLS AND GENERAL NOTES

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-5000 C
80% DETAIL DESIGN
AUGUST 2020
COOLING TOWER

VENT VENT VENT VENT


COWL COWL COWL COWL

ROOF LEVEL FT FT

Ø50 VP
Ø50 VP

Ø50 VP

Ø50 VP
CO
Ø100 (1:90)

CATCHER ROOM 1 DAHU GALLERY DAHU GALLERY CHILLER


PLANTROOM

GROUND FLOOR (FFL 46.00) CO IC-2 CO FW FT FW FW FT FW FW FT FW FW FT FW FW FT FW CO FW FT FW IC-1 FW FT FW FW FT FW FW FT FW FW FT FW CO FT FT FT FT CO

B
Ø200 (1:190) IL:44.10 Ø200 (1:190) IL:44.36 Ø200 (1:190)

VENT VENT
COWL COWL

ROOF LEVEL

Ø50 VP

Ø50 VP
DAHU GALLERY DAHU GALLERY

GROUND FLOOR (FFL 46.00) CO IC-4 CO FW FT FW FW FT FW FW FT FW FW FT FW IC-3 FW FT FW CO FW FT FW FW FT FW FW FT FW FW FT FW FW FT FW CO

IL: 45.05
A
IL:44.40 Ø200 (1:190) Ø200 (1:190) IL:44.63 Ø200 (1:190)

VENT VENT VENT


COWL COWL COWL

ROOF LEVEL
Ø50 VP Ø50 VP Ø50 VP Ø50 VP
Ø50 VP

Ø50 VP

Ø50 VP

Ø50 VP

Ø50 VP
JANITOR BREAK MALE FEMALE SECURITY VESTIBULE ABLUTION ABLUTION DRINKING QUIET JANITOR SECURITY DRINKING
ROOM TOILET TOILET WASHROOMS WATER ROOM WASHROOMS WATER

SINK WB WC WC UR UR WB WB WB WC WC WC WC WB WB WB WC WC WB WB SINK SINK WC WB


EXISTING
GROUND FLOOR (FFL 46.00) TL: 45.50 IC NO.1
SAMPLING
SUMP CO IC-5 CO FT FT FT FT UT FT CO FT FT FT FT FT CO FT FT FT CO FT FT FT FT FT FT CO FT CO OFFICE PHASE
IL: 43.67 B Ø100 (1:90) Ø100 (1:90) Ø100 (1:90) Ø100 (1:90)
A
IL:43.75 BIO-SEPTIC TANK IL:43.85 Ø200 (1:190) Ø200 (1:190) Ø200 (1:190) Ø200 (1:190)

IL: 43.54 C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


NOTE:- B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
1. MANUFACTURER SHALL PROVIDE 10 YEARS WARRANTY. A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
2. THE DISCHARGE EFFLUENT SHALL COMPLY TO:-
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
BOD < 20-50 MG/L
COD < 50-80 MG/L
OIL & FAT < 20-30 MG/L MEP ENGINEER:
AMMONIA < 10 MG/L
KMnO4 < 85 MG/L
TSS < 50 MG/L DSCO Group Pte Ltd
BLUE METILEN < 2 MG/L
PH 6-9 # 04-02 HarbourFront Tower 2
3. DESIGNED TO TREAT MINIMUM 30 PAX OF UNTREATED WASTEWATER. 3 HarbourFront Place, Singapore 099254
4. CONTRACTOR TO ENSURE DISCHARGE EFFLUENT COMPLY TO LAMPIRAN 1 PERATURAN MENTERI LINKUNGAN HIDUP DAN KEHUTANAN PEPUBLIK INDONESIA NOMOR P.68/MENLHK-SETJEN/2016.
5. THE DESIGN AND CONSTRUCTION OF SEPTIC TANK SHALL COMPLY TO SNI 03-2398-2002
T +65 6216 0022 F +65 6216 0020

BBCS & SI CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

PROJECT:
CGK063

TITLE:
ACMV SERVICES
WATER DRAINAGE SCHEMATIC

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-5001 C
ROOF LEVEL

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON


DRAINAGE
GROUND FLOOR PIT CB CB CB CB CB CB CB

OPEN DRAIN OPEN DRAIN OPEN DRAIN

ROOF LEVEL
Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON

Ø200 RWP CAST IRON


DRAINAGE DRAINAGE DRAINAGE
GROUND FLOOR PIT PIT CB CB CB PIT CB CB CB CB CB CB CB

OPEN DRAIN OPEN DRAIN OPEN DRAIN OPEN DRAIN


A
CONNECT TO
EXISTING DRAIN OPEN DRAIN OPEN DRAIN

BBCS & SI

C 31AUG2020
17AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
ACMV SERVICES
WATER DRAINAGE SERVICES

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-5002 C
16.6 20

UP UP UP UP UP UP UP

UP

UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP

LAYOUT 1 LAYOUT 3 LAYOUT 5


C

LAYOUT 2 LAYOUT 4 LAYOUT 6


E

E7
F C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
F.3 A - NOT ISSUED

F.5 REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
F.8
DSCO Group Pte Ltd
G # 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
7 8 9 10 11 12 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
1 2 3 4.1
4 5 6 13 14 15 16 17 18 19 Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 OVERALL GROUND FLOOR SOILS & WASTE WATER LAYOUT (BBCS)
TITLE:
scale1 : 300
OVERALL GROUND FLOOR SOILS & WASTE WATER
LAYOUT
SCALE: DRAWING NO.: REV.:
1 : 300 CGK063-DSCO-1A-01-DR-M-5080 C
200ø SEWAGE PIPE
(1:190)
CLEANOUT
CLEANOUT
200ø SEWAGE PIPE
(1:190) 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE
(1:190) (1:190) (1:190) (1:190)
DEAD END CONNECTION

100ø SEWAGE PIPE


(1:100)

100ø SEWAGE PIPE


(1:100)

100ø SEWAGE PIPE


(1:100) TYPICAL

FW FW FW
B
50ø SEWAGE PIPE
50ø SEWAGE PIPE
(1:60) 50ø SEWAGE PIPE
(1:60)
(1:60)

FT FT FT
50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE
(1:60) (1:60) (1:60)

50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE


(1:60) (1:60) (1:60)
CLENAOUT

100ø SEWAGE PIPE


(1:100)
FT

100ø SEWAGE PIPE


(1:100)

C
FW FW FW

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
D T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

FT Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 2 3 44.1 5 6 7
TITLE:

PARTIAL GROUND FLOOR SOILS & WASTE WATER


1 PARTIAL GROUND FLOOR SOILS & WASTE WATER LAYOUT 1 (BBCS) LAYOUT 1
scale 1 : 100 SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5081 C
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5101 FOR
CONTINUATION
D
100ø SEWAGE PIPE
(1:100)
FT

100ø SEWAGE PIPE


(1:100)

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5104 FOR


CLEANOUT

100ø SEWAGE PIPE


(1:100)

CONTINUATION
100ø SEWAGE PIPE
(1:100)
FT E7

FW FW FW

F.3

F.5

50ø SEWAGE PIPE


50ø SEWAGE PIPE
50ø SEWAGE PIPE (1:60)
(1:60)
(1:60) F.8
FT FT FT

100ø SEWAGE PIPE


(1:100) TYPICAL

G
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
200ø SEWAGE PIPE A - NOT ISSUED
DEAD END CONNECTION (1:190) REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


200ø SEWAGE PIPE # 04-02 HarbourFront Tower 2
200ø SEWAGE PIPE 200ø SEWAGE PIPE
(1:190) 3 HarbourFront Place, Singapore 099254
(1:190) (1:190)
T +65 6216 0022 F +65 6216 0020
CLEANOUT

CIVIL/ STRUCTURAL ENGINEER :


200ø SEWAGE PIPE
(1:190) VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

7 ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
1 2 3 44.1 5 6 #12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

1 PARTIAL GROUND FLOOR SOILS & WASTE WATER LAYOUT 2 (BBCS) TITLE:

PARTIAL GROUND FLOOR SOILS & WASTE WATER


scale 1 : 100 LAYOUT 2
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5082 C
CLEANOUT CLEANOUT

200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE
(1:190) IC 01 (1:190) (1:190)
(1:190) (1:190) (1:190) (1:190) (1:190) (1:190)

100ø SEWAGE PIPE


(1:100) TYPICAL

FW FW FW FW FW FW FW
100ø SEWAGE PIPE
(1:0) B
50ø SEWAGE PIPE 50ø SEWAGE PIPE
(1:60) 50ø SEWAGE PIPE 50ø SEWAGE PIPE
(1:60) (1:60) 50ø SEWAGE PIPE
(1:60) 50ø SEWAGE PIPE 50ø SEWAGE PIPE (1:60)
(1:60) (1:60)
FT FT FT FT FT FT
50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE
50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE
(1:60) (1:60) (1:60) (1:60)
(1:60) (1:60) (1:60)
50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE
50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE
(1:60) (1:60) (1:60)
(1:60) (1:60) (1:60)

C
FW FW FW FW FW FW

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
D 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

7 8 9 10 11 12 AGILE No.: 000-000000-000


PROJECT:
CGK063

1 PARTIAL GROUND FLOOR SOILS & WASTE WATER LAYOUT 3 (BBCS) TITLE:

scale 1 : 100 PARTIAL GROUND FLOOR SOILS & WASTE WATER


LAYOUT 3
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5083 C
D

FW FW FW FW FW FW

F.3

F.5
50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE 50ø SEWAGE PIPE
(1:60) (1:60) 50ø SEWAGE PIPE
(1:60) (1:60) (1:60)
(1:60)

F.8
FT FT FT FT FT FT

200ø SEWAGE PIPE


(1:190)

G
200ø SEWAGE PIPE
200ø SEWAGE PIPE CLEANOUT CLEANOUT (1:190)
(1:190)
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
IC 03
200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE MEP ENGINEER:
200ø SEWAGE PIPE (1:190)
(1:190) (1:190) (1:190) (1:190)
(1:190)
DSCO Group Pte Ltd
# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
7 8 9 10 11 12 T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL GROUND FLOOR SOILS & WASTE WATER LAYOUT 4 (BBCS) PROJECT:
CGK063
scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR SOILS & WASTE WATER


LAYOUT 4
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5084 C
SEPTIC TANK
200ø SEWAGE PIPE
(1:190)

TO DRAIN

200ø SEWAGE PIPE


(1:190)

200ø SEWAGE PIPE


(1:190)

200ø SEWAGE PIPE 200ø SEWAGE PIPE


200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE 200ø SEWAGE PIPE (1:190) (1:190)
(1:190) (1:190) (1:190) (1:190) (1:190)
IC 02

CLEANOUT
CLEANOUT

IC 05
200ø SEWAGE PIPE A
(1:190)

100ø SEWAGE PIPE


200ø SEWAGE PIPE
(1:100)
(1:190)

FW FW

B
50ø SEWAGE PIPE
(1:60)
50ø SEWAGE PIPE
FT (1:60) FT

50ø SEWAGE PIPE


(1:60)
50ø SEWAGE PIPE
(1:60)

CLEANOUT

50ø SEWAGE PIPE


(1:60)
C
FW 200ø SEWAGE PIPE 200ø SEWAGE PIPE
(1:190) (1:190)
100ø SEWAGE PIPE
(1:60) C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
150ø SEWAGE PIPE B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
100ø SEWAGE PIPE
200ø SEWAGE PIPE (1:100) A - NOT ISSUED
(1:0) REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
(1:190)
100ø SEWAGE PIPE FT
MEP ENGINEER:
(1:60)

DSCO Group Pte Ltd


200ø SEWAGE PIPE # 04-02 HarbourFront Tower 2
(1:190) 3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:
D
Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
13 14 15 16 16.6 17 18 19 CGK063

19 20 TITLE:
1 PARTIAL GROUND FLOOR SOILS & WASTE WATER LAYOUT 5 (BBCS) PARTIAL GROUND FLOOR SOILS & WASTE WATER
scale 1 : 100 LAYOUT 5
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5085 C
D
200ø SEWAGE PIPE
(1:190)

32ø SEWAGE PIPE


(1:60)

32ø SEWAGE PIPE


(1:60)

200ø SEWAGE PIPE


(1:190)
150ø SEWAGE PIPE
(1:60)

DEAD END CONNECTION

150ø SEWAGE PIPE


E
(1:60)

200ø SEWAGE PIPE


(1:190)

FT
200ø SEWAGE PIPE
(1:190)
150ø SEWAGE PIPE
150ø SEWAGE PIPE (1:100)
(1:100) CLEANOUT

150ø SEWAGE PIPE


(1:100)
FW

50ø SEWAGE PIPE F.3


(1:60) 200ø SEWAGE PIPE
(1:190)

150ø SEWAGE PIPE


(1:100) F.5

FT FT

F.8
FT
150ø SEWAGE PIPE
100ø SEWAGE PIPE (1:100)
(1:0) 200ø SEWAGE PIPE
(1:190)

G
200ø SEWAGE PIPE CLEANOUT
200ø SEWAGE PIPE (1:190)
(1:190) C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
IC 04 B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
DEAD END CONNECTION REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

CLEANOUT 200ø SEWAGE PIPE


200ø SEWAGE PIPE (1:190) DSCO Group Pte Ltd
(1:190) # 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
200ø SEWAGE PIPE T +65 6216 0022 F +65 6216 0020
(1:190)
CIVIL/ STRUCTURAL ENGINEER :
14 16 17 19
VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

13 15 16.6 18 Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 PARTIAL GROUND FLOOR SOILS & WASTE WATER LAYOUT 6 (BBCS)
scale 1 : 100 TITLE:

PARTIAL GROUND FLOOR SOILS & WASTE WATER


LAYOUT 6
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5086 C
UP UP UP UP UP UP UP

UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP

LAYOUT 1 LAYOUT 3 LAYOUT 5


C

LAYOUT 2 LAYOUT 4 LAYOUT 6


E

F.3 C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
F.5 A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
F.8 MEP ENGINEER:

G DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
7 8 9 10 11 12 # 05-09 Harbour Link Complex
1 2 3 4 4.1 5 6 13 14 15 16 16.6 17 18 19 20 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:

1 OVERALL GROUND FLOOR DRAINAGE WATER LAYOUT (BBCS) CGK063

scale1 : 300
TITLE:

OVERALL GROUND FLOOR DRAINAGE WATER LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 300 CGK063-DSCO-1A-01-DR-M-5100 C
150ø STORM WATER
PIPE
(1:60) 200ø STORM WATER
150ø STORM WATER
PIPE CLEANOUT PIPE
150ø STORM WATER
(1:150) (TYPICAL) (1:150)
PIPE
(1:150)
150ø STORM WATER 200ø STORM WATER
150ø STORM WATER
PIPE PIPE
PIPE
(1:150) (1:150)
(1:150)

200ø STORM WATER A


150ø FROM ABOVE PIPE
200ø FROM ABOVE (1:60)

200ø FROM ABOVE

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5083 FOR


B

CONTINUATION
150ø STORM WATER
PIPE
(1:60)

150ø STORM WATER


PIPE
(1:150)

150ø STORM WATER


PIPE
(1:150)

C
150ø FROM ABOVE
TO DRAIN CLEANOUT
(TYPICAL)

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
D T +65 6561 4078 F +65 6561 5198
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5102 FOR Mechanical & Electrical (LEAD) Consultant:

CONTINUATION
ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

1 2 3 44.1 5 6 7 AGILE No.: 000-000000-000


PROJECT:
CGK063
1 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 1 (BBCS)
TITLE:
scale 1 : 100
PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 1

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-5101 C
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5101 FOR
CONTINUATION

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5104 FOR


150ø STORM WATER
PIPE
(1:150)
150ø STORM WATER 150ø FROM ABOVE
PIPE
(1:150)
150ø STORM WATER E7
PIPE

CONTINUATION
(1:60)
TO DRAIN
150ø STORM WATER
CLEANOUT PIPE
(TYPICAL) (1:60)

F.3

F.5

F.8
200ø FROM ABOVE
200ø STORM WATER
PIPE
(1:60)
200ø STORM WATER G
PIPE
(1:60) 200ø STORM WATER
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
PIPE
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
(1:150) A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

CLEANOUT 200ø STORM WATER MEP ENGINEER:


(TYPICAL) PIPE
(1:150) DSCO Group Pte Ltd
# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
7 Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

1 2 3 44.1 5 6 Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
TO DRAIN Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

1 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 2 (BBCS)


TITLE:
scale 1 : 100 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 2

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-5102 C
TO DRAIN

200ø STORM WATER 200ø STORM WATER


CLEANOUT PIPE
PIPE (TYPICAL)
(1:150) (1:150)

200ø STORM WATER 200ø STORM WATER


PIPE PIPE
(1:150) 200ø STORM WATER (1:150)
PIPE
(1:60) A
200ø FROM ABOVE
200ø FROM ABOVE

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5105 FOR


REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5101 FOR

CONTINUATION
CONTINUATION

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex

D 61 Alexandra Terrace, Singapore 119936


T +65 6561 4078 F +65 6561 5198
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5104 FOR Mechanical & Electrical (LEAD) Consultant:
CONTINUATION
ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
7 8 9 10 11 12
TITLE:

PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 3


1 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 3 (BBCS)
scale 1 : 100 SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5103 C
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5103 FOR
CONTINUATION
D

E
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5102 FOR

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5106 FOR


CONTINUATION

CONTINUATION
F

F.3

F.5

F.8

200ø FROM ABOVE 200ø FROM ABOVE

G
200ø STORM WATER 200ø STORM WATER
PIPE PIPE C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
(1:150) (1:150) B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

200ø STORM WATER MEP ENGINEER:


200ø STORM WATER
PIPE PIPE
(1:150) (1:150) DSCO Group Pte Ltd
# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
7 8 9 10 11 12 T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
TO DRAIN TO DRAIN Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

1 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 4 (BBCS) TITLE:

PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 4


scale 1 : 100
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5104 C
200ø STORM WATER 200ø STORM WATER
PIPE PIPE 200ø STORM WATER
(1:150) (1:150) PIPE
(1:150)

200ø STORM WATER 200ø STORM WATER 200ø STORM WATER


PIPE PIPE PIPE
(1:150) (1:150) (1:150)

A
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5103 FOR
CONTINUATION

200ø STORM WATER


PIPE
(1:60)

C
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


D 11 North Buona Vista Drive,
#12-07 The Metropolis Tower 2
T +65 6734 4733
singapore@aedas.com
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5106 FOR
Singapore 138589 aedas.com
CONTINUATION
AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

13 14 15 16 16.6 17 18 19 20 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 5

1 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 5 (BBCS) SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-5105 C
scale 1 : 100
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5105 FOR
CONTINUATION
D

E
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-5104 FOR

200ø STORM WATER


CONTINUATION

PIPE
(1:60)

F
200ø FROM ABOVE

200ø STORM WATER


PIPE
(1:60) F.3

F.5

F.8
200ø STORM WATER
PIPE 200ø STORM WATER
(1:150) PIPE
(1:150)

G
CLEANOUT (TYPICAL)
200ø STORM WATER C 31AUG2020 ISSUE FOR 80% REVIEW ZLT YY YY BF
PIPE B 21JUL2020 ISSUE FOR 50% REVIEW ZLT YY YY BF
(1:150) A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

200ø STORM WATER


PIPE DSCO Group Pte Ltd
(1:150) 200ø STORM WATER 200ø STORM WATER # 04-02 HarbourFront Tower 2
PIPE PIPE 3 HarbourFront Place, Singapore 099254
(1:150) (1:150) T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

13 14 15 16 16.6 17 18 19 Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
TO DRAIN Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 6 (BBCS)
scale 1 : 100 TITLE:

PARTIAL GROUND FLOOR DRAINAGE WATER LAYOUT 6

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-5106 C
TO TT AND RH IN AREA TO OUTDOOR TO TT, RH AND DP TO TT, RH AND DP
SENSORS SENSORS IN AREA SENSORS IN AREA

MAX COOLING TYPICAL AREA 1 TYPICAL USB TYPICAL AREA 2 CHILLER ROOM WEATHER STATION HYDRAULIC SYSTEM FIRE SYSTEM
(MxC) PANEL BMS ENCLOSURE BMS ENCLOSURE BMS ENCLOSURES

C RH P

HARDWARE
INTERFACE
MASTER
AREA
COORDINATING
CONTROLLER
CONTROLLER

ETHERNET ETHERNET ETHERNET CHILLER WEATHER ETHERNET ETHERNET


INTERFACE INTERFACE INTERFACE CONTROLLER STATION INTERFACE INTERFACE

BMS NETWORK

HEAD END SWITCH A HEAD END SWITCH B

BMS SERVER A BMS SERVER B

FIREWALL A FIREWALL B

CO-AGG A CO-AGG B C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF


B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
CORP CLOUD MEP ENGINEER:

BMS RACKS PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
BMS FUNCTIONAL SCHEMATIC TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
BMS FUNCTIONAL SCHEMATIC DIAGRAM

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-ZZ-DR-M-6010 C
BMS SERVICES BMS LEGEND

SNO. SYMBOL DESCRIPTION


CORP CLOUD
01 T TEMPERATURE SENSOR

02 T IMMERSION TEMPERATURE SENSOR

03 TTRH TEMPERATURE AND RH COMBO SENSOR


CO-AGG A CO-AGG B
04 TMxC TEMPERATURE SENSOR FOR MAX COOLING

05 DPS DIFFERENTIAL PRESSURE SENSOR


PHASE 2
06 DPSMxC DIFFERENTIAL PRESSURE SENSOR FOR MAX COOLING
ELECTRICAL ROOM 1.2 DATAHALL - PHASE 2
07 ΔP DIFFERENTIAL PRESSURE SWITCH FOR FILTER
FIREWALL A FIREWALL B
08 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)
EXHAUST FAN (1D) FRESH AIR FAN (1D)
PHASE 1 T T T T BMS BMS PANEL
-ON/OFF STATUS -ON/OFF STATUS 09
BMS SERVER A BMS SERVER B
-TRIP STATUS -TRIP STATUS 10 MxC MAX COOLING PANEL
DATAHALL - PHASE 1 ELECTRICAL ROOM 1.1 TTRH TTRH
11 ANNUNCIATOR PANEL FOR MAX COOLING MODE
HEAD END SWITCH A HEAD END SWITCH B
FRESH AIR FAN (1D) EXHAUST FAN (1D) DPSSP DPSSP DPSSP DPSSP 12 HMI HUMAN MACHINE INTERFACE
T T T T T T
-ON/OFF STATUS -ON/OFF STATUS 13 M MOTORIZED VALVE
-TRIP STATUS -TRIP STATUS HEAD END FIBER HEAD END FIBER PICV
DX-SPLIT UNIT (4D+1S) DPSDH DPSDH DPSDH DPSDH 14 PRESSURE INDEPENDENT CONTROL VALVE
TTRH TTRH PATCH PNL-1 PATCH PNL-1 TTRH
-TEMP MONITORING 15 WLD WATER LEAK DETECTOR
-ON/OFF STATUS DEWP
DPSSP DPSSP DPSSP DPSSP -TRIP STATUS 16 SD SMOKE DETECTOR
T T DHUM 17 WDP WATER DIFFERENTIAL PRESSURE SENSOR

DPSDH DPSDH DPSDH DPSDH I/O MAU


DX-SPLIT UNIT (4D+1S) 18 FM WATER FLOW METER
TTRH
-TEMP MONITORING
19 ETHERNET / CAT-6 CABLE
DEWP -ON/OFF STATUS NETWORK
-TRIP STATUS SWITCH DAHU-1 DAHU-2 DAHU-8 20 SERIAL / INTEGRATION CABLE
DHUM
21 HARDWIRE CABLE
MAU I/O AREA
CONTROLLER CONNECTED TO 22 FIBER OPTIC CABLE
MxC MxC ANNUNCIATOR PNL
NETWORK D2-BMS PNL 23 RESPECTIVE EQUIPMENT VENDOR
D2-MxC PNL TMxC TMxC
DAHU-10 DAHU-2 DAHU-1 SWITCH PANEL LOCATED IN PANEL LOCATED AT 24 BMS VENDOR
ELECTRICAL ROOM 1.2 D2 ENTRANCE
AREA
CONTROLLER
MxC NOTES:-
TMxC TMxC D1-BMS PNL PHASE 3
D1-MxC PNL 1. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 120"W x 18"D.

PANEL LOCATED AT PANEL LOCATED IN INCLUDES AREA CONTROLLER, MASTER COORDINATING


ELECTRICAL ROOM 1.3 DATAHALL - PHASE 3 CONTROLLER, AND MAX COOL CONTROLLER.
D1 ENTRANCE ELECTRICAL ROOM 1.1
2. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 84"W x 18"D.
MASTER INCLUDES AREA CONTROLLER, AND MAX COOL CONTROLLER.

OUTDOOR AREA COORDINATING EXHAUST FAN (1D) FRESH AIR FAN (1D)
3. PROVIDE BMS HMI/MAX COOL PANELS - 24"H x 54"W x 8"D. INCLUDES
HORN/STROBE TO BE MOUNTED ABOVE MAX COOL PANEL AT 10' AFF.
CONTROLLER T T T T
-ON/OFF STATUS -ON/OFF STATUS 4. PROVIDE MAX COOL ANNUNCIATOR PANEL. PANEL SHALL BE
MxC ANNUNCIATOR PNL SEMI-RECESSED, AND MAY EXTEND NO MORE THAN 4" INTO THE
OAT DH MCC PNL -TRIP STATUS -TRIP STATUS OFFICE WALKWAY- 30"H x 24"W x 10"D.
PANEL LOCATED IN
PANEL LOCATED IN TTRH TTRH 5. PROVIDE COLD AISLE TEMPERATURE SENSOR - EIGHT PER COLD
SECURITY ROOM AISLE.
ELECTRICAL ROOM 1.1
6. PROVIDE HOT AISLE TEMPERATURE SENSOR - TWO PER AREA
LOCATED IN THE PLENUM AREA ABOVE THE HOT AISLE.
DPSSP DPSSP DPSSP DPSSP
T T 7. PROVIDE COLD AISLE RELATIVE HUMIDITY SENSOR - TWO PER AREA.
BBCS 8. PROVIDE MAX COOL TEMPERATURE SENSOR - TWO PER AREA,
CENTERED IN THE AISLE.
CHILLER PLANT ROOM DX-SPLIT UNIT (4D+1S) DPSDH DPSDH DPSDH DPSDH
TTRH 9. PROVIDE WALL-MOUNTED COMBINATION TEMPERATURE/RELATIVE

CHOMP-BMS PNL -TEMP MONITORING HUMITIY SENSOR (ELECTRICAL ROOM).

PANEL LOCATED IN -ON/OFF STATUS DEWP


10. PROVIDE COMBINATION OUTSIDE AIR DRY BULB/DEW POINT
TEMPERATURE SENSOR - ONE PER MASTER COORDINATING
CHILLER PLANT ROOM -TRIP STATUS CONTROLLER, ONE ON EACH SIDE OF THE BUILDING, 6-12" BELOW
AND IN CENTER OF THE OUTSIDE AIR INTAKE LOUVER.
DHUM
11. PROVIDE DAHU GALLERY SPOT LEAK DETECTOR - TWO PER PHASE.
NETWORK I/O MAU 12. PROVIDE DEWPOINT SENSOR - ONE PER AREA.
SWITCH FRESH AIR FAN (2D+1S) EXHAUST FAN (2D+1S)
WCC-1 WCC-2 WCC-3 WCC-4 -ON/OFF STATUS -ON/OFF STATUS
CT-1 CT-2 CT-3 CT-4 AREA AREA NETWORK
-TRIP STATUS -TRIP STATUS
CWP-1 CWP-2 CWP-3 CWP-4 SWITCH DAHU-1 DAHU-2 DAHU-10
CONT. CONT.
CHWP-1 CHWP-2 CHWP-3 CHWP-4
DX-SPLIT UNIT (4D+1S) AREA
MWP-1 MWP-2 CONNECTED TO
I/O -TEMP MONITORING CONTROLLER
TTRH MxC ANNUNCIATOR PNL
T T -ON/OFF STATUS MxC
-TRIP STATUS D3-BMS PNL D3-MxC PNL
PANEL LOCATED IN TMxC TMxC
PANEL LOCATED AT
ELECTRICAL ROOM 1.3 D3 ENTRANCE
MECH ELECTRICAL ROOM
T T T T
DX-SPLIT UNIT (8D+1S)
WDP WDP WDP WDP -TEMP MONITORING
T T -ON/OFF STATUS PHASE 4
TTRH
-TRIP STATUS
M M M M ELECTRICAL ROOM 1.4 DATAHALL - PHASE 4
MAU
C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF
FRESH AIR FAN (1D) EXHAUST FAN (1D) A - NOT ISSUED - - - -
EXHAUST FAN (1D) FRESH AIR FAN (1D)
-ON/OFF STATUS -ON/OFF STATUS T T T T REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
-ON/OFF STATUS -ON/OFF STATUS
-TRIP STATUS -TRIP STATUS MEP ENGINEER:
FCC ROOM -TRIP STATUS -TRIP STATUS
TTRH TTRH PT. DSCO Indonesia
CATCHER ROOM 1 Kencana Tower, Level 2,
Business Park Kebon Jeruk,
DX-SPLIT UNIT (1D+1S) Jl Raya Meruya llir
DPSSP DPSSP DPSSP DPSSP No.88 Jakarta Barat 11620, Indonesia
-TEMP MONITORING T T T T TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
-ON/OFF STATUS DX-SPLIT UNIT (2D+1S)
T T -TEMP MONITORING
-TRIP STATUS TTRH DX-SPLIT UNIT (4D+1S) DPSDH DPSDH DPSDH DPSDH CIVIL/ STRUCTURAL ENGINEER :
-ON/OFF STATUS TTRH
-TEMP MONITORING VB + E Pte Ltd
CATCHER ROOM 2 TTRH -TRIP STATUS -ON/OFF STATUS # 05-09 Harbour Link Complex
DEWP 61 Alexandra Terrace, Singapore 119936
-TRIP STATUS T +65 6561 4078 F +65 6561 5198
HOUSE LOAD ROOM DHUM Mechanical & Electrical (LEAD) Consultant:
I/O MAU
T T ARCHITECT:
I/O DX-SPLIT UNIT (2D+1S)
T T -TEMP MONITORING Aedas Pte Ltd
DX-SPLIT UNIT (2D+1S) TTRH NETWORK
11 North Buona Vista Drive, T +65 6734 4733
-TEMP MONITORING -ON/OFF STATUS SWITCH DAHU-1 DAHU-2 DAHU-8 #12-07 The Metropolis Tower 2 singapore@aedas.com
-ON/OFF STATUS TTRH -TRIP STATUS Singapore 138589 aedas.com
-TRIP STATUS MAU NETWORK AREA
SWITCH CONTROLLER CONNECTED TO AGILE No.: 000-000000-000
MxC MxC ANNUNCIATOR PNL
PROJECT:
ER-BMS PNL D4-BMS PNL D4-MxC PNL TMxC TMxC CGK063
PANEL LOCATED IN PANEL LOCATED IN PANEL LOCATED AT
CATCHER ROOM 2 ELECTRICAL ROOM 1.4 D4 ENTRANCE TITLE:
MECHANICAL SERVICES
BMS SINGLE LINE DIAGRAM

BMS NETWORK ARCHITECTURE SCHEMATIC SCALE:

N.T.S.
DRAWING NO.:

CGK063-DSCO-ZZ-ZZ-DR-M-6011
REV.:

C
BMS LEGEND

SNO. SYMBOL DESCRIPTION

01 T TEMPERATURE SENSOR

02 T IMMERSION TEMPERATURE SENSOR

03 TTRH TEMPERATURE AND RH COMBO SENSOR

04 TMxC TEMPERATURE SENSOR FOR MAX COOLING

05 DPS DIFFERENTIAL PRESSURE SENSOR

06 DPSMxC DIFFERENTIAL PRESSURE SENSOR FOR MAX COOLING

07 ΔP DIFFERENTIAL PRESSURE SWITCH FOR FILTER

08 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

09 BMS BMS PANEL


AI
10 MxC MAX COOLING PANEL
MCC (MASTER
AO
COORDINATING 11 ANNUNCIATOR PANEL FOR MAX COOLING MODE
DI CONTROLLER)
12 HMI HUMAN MACHINE INTERFACE
DO
13 M MOTORIZED VALVE

COLD AISLE TEMPERATURE SETPOINT


SUPPLY AIR TEMPERATURE SETPOINT
SUPPLY PLENUM DP SETPOINT OUT
PICV
14 PRESSURE INDEPENDENT CONTROL VALVE

SUPPLY PLENUM DP LOOP IN


HIGH TEMP MAX. COOLING
15 WLD WATER LEAK DETECTOR

16 SD SMOKE DETECTOR

17 WDP WATER DIFFERENTIAL PRESSURE SENSOR

DAHU START/STOP 18 FM WATER FLOW METER

DAHU GENERAL ALARM 19 ETHERNET / CAT-6 CABLE

SF VFD SPEED CONTROL 20 SERIAL / INTEGRATION CABLE

DAHU SUPPLY AIR TEMP. SETPOINT 21 HARDWIRE CABLE

22 FIBER OPTIC CABLE

23 RESPECTIVE EQUIPMENT VENDOR / GC


AI AI
24 BMS VENDOR
AO AREA AO
CONTROLLER
DI DI
NOTES:-
DO DO
1. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 120"W x 18"D.

MAX. COOL PANEL POWER ALARM


INCLUDES AREA CONTROLLER, MASTER COORDINATING

CONTROLLER BYPASS MODE


CONTROLLER, AND MAX COOL CONTROLLER.

HIGH TEMP MAX. COOLING

MANUAL MAX. COOLING


2. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 84"W x 18"D.
INCLUDES AREA CONTROLLER, AND MAX COOL CONTROLLER.
3. PROVIDE BMS HMI/MAX COOL PANELS - 24"H x 54"W x 8"D. INCLUDES
HORN/STROBE TO BE MOUNTED ABOVE MAX COOL PANEL AT 10' AFF.
AI
DAHU

OAT DRY BULB AND DEW POINT TEMP.


4. PROVIDE MAX COOL ANNUNCIATOR PANEL. PANEL SHALL BE

COLD AISLE DIFFERENTIAL PRESSURE


HOT AISLE DIFFERENTIAL PRESSURE
BACNET UNIT LEVEL AO SEMI-RECESSED, AND MAY EXTEND NO MORE THAN 4" INTO THE
OFFICE WALKWAY- 30"H x 24"W x 10"D.
ROW SUPPLY DAMPER FEEDBACK

CONTROLLER
ROW SUPPLY DAMPER CONTROL

DI

COLD AISLE TEMPERATURE


5. PROVIDE COLD AISLE TEMPERATURE SENSOR - EIGHT PER COLD

HOT AISLE TEMPERATURE

COLD AISLE HUMIDITY RH


(ULC) AISLE.
DO
SUPPLY AIR HEADER DP

6. PROVIDE HOT AISLE TEMPERATURE SENSOR - TWO PER AREA

WATER LEAK DETECTION MONITORING

SUPPLY AIR TEMP. & RH MONITORING (UPPER)


LOCATED IN THE PLENUM AREA ABOVE THE HOT AISLE.

SUPPLY AIR TEMP. & RH MONITORING (LOWER)


RA DAMPER ACTUATOR MONITORING
MxC MODE
RETURN AIR TEMP. & RH MONITORING

CHW RETURN TEMP. MONITORING

RA DAMPER ACTUATOR CONTROL


CHW PICV ACTUATOR FEEDBACK
CHW PICV ACTUATOR CONTROL
7. PROVIDE COLD AISLE RELATIVE HUMIDITY SENSOR - TWO PER AREA.
ENABLE
8. PROVIDE MAX COOL TEMPERATURE SENSOR - TWO PER AREA,
SIGNAL

DAHU GALLERY LEAK


BACNET
DAHU FILTER CLOG STATUS

CENTERED IN THE AISLE.


HMI 9. PROVIDE WALL-MOUNTED COMBINATION TEMPERATURE/RELATIVE
SMOKE DETECTOR

SMOKE DETECTOR
HUMITIY SENSOR (ELECTRICAL ROOM).
AI 10. PROVIDE COMBINATION OUTSIDE AIR DRY BULB/DEW POINT

AO MxC TEMPERATURE SENSOR - ONE PER MASTER COORDINATING


CONTROLLER, ONE ON EACH SIDE OF THE BUILDING, 6-12" BELOW
Panel AND IN CENTER OF THE OUTSIDE AIR INTAKE LOUVER.
DI 11. PROVIDE DAHU GALLERY SPOT LEAK DETECTOR - TWO PER PHASE.

DO 12. PROVIDE DEWPOINT SENSOR - ONE PER AREA.


KEY
SWITCH

MxC
Annunciator
OAT Panel

DAMPER FAIL POSITION


SECURITY MESH
TTRH SD SD PICV

DAHU AREA RETURN AIR DAMPER


T

CU OUTDOOR
(>5M FROM PAHU) PAHU
MERV
MERV
14
6

RA RA
TTRH
REFRIGERANT PIPING
SECURITY MESH
TTRH C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
B - NOT ISSUED - - - -
A - NOT ISSUED - - - -
T DPS DPS TTRH T TMxC REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
RA RA

COLD AISLE COLD AISLE COLD AISLE MEP ENGINEER:


DATA HALL ELECTRICAL
COLD
ROOM
AIR PT. DSCO Indonesia
PLENUM HOT AISLE HOT AISLE
Kencana Tower, Level 2,

CABINET

CABINET

CABINET

CABINET
SERVER

SERVER

SERVER

SERVER
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
DPS TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

LEVEL 1
HOT AISLE COLD AISLE
CIVIL/ STRUCTURAL ENGINEER :

ΔP WLD SECURITY MESH


VB + E Pte Ltd
For Electrical Room HVAC Scheme DAHU AIR HANDLERS WLD OPPOSED BLADE DAMPER # 05-09 Harbour Link Complex
Refer Dwg.No.
CGK063-DSCO-00-ZZ-DR-M-1010 NOTE: 61 Alexandra Terrace, Singapore 119936
MOTORISED DAMPER
1) REFER TO BMS EQUIPMENT LAYOUT FOR NO. AND LOCATION OF SENSORS T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

TYPICAL CONTROL SCHEME FOR DATA HALL AND DAHU AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
TYPICAL CONTROLS & SCOPE DIAGRAM (FOR DATAHALL & DAHU)

SCALE: DRAWING NO.: REV.:

N.T.S. CGK063-DSCO-ZZ-XX-DR-M-6012 C
BMS LEGEND

SNO. SYMBOL DESCRIPTION

01 T TEMPERATURE SENSOR

02 T IMMERSION TEMPERATURE SENSOR

03 TTRH TEMPERATURE AND RH COMBO SENSOR

04 TMxC TEMPERATURE SENSOR FOR MAX COOLING

05 DPS DIFFERENTIAL PRESSURE SENSOR

06 DPSMxC DIFFERENTIAL PRESSURE SENSOR FOR MAX COOLING

07 ΔP DIFFERENTIAL PRESSURE SWITCH FOR FILTER

08 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

09 BMS BMS PANEL

10 MxC MAX COOLING PANEL

11 ANNUNCIATOR PANEL FOR MAX COOLING MODE

12 HMI HUMAN MACHINE INTERFACE

13 M MOTORIZED VALVE

PICV
14 PRESSURE INDEPENDENT CONTROL VALVE

15 WLD WATER LEAK DETECTOR

16 SD SMOKE DETECTOR

17 WDP WATER DIFFERENTIAL PRESSURE SENSOR

18 FM WATER FLOW METER

19 ETHERNET / CAT-6 CABLE

20 SERIAL / INTEGRATION CABLE


AI
21 HARDWIRE CABLE
AO AREA
CONTROLLER 22 FIBER OPTIC CABLE
DI
23 RESPECTIVE EQUIPMENT VENDOR / GC
DO

ROOM TO OA DIFFERENTIAL PRESSURE


24 BMS VENDOR

OAU LATCHED COMMON ALARM


TEMPERATURE MONITORING

ROOM DTEMPERATURE

ROOM DTEMPERATURE
NOTES:-

ON/OFF STATUS

ROOM HUMIDITY RH
1. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 120"W x 18"D.

TRIP STATUS
INCLUDES AREA CONTROLLER, MASTER COORDINATING

BACNET
CONTROLLER, AND MAX COOL CONTROLLER.
2. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 84"W x 18"D.
INCLUDES AREA CONTROLLER, AND MAX COOL CONTROLLER.
3. PROVIDE BMS HMI/MAX COOL PANELS - 24"H x 54"W x 8"D. INCLUDES
HORN/STROBE TO BE MOUNTED ABOVE MAX COOL PANEL AT 10' AFF.
4. PROVIDE MAX COOL ANNUNCIATOR PANEL. PANEL SHALL BE
SEMI-RECESSED, AND MAY EXTEND NO MORE THAN 4" INTO THE
OFFICE WALKWAY- 30"H x 24"W x 10"D.
5. PROVIDE COLD AISLE TEMPERATURE SENSOR - EIGHT PER COLD
AISLE.
6. PROVIDE HOT AISLE TEMPERATURE SENSOR - TWO PER AREA
LOCATED IN THE PLENUM AREA ABOVE THE HOT AISLE.
7. PROVIDE COLD AISLE RELATIVE HUMIDITY SENSOR - TWO PER AREA.
AI
UNIT LEVEL 8. PROVIDE MAX COOL TEMPERATURE SENSOR - TWO PER AREA,
AO CONTROLLER CENTERED IN THE AISLE.
9. PROVIDE WALL-MOUNTED COMBINATION TEMPERATURE/RELATIVE
DI (ULC) HUMITIY SENSOR (ELECTRICAL ROOM).

DPS TTRH T T DO
10. PROVIDE COMBINATION OUTSIDE AIR DRY BULB/DEW POINT
TEMPERATURE SENSOR - ONE PER MASTER COORDINATING

FILTER CLOG STATUS

FILTER CLOG STATUS


AI CONTROLLER, ONE ON EACH SIDE OF THE BUILDING, 6-12" BELOW

SUPPLY AIR PRESSURE

SUPPLY AIR PRESSURE

SUPPLY AIR PRESSURE


UNIT LEVEL AND IN CENTER OF THE OUTSIDE AIR INTAKE LOUVER.

CONTROLLER AO DPS 11. PROVIDE DAHU GALLERY SPOT LEAK DETECTOR - TWO PER PHASE.

(ULC) DPS 12. PROVIDE DEWPOINT SENSOR - ONE PER AREA.

MERV
MERV
DI

14
DPS

6
DO
PACU CU
(>5M FROM PACU)
REFRIGERANT PIPING
ΔP ΔP

INDOOR FAN COIL UNIT

OUTDOOR CONDENSING UNIT


REFRIGERANT PIPING

MAKEUP AIR
HANDLING UNIT
DX SPLIT UNIT NOTE: (MAU)
1) REFER TO BMS EQUIPMENT LAYOUT FOR
NO. AND LOCATION OF SENSORS
2) REFER TO BMS ARCHITECHTURE FOR NO.
OF ACMV EQUIPMENT

C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF


B - NOT ISSUED - - - -
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
TYPICAL CONTROL SCHEME FOR PT. DSCO Indonesia
Kencana Tower, Level 2,
ELECTRICAL ROOM / CATCHER ROOM / Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia

MECH ER ROOM / CHILLER PLANT ROOM / TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

FCC ROOM VB + E Pte Ltd


# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
TYPICAL CONTROLS & SCOPE DIAGRAM (FOR DX SPLIT UNIT & MAU)

SCALE: DRAWING NO.: REV.:

N.T.S. CGK063-DSCO-ZZ-XX-DR-M-6013 C
BMS LEGEND

SNO. SYMBOL DESCRIPTION

01 T TEMPERATURE SENSOR

02 T IMMERSION TEMPERATURE SENSOR

03 TTRH TEMPERATURE AND RH COMBO SENSOR

04 TMxC TEMPERATURE SENSOR FOR MAX COOLING

05 DPS DIFFERENTIAL PRESSURE SENSOR

06 DPSMxC DIFFERENTIAL PRESSURE SENSOR FOR MAX COOLING

07 ΔP DIFFERENTIAL PRESSURE SWITCH FOR FILTER

08 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

09 BMS BMS PANEL

10 MxC MAX COOLING PANEL

11 ANNUNCIATOR PANEL FOR MAX COOLING MODE

12 HMI HUMAN MACHINE INTERFACE

13 M MOTORIZED VALVE

PICV
14 PRESSURE INDEPENDENT CONTROL VALVE
AI AI
15 WLD WATER LEAK DETECTOR
AO AO
DI DI 16 SD SMOKE DETECTOR

DO DO 17 WDP WATER DIFFERENTIAL PRESSURE SENSOR

CHW MAINTENANCE COMMON HEADER


CHW MAINTENANCE COMMON HEADER
CW MAINTENANCE COMMON HEADER
CW MAINTENANCE COMMON HEADER

CHW OUTLET TEMPERATURE MONITORING


CHILLER ENABLE / DISABLE

CW OUTLET TEMPERATURE MONITORING


FM WATER FLOW METER

CHILLER GENERAL ALARM


18

CHW INLET TEMPERATURE MONITORING

CW EXITING ISOLATION VALVE COMMAND


CW EXITING ISOLATION VALVE FEEDBACK

CHWP SPEED FEEDBACK


CW INLET TEMPERATURE MONITORING

CHWS ISOLATION VALVE COMMAND


CHWS ISOLATION VALVE FEEDBACK

CWP SPEED FEEDBACK

REFRIGERANT LEAK DETECTION


QUICK START MODE

CHWP START/STOP
19

CWP START/STOP
ETHERNET / CAT-6 CABLE

CHWS SETPOINT
CHILLER PROOF
CHW FLOW MONITORING

CHWP STATUS
CHWP PROOF

CHWP SPEED
CW FLOW MONITORING

CHILLER HOA

CWP STATUS
CHWP FAULT

CHWP FAULT
CWP PROOF

CWP SPEED
20 SERIAL / INTEGRATION CABLE
VALVE COMMAND

VALVE COMMAND
VALVE FEEDBACK

VALVE FEEDBACK

21 HARDWIRE CABLE

22 FIBER OPTIC CABLE

23 RESPECTIVE EQUIPMENT VENDOR / GC

24 BMS VENDOR

AI AI AI
CHILLER NOTES:-
AO UNIT LEVEL AO CHW PUMP AO CW PUMP 1. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 120"W x 18"D.
CHOMP- INCLUDES AREA CONTROLLER, MASTER COORDINATING
DI CONTROLLER DI PANEL DI PANEL CONTROLLER, AND MAX COOL CONTROLLER.
M AREA
(ULC) 2. PROVIDE BMS/MAX COOL FIELD PANELS - 72"H x 84"W x 18"D.
DO CONTROLLER DO DO INCLUDES AREA CONTROLLER, AND MAX COOL CONTROLLER.
REFRIGERANT
3. PROVIDE BMS HMI/MAX COOL PANELS - 24"H x 54"W x 8"D. INCLUDES
LEAK HORN/STROBE TO BE MOUNTED ABOVE MAX COOL PANEL AT 10' AFF.
FM M DETECTION
T

T
4. PROVIDE MAX COOL ANNUNCIATOR PANEL. PANEL SHALL BE
CHILLED WATER CONDENSER SYSTEM SEMI-RECESSED, AND MAY EXTEND NO MORE THAN 4" INTO THE
OFFICE WALKWAY- 30"H x 24"W x 10"D.
M CHILLED WATER PUMP WATER PUMP
5. PROVIDE COLD AISLE TEMPERATURE SENSOR - EIGHT PER COLD
AISLE.
FM M 6. PROVIDE HOT AISLE TEMPERATURE SENSOR - TWO PER AREA
T

T
LOCATED IN THE PLENUM AREA ABOVE THE HOT AISLE.
CHILLER
7. PROVIDE COLD AISLE RELATIVE HUMIDITY SENSOR - TWO PER AREA.
CONDENSER WATER 8. PROVIDE MAX COOL TEMPERATURE SENSOR - TWO PER AREA,
BACNET CENTERED IN THE AISLE.
9. PROVIDE WALL-MOUNTED COMBINATION TEMPERATURE/RELATIVE
HUMITIY SENSOR (ELECTRICAL ROOM).
10. PROVIDE COMBINATION OUTSIDE AIR DRY BULB/DEW POINT
TEMPERATURE SENSOR - ONE PER MASTER COORDINATING
AI AI CONTROLLER, ONE ON EACH SIDE OF THE BUILDING, 6-12" BELOW
AND IN CENTER OF THE OUTSIDE AIR INTAKE LOUVER.
AO AO 11. PROVIDE DAHU GALLERY SPOT LEAK DETECTOR - TWO PER PHASE.
12. PROVIDE DEWPOINT SENSOR - ONE PER AREA.
DI DI
DO DO

FILTER DIFFERENTIAL PRESSURE


TOWER PUMP SPEED FEEDBACK

CHW / CW FLOWMETER REVERSE FLOW STATUS


COOLING TOWER BASIN TEMP.

CT WATER HIGH LEVEL ALARM


CT WATER LOW LEVEL ALARM

CT OUTLET VALVE COMMAND

THERMAL ENERGY STORAGE TANK TEMP.


CHW / CW SUPPLY HEADER TEMP.

CHW / CW RETURN HEADER TEMP.

CHW / CW HEADER DIFFERENTIAL PRESSURE


CT INLET VALVE COMMAND

THERMAL ENERGY STORAGE TANK INLET &


TOWER PUMP START/STOP

WATER TREATMENT GENERAL FAULT

THERMAL ENERGY STORAGE TANK INLET &


CT OUTLET VALVE STATUS

MINIMUM FLOW BYPASS VALVE COMMAND

MINIMUM FLOW BYPASS VALVE FEEDBACK


CT INLET VALVE STATUS
FAN SPEED FEEDBACK

TOWER PUMP STATUS


TOWER PUMP PROOF

TOWER PUMP SPEED


TOWER PUMP FAULT
FAN START/STOP

SYSTEM STATUS

SYSTEM STATUS
SYSTEM FAULT

SYSTEM FAULT
CT VIBRATION
FAN STATUS
FAN PROOF

FAN SPEED
FAN FAULT

OUTLET VALVE COMMAND

OUTLET VALVE FEEDBACK


CHW / CW FLOWRATE
AI AI AI
AO COOLING AO SIDESTREAM AO DEGASSER
TOWER FILTRATION
DI DI DI SYSTEM PANEL
PANEL SYSTEM PANEL C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
B - NOT ISSUED - - - -
DO DO DO A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

SIDESTREAM T T M WDP FM M T
COOLING TOWER MEP ENGINEER:
FILTRATION DEGASSER
PT. DSCO Indonesia
SYSTEM FOR CT FIELD SENSORS SYSTEM
Kencana Tower, Level 2,
WATER Business Park Kebon Jeruk,
TREATMENT Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

NOTE: CIVIL/ STRUCTURAL ENGINEER :


1) REFER TO CHILLED WATER AND CONDENSER WATER SCHEMATIC FOR NO. AND LOCATION OF SENSORS AND EQUIPMENT. VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198

TYPICAL CONTROL SCHEME FOR CHILLER PLANT ARCHITECT:


Mechanical & Electrical (LEAD) Consultant:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
TYPICAL CONTROLS & SCOPE DIAGRAM (FOR CHILLER PLANT)

SCALE: DRAWING NO.: REV.:

N.T.S. CGK063-DSCO-ZZ-XX-DR-M-6014 C
Legend of work classification Water Cooled Chiller Cooling Tower Datahall Air Handling Unit (DAHU)

Power supply

DAHU Fan Power panel


BMS Scope
AC Water Cooled Chiller
Power supply
Cooling tower
RCP
LLE Scope
Power supply
Chilled Water Pump Power panel Interlock signal
Detector signal
Cooling Water Pump
GC Scope ULC
Status signal
Power panel Sensor (LLE)

Detector signal Control /


RCP Motorized Valve Interlock signal Control valve (LLE) ULC Monitoring
Sensor
Detector signal Interlock signal DAHU On board Controller
Sensor Detector signal
Interlock signal power supply Sensor
RCP Conductivity Sensor
Detector signal (Power supply included)
Interlock signal power supply

Flow meter Operation signal (Power supply included) AC


Damper
AC
Operation signal (Power supply included)
Control Valve MCC
Control Valve
Max Cooling Panel Max Cooling Panel

Makeup Air Handling Unit (MAU) Packaged air conditioner - Energy recovery ventilator Fan Water Tank

Control / Monitoring
Power supply Monitoring Power supply
Power supply Power panel
Distribution panel Power panel
Outdoor unit
Power supply AC
Power panel Supply fan AC
Outdoor unit
Refrigerant pipes Water Level Monitoring

Power panel Control / Monitoring Operation signal (Power supply included)


Interlocking
Refrigerant pipes Distribution panel Energy recovery ventilator ERV
Monitoring
VRV VRV Water tank control panel
Power panel
Power supply (Plumbing work)
Power supply
Exhaust fan
Indoor unit CRC Wiring Interlock Operation signal
Power supply Idle prevention
Control Valve
Operating / Monitoring Control / Monitoring Incoming water
Solenoid valve
Control / Monitoring (Plumbing work)
Monitoring
Detection signal
Monitoring
HRC RC
Sensor AC Constant water level valve
AC (Plumbing work)
Detector signal Make up water pump unit
Water tank Level catcher (Plumbing work)

Electric Water Heater Measurement

Distribution panel

Monitoring
C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF
AC A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
Electrical water heater
Measurement
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
Water Meter TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
(Plumbing work)
CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
SW 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

Note: AGILE No.: 000-000000-000


PROJECT:
Refer to the typical control scope diagram and point list for BMS interface. CGK063

TITLE:
MECHANICAL SERVICES
STANDARD BMS DETAILS

SCALE: DRAWING NO.: REV.:

N.T.S. CGK063-DSCO-ZZ-XX-DR-M-6015 C
PHASING

PHASE 1

PHASE 2

PHASE 3

PHASE 4

1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 19 19.1

20 OFFICE
7750 8400 9300 600 3548 10110 10110 10110 10824 10824 10110 10110 10110 5653 4245

5500
1255 3747

9225
5478 7120

11070
3950 11100 4070 625 5530
PHASE

BBCS
GENERATOR YARD GENERATOR YARD GENERATOR YARD
A.GF.33.00 A.GF.33.00 A.GF.33.00
?
FUEL TRUCK PARKING LOT

200
150

UP
200

UP

UP

UP

DPS DPS OA-T DPS


275

A TTRH TTRH TTRH TTRH TTRH TTRH TTRH

CORRIDOR
D4-BMS PNL D3-BMS PNL D2-BMS PNL DH-MCC PNL

A.GF.06.00
250 D1-BMS PNL HOUSE LOAD CATCHER ROOM 3 CATCHER ROOM 2
CORRIDOR FIRE PAV FIRE PAV

BMS

BMS

BMS
FIRE PAV FIRE PAV ROOM A.GF.10.00 A.GF.11.00

BMS

BMS
FIRE PAV A.GF.03.00 R.A.02.00 R.A.03.00
R.A.04.00 UP
FUEL PUMP A R.A.01.00 R.A.05.00 A.GF.09.00
A.GF.01.01
?
ER-BMS PNL
UP

BMS
11500

21665 2500 18535 18430 6245


11500

FUEL PUMP B
A.GF.01.02
? STORE ROOM
A.GF.02.00
NV FIRE COMMAND

T
T

T
T
T

T
CENTRE

T
ELECTRICAL ELECTRICAL ELECTRICAL A.GF.12.00 LOADING DOCK

T
T
ELECTRICAL A.GF.32.00

T
T
ROOM 1.4 ROOM 1.3 ROOM 1.2
A.GF.04.00 A.GF.05.00 A.GF.07.00 ROOM 1.1
4102 A.GF.08.00 150 150

B TTRH
1200

CORRIDOR DAHU GALLERY DAHU GALLERY


A.GF.03.00 2.1B 2.1A
5415

A.GF.17.00 5057 5053 A.GF.15.00 A.GF.14.00 A.GF.13.00


FIRE CV IHB
R.A.07.00 R.A.06.00
8450
11000

B.5 ?
DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU
T

DC PANEL

MSDB-1.1MA1 UPS
160kVA
BATT
4 Min
T
5585

338 3100 800 3100 2100 3100 800 3100 2325 3100 800 3100 2100 3100 800 3100 2100 3100 1593 1655 3100 800 3100 2100 3100 800 3100 3360 3100 800 3100 2100 3100 800 3100 2100 3100 2955
CHILLER PLANT
MSB-1.1MA

MECH ER 1.1
ROOM A.GF.16.00 2500 1148 AIR LOCK COLD AIR PLENUM COLDDPS
AIR PLENUM VESTIBULE COLDDPSAIR PLENUM COLD AIR PLENUM AIR LOCK
A.GF.19.00
2375

A.GF.01.00 A.GF.18.01
DPS DPS DPS DPS
A.GF.20.00 DPS A.GF.06.01 DPS
A.GF.21.00 DPS DPS DPS
A.GF.21.00 DPS
A.GF.13.01
2615 1200 2700 1200 4000 1200 2700 1200 5250 1200 2700 1200 4000 1200 2700 1200 4000 1200 2155
C CHOMP-BMS PNL
1288 1200 2700 1200 4225 1200 2700 1200 4000 1200 2700 1200 4000 1200 2700 1200 3850 1200 1749
BMS

MxC DATA HALL DATA HALL MxC MxC DATA HALL DATA HALL MxC
2325
DC PANEL

MSDB-1.1MA2 UPS
160kVA
BATT
4 Min
D4-MxC PNL A.GF.23.00 A.GF.23.00 D3-MxC PNL D2-MxC PNL A.GF.22.00 A.GF.22.00 D1-MxC PNL
CORRIDOR
A.GF.03.00

1620 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1436 1167 1200 1167 1396 1167 1200 1167 ?
1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 ?
1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1574
TTRH

MxC ANUNCIATION PNL

DPS DPS TMxC DPS DPS TMxC DPS DPS TTMxC DPS DPS TMxC
DC PANEL

MSDB-1.1MA3
10620

UPS BATT
10620

160kVA 4 Min

T T T T T T T T T T T T T T T T T
MSDB-1.1MA
TTRH

T T T T T T T T T T T T T T T T T
65365

596 600
T

481 600 596 600 596 600 600 596 600 596 600 596 600 596 1149
DC PANEL

D MSDB-1.1MA4 UPS BATT


160kVA 4 Min

T T T T T T T T T T T T T T T T T

T T T T T T T T T T T T T T T T T
FILTER
SAND

FILTER
SAND

TTRH TTRH TTRH TTRH TTRH TTRH TTRH TTRH


10220
11000

FILTER
SAND

FILTER
SAND

CORRIDOR
A.GF.03.00

T T T T T T T T T T T T T T T T T

INDUSTRIAL
D.9 WATER PLANT
T T T T T T T T T T T T T T T T T
T

ROOM
780

E A.GF.18.00
FILTER

FILTER
SAND

SAND

T T T T T T T T T T T T T T T T T
FILTER

FILTER
SAND

SAND
7300
10620

STAIRCASE 03 3mx2mx2mH
9M3
3mx2mx2mH T T T T T T T T T T T T T T T T T
S.A.03.00 9M3
11,000KG 11,000KG
TMxC DPS DPS TMxC DPS DPS TMxC DPS DPS TMxC DPS DPS

E.7
IHB DATA HALL
3320

DATA HALL
2325

A.GF.23.00 R.A.08.00 A.GF.22.00

F MAKE UP WATER TANK 1 AIR LOCK DPS COLD AIR PLENUM


2375

DPS DPS DPS DPS DPS DPS DPS DPS DPS COLD AIR PLENUMDPS DPSAIR LOCK
2850

21M x 5M x 5M(H) A.GF.24.01 A.GF.24.00 A.GF.25.00


1148 A.GF.25.01
EFF CAP:477M3 7120 3950

F.3 550,000KG VESTIBULE


2150

A.GF.25.01

2150
DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU
10625

F.5
2650

2650
8425

MAKE UP WATER TANK 2


F.8 21M x 5M x 5M(H)
550M3 DAHU GALLERY
DAHU GALLERY DAHU GALLERY DAHU GALLERY
550,000KG 798203
2.3B 2.3A 1.3B 1.3A
1200

A.GF.29.00 A.GF.28.00 A.GF.27.00 A.GF.26.00

325
G

200
C 31AUG2020 REVISION C ZLT WJK YY BF
B - NOT ISSUED - - - -
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
OVERALL GROUND FLOOR BMS PHASING PLAN

SCALE: DRAWING NO.: REV.:

1:400 CGK063-DSCO-ZZ-01-DR-M-6100 C
BMS LEGEND

SNO. SYMBOL DESCRIPTION

01 T TEMPERATURE SENSOR

02 TTRH TEMPERATURE AND RH COMBO SENSOR

03 TMxC TEMPERATURE SENSOR FOR MAX COOLING

04 DPS DIFFERENTIAL PRESSURE SENSOR

05 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

06 BMS BMS PANEL

07 MxC MAX COOLING PANEL

08 ANNUNCIATOR PANEL FOR MAX COOLING MODE

09 HMI HUMAN MACHINE INTERFACE

1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 19 19.1

20
7750 8400 9300 600 3548 10110 10110 10110 10824 10824 10110 10110 10110 5653 4245 1255 3747 5478 7120 3950 11100 4070 625 5530

5500 9225 11070

GENERATOR YARD GENERATOR YARD GENERATOR YARD


A.GF.33.00 A.GF.33.00 A.GF.33.00
?
FUEL TRUCK PARKING LOT

200
150

UP
200

UP

UP

UP

DPS DPS OA-T DPS


275

A TTRH TTRH TTRH TTRH TTRH TTRH TTRH

CORRIDOR
D4-BMS PNL D3-BMS PNL D2-BMS PNL DH-MCC PNL

A.GF.06.00
250 D1-BMS PNL HOUSE LOAD CATCHER ROOM 3 CATCHER ROOM 2
CORRIDOR FIRE PAV FIRE PAV

BMS

BMS

BMS
FIRE PAV FIRE PAV ROOM A.GF.10.00 A.GF.11.00

BMS

BMS
FIRE PAV A.GF.03.00 R.A.02.00 R.A.03.00
R.A.04.00 UP
FUEL PUMP A R.A.01.00 R.A.05.00 A.GF.09.00
A.GF.01.01
?
ER-BMS PNL
UP

BMS
11500

21665 2500 18535 18430 6245


11500

FUEL PUMP B
A.GF.01.02
? STORE ROOM
A.GF.02.00
NV FIRE COMMAND

T
T

T
T
T

T
CENTRE

T
ELECTRICAL ELECTRICAL ELECTRICAL A.GF.12.00 LOADING DOCK

T
T
ELECTRICAL A.GF.32.00

T
T
ROOM 1.4 ROOM 1.3 ROOM 1.2
A.GF.04.00 A.GF.05.00 A.GF.07.00 ROOM 1.1
4102 A.GF.08.00 150 150

B TTRH
1200

CORRIDOR DAHU GALLERY DAHU GALLERY


A.GF.03.00 2.1B 2.1A
5415

A.GF.17.00 5057 5053 A.GF.15.00 A.GF.14.00 A.GF.13.00


FIRE CV IHB
R.A.07.00 R.A.06.00
8450
11000

B.5 ?
DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU
T

LAYOUT 1 LAYOUT 3 LAYOUT 5


DC PANEL

MSDB-1.1MA1 UPS
160kVA
BATT
4 Min
T
5585

338 3100 800 3100 2100 3100 800 3100 2325 3100 800 3100 2100 3100 800 3100 2100 3100 1593 1655 3100 800 3100 2100 3100 800 3100 3360 3100 800 3100 2100 3100 800 3100 2100 3100 2955
CHILLER PLANT
MSB-1.1MA

MECH ER 1.1
ROOM A.GF.16.00 2500 1148 AIR LOCK COLD AIR PLENUM COLDDPS
AIR PLENUM VESTIBULE COLDDPSAIR PLENUM COLD AIR PLENUM AIR LOCK
A.GF.19.00
2375

A.GF.01.00 A.GF.18.01
DPS DPS DPS DPS
A.GF.20.00 DPS A.GF.06.01 DPS
A.GF.21.00 DPS DPS DPS
A.GF.21.00 DPS
A.GF.13.01
2615 1200 2700 1200 4000 1200 2700 1200 5250 1200 2700 1200 4000 1200 2700 1200 4000 1200 2155
C CHOMP-BMS PNL
1288 1200 2700 1200 4225 1200 2700 1200 4000 1200 2700 1200 4000 1200 2700 1200 3850 1200 1749
BMS

MxC DATA HALL DATA HALL MxC MxC DATA HALL DATA HALL MxC
2325
DC PANEL

MSDB-1.1MA2 UPS
160kVA
BATT
4 Min
D4-MxC PNL A.GF.23.00 A.GF.23.00 D3-MxC PNL D2-MxC PNL A.GF.22.00 A.GF.22.00 D1-MxC PNL
CORRIDOR
A.GF.03.00

1620 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1436 1167 1200 1167 1396 1167 1200 1167 ?
1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 ?
1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1574
TTRH

MxC ANUNCIATION PNL

DPS DPS TMxC DPS DPS TMxC DPS DPS TTMxC DPS DPS TMxC
DC PANEL

MSDB-1.1MA3
10620

UPS BATT
10620

160kVA 4 Min

T T T T T T T T T T T T T T T T T
MSDB-1.1MA
TTRH

T T T T T T T T T T T T T T T T T
65365

596 600
T

481 600 596 600 596 600 600 596 600 596 600 596 600 596 1149
DC PANEL

D MSDB-1.1MA4 UPS BATT


160kVA 4 Min

T T T T T T T T T T T T T T T T T

T T T T T T T T T T T T T T T T T
FILTER
SAND

FILTER
SAND

TTRH TTRH TTRH TTRH TTRH TTRH TTRH TTRH


10220
11000

FILTER
SAND

FILTER
SAND

CORRIDOR
A.GF.03.00

T T T T T T T T T T T T T T T T T

INDUSTRIAL
D.9 WATER PLANT
T T T T T T T T T T T T T T T T T
T

ROOM
780

E A.GF.18.00
FILTER

FILTER
SAND

SAND

T T T T T T T T T T T T T T T T T
FILTER

FILTER
SAND

SAND
7300
10620

STAIRCASE 03 3mx2mx2mH
9M3
3mx2mx2mH T T T T T T T T T T T T T T T T T
S.A.03.00 9M3
11,000KG 11,000KG
TMxC DPS DPS TMxC DPS DPS TMxC DPS DPS TMxC DPS DPS

E.7
IHB DATA HALL
3320

DATA HALL
LAYOUT 2 LAYOUT 4 LAYOUT 6
2325

A.GF.23.00 R.A.08.00 A.GF.22.00

F MAKE UP WATER TANK 1 AIR LOCK DPS COLD AIR PLENUM


2375

DPS DPS DPS DPS DPS DPS DPS DPS DPS COLD AIR PLENUMDPS DPSAIR LOCK
2850

21M x 5M x 5M(H) A.GF.24.01 A.GF.24.00 A.GF.25.00


1148 A.GF.25.01
EFF CAP:477M3 7120 3950

F.3 550,000KG VESTIBULE


2150

A.GF.25.01

2150
DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU
10625

F.5
2650

2650
8425

MAKE UP WATER TANK 2


F.8 21M x 5M x 5M(H)
550M3 DAHU GALLERY
DAHU GALLERY DAHU GALLERY DAHU GALLERY
550,000KG 798203
2.3B 2.3A 1.3B 1.3A
1200

A.GF.29.00 A.GF.28.00 A.GF.27.00 A.GF.26.00

325
G

200
C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
OVERALL GROUND FLOOR BMS EQUIPMENT LAYOUT

SCALE: DRAWING NO.: REV.:

1:400 CGK063-DSCO-ZZ-01-DR-M-6101 C
BMS LEGEND

1 2 3 4 4.1 5 6 7 SNO.

01
SYMBOL

T
DESCRIPTION

TEMPERATURE SENSOR

02 TTRH TEMPERATURE AND RH COMBO SENSOR


200

03 TMxC TEMPERATURE SENSOR FOR MAX COOLING

04 DPS DIFFERENTIAL PRESSURE SENSOR

05 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

06 BMS BMS PANEL

07 MxC MAX COOLING PANEL

08 ANNUNCIATOR PANEL FOR MAX COOLING MODE

09 HMI HUMAN MACHINE INTERFACE

CGK063-DSCO-1A-01-DR-M-6104
FOR CONTINUATION
REFER TO DWG NO:
DPS
275

A 250
D4-BMS PNL
TTRH
D3-BMS PNL
CORRIDOR FIRE PAV

BMS

BMS
FIRE PAV A.GF.03.00 R.A.02.00
FUEL PUMP A R.A.01.00
A.GF.01.01
?
11500

FUEL PUMP B
A.GF.01.02
? STORE ROOM
A.GF.02.00
NV

T
T
ELECTRICAL ELECTRICAL
ROOM 1.4 ROOM 1.3
A.GF.04.00 A.GF.05.00
B

1200
CORRIDOR DAHU GALLERY DAHU GALLERY
A.GF.03.00 2.1B 2.1A
A.GF.17.00 5057 5053 A.GF.15.00

8450
11000

B.5 ?
DAHU DAHU DAHU DAHU DAHU DAHU DAHU
T

DC PANEL

MSDB-1.1MA1 UPS
160kVA
BATT
4 Min
T

338 3100 800 3100 2100 3100 800 3100 2325 3100 800 3100 2100 3100
CHILLER PLANT
MSB-1.1MA

MECH ER 1.1
ROOM A.GF.16.00 2500 1148 AIR LOCK COLD AIR PLENUM COLDDPS
AIR PLENUM C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
A.GF.19.00

2375
A.GF.01.00 A.GF.18.01
DPS DPS DPS DPS
A.GF.20.00B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF
A - NOT ISSUED - - - -

C CHOMP-BMS PNL
1288 1200 2700 1200 4225 1200 2700 1200 4000 1200 2700 1200 4000 1200
REV. DATE DESCRIPTION

MEP ENGINEER:
DRWN ENGR CHK APP'D
BMS

MxC DATA HALL DATA HALL

2325
PT. DSCO Indonesia
A.GF.03.00
DC PANEL

MSDB-1.1MA2 UPS
160kVA
BATT
4 Min
D4-MxC PNL A.GF.23.00 A.GF.23.00 Kencana Tower, Level 2,
CORRIDOR

1620 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 Business Park Kebon Jeruk,
TTRH

Jl Raya Meruya llir


No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

DPS DPS TMxC DPS DPS TMxC VB + E Pte Ltd


DC PANEL

MSDB-1.1MA3
10620

UPS BATT
160kVA 4 Min
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T T T T T T T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:
MSDB-1.1MA

ARCHITECT:
TTRH

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
T T T T T T #12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

596 600 000-000000-000


T

AGILE No.:
481 600 596 600
DC PANEL

D REFER TO DWG NO: MSDB-1.1MA4 UPS


160kVA
BATT
4 Min PROJECT:
CGK063
CGK063-DSCO-00-1A-DR-M-6103 T T T T T T
TITLE:
FOR CONTINUATION MECHANICAL SERVICES
PARTIAL GROUND FLOOR BMS EQUIPMENT LAYOUT 1

SCALE: DRAWING NO.: REV.:

1:100 CGK063-DSCO-1A-01-DR-M-6102 C
T T T T T T
FILTER
SAND

FILTER
SAND
000

FILTER
SAND

FILTE
SAND
BMS LEGEND

1 2 3 4 4.1 5 6 7 SNO. SYMBOL DESCRIPTION

10620
01 T TEMPERATURE SENSOR

T T T T T T 02 TTRH TEMPERATURE AND RH COMBO SENSOR

MSDB-1.1MA
REFER TO DWG NO: 03

04
TMxC

DPS
TEMPERATURE SENSOR FOR MAX COOLING

DIFFERENTIAL PRESSURE SENSOR

TTRH
CGK063-DSCO-1A-01-DR-M-6102 05 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

FOR CONTINUATION T T T T T T 06 BMS BMS PANEL

07 MxC MAX COOLING PANEL

596 600

T
481 600 596 600 08 ANNUNCIATOR PANEL FOR MAX COOLING MODE

DC PANEL
D MSDB-1.1MA4 UPS BATT
160kVA 4 Min

09 HMI HUMAN MACHINE INTERFACE

T T T T T T

T T T T T T

FILTER
SAND

FILTER
SAND
TTRH TTRH TTRH
11000

FILTER
SAND

FILTER
SAND

A.GF.03.00
CORRIDOR
T T T T T T

INDUSTRIAL
D.9 WATER PLANT
T T T T T T
T

ROOM
E A.GF.18.00

FILTER

FILTER
SAND

SAND
T T T T T T

FILTER

FILTER
SAND

SAND
10620

STAIRCASE 03 3mx2mx2mH
9M3
3mx2mx2mH T T T T T T
S.A.03.00 9M3
11,000KG 11,000KG
TMxC DPS DPS

E.7
DATA HALL

2325
A.GF.23.00

F MAKE UP WATER TANK 1 COLD AIR PLENUM


AIR LOCK DPS

2375
DPS DPS DPS DPS
21M x 5M x 5M(H) 1148 A.GF.24.01 A.GF.24.00
EFF CAP:477M3
550,000KG

DAHU DAHU DAHU DAHU DAHU DAHU DAHU


10625

8425
MAKE UP WATER TANK 2
21M x 5M x 5M(H)
550M3 DAHU GALLERY
550,000KG 798203
2.3B

1200
A.GF.29.00
G C 31AUG2020 ISSUED FOR 80% REVIEW
B 20JUL2020 ISSUED FOR 50% REVIEW
ZLT WJK YY
ZLT WJK YY
BF
BF

CGK063-DSCO-1A-01-DR-M-6105
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia

FOR CONTINUATION
REFER TO DWG NO:
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
PARTIAL GROUND FLOOR BMS EQUIPMENT LAYOUT 2

SCALE: DRAWING NO.: REV.:

1:100 CGK063-DSCO-1A-01-DR-M-6103 C
BMS LEGEND

7 8 9 10 11 12 13 SNO.

01
SYMBOL

T
DESCRIPTION

TEMPERATURE SENSOR

02 TTRH TEMPERATURE AND RH COMBO SENSOR

UP 03

04
TMxC

DPS
TEMPERATURE SENSOR FOR MAX COOLING

DIFFERENTIAL PRESSURE SENSOR

05 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

06 BMS BMS PANEL

07 MxC MAX COOLING PANEL

08 ANNUNCIATOR PANEL FOR MAX COOLING MODE


CGK063-DSCO-1A-01-DR-M-6102

CGK063-DSCO-1A-01-DR-M-6106
FOR CONTINUATION 09 HMI HUMAN MACHINE INTERFACE

FOR CONTINUATION
REFER TO DWG NO:

REFER TO DWG NO:


UP

DPS DPS OA-T DPS

A.GF.06.00
A TTRH TTRH TTRH

CORRIDOR
D3-BMS PNL D2-BMS PNL DH-MCC PNL HOUSE LOAD
D1-BMS PNL
FIRE PAV
BMS

BMS
FIRE PAV FIRE PAV ROOM

BMS

BMS
R.A.02.00 R.A.03.00
R.A.04.00 R.A.05.00 A.GF.09.00
11500

21665 2500 18535 18430 6245


T
T

T
T

T
T
ELECTRICAL ELECTRICAL
ELECTRICAL

T
T

ROOM 1.3 ROOM 1.2


A.GF.05.00 A.GF.07.00 ROOM 1.1
4102 A.GF.08.00 150 150

B
DAHU GALLERY
2.1A
A.GF.15.00 A.GF.14.00 A.GF.13.00
11000

B.5 DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU

2325 3100 800 3100 2100 3100 800 3100 2100 3100 1593 1655 3100 800 3100 2100 3100 800 3100 3360 3100 800 3100 2100 3100 800 3100 2100 3100

COLDDPS
AIR PLENUM VESTIBULE COLD AIR PLENUM COLD AIR PLENUM C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
DPS
A.GF.20.00 DPS A.GF.06.01 DPS DPS
A.GF.21.00 DPS DPS DPS
A.GF.21.00 DPS B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF
A - NOT ISSUED - - - -
2615 1200 2700 1200 4000 1200 2700 1200 5250 1200 2700 1200 4000 1200 2700 1200 4000 1200
C 4000 1200 2700 1200 4000 1200 2700 1200 3850 1200 1749

MxC MxC
REV. DATE

MEP ENGINEER:
DESCRIPTION DRWN ENGR CHK APP'D

DATA HALL DATA HALL DATA HALL PT. DSCO Indonesia


A.GF.23.00 D3-MxC PNL D2-MxC PNL A.GF.22.00 A.GF.22.00 D1-MxC PNL Kencana Tower, Level 2,
1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1436 1167 1200 1167 1396 1167 1200 1167 ?
1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1396 1167 1200 ?
1167 1646 1167 1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

DPS DPS TMxC DPS DPS TTMxC DPS DPS TMxC VB + E Pte Ltd
10620

# 05-09 Harbour Link Complex


61 Alexandra Terrace, Singapore 119936
T T T T T T T T T T T T T T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
T T T T T T T T T T T T T #12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

596 600 596 600 600 596


AGILE No.: 000-000000-000
600 596 600 596 600 596
D REFER TO DWG NO:
PROJECT:
CGK063
T T T T T T T T T T T T T
CGK063-DSCO-1A-01-DR-M-6105 TITLE:
MECHANICAL SERVICES
PARTIAL GROUND FLOOR BMS EQUIPMENT LAYOUT 3
FOR CONTINUATION SCALE: DRAWING NO.: REV.:

1:100 CGK063-DSCO-1A-01-DR-M-6104 C
T T T T T T T T T T T T T
000
C
BMS LEGEND

7 8 9 10 11 12 13 SNO. SYMBOL DESCRIPTION

01 T TEMPERATURE SENSOR

02 TTRH TEMPERATURE AND RH COMBO SENSOR

03 TMxC TEMPERATURE SENSOR FOR MAX COOLING


DPS DPS TMxC DPS DPS TTMxC DPS DPS TMxC
04 DPS DIFFERENTIAL PRESSURE SENSOR
10620

05 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)


T T T T T T T T T T T T T
06 BMS BMS PANEL

REFER TO DWG NO: 07

08
MxC MAX COOLING PANEL

ANNUNCIATOR PANEL FOR MAX COOLING MODE

T T T T T
CGK063-DSCO-1A-01-DR-M-6104
T T T T T T T T 09 HMI HUMAN MACHINE INTERFACE

FOR CONTINUATION
596 600 596 600 600 596 600 596 600 596
600 596
D
T T T T T T T T T T T T T

T T T T T T T T T T T T T
TTRH TTRH TTRH TTRH TTRH TTRH
11000

T T T T T T T T T T T T T

D.9
T T T T T T T T T T T T T

E
T T T T T T T T T T T T T
10620

T T T T T T T T T T T T T

TMxC DPS DPS TMxC DPS DPS TMxC DPS DPS

E.7
IHB DATA HALL
R.A.08.00 A.GF.22.00

F
DPS DPS DPS DPS DPS DPS DPS COLD AIR PLENUMDPS DPS AIR LOCK
A.GF.25.00 A.GF.25.01

VESTIBULE
A.GF.25.01
DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU DAHU
10625

DAHU GALLERY DAHU GALLERY DAHU GALLERY C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF
B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF

2.3A 1.3B 1.3A A - NOT ISSUED - - - -

CGK063-DSCO-1A-01-DR-M-6107
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

A.GF.28.00 A.GF.27.00 A.GF.26.00 MEP ENGINEER:

G
CGK063-DSCO-1A-01-DR-M-6103

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
FOR CONTINUATION

FOR CONTINUATION
REFER TO DWG NO:

REFER TO DWG NO:


TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
MECHANICAL SERVICES
PARTIAL GROUND FLOOR BMS EQUIPMENT LAYOUT 4

SCALE: DRAWING NO.: REV.:

1:100 CGK063-DSCO-1A-01-DR-M-6105 C
BMS LEGEND

13 14 14.8 15 15.4 16 16.6 17 18 1919.1 SNO. SYMBOL DESCRIPTION

01 T TEMPERATURE SENSOR

02 TTRH TEMPERATURE AND RH COMBO SENSOR

03 TMxC TEMPERATURE SENSOR FOR MAX COOLING

UP 04 DPS DIFFERENTIAL PRESSURE SENSOR

05 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)

06 BMS BMS PANEL

07 MxC MAX COOLING PANEL


CGK063-DSCO-1A-01-DR-M-6104 08 ANNUNCIATOR PANEL FOR MAX COOLING MODE

FOR CONTINUATION 09 HMI HUMAN MACHINE INTERFACE


REFER TO DWG NO:

UP

OA-T DPS

A DH-MCC PNL HOUSE LOAD


TTRH TTRH
CATCHER ROOM 3
TTRH
CATCHER ROOM 2
ROOM A.GF.10.00 A.GF.11.00
BMS

UP
A.GF.09.00

ER-BMS PNL
BMS
UP
11500

6245

FIRE COMMAND
T
T

T
T

CENTRE
A.GF.12.00 LOADING DOCK
T
T

A.GF.32.00

B TTRH

A.GF.13.00
FIRE CV IHB
R.A.07.00 R.A.06.00
11000

B.5 DAHU DAHU DAHU

3100 800 3100 2100 3100 2955

COLD AIR PLENUM


DPS DPS
AIR LOCK C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF

A.GF.21.00 A.GF.13.01 B 20JUL2020 ISSUED FOR 50% REVIEW


A - NOT ISSUED
ZLT WJK YY
- - -
BF
-
1200 2700 1200 4000 1200 2155
C MxC
REV. DATE

MEP ENGINEER:
DESCRIPTION DRWN ENGR CHK APP'D

PT. DSCO Indonesia


D1-MxC PNL Kencana Tower, Level 2,
1200 1167 1396 1167 1200 1167 1646 1167 1200 1167 1574 Business Park Kebon Jeruk,
MxC ANUNCIATION PNL Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

TMxC VB + E Pte Ltd


10620

# 05-09 Harbour Link Complex


61 Alexandra Terrace, Singapore 119936
T T T T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
T T T #12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

600 596 1149


AGILE No.: 000-000000-000

D REFER TO DWG NO: PROJECT:


CGK063
T T T CGK063-DSCO-1A-01-DR-M-6107
TITLE:
FOR CONTINUATION MECHANICAL SERVICES
PARTIAL GROUND FLOOR BMS EQUIPMENT LAYOUT 5

SCALE: DRAWING NO.: REV.:

1:100 CGK063-DSCO-1A-01-DR-M-6106 C
T T T
000
C
BMS LEGEND

13 14 14.8 15 15.4 16 16.6 17 18 1919.1 SNO. SYMBOL DESCRIPTION

01 T TEMPERATURE SENSOR

02 TTRH TEMPERATURE AND RH COMBO SENSOR

03 TMxC TEMPERATURE SENSOR FOR MAX COOLING


TMxC
04 DPS DIFFERENTIAL PRESSURE SENSOR
10620

05 OAT OUTSIDE AIR TEMPERATURE SENSOR (DB + DEW POINT)


T T T
06 BMS BMS PANEL

REFER TO DWG NO: 07 MxC MAX COOLING PANEL

CGK063-DSCO-1A-01-DR-M-6106 08 ANNUNCIATOR PANEL FOR MAX COOLING MODE

T T T
09 HMI HUMAN MACHINE INTERFACE

FOR CONTINUATION
600 596 1149
D
T T T

T T T
TTRH
11000

T T T

D.9
T T T

E
T T T
10620

T T T

TMxC DPS DPS

E.7

F
COLD AIR PLENUMDPS AIR LOCK
DPS
A.GF.25.00 A.GF.25.01
7120 3950
2150

DAHU DAHU DAHU


10625

2650

DAHU GALLERY C 31AUG2020 ISSUED FOR 80% REVIEW ZLT WJK YY BF


B 20JUL2020 ISSUED FOR 50% REVIEW ZLT WJK YY BF
1.3A A -
REV. DATE
NOT ISSUED
DESCRIPTION
- - - -
DRWN ENGR CHK APP'D

A.GF.26.00

325
MEP ENGINEER:

G
CGK063-DSCO-1A-01-DR-M-6105

200
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
FOR CONTINUATION
REFER TO DWG NO:

TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
BMS SERVICES
PARTIAL GROUND FLOOR BMS EQUIPMENT LAYOUT 6

SCALE: DRAWING NO.: REV.:

1:100 CGK063-DSCO-1A-01-DR-M-6107 C
Xref 390AR-SITE

FIRE PROTECTION LEGEND

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

MIMIC
NEW EXPOSED SPRINKLER HEAD (WET) MP NEW SILK SCREEN TYPE MIMIC PANEL

NEW CONCEALED SPRINKLER HEAD (WET) MM NEW SILK SCREEN TYPE MASTER MIMIC PANEL

NEW ROYAL FLUSH SPRINKLER HEAD (WET) ASD NEW ASPIRATING SMOKE DETECTION SYSTEM PANEL

NEW UNDER DUCT / BEAM / CABLE TRAY SPRINKLER HEAD (WET) NEW ASPIRATING SMOKE DETECTION SYSTEM
M_ASD
C/W WIRE GUARD & WATER SHIELD (WET) FLOOR MASTER CONTROL PANEL

NEW CUT-OFF SPRINKLER NEW ASPIRATING SMOKE DETECTION SYSTEM


MM_ASD
MAIN MASTER CONTROL PANEL

NEW SIDE-WALL SPRINKLER HEAD WMCP NEW FIRE ALARM INTERFACING MODULES FOR WATER MIST SYSTEM

NEW PRE-ACTION SPRINKLER HEAD C/W WIRE GUARD


(INSTALLED AT UPRIGHT POSITION)
NEW ASPIRATING SMOKE DETECTION SYSTEM
AIR SAMPLING PIPE C/W SAMPLING HOLE (STAINLESS STEEL PIPE)
NEW DRY PENDENT PRE-ACTION SPRINKLER HEAD
INSTALLED AT HIGH LEVEL
(ROYAL FLUSH TYPE)

NEW PRE-ACTION SPRINKLER UNDER DUCT / BEAM


C/W WIRE GUARD NEW ASPIRATING SMOKE DETECTION SYSTEM
AIR SAMPLING PIPE C/W SAMPLING HOLE (STAINLESS STEEL PIPE)
INSTALLED AT REFLECTED CEILING LEVEL ( HOT AISLE AREA)
S NEW EXPOSED SMOKE DETECTOR

S NEW CONCEALED SMOKE DETECTOR


C/W REMOTE ALARM INDICATOR LIGHT (INSTALLED AT CEILING VOID) NEW ASPIRATING SMOKE DETECTION SYSTEM
AIR SAMPLING PIPE C/W SAMPLING HOLE (STAINLESS STEEL PIPE)
H NEW HEAT DETECTOR INSTALLED AT REFLECTED CEILING LEVEL

NEW ALARM BELL / MANUAL CALL POINT /


VISUAL STROBE LIGHT C/W SOUNDER ALARM MONITORED VALVE

FS NEW FLOW SWITCH


TEST DRAIN PIPE

NEW SPRINKLER MAIN PIPE GATE VALVE

NEW WET SPRINKLER PIPE CHECK VALVE

NEW PRE-ACTION SPRINKLER PIPE P


PRESSURE GAUGE

NEW INDOOR HYDRANT PIPE STRAINER

NEW OUTDOOR HYDRANT PIPE FLEXIBLE CONNECTION

NEW DRAIN PIPE T/A TO ABOVE

NEW SPRINKLER CONTROL VALVE (PLAN) T/B TO BELOW

NEW PRE-ACTION SPRINKLER CONTROL VALVE /


NEW WET SPRINKLER CONTROL VALVE (SCHEMATIC) F/A FROM ABOVE

NEW EXTERNAL HYDRANT (PLAN) F/B FROM BELOW C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW CYY AUNG YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
NEW EXTERNAL HYDRANT (SCHEMATIC) H/L HIGH LEVEL
MEP ENGINEER:

PT. DSCO Indonesia


NEW Ø150mm x 4 WAY BREECHING INLET (SCHEMATIC) L/L LOW LEVEL Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
NEW INDOOR HYDRANT BOX C/W Ø50mm HOSEREEL & Ø65 LANDING VALVE TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
U/G UNDERGROUND
CIVIL/ STRUCTURAL ENGINEER :

FA VB + E Pte Ltd
50 KG 50KG TROLLEY MOUNTED FIRE EXTINGUISHER WP WEATHER PROOF TYPE # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:
FA 5KG HALOTRON FIRE EXTINGUISHER 79 SPRINKLER TEMPERATURE 79 ° c
5 KG

ARCHITECT:

FA 4.5KG CO² ABC FIRE EXTINGUISHER


4.5 KG 141 SPRINKLER TEMPERATURE 141 ° c Aedas Pte Ltd
CO² 11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
MAP NEW MAIN FIRE ALARM PANEL
AGILE No.: 000-000000-000
PROJECT:
SAP NEW SUB FIRE ALARM PANEL CGK063

TITLE:
PR NEW FIRE ALARM REPEATER PANEL
FIRE PROTECTION LEGEND OF SYMBOLS

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-7000 C
NOTES:- PRE-ACTION SYSTEM OPERATION REQUIREMENTS AND PROCEDURES
1. The building works and fire safety works shown on these plans have been designed
in accordance with the provisions of the applicable Code of Practice for Fire Precautions 1. The pre-action alarm valve controlling the water supply, shall be operated by
including all amendments applicable up to the date of this submission, the fire safety the approved type detector (Photoelectric Smoke Detectors) ,
act and its regulations, the relevant code of practice of designed guidelines alarms, wire circuits, control panel & the solenoid valve shall constantly be
supervised such that any electrical faults shall cause a trouble alarm to
sound and the sprinkler pipe work shall be charged with water. The operation
of the sprinkler system shall be unaffected by any failure in the detector system.
2. The hydrant, automatic sprinkler & pre-action systems shall be installed and commissioned
in accordance to NFPA13 and SNI 03-3989-2000 - Tata cara perencanaan dan pemasangan 2. The detector system shall operate on approved continuously energized valve or
sistem sprinkler otomatik untuk pencegahan bahaya kebakaran pada bangunan gedung trip mechanism to release the pre-action control valve when the valve or trip
mechanism becomes de-energized ( i.e normally open solenoid valve).
3. The automatic fire alarm system and fireman intercom system shall be installed and commissioned in
accordance to NFPA 72 and SNI 03-3985-2000 - Tata cara perencanaan dan pemasangan 3. In the event of fire, the activation of the first smoke detector (first zone) shall bring
sistem deteksi dan alarm kebakaran untuk pencegahan bahaya kebakaran pada bangunan gedung on the alarm bell and signal the SAP. On the activation of the second detector
(second zone) a signal shall be sent to open the pre-action solenoid valve.
4. The internal hydrant systems shall be installed and commissioned in accordance to SNI 03-1745-2000:
Tata cara perencanaan dan pemasangan sistem pipa tegak dan slang untuk pencegahan bahaya
kebakaran pada bangunan gedung
MODE OF OPERATION FOR PRE-ACTION SPRINKLER SYSTEM SEQUENCE
5. All Major fire protection equipments such as fire pumps, pipe fittings, fire alarm system, flow switches, etc. OF OPERATION
shall be FM approved and UL listed.
1. Upon accidental mechanical breakage of the sprinkler point, the low-pressure
6. Fire protection installation drawings are to be read in conjunction with the
alarm shall be sent to the pre-action control panel. A buzzer sounds with a low
architectural, structural and other related drawings as well as the specification.
-pressure indication on the panel. Upon replacement of the sprinkler, the
The architect, I.D / Engineers shall be notified immediately of any discrepancy
compressor will start to charge the system pressure to normal conditions.
found therein.
2. Upon activation of the first photoelectric smoke detector in any zone, a signal of
7. The current layout of luminaires, sprinklers, ductwork, diffusers, detectors and the alarm will be reported to the pre-action control panel. This control panel is to
all other visible M&E accessories may be subject to change in and position be interfaced with the BMS system and sub-fire alarm board. The occurence
dependent on finalisation of reflected ceiling plans or other architectural details. of this is signaled to the two systems.
The contractor is deemed to have included for all such alterations in his original
tender. The contractor is to ensure his bid allows for coordination with other 3. Upon activation of a second photoelectric smoke detector in the second zone,
services and the building fabric. Contractor's coordinated shop drawings shall a signal of the alarm will be reported to the pre-action control panel. This control
be prepared when the ceiling plans have been issued. panel will command the solenoid valve to open. A signal of the alarm will be
reported to the BMS system and sub-fire alarm board.
8. All fire services pipework shall be painted red / as per Archi / ID consultant requirements.
4. Water will discharge only upon the breakage of a sprinkler head due to a fire conditon.
9. The Contractor shall allow for all coordination / clarification with the landlord.
5. Upon sensing normal power failure, the battery shall take over providing the
10. The Contractor shall include for an interfacing from fire alarm system to other M&E systems. necessary power for the Pre-Action control (PCP) panel. PCP indicates "charging
Cables and terminations to the other M&E systems are to be included in the tender price. fault". Upon losing the battery power (24hours), the control valve shall open
(normally open solenoid valve) allowing the sprinkler system to reverts to
11. The Contractor shall include all necessary interfacing units associated with a dry sprinkler system.
this contract in their tender price.

12. All the area with false ceiling shall be provided with royal flush (RF-II) sprinklers. ADDITIONAL NOTES AND REQUIREMENTS:-
(For pre-action sprinkler protected area shall be royal flush (RF-II) dry pendant sprinklers) 1. Refer to specifications for additional requirements. sprinkler systems shall be designed by the
contractor and submitted for approval.
13. No part of the installations is to contain materials considered as deleterious by
by current, common or good practice, or that are determined as deleterious by 2. Sprinkler selection for each hazard area shall be in accordance with the sprinkler design
statute or government directions. schedule indicated on the drawings.
14. All materials or substances used in the Fire Protection Systems installations shall
be classed as environmentally friendly. All materials or substances shall conform 3. Provide a pre-action alarm valve test header with hose connections connected downstream of
to the 'Montreal Protocol on Substances that deplete the Ozone Layer". each pre-action alarm valve. provide isolation valves (with tamper switches) on the discharge
from each alarm valve to direct system flow to either the test header or to the connected
15. The Contractor shall ensure all requirements for penetrations through sprinklers.
walls, floor slabs, ...etc, are submitted in advance to the Structural Engineer for
approval prior to construction. All remedial works arising from failure to do so 4. All sprinkler systems shall be designed to operate with a water supply pressure buffer of not
shall be borne by the the Contractor. less than 10 psig. for systems with static pressures exceeding 100 psig, the pressure buffer
shall be 10 percent of the static pressure. sprinkler systems design shall be based on approved
16. All drawing submittals shall be presented in both a soft copy format as well as water flow test data, taken no more than one year from construction contract award. provide
hard copy. All soft copy drawings should be presented in an BIM, AutoCAD 2015 & additional water flow testing if the water supply data provided in the contract documents is not
PDF format to expedite the submittal process soft copies of the Consultants Tender
within this time frame. water flow testing shall be witnessed by the owner’s representative.
drawings may be purchased from the Consulting Engineer.
5. Sprinkler heads within the data center equipment areas shall be installed such that both hot
17. Where differences occur between the drawings and specifications or within each
aisles and cold aisles have code required sprinkler coverage. sprinkler heads located at the roof
document itself, the item or arrangement of better quality, or higher costs shall
level above data center equipment areas shall be aligned (centered) on the hot aisles, with a
be deemed to included in the tender offer.
maximum 10’ spacing along the hot aisles, and shall be provided with intermediate temperature,
200 deg f (93.3 deg c), quick response upright sprinklers (or equivalent).
18. All wall and floor openings shall be sealed up and made good with firestops
required after the installation of services.
6. Sprinkler heads located in dahu galleries shall be intermediate temperature, 200 deg f (99.3 deg
19. All support hangers, bolts & etc. for pipes & conduits shall be of appropriate material c), quick response upright sprinklers (or equivalent).
to resist corrosion and taking into account any expansion & contraction movement. All
major pipeworks shall be suitably mounted in accordance to Landlord's or Construction 7. Sprinkler heads located in lay-in ceilings within the data center equipment areas shall be
Manager requirements whichever is more stringent. intermediate temperature, 212 deg f (93.3 deg c) concealed pendant sprinklers (or equivalent),
centered in ceiling tiles. provide flexible sprinkler head connection and a return bend taken off
20. The dry pre-action sprinkler heads shall be installed at upright position. Where it is the top of the supply pipe and extending at least 6-inches upwards for each sprinkler.
necessary to install sprinkler at pendent position, the sprinkler shall be of dry pendent
type. All dry pre-action sprinkler heads install (high and raised floor level) shall be
complete with metal Wire Guard. 8. Sprinkler heads located in all other spaces shall be designed with ordinary temperature 155 deg
f (68.3 deg c) rated heads (or similar). provide concealed sprinklers where located in lay-in
21. All pre-action sprinkler distributor, range and drain pipes shall be at a gradient of ceiling tiles. C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
1:200. Drain-off valves shall be provided at the remote end of the pipe and out of B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
the protected space or at the locations shown in the tender documents. 9. Where sprinklers are initially installed as a dry-pipe or non-interlocked pre-action sprinkler A 08JUN2020 ISSUE FOR 30% REVIEW CYY AUNG YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
system, they shall incorporate a 30% design area increase per nfpa-13. the scheduled design
22. All fire services panel including the water mist control panel, fire alarm system areas do not include this area increase. MEP ENGINEER:
panel, shall incorporate provisions for BMS monitoring indicating the alarm,
discharge etc... status as per schematic drawing. PT. DSCO Indonesia
10. Use of the ‘design area reduction rule’ with quick-response sprinklers referenced in nfpa 13 Kencana Tower, Level 2,
23. Pre-action control valve shall be single interlock system & section 11.2.3.2.3 is limited for use on wet pipe sprinkler systems in office areas only. remote Business Park Kebon Jeruk,
Jl Raya Meruya llir
solenoid valve for pre-action control valve shall be Normally Open (NO) type. area reductions shall not be used with any pre-action systems, or for the protection of any other No.88 Jakarta Barat 11620, Indonesia
rooms. TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
24. Aspirating Smoke Detection (ASD) system shall be installed and commissioned in
accordance to NFPA 76 and manufacture's guidelines. 11. Sprinkler spacing and installation details shall be in strict accordance with the sprinkler CIVIL/ STRUCTURAL ENGINEER :

manufacturer’s specifications, installation instructions, and nfpa 13. VB + E Pte Ltd


25. Aspirating Smoke Detection (ASD) system panels and sampling pipe shown as tender drawings
# 05-09 Harbour Link Complex
are indicative only. Aspirating Smoke Detection (ASD) system shall be designed as per Class A 61 Alexandra Terrace, Singapore 119936
12. Provide wet-pipe sprinkler protection for the mechanical access platform.
requirements and all the cost shall be included at the tender proposal. T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:
26. The portable fire extinguisher shall be installed and commissioned in accordance to SNI 03-3987-1995: 13. Provide auxiliary pre-action alarm valve for electrical catcher room c2 (connect c2 sprinklers to
Tata cara perencanaan dan pemasangan pemadam api ringan untuk pencegahan bahaya kebakaran zone 8 and remove as part of phase 7 sow) (connect to zone 7 and c2 sprinklers in phase 1) ARCHITECT:
pada rumah dan gedung.
14. Duty and standby nitrogen generators c/w power supply, control, enclosure and necessary Aedas Pte Ltd
accessories shall be provided for pre-action sprinkler system. 11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

FIRE PROTECTION GENERAL NOTES

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-7001 C
FIRE PROTECTION SERVICES CONTROL OPERATION PRE-ACTION SYSTEM OPERATION REQUIREMENTS AND PROCEDURES
COMPARTMENTED WATER TANK CAPACITY
(APPLICABLE TO ALL AREAS PROTECTED WITH ANY FIRE PROTECTION SYSTEM)
1. The pre-action alarm valve controlling the water supply, shall be operated by
3 the approved type detector (Photoelectric Smoke Detectors) ,
AUTOMATIC FIRE SPRINKLER WATER TANK EFFECTIVE CAPACITY 620 m
alarms, wire circuits, control panel & the solenoid valve shall constantly be
GENERAL ALARM STAGE RESULT supervised such that any electrical faults shall cause a trouble alarm to
sound and the sprinkler pipe work shall be charged with water. The operation
Activation of ONE smoke detector OR > Signal to SAP and Landlord's MAP of the sprinkler system shall be unaffected by any failure in the detector system.
Activation of ONE heat detector OR > Report Signal to BMS
2. The detector system shall operate on approved continuously energized valve or
Activation of Any manual call point OR > Alert Facility Staff (Via SMS) trip mechanism to release the pre-action control valve when the valve or trip
Activation of any water mist system manual release station OR > Trained Facility Staff To Investigate
PERFORMANCE CHARACTERISTICS OF AUTOMATIC FIRE SPRINKLER PUMPS mechanism becomes de-energized ( i.e normally open solenoid valve).
Activation of wet sprinkler water flow switch OR
> Alarm bell / strobe light activate
Activation of pre-action sprinkler water flow switch /
3. In the event of fire, the activation of the first smoke detector (first zone) shall bring
alarm pressure switch
DESCRIPTION PUMP NAME FLOW PRESSURE REMARKS on the alarm bell and signal the SAP. On the activation of the second detector
(second zone) a signal shall be sent to open the pre-action solenoid valve.
ELECTRIC MOTOR DRIVEN DUTY PUMP FHPR-1-01 80 lps 700 kPa EXISTING PUMP TO BE DISMANTLED
(DIESEL ENGINE DRIVEN PUMP)

ELECTRIC MOTOR DRIVEN STANDBY PUMP FHPR-1-02 80 lps 700 kPa EXISTING PUMP TO BE DISMANTLED MODE OF OPERATION FOR PRE-ACTION SPRINKLER SYSTEM SEQUENCE
(DIESEL ENGINE DRIVEN PUMP)
FIRE PROTECTION SERVICES CONTROL OPERATION OF OPERATION

ELECTRIC MOTOR DRIVEN JOCKEY PUMP FHJPR-1-01 0.8 lps 770 kPa EXISTING PUMP TO BE DISMANTLED
(APPLICABLE TO ALL AREAS PROTECTED WITH ASD & PRE-ACTION SPRINKLER SYSTEMS)
1. Upon accidental mechanical breakage of the sprinkler point, the low-pressure
alarm shall be sent to the pre-action control panel. A buzzer sounds with a low
ELECTRIC MOTOR DRIVEN DUTY PUMP -pressure indication on the panel. Upon replacement of the sprinkler, the
3,500 gpm NEW
(DIESEL ENGINE DRIVEN PUMP) FHPR-2-01 1,100 kPa PRE-ALARM STAGE (INVESTIGATION) RESULT compressor will start to charge the system pressure to normal conditions.
UL / FM APPROVED FIRE PUMP
(DUTY PUMP)

ELECTRIC MOTOR DRIVEN DUTY PUMP Activation of Level 1 (Alert) signal (OR) > Signal to SAP and Landlord's MAP 2. Upon activation of the first photoelectric smoke detector in any zone, a signal of
NEW
(DIESEL ENGINE DRIVEN PUMP) FHPR-2-02 3,500 gpm 1,100 kPa Activation of Level 2 (Action) signal (OR) > Report Signal to BMS the alarm will be reported to the pre-action control panel. This control panel is to
UL / FM APPROVED FIRE PUMP
(STANDBY PUMP) Activation of Level 3 (Fire 1) signal be interfaced with the BMS system and sub-fire alarm board. The occurence
> Alert Facility Staff (Via SMS)
from Aspirating Smoke Detection (ASD) panel of this is signaled to the two systems.
> Trained Facility Staff To Investigate
ELECTRIC MOTOR DRIVEN JOCKEY PUMP FHJPR-2-01 10 lps 1,210 kPa NEW JOCKEY PUMP to the Fire Alarm System
3. Upon activation of a second photoelectric smoke detector in the second zone,
a signal of the alarm will be reported to the pre-action control panel. This control
STAGE 1 (PRE-ACTION SPRINKLER SYSTEM) RESULT panel will command the solenoid valve to open. A signal of the alarm will be
reported to the BMS system and sub-fire alarm board.
> Signal to SAP and Landlord's MAP
4. Water will discharge only upon the breakage of a sprinkler head due to a fire conditon.
Activation of Level 4 (Fire 2) signal > Report Signal to BMS
from Aspirating Smoke Detection (ASD) panel > Alert Facility Staff (Via SMS) 5. Upon sensing normal power failure, the battery shall take over providing the
to the Fire Alarm System > Trained Facility Staff To Investigate necessary power for the Pre-Action control (PCP) panel. PCP indicates "charging
> Alarm bell / strobe light activate fault". Upon losing the battery power (24hours), the control valve shall open
(normally open solenoid valve) allowing the sprinkler system to reverts to
SPRINKLER DESIGN DATA
STAGE 2 (PRE-ACTION SPRINKLER SYSTEM) RESULT a dry sprinkler system.

AREA TO BE SERVED OFFICE / COMMON AREAS DATA HALL / ELECT/ UPS/ MECHANICAL PLANT Activation of Level 4 (Fire 2) signal > Signal to SAP and Landlord's MAP
DESCRIPTION BATT ROOM AREAS ROOM
from Another Aspirating Smoke Detection (ASD) panel > Report Signal to BMS
CLASSIFICATION OF OCCUPANCIES - - - to the Fire Alarm System > Alert Facility Staff (Via SMS)
DENSITY OF DISCHARGE (mm/min) 4.1 8.2 8.2 OR > Trained Facility Staff To Investigate

ASSUMED AREA OF OPERATION (sq.m.) 140 186 186 > Alarm bell / strobe light activate
Activation of Level 4 (Fire 2) signal
> Signal to close all motorised damper serving the zones (if applicable)
MINIMUM SPRINKLER DISCHARGE PRESSURE (kPa) 50 50 50 from any TWO Aspirating Smoke Detection (ASD) panels
> Signal to shut-off FCUs serving the zones (if applicable)
within the same compartment to the Fire Alarm System
AREA OF COVERAGE PER SPRINKLER (sq.m.) 12 12 12 > Open Pre-action Sprinkler Solenoid Valve
without the pre-alarm condition described above
NOMINAL SIZE OF ORIFICE (mm) 15 15/20 15 / 20
STAGE 3 (PRE-ACTION SPRINKLER SYSTEM)
K FACTOR OF SPRINKLER (lpm/Kpa (1/2)) 8.0 11.5 11.5 / 16.1 RESULT
(DAMAGE LIMITATION)
TEMPERATURE RATING OF SPRINKLER 68°C 68°C / 79°C/ 93°C 68°C

TYPE OF SPRINKLER (COVERAGE / RESPONSE) STANDARD / QUICK STANDARD / QUICK STANDARD / QUICK > Upon breakage of sprinkler head, water will discharge
Room temperature rises sufficient to burst sprinkler
through the affected sprinkler head

Note: Royal Flush (RF II) sprinkler (wet & pre-action system) shall be provided at the false ceiling.

SPRINKLER CONTROL VALVE SCHEDULE REMARK FIRE PROTECTION SERVICES CONTROL OPERATION
(APPLICABLE TO ALL AREAS PROTECTED WITH SMOKE DETECTOR & PRE-ACTION SPRINKLER SYSTEMS)
BBCS OFFICE PHASE 1 PHASE 2 PHASE 3 PHASE 4
LOCATION CONTROL VALVE. NO AREA TO SERVE
PACKAGE PACKAGE PACKAGE PACKAGE PACKAGE PACKAGE

LEVEL 1 SCV 1-1 (WET) GENERAL OFFICE AREA, DOMESTIC WATER PLANT ROOM - - - - - -
STAGE 1 (PRE-ACTION SPRINKLER SYSTEM) RESULT
STORE ROOMS, CHILLER PLANT ROOM,
LEVEL 1 SCV 1-2 (WET) - - - - - -
INDUSTRIAL WATER PLANT ROOM, COMMON CORRIDOR
> Signal to SAP and Landlord's MAP
LEVEL 1 SCV 1-3 (WET_IHB) TO SERVE INDOOR HYDRANT SYSTEM - - - - - - > Report Signal to BMS
Activation of one smoke detector > Alert Facility Staff (Via SMS)
LEVEL 1 PACV 1-1 CATCHER ROOM 1, CATCHER ROOM 2, HOUSE LOAD ROOM NON-INTERLOCK - SINGLE INTERLOCK - - -
> Trained Facility Staff To Investigate
LEVEL 1 PACV 1-2 POD 1, ELECTRICAL ROOM 1.1, DAHU GALLERY 1.1A, DAHU GALLERY 1.3A NON-INTERLOCK - SINGLE INTERLOCK - - - > Alarm bell / strobe light activate

LEVEL 1 PACV 1-3 POD 2, ELECTRICAL ROOM 1.2, DAHU GALLERY 1.1B, DAHU GALLERY 1.3B NON-INTERLOCK - - SINGLE INTERLOCK - -
STAGE 2 (PRE-ACTION SPRINKLER SYSTEM) RESULT
LEVEL 1 PACV 1-4 POD 3, ELECTRICAL ROOM 1.3, DAHU GALLERY 2.1A, DAHU GALLERY 2.3A NON-INTERLOCK - - - SINGLE INTERLOCK -
> Signal to SAP and Landlord's MAP
PACV 1-5 Activation of another smoke detector
LEVEL 1 POD 4, ELECTRICAL ROOM 1.4, DAHU GALLERY 2.1B, DAHU GALLERY 2.3B NON-INTERLOCK - - - - SINGLE INTERLOCK
> Report Signal to BMS
within the same compartment
LEVEL 1 PACV 1-6 MECH ER 1.1 NON-INTERLOCK - SINGLE INTERLOCK - - - > Alert Facility Staff (Via SMS)
OR > Trained Facility Staff To Investigate
> Alarm bell / strobe light activate
Activation of any two smoke detectors
> Signal to close all motorised damper serving the zones (if applicable)
within the same compartment
> Signal to shut-off FCUs serving the zones (if applicable)
> Open Pre-action Sprinkler Solenoid Valve

STAGE 3 (PRE-ACTION SPRINKLER SYSTEM)


RESULT
(DAMAGE LIMITATION)

> Upon breakage of sprinkler head, water will discharge


Room temperature rises sufficient to burst sprinkler C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
through the affected sprinkler head
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW CYY AUNG YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
FIRE PROTECTION SERVICES CONTROL OPERATION Business Park Kebon Jeruk,
Jl Raya Meruya llir
(APPLICABLE TO ALL AREAS PROTECTED WITH HEAT DETECTOR & WATER MIST SYSTEMS) No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :


STAGE 1 (WATER MIST SYSTEM) RESULT
VB + E Pte Ltd
> Signal to SAP and Landlord's MAP
# 05-09 Harbour Link Complex
> Report Signal to BMS 61 Alexandra Terrace, Singapore 119936
Activation of one heat detector > Alert Facility Staff (Via SMS) T +65 6561 4078 F +65 6561 5198
> Trained Facility Staff To Investigate Mechanical & Electrical (LEAD) Consultant:
> Alarm bell / strobe light activate
> 'Evacuation Sign' flash for possible room evacuation ARCHITECT:

STAGE 2 (PRE-ACTION SPRINKLER SYSTEM) RESULT


Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
> Signal to SAP and Landlord's MAP Singapore 138589 aedas.com
Activation of another heat detector (different zone)
> Report Signal to BMS
within the same compartment
> Alert Facility Staff (Via SMS)
OR > Trained Facility Staff To Investigate AGILE No.: 000-000000-000
> Alarm bell / Horn / strobe light activate PROJECT:
Activation of any two heat detector (two different zones)
> 'Gas Discharge’ sign flash for possible room CGK063
within the same compartment
> Water Mist Discharged after 30 second time delay
> ‘Gas Discharge’ sign stable after Water Mist Discharged
TITLE:

FIRE PROTECTION EQUIPMENT SCHEDULE

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-7002 C
SUPPLY, INSTALL, TESTING AND COMMISSIONING OF NEW HYDRANT PUMP C/W CONTROL PANEL AND ACCESSORIES
NEW HYDRANT TANK AND MODIFICATION TO EXISTING HYDRANT TANK AND PUMP SYSTEM LEGEND

SCOPE OF WORKS MENTIONED BELOW ARE INDICATIVE ONLY AND DETAILS OF EACH STEPS SHALL BE SUBMITTED
SYMBOL DESCRIPTION
FOR APPROVAL.

FH FIRE HYDRANT
PHASE 1 - PREPARATION
ISOLATING VALVE
· SURVEY SPACE, CLEARANCE, ROUTING FOR NEW TANK, PUMP, PIPE, VALVE, DIESEL TANK, CONTROL PANEL.
Ø150mm x 4 WAY BREECHING INLET
· CONDUCT RISK ASSESSMENT AND SUBMIT METHOD STATEMENT.

FH FIRE HYDRANT PILLAR


PHASE 2 - CONSTRUCTION OF NEW HYDRANT TANK AND PUMP P

P
FIRE HYDRANT PUMP
· ENSURE EXISTING HYDRANT SYSTEM IS UNDER AUTOMATIC MODE.
NEW FIRE HYDRANT PIPE
· SUPPLY AND CONSTRUCTION OF NEW HYDRANT TANK B, PIPE, FLOAT VALVE, WATER LEVEL INDICATOR, VENT,
ACCESS PANEL, VALVES, CONNECTING PIPE, DRAIN, SAMPLING POINT AND OTHER REQUIRED ACCESSORIES.
EXISTING FIRE HYDRANT PIPE
· WATER HOLDING TEST AND TOP UP HYDRANT TANK WITH CLEAN WATER TO NEW WATER LEVEL.
· SUPPLY AND INSTALL NEW HYDRANT PUMP, CONTROL PANEL, PIPE, PRESSURE SWITCH, DIESEL TANK, ENGINE
EXHAUST DUCT, STRAINER, VALVES, FLEXIBLE JOINT, STRUCTURAL SUPPORTS AND OTHER REQUIRED
ACCESSORIES.
FIRE WATER TANK A FIRE WATER TANK B
· PIPE PRESSURE TEST.
· PUMP TEST. SCOPE EXISTING TO MODIFY NEW

· WATER PROVING OF NEW PUMP. TOP SUMP YES YES


· TOP UP DIESEL TO NEW DIESEL TANK. TYPE HDG PRESSED STEEL HDG PRESSED STEEL
· SYSTEM COMMISSIONING WITH FINALIZED SETTINGS.
TANK SIZE 14M X 7M X 4M (HT) 14M X 7M X 4M (HT)
· INTERFACE NEW PUMP AND TANK STATUS WITH ALL EXISTING MAIN FIRE PANELS.
· TIE-IN NEW HYDRANT PUMP INTO EXISTING HEADER. EFF CAP 313M3 313M3

PHASE 3 - MODIFICATION OF EXISTING HYDRANT TANK AND REPLACEMENT OF EXISTING HYDRANT PUMPS
· ISOLATION AND DRAINING OFF OF HYDRANT TANK A. ALL PIPES CONNECTED TO TANK A SHALL BE ISOLATED.
· ISOLATION AND DRAINING OFF PIPES CONNECTED TO HYDRANT TANK A.
· REMOVAL OF TANK PANELS, SUPPLY INSTALL NEW PANELS AND MODIFY TANK WITH NEW PANELS AND INTERNAL
STRUCTURE.
· REINSTATE AND PROVIDE NEW TANK INCOMING PIPE, FLOAT VALVE, WATER LEVEL INDICATOR, VENT, ACCESS
PANEL, VALVES, PIPE CONNECTION AND OTHER REQUIRED ACCESSORIES.
· PIPE PRESSURE TEST.
· WATER HOLDING TEST AND TOP UP HYDRANT TANK WITH CLEAN WATER TO NEW WATER LEVEL.
· INTERFACE NEW TANK STATUS WITH ALL EXISTING MAIN FIRE PANELS.
SUPPLY AND INSTALL NEW HYDRANT PUMPS, CONTROL PANEL, PIPE, PRESSURE SWITCH, DIESEL TANK, ENGINE
EXHAUST DUCT, STRAINER, VALVES, FLEXIBLE JOINT, STRUCTURAL SUPPORTS AND OTHER REQUIRED
ACCESSORIES.
· WATER PROVING OF NEW PUMP.
· TOP UP DIESEL TO NEW DIESEL TANK.
· SYSTEM COMMISSIONING WITH FINALIZED SETTINGS.
· INTERFACE NEW PUMP AND TANK STATUS WITH ALL EXISTING MAIN FIRE PANELS.
· TIE-IN NEW HYDRANT PUMP INTO EXISTING HEADER.
M
TE
DR LE D

YS
HY INK UN

PHASE 4 - TIE-IN NEW TO EXISTING HYDRANT SYSTEM


AN R
TS
OR SPR GRO

· NORMALISE VALVES TO NORMALLY CLOSE OR OPEN POSITION.


R

· ENSURE NEW HYDRANT SYSTEM IS UNDER AUTOMATIC MODE. MODIFICATION WORKS IN HYDRANT PUMP
IN E TO DE

PUMP ROOM UNDER THIS CONTRACT NEW Ø150 WATER INCOMING


N

Ø150 Ø150
PIP 50 U
Ø2

DO

Ø150

Ø150

Ø150

Ø150
Ø200
BREECHING INLET
P P
P

FH FH FH FH FH P P GROUND FLOOR
FUTURE EXISTING P

FHPR-2-02 FHPR-2-01 FHJPR-2-01 FIRE WATER TANK A FIRE WATER TANK B


Ø250 UNDERGROUND Ø250 UNDERGROUND E
FIRE HYDRANT PIPE FIRE HYDRANT PIPE
Note :
FH FH Existing pump set ( FHPR-1-01, FHPR-1-02 & FHJPR-1-01) to be dismantled.

FH FH 4 POD AND OFFICE BUILDING FH FH FH

FUTURE C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


Ø250 UNDERGROUND Ø250 UNDERGROUND EXISTING B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
FIRE HYDRANT PIPE FIRE HYDRANT PIPE A 08JUN2020 ISSUE FOR 30% REVIEW CYY AUNG YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

FIRE HYDRANT SCHEMATIC

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-1A-ZZ-DR-M-7003 C
FIRE PROTECTION LEGEND

SYMBOL DESCRIPTION

/ EXPOSED SPRINKLER (WET SPRINKLER SYSTEM)

CONCEALED SPRINKLER (WET SPRINKLER SYSTEM)

UPRIGHT SPRINKLER (PRE-ACTION SPRINKLER SYSTEM)

DRY PENDENT SPRINKLER- RFII (PRE-ACTION SPRINKLER SYSTEM)

WET SPRINKLER PIPE

PRE-ACTION SPRINKLER PIPE

DRAIN PIPE

PRE-ACTION SPRINKLER CONTROL VALVE

RETURN AIR PLENUM RETURN AIR PLENUM WET SPRINKLER CONTROL VALVE

FS FLOW SWITCH

4 WAY BREECHING INLET

FS IHB INDOOR HYDRANT BOX

FS

FS N2 NITROGEN GENERATOR C/W POWER SUPPLY


FS
GENERATOR

ELECTRICAL ROOM DAHU GALLERY 1.3B DATA HALL DAHU GALLERY 1.1B ELECTRICAL ROOM DAHU GALLERY 1.3A DATA HALL DAHU GALLERY 1.1A HOUSE LOAD ROOM CATCHER ROOM 2 CATCHER ROOM 1 N2 GENERAL OFFICE DOMESTIC WATER
GENERATOR
1.2 POD 2 1.1 POD 1 AREA PLANT ROOM

TEST DRAIN TEST DRAIN TEST DRAIN TEST DRAIN TEST DRAIN TEST DRAIN
VALVE VALVE VALVE VALVE VALVE VALVE
HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE
SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK
FM

GROUND FLOOR GROUND FLOOR


E

FLOOR FLOOR FLOOR FLOOR FLOOR FLOOR


TO NEAREST OPEN DRAIN
TRAP TRAP TRAP TRAP TRAP TRAP

Ø 250 mm SPRINKLER PIPE Ø 250 mm SPRINKLER PIPE


FROM FIRE WATER RING MAIN FROM FIRE WATER RING MAIN

RETURN AIR PLENUM RETURN AIR PLENUM

FS

FS

FS

N2
GENERATOR FS
TO IHB SYSTEM

MECH ER 1.1 STORE ROOMS CHILLER INDUSTRIAL WATER ELECTRICAL ROOM DAHU GALLERY 2.3B DATA HALL DAHU GALLERY 2.1B ELECTRICAL ROOM DAHU GALLERY 2.3A DATA HALL DAHU GALLERY 2.1A
PLANT ROOM PLANT ROOM 1.4 POD 4 1.3 POD 3

TEST DRAIN TEST DRAIN TEST DRAIN TEST DRAIN TEST DRAIN TEST DRAIN TEST DRAIN
VALVE VALVE VALVE VALVE VALVE VALVE VALVE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE

HOT AISLE
SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK

SERVER RACK
FM

GROUND FLOOR GROUND FLOOR


E

FLOOR FLOOR FLOOR FLOOR FLOOR FLOOR FLOOR FLOOR


TO NEAREST OPEN DRAIN TO NEAREST OPEN DRAIN
TRAP TRAP TRAP TRAP TRAP TRAP TRAP TRAP

Ø 250 mm SPRINKLER PIPE Ø 250 mm SPRINKLER PIPE


FROM FIRE WATER RING MAIN FROM FIRE WATER RING MAIN

AUTOMATIC FIRE SPRINKLER SYSTEM SCHEMATIC DRAWING

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


RETURN AIR PLENUM RETURN AIR PLENUM RETURN AIR PLENUM RETURN AIR PLENUM B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW CYY AUNG YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
INDUSTRIAL TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
CHILLER MECH ELECTRICAL DAHU DATA HALL DAHU ELECTRICAL DAHU DATA HALL DAHU ELECTRICAL DAHU DATA HALL DAHU ELECTRICAL DAHU DATA HALL DAHU HOUSE CATCHER CATCHER GENERAL OFFICE DOMESTIC WATER
WATER
PLANT ROOM ER 1.1 ROOM 1.2 GALLERY POD 2 GALLERY ROOM 1.3 GALLERY POD 3 GALLERY ROOM 1.2 GALLERY POD 2 GALLERY ROOM 1.1 GALLERY POD 1 GALLERY LOAD ROOM 2 ROOM 1 AREA PLANT ROOM
PLANT
2.3B 2.1B 2.3A 2.1A 1.3B 1.1B 1.3A 1.1A ROOM
ROOM CIVIL/ STRUCTURAL ENGINEER :
MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON MANUAL PUSH BUTTON
TO SPRINKLER
SYSTEM
VB + E Pte Ltd
FM
# 05-09 Harbour Link Complex
IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB IHB 61 Alexandra Terrace, Singapore 119936
GROUND FLOOR GROUND FLOOR
E T +65 6561 4078 F +65 6561 5198
TO NEAREST OPEN DRAIN
Mechanical & Electrical (LEAD) Consultant:
Ø 250 mm SPRINKLER PIPE
FROM FIRE WATER RING MAIN

ARCHITECT:

INDOOR FIRE HYDRANT SYSTEM SCHEMATIC DRAWING Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
AUTOMATIC FIRE SPRINKLER & INDOOR
FIRE HYDRANT SYSTEM SCHEMATIC

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-1A-ZZ-DR-M-7004 C
PHASE 4
LEGEND
1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 1919.1

20
7750 8400 9300
air discharge
600 3548 10110
air discharge air discharge
10110 10110
air discharge air discharge
10824 10824 10110
air discharge
10110
air discharge air discharge
10110 5653 air discharge
4245 1255 3747 air discharge 5478 7120 3950 11100 4070 625 5530
PHASE 1
5500 9225 11070

air discharge

GENSET with
CAMLOCK
GENSET with
CAMLOCK
GENERATOR YARD

GENSET with
CAMLOCK
GENSET with
CAMLOCK
GENSET with
CAMLOCK
GENERATOR YARD
GENSET with
CAMLOCK
GENSET with
CAMLOCK
GENSET with
CAMLOCK
GENSET with
CAMLOCK
GENSET with GENSET with
CAMLOCK
GENERATOR YARD GENSET with
CAMLOCK
PHASE 2
CAMLOCK

UP

PHASE 3

200
150

air intake air intake air intake air intake air intake
UP air intake air intake air intake air intake air intake air intake air intake
UP

RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU
Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise

UP PHASE 4
(Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor)
XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR

UP

A FUEL PUMP A STORE ROOM FIRE PAV ELECTRICAL


FIRE PAV ELECTRICAL
ROOM 1.3
FIRE PAV
ELECTRICAL
FIRE PAV FIRE PAV ELECTRICAL HOUSE LOAD
ROOM
CATCHER ROOM 3 CATCHER ROOM 2

OFFICE
ROOM 1.2 ROOM 1.1

CORRIDOR
4.5M DIA X 4M(H)
BUFFER TANK
PHASE

65,000KG
63M3
UP
FUEL PUMP B

11500

11500
LOADING DOCK

CORRIDOR
COOLING TOWER FCC
11.0M X 7.4M X 7.1M(H)
42,000KG MDF RM

4.5M DIA X 4M(H)


BUFFER TANK

65,000KG
BBCS & SI

63M3
B CORRIDOR DAHU GALLERY
FIRE CV IHB
DAHU GALLERY DAHU GALLERY 1.1A
DAHU GALLERY 1.1B

2500KG

2500KG

2500KG
2500KG
SSF

SSF

PPU

PPU
5415
MECH ER 1.1

11000

2500KG
B.5

CWP
OPEN
CHILLER UPS BATT
OFFICE

DC PANEL
MSDB-1.1MA1 160kVA 4 Min

6.2M X 4.2M X 3.6M(H)


28,000KG

2500KG
CHWP
5585
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG SECURITY
CONTROL
COLD AIR PLENUM LOADING
VESTIBULE

MSB-1.1MA
COLD AIR PLENUM COLD AIR PLENUM COLD AIR PLENUM AIR DOCK
LOCK

C DATA HALL DATA HALL DATA HALL DATA HALL


ENTRY
LOBBY

2500KG
CWP
UPS BATT
WC

DC PANEL
160kVA 4 Min

MSDB-1.1MA2

CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)


CHILLER
6.2M X 4.2M X 3.6M(H)
CHILLER PLANTROOM

CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)


28,000KG

COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

2500KG
CHWP
UPS BATT STORAGE

DC PANEL
160kVA 4 Min

10620
MSDB-1.1MA3

10620
MEDIUM
OFFICE CONF.

2500KG
CWP
FIBRE ROOM
OFFICE

MSDB-1.1MA
CHILLER
6.2M X 4.2M X 3.6M(H) COOLING TOWER OFFICE OFFICE OFFICE
28,000KG 11.0M X 7.4M X 7.1M(H)
42,000KG
MEDIUM STORAGE FIBRE

2500KG
CHWP
CONF.

65365
ROOM
UPS BATT

DC PANEL
MSDB-1.1MA4 160kVA 4 Min

D ELECTRICAL
CONF.
SEC.
MDF

2500KG
FLEX ROOM

CWP
CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG
JAN.

FILTER
SAND

FILTER
SAND
2500KG
CHWP
10220
11000

FILTER
SAND

FILTER

STORAGE
SAND
QUIET
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG LARGE ROOM
CONFERENCE
ROOM

CORRIDOR
LOGISTICS
PARTS
INDUSTRIAL

FIBRE
2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG
D.9 WATER PLANT

CWP

CWP

CWP

CWP

CWP

CWP

CWP

CWP
ROOM

780
SHWR.
E STAIRCASE 03

CICO OUT
FILTER

FILTER
SAND

SAND
4200KG

4200KG

4200KG

4200KG
HX

HX

HX

HX
BREAK

FILTER

FILTER
SEC. DISK

SAND

SAND
MEN WOMEN WC
ROOM MDF DESTRUCT. FIBRE

CICO IN
STORAGE
7300
10620
3mx2mx2mH 3mx2mx2mH CICO
9M3 9M3
11,000KG
11,000KG JAN. RED ZONE
OFFICE

E.7 STORAGE STORE

DATA HALL
3320

DATA HALL

F COLD AIR PLENUM COLD AIR PLENUM IHB COLD AIR PLENUM COLD AIR PLENUM

AIR LOCK
AIR LOCK
2850

MAKE UP WATER TANK 1


21M x 5M x 5M(H)
EFF CAP:477M3
550,000KG VESTIBULE

F.3 AC CONDENSER ZONE


2150

F.5
10625

2650

F.8
MAKE UP WATER TANK 2
21M x 5M x 5M(H)
550M3
550,000KG

DAHU GALLERY DAHU GALLERY DAHU GALLERY DAHU GALLERY

325
G 2.3B 1.3B 1.3A

200
2.3A

FIRE PROTECTION PHASING LAYOUT

1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 1919.1

20
7750 8400 9300
air discharge
600 3548 10110
air discharge air discharge
10110 10110
air discharge air discharge
10824 10824 10110
air discharge
10110
air discharge air discharge
10110 5653 air discharge
4245 1255 3747 air discharge 5478 7120 3950 11100 4070 625 5530

5500 9225 11070

air discharge

GENERATOR YARD
GENERATOR YARD
GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENERATOR YARD GENSET with
CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK

UP
200

150

air intake air intake air intake air intake air intake
UP air intake air intake air intake air intake air intake air intake air intake
UP

RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU
Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise

(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
UP (Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor) (Outdoor) (Outdoor)
XFMR
(Outdoor)
XFMR

UP

A FUEL PUMP A STORE ROOM FIRE PAV ELECTRICAL


FIRE PAV ELECTRICAL
ROOM 1.3
FIRE PAV
ELECTRICAL
ROOM 1.2
FIRE PAV FIRE PAV ELECTRICAL
ROOM 1.1
HOUSE LOAD
ROOM
CATCHER ROOM 3 CATCHER ROOM 2
CORRIDOR
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

UP
FUEL PUMP B
11500

11500

LOADING DOCK
CORRIDOR

COOLING TOWER FCC


11.0M X 7.4M X 7.1M(H)
42,000KG MDF RM
C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG

B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF


63M3

B CORRIDOR DAHU GALLERY


DAHU GALLERY
DAHU GALLERY 1.1B
DAHU GALLERY 1.1A
FIRE CV IHB
A - NOT ISSUED - - - -
2500KG

2500KG

2500KG
2500KG
SSF

SSF

PPU

PPU
5415

MECH ER 1.1
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
11000

2500KG

B.5
CWP

OPEN
CHILLER UPS BATT
OFFICE
MEP ENGINEER:
DC PANEL

MSDB-1.1MA1 160kVA 4 Min

6.2M X 4.2M X 3.6M(H)


28,000KG
2500KG
CHWP
5585

COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG SECURITY
CONTROL
LOADING

PT. DSCO Indonesia


COLD AIR PLENUM VESTIBULE
MSB-1.1MA

COLD AIR PLENUM COLD AIR PLENUM COLD AIR PLENUM AIR DOCK
LOCK

C DATA HALL DATA HALL DATA HALL


ENTRY
LOBBY

Kencana Tower, Level 2,


DATA HALL
2500KG
CWP

UPS BATT
WC
DC PANEL

160kVA 4 Min

MSDB-1.1MA2
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CHILLER

Business Park Kebon Jeruk,


6.2M X 4.2M X 3.6M(H)
CHILLER PLANTROOM
CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)

28,000KG
COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

2500KG
CHWP

UPS BATT STORAGE


Jl Raya Meruya llir
DC PANEL

160kVA 4 Min
10620

MSDB-1.1MA3
10620

MEDIUM
OFFICE CONF.
No.88 Jakarta Barat 11620, Indonesia
2500KG
CWP

FIBRE ROOM
OFFICE
MSDB-1.1MA

CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG
OFFICE OFFICE
MEDIUM
OFFICE
STORAGE FIBRE
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
2500KG
CHWP

CONF.
65365

ROOM
UPS BATT
DC PANEL

MSDB-1.1MA4 160kVA 4 Min

D ELECTRICAL
CONF.
SEC.
MDF CIVIL/ STRUCTURAL ENGINEER :
2500KG

FLEX ROOM
CWP

CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG
JAN.
FILTER
SAND

FILTER

VB + E Pte Ltd
SAND
2500KG
CHWP
10220
11000

FILTER
SAND

FILTER

STORAGE
SAND

QUIET
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG LARGE ROOM

# 05-09 Harbour Link Complex


CONFERENCE
ROOM
CORRIDOR

LOGISTICS
PARTS
INDUSTRIAL

61 Alexandra Terrace, Singapore 119936


FIBRE
2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

D.9 WATER PLANT


CWP

CWP

CWP

CWP

CWP

CWP

CWP

CWP

ROOM
780

SHWR.
E STAIRCASE 03 T +65 6561 4078 F +65 6561 5198
CICO OUT
FILTER

FILTER
SAND

SAND
4200KG

4200KG

4200KG

4200KG

Mechanical & Electrical (LEAD) Consultant:


HX

HX

HX

HX

BREAK
FILTER

FILTER

SEC. DISK
SAND

SAND

MEN WOMEN WC
ROOM MDF DESTRUCT. FIBRE

CICO IN
STORAGE
7300
10620

3mx2mx2mH 3mx2mx2mH CICO


9M3 9M3
11,000KG
11,000KG JAN. RED ZONE
OFFICE

E.7 STORAGE STORE


ARCHITECT:
DATA HALL
3320

DATA HALL

F COLD AIR PLENUM IHB COLD AIR PLENUM COLD AIR PLENUM

Aedas Pte Ltd


COLD AIR PLENUM
AIR LOCK
AIR LOCK
2850

MAKE UP WATER TANK 1


21M x 5M x 5M(H)
EFF CAP:477M3
550,000KG
VESTIBULE

F.3 AC CONDENSER ZONE 11 North Buona Vista Drive, T +65 6734 4733
2150

#12-07 The Metropolis Tower 2 singapore@aedas.com


10625

F.5
2650

Singapore 138589 aedas.com


F.8
MAKE UP WATER TANK 2
21M x 5M x 5M(H)
550M3
550,000KG

DAHU GALLERY DAHU GALLERY DAHU GALLERY DAHU GALLERY


325

G 2.3B 1.3B 1.3A


200
2.3A

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:

FIRE PROTECTION PHASING PLAN


FIRE PROTECTION BBCS LAYOUT
SCALE: DRAWING NO.: REV.:
N.T.S CGK063-DSCO-1A-ZZ-DR-M-7005 C
LEGEND

AREA PROTECTED BY
WET SPRINKLER SYSTEM

AREA PROTECTED BY
PRE-ACTION SPRINKLER SYSTEM

1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 1919.1

20
7750 8400 9300
air discharge
600 3548 10110
air discharge air discharge
10110 10110
air discharge air discharge
10824 10824 10110
air discharge
10110
air discharge air discharge
10110 5653 4245
air discharge
1255 3747 air discharge 5478 7120 3950 11100 4070 625 5530

5500 9225 11070

air discharge

GENERATOR YARD
GENERATOR YARD
GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENERATOR YARD GENSET with
CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK

UP
200

150

air intake air intake air intake air intake air intake
UP air intake air intake air intake air intake air intake air intake air intake
UP

RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU
Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise

(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
UP (Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor)
XFMR
(Outdoor) (Outdoor) (Outdoor)
XFMR
(Outdoor)
XFMR

UP

A FUEL PUMP A STORE ROOM FIRE PAV ELECTRICAL


FIRE PAV ELECTRICAL
ROOM 1.3
FIRE PAV
ELECTRICAL
ROOM 1.2
FIRE PAV FIRE PAV ELECTRICAL
ROOM 1.1
HOUSE LOAD
ROOM
CATCHER ROOM 3 CATCHER ROOM 2

CORRIDOR
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

UP
FUEL PUMP B
11500

11500

LOADING DOCK
CORRIDOR

COOLING TOWER FCC


11.0M X 7.4M X 7.1M(H)
42,000KG MDF RM
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

B CORRIDOR DAHU GALLERY


FIRE CV IHB
DAHU GALLERY DAHU GALLERY 1.1A
DAHU GALLERY 1.1B
2500KG

2500KG

2500KG
2500KG
SSF

SSF

PPU

PPU
5415

MECH ER 1.1
11000

2500KG

B.5
CWP

OPEN
CHILLER UPS BATT
OFFICE
DC PANEL

MSDB-1.1MA1 160kVA 4 Min

6.2M X 4.2M X 3.6M(H)


28,000KG
2500KG
CHWP
5585

COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG SECURITY
CONTROL
COLD AIR PLENUM LOADING
VESTIBULE
MSB-1.1MA

COLD AIR PLENUM COLD AIR PLENUM COLD AIR PLENUM AIR DOCK
LOCK

C DATA HALL DATA HALL DATA HALL DATA HALL


ENTRY
LOBBY
2500KG
CWP

UPS BATT
WC
DC PANEL

160kVA 4 Min

MSDB-1.1MA2
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CHILLER
6.2M X 4.2M X 3.6M(H)
CHILLER PLANTROOM
CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)

28,000KG
COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

2500KG
CHWP

UPS BATT STORAGE


DC PANEL

160kVA 4 Min
10620

MSDB-1.1MA3
10620

MEDIUM
OFFICE CONF.
2500KG
CWP

FIBRE ROOM
OFFICE
MSDB-1.1MA

CHILLER
6.2M X 4.2M X 3.6M(H) COOLING TOWER OFFICE OFFICE OFFICE
28,000KG 11.0M X 7.4M X 7.1M(H)
42,000KG
MEDIUM STORAGE FIBRE
2500KG
CHWP

CONF.
65365

ROOM
UPS BATT
DC PANEL

MSDB-1.1MA4 160kVA 4 Min

D ELECTRICAL
CONF.
SEC.
MDF
2500KG

FLEX ROOM
CWP

CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG
JAN.
FILTER
SAND

FILTER
SAND
2500KG
CHWP
10220
11000

FILTER
SAND

FILTER

STORAGE
SAND

QUIET
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG LARGE
CONFERENCE
ROOM C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
ROOM
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
CORRIDOR

LOGISTICS
PARTS
INDUSTRIAL A - NOT ISSUED - - - -

FIBRE
2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

D.9 WATER PLANT


CWP

CWP

CWP

CWP

CWP

CWP

CWP

CWP

ROOM REV. DATE DESCRIPTION DRWN ENGR CHK APP'D


780

SHWR.
E STAIRCASE 03
MEP ENGINEER:

CICO OUT
FILTER

FILTER
SAND

SAND

PT. DSCO Indonesia


4200KG

4200KG

4200KG

4200KG
HX

HX

HX

HX

BREAK
FILTER

FILTER

SEC. DISK
SAND

SAND

MEN WOMEN WC
ROOM MDF DESTRUCT. FIBRE
Kencana Tower, Level 2,

CICO IN
STORAGE
7300

Business Park Kebon Jeruk,


Jl Raya Meruya llir
10620

3mx2mx2mH 3mx2mx2mH CICO


9M3
11,000KG
9M3
11,000KG JAN. RED ZONE
No.88 Jakarta Barat 11620, Indonesia
OFFICE TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
E.7 STORAGE STORE

DATA HALL CIVIL/ STRUCTURAL ENGINEER :


3320

DATA HALL

VB + E Pte Ltd
F COLD AIR PLENUM COLD AIR PLENUM IHB COLD AIR PLENUM COLD AIR PLENUM

AIR LOCK
# 05-09 Harbour Link Complex
AIR LOCK
2850

MAKE UP WATER TANK 1


21M x 5M x 5M(H)
EFF CAP:477M3
550,000KG VESTIBULE 61 Alexandra Terrace, Singapore 119936
F.3 T +65 6561 4078 F +65 6561 5198
AC CONDENSER ZONE
2150

Mechanical & Electrical (LEAD) Consultant:


10625

F.5
ARCHITECT:
2650

F.8
MAKE UP WATER TANK 2
21M x 5M x 5M(H)
550M3
550,000KG
Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
DAHU GALLERY DAHU GALLERY DAHU GALLERY
DAHU GALLERY
#12-07 The Metropolis Tower 2 singapore@aedas.com

325
G 2.3B 1.3B 1.3A

200
2.3A
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
FIRE SRINKLER ZONE LAYOUT

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-1A-01-DR-M-7100 C
DN DN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 1919.1

1800

20
7750 8400 9300
air discharge
600 3548 10110
air discharge
UP air discharge
10110 10110
air discharge
UP air discharge
10824 10824 UP 10110
air discharge
10110
air discharge
UP air discharge
10110 UP 5653 UP air discharge
4245 1255 UP 3747 air discharge 5478 7120 3950 11100 4070 625 5530

5500 9225 11070

air discharge

GENERATOR YARD
GENERATOR YARD
GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENERATOR YARD GENSET with
CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK

LAYOUT 7 LAYOUT 8 UP LAYOUT 9 UP

FALL 1:16 (MAX.)


200
FUEL + REFILL

UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP
150
POINT

FALL 1:15 (MAX.)

air intake air intake air intake air intake air intake air intake air intake air intake air intake air intake air intake air intake
UP

RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU
LOAD BANK Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise

(Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor)


UP (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor)
XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR

UP
1800
1800

1800
1800
A FUEL PUMP A STORE ROOM FIRE PAV ELECTRICAL
FIRE PAV ELECTRICAL
ROOM 1.3
FIRE PAV
ELECTRICAL
ROOM 1.2
FIRE PAV FIRE PAV ELECTRICAL
ROOM 1.1
HOUSE LOAD
ROOM
CATCHER ROOM 3 CATCHER ROOM 2

A
CORRIDOR
4.5M DIA X 4M(H)
BUFFER TANK

65, 000KG
63M3

UP
FUEL PUMP B
11500

11500

LOADING DOCK
CORRIDOR

COOLING TOWER FCC


11.0M X 7.4M X 7.1M(H)
42,000KG MDF RM
4.5M DIA X 4M(H)
BUFFER TANK

65, 000KG
63M3

B CORRIDOR DAHU GA LLERY


DAHU GA LLERY DAHU GALLERY 1.1A
FIRE CV IHB
B
1800

LAYOUT 5
DAHU GALLERY 1.1B
2500KG

2500KG

2500KG
2500KG
SSF

SSF

PPU

PPU
5415

MECH ER 1.1

LAYOUT 1 LAYOUT 3
11000

2500KG

B.5
CWP

OPEN
CHILLER UPS BATT
OFFICE
DC PANEL

MSDB-1.1MA1 160kVA 4 Min

6.2M X 4.2M X 3.6M(H)


28,000KG
2500KG
CHWP
5585

COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG SECURITY
CONTROL
COLD AIR PLENUM LOADING
VESTIBULE
MSB-1.1MA

COLD AIR PLENUM COLD AIR PLENUM COLD AIR PLENUM AIR DOCK

C
LOCK

C DATA HALL DATA HALL DATA HALL DATA HALL


ENTRY
LOBBY
2500KG
CWP

UPS BATT
WC
DC PANEL

160kVA 4 Min

MSDB-1.1MA2
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CHILLER
6.2M X 4.2M X 3.6M(H)
CHILLER PLANTROOM
CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)

28,000KG
2500KG
COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

CHWP

UPS BATT STORAGE


DC PANEL

160kVA 4 Min
10620

MSDB-1.1MA3
10620

MEDIUM
OFFICE CONF.
2500KG

FIBRE
CWP

ROOM
OFFICE
MSDB-1.1MA

CHILLER
6.2M X 4.2M X 3.6M(H) COOLING TOWER OFFICE OFFICE OFFICE
28,000KG 11.0M X 7.4M X 7.1M(H)
42,000KG
MEDIUM STORAGE FIBRE
2500KG
CHWP

CONF.
65365

ROOM
UPS BATT

D
DC PANEL

MSDB-1.1MA4

D
160kVA 4 Min

ELECTRICAL
CONF.
SEC.
MDF
2500KG

FLEX ROOM
CWP

CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG
JAN.
FILTER
SAND

FILTER
SAND
2500KG
CHWP
10220
11000

FILTER
SAND

STORAGE
FILTER
SAND

QUIET
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG LARGE ROOM
CONFERENCE
ROOM
LOGISTICS
CORRIDOR

PARTS
INDUSTRIAL
1800

D.9
2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

FIBRE

WATER PLANT
CWP

CWP

CWP

CWP

CWP

CWP

CWP

CWP

ROOM

E
780

SHWR.
E

LAYOUT 6
STAIRCASE 03
1200

CICO OUT
FILTER

FILTER
SAND

SAND
4200KG

4200KG

4200KG

4200KG
STAIRCASE

HX

HX

HX

HX

BREAK SEC. DISK


FILTER

FILTER
SAND

SAND

ROOM MEN WOMEN WC MDF DESTRUCT. FIBRE


CICO IN
STORAGE
7300

LAYOUT 2 LAYOUT 4
10620

3mx2mx2mH 3mx2mx2mH CICO


9M3 9M3
11,000KG
11,000KG JAN. RED ZONE
OFFICE

E.7 STORAGE STORE

DATA HALL DATA HALL


3320

F COLD AIR PLENUM COLD AIR PLENUM IHB COLD AIR PLENUM COLD AIR PLENUM

F
AIR LOCK
AIR LOCK
2850

MAKE UP WATER TANK 1


21M x 5M x 5M(H)
EFF CAP:477M3
550,000KG VESTIBULE

F.3 AC CONDENSER ZONE


2150

F.5
10625

2650

F.8
MAKE UP WATER TANK 2
21M x 5M x 5M(H)
550M3
550,000KG
C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
G
DAHU GA LLERY DAHU GA LLERY DAHU GA LLERY DAHU GA LLERY
325

G 2.3B 1.3B 1.3A


200

2.3A

A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
1 OVERALL GROUND FLOOR HIGH LEVEL SPRINKLER LAYOUT - BBCS #12-07 The Metropolis Tower 2
Singapore 138589
singapore@aedas.com
aedas.com
scale 1 : 500
AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

OVERALL GROUND FLOOR HIGH LEVEL SPRINKLER


LAYOUT
SCALE: DRAWING NO.: REV.:
1 : 500 CGK063-DSCO-1A-01-DR-M-7101 C
1 2 3 4 5 6 7

1800
1800
Ø250 U/G FIRE HYDRANT Ø250 U/G FIRE HYDRANT

FUEL PUMP A FIRE PAV FIRE PAV A


STORE ROOM ELECTRICAL

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7104 FOR


4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3
FUEL PUMP B

CONTINUATION
CORRIDOR
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG MDF RM
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

DAHU GALLERY
B
CORRIDOR
DAHU GALLERY
1800

2500KG

2500KG

2500KG
2500KG
SSF

SSF

PPU

PPU

MECH ER 1.1
2500KG
CWP

CHILLER MSDB-1.1MA1 UPS BATT

DC PANEL
160kVA 4 Min

6.2M X 4.2M X 3.6M(H)


28,000KG
2500KG
CHWP

COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG

COLD AIR PLENUM

MSB-1.1MA
C
DATA HALL DATA HALL
2500KG
CWP

UPS BATT
DC PANEL

160kVA 4 Min

MSDB-1.1MA2
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CHILLER
6.2M X 4.2M X 3.6M(H)
CHILLER PLANTROOM
CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)

28,000KG
2500KG
COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

CHWP

UPS BATT
DC PANEL

160kVA 4 Min

MSDB-1.1MA3 C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
2500KG
CWP

MEP ENGINEER:
MSDB-1.1MA

PT. DSCO Indonesia


CHILLER
Kencana Tower, Level 2,
6.2M X 4.2M X 3.6M(H) COOLING TOWER
Business Park Kebon Jeruk,
28,000KG 11.0M X 7.4M X 7.1M(H)
42,000KG Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
2500KG
CHWP

TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :


UPS BATT
DC PANEL

MSDB-1.1MA4 160kVA 4 Min

D VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7103 FOR Mechanical & Electrical (LEAD) Consultant:
CONTINUATION
ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER LAYOUT 1 - BBCS PROJECT:

scale 1 : 100 CGK063

TITLE:

PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER


LAYOUT 1
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-7102 C
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)


1 2 3 4 5 6 7

COOLING TOWER PLANT ABOVE CHILLER PLANTROOM


REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7102 FOR
CONTINUATION

2500KG
CWP

MSDB-1.1MA
CHILLER
6.2M X 4.2M X 3.6M(H) COOLING TOWER
28,000KG 11.0M X 7.4M X 7.1M(H)
42,000KG

2500KG
CHWP
UPS BATT

DC PANEL
MSDB-1.1MA4 160kVA 4 Min

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7105 FOR


2500KG
CWP
CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG

FILTER
SAND

FILTER
SAND

CONTINUATION
2500KG
CHWP

FILTER
SAND

FILTER
SAND
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG

CORRIDOR
INDUSTRIAL
1800

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG
WATER PLANT
CWP

CWP

CWP

CWP

CWP

CWP

CWP

CWP
ROOM

E
STAIRCASE 03
1200

FILTER

FILTER
SAND

SAND
4200KG

4200KG

4200KG

4200KG
STAIRCASE

HX

HX

HX

HX

FILTER

FILTER
SAND

SAND
3mx2mx2mH 3mx2mx2mH
9M3 9M3
11,000KG
11,000KG

DATA HALL

COLD AIR PLENUM COLD AIR PLENUM F

AIR LOCK
MAKE UP WATER TANK 1
21M x 5M x 5M(H)
EFF CAP:477M3
550,000KG

MAKE UP WATER TANK 2


21M x 5M x 5M(H)
550M3
550,000KG
C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
DAHU GALLERY
MEP ENGINEER:
2.3B
G PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
1 PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER LAYOUT 2 - BBCS
scale 1 : 100 AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER


LAYOUT 2
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-7103 C
8 9 10 11 12 13

Ø250 U/G FIRE HYDRANT

FIRE PAV FIRE PAV FIRE PAV


ELECTRICAL
ROOM 1.3
ELECTRICAL ELECTRICAL A
ROOM 1.2 ROOM 1.1

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7106 FOR


REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7102 FOR

CORRIDOR

CONTINUATION
CONTINUATION

B
DAHU GALLERY DAHU GALLERY 1.1A
DAHU GALLERY 1.1B

VESTIBULE
COLD AIR PLENUM COLD AIR PLENUM COLD AIR PLENUM

C
DATA HALL DATA HALL DATA HALL

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

D VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7105 FOR Mechanical & Electrical (LEAD) Consultant:
CONTINUATION
ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER LAYOUT 3 - BBCS PROJECT:
CGK063
scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER


LAYOUT 3
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-7104 C
8 9 10 11 12

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7104 FOR


CONTINUATION

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7107 FOR


REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7103 FOR

CONTINUATION
CONTINUATION

DATA HALL

COLD AIR PLENUM IHB COLD AIR PLENUM COLD AIR PLENUM F

VESTIBULE

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
DAHU GALLERY DAHU GALLERY DAHU GALLERY REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
1.3B 1.3A
2.3A G MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
1 PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER LAYOUT 4 - BBCS
scale 1 : 100 AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER


LAYOUT 4
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-7105 C
13 14 15 16 17 18 19

UP

1800
1800
Ø250 U/G FIRE HYDRANT

HOUSE LOAD CATCHER ROOM 3 CATCHER ROOM 2 A


ROOM
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7104 FOR

Ø250 U/G FIRE HYDRANT


UP
CONTINUATION

LOADING DOCK

FCC

B
FIRE CV IHB

OPEN
OFFICE

SECURITY
CONTROL
LOADING
AIR DOCK
LOCK

ENTRY
LOBBY
C
WC

STORAGE

MEDIUM C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


OFFICE CONF. B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
FIBRE ROOM A - NOT ISSUED - - - -
OFFICE REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
OFFICE OFFICE OFFICE PT. DSCO Indonesia
Kencana Tower, Level 2,
MEDIUM STORAGE FIBRE Business Park Kebon Jeruk,
CONF. Jl Raya Meruya llir
ROOM No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

ELECTRICAL D CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
CONF. # 05-09 Harbour Link Complex
SEC. REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7107 FOR 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
CONTINUATION
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
1 PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER LAYOUT 5 - BBCS
scale 1 : 100 AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER


LAYOUT 5
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-7106 C
13 14 15 16 17 18 19

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7106 FOR


CONTINUATION
FIBRE ROOM
OFFICE

OFFICE OFFICE OFFICE


MEDIUM STORAGE FIBRE
CONF.
ROOM

ELECTRICAL D
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7105 FOR

CONF.
SEC.
MDF
FLEX ROOM

JAN.
CONTINUATION

STORAGE
QUIET
LARGE ROOM
CONFERENCE
ROOM
LOGISTICS
PARTS
FIBRE

SHWR.
E

CICO OUT
BREAK SEC. DISK
MEN WOMEN WC
ROOM MDF DESTRUCT. FIBRE

CICO IN
STORAGE

CICO
JAN. RED ZONE
OFFICE

STORAGE STORE

F
AIR LOCK

AC CONDENSER ZONE

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir

325
G

200
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER LAYOUT 6 - BBCS PROJECT:
CGK063
scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR HIGH LEVEL SPRINKLER


LAYOUT 6
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-7107 C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1 2 3 4 4.1 5 6 7 8 9 10 11 12 13 14 14.8 15 15.4 16 16.6 17 18 19 19.1

1800

7750 8400 9300 600 3548 10110 10110 10110 10824 10824 10110 10110 10110 5653
air discharge air discharge UP air discharge air discharge UP air discharge UP air discharge air discharge UP air discharge UP UP air discharge4245 1255 3747 air discharge
UP 5478 7120 3950 11100 4070 625 5530

5500 9225 11070

air discharge

GENERATOR YARD
GENERATOR YARD
GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with GENERATOR YARD GENSET with
CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK

LAYOUT 7 LAYOUT 8 LAYOUT 9


UP UP

FALL 1:16 (MAX.)


200
FUEL + REFILL

150
POINT

UP

FALL 1:15 (MAX.)


UP air intake UP UP air intake UP air intake UP UP air intake UP air intake UP UP air intake UP air intake UP UP air intake UP air intake UP air intake UP air intake UP air intake UP
UP

RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU RMU
LOAD BANK Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise Containerise

(Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor)


UP (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor)
XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR XFMR

UP
1800
1800

1800
1800
FUEL PUMP A STORE ROOM FIRE PAV ELECTRICAL
FIRE PAV ELECTRICAL
ROOM 1.3
FIRE PAV
ELECTRICAL
ROOM 1.2
FIRE PAV FIRE PAV ELECTRICAL
ROOM 1.1
HOUSE LOAD
ROOM
CATCHER ROOM 3 CATCHER ROOM 2
A

CORRIDOR
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

UP
FUEL PUMP B

LAYOUT 5 LOADING DOCK


CORRIDOR

COOLING TOWER FCC


11.0M X 7.4M X 7.1M(H)
42,000KG MDF RM
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

CORRIDOR DAHU GALLERY


DAHU GALLERY DAHU GALLERY 1.1A
FIRE CV IHB
B
180 0

DAHU GALLERY 1.1B


2500KG

2500KG

2500KG
2500KG
SSF

SSF

PPU

PPU

MECH ER 1.1

LAYOUT 1 LAYOUT 3
2500KG
CWP

OPEN
OFFICE
CHILLER UPS BATT
DC PANEL

MSDB-1.1MA1 160kVA 4 Min

6.2M X 4.2M X 3.6M(H)


28,000KG
2500KG
CHWP

COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG SECURITY
CONTROL
COLD AIR PLENUM LOADING
VESTIBULE
MSB-1.1MA

COLD AIR PLENUM COLD AIR PLENUM COLD AIR PLENUM AIR DOCK
LOCK

DATA HALL DATA HALL DATA HALL DATA HALL


ENTRY
LOBBY C
2500KG

WC
CWP

UPS BATT
DC PANEL

160kVA 4 Min

MSDB-1.1MA2
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CHILLER
6.2M X 4.2M X 3.6M(H)
CHILLER PLANTROOM
CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)

28,000KG
2500KG
COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

CHWP

UPS BATT STORAGE


DC PANEL

160kVA 4 Min

MSDB-1.1MA3

MEDIUM
OFFICE CONF.
2500KG

FIBRE
CWP

ROOM
OFFICE
MSDB-1.1MA

CHILLER
6.2M X 4.2M X 3.6M(H) COOLING TOWER OFFICE OFFICE OFFICE
28,000KG 11.0M X 7.4M X 7.1M(H)
42,000KG
MEDIUM STORAGE FIBRE
2500KG
CHWP

CONF.
ROOM

D
UPS BATT
DC PANEL

MSDB-1.1MA4 160kVA 4 Min

ELECTRICAL
CONF.
SEC.
MDF
2500KG

FLEX ROOM
CWP

CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG
JAN.
FILTER
SAND

FILTER
SAND
2500KG
CHWP

FILTER
SAND

STORAGE
FILTER
SAND

QUIET
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG LARGE ROOM
CONFERENCE
ROOM
CORRIDOR

LOGISTICS
PARTS
INDUSTRIAL
1800

FIBRE
2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

WATER PLANT
CWP

CWP

CWP

CWP

CWP

CWP

CWP

CWP

ROOM

E
SHWR.

STAIRCASE 03
1200

CICO OUT
FILTER

FILTER
SAND

SAND

LAYOUT 6
4200KG

4200KG

4200KG

4200KG
STAIRCASE

LAYOUT 2 LAYOUT 4
HX

HX

HX

HX

BREAK SEC. DISK


FILTER

FILTER
SAND

SAND

MEN WOMEN WC
ROOM MDF DESTRUCT. FIBRE

CICO IN
STORAGE
3mx2mx2mH 3mx2mx2mH
CICO
9M3 9M3
11,000KG
11,000KG JAN. RED ZONE
OFFICE
C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
STORAGE STORE

DATA HALL
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
DATA HALL
A - NOT ISSUED - - - -
COLD AIR PLENUM COLD AIR PLENUM IHB COLD AIR PLENUM COLD AIR PLENUM
F REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

AIR LOCK
AIR LOCK

MAKE UP WATER TANK 1


21M x 5M x 5M(H)
EFF CAP:477M3
550,000KG VESTIBULE MEP ENGINEER:
AC CONDENSER ZONE PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
MAKE UP WATER TANK 2
21M x 5M x 5M(H)
550M3
No.88 Jakarta Barat 11620, Indonesia
550,000KG

TEL: +62 21 2949 0611 FAX: +62 21 2949 0612


DAHU GALLERY DAHU GALLERY DAHU GALLERY

G
DAHU GALLERY

325
2.3B 1.3B 1.3A

200
2.3A
CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 OVERALL GROUND FLOOR HYDRANT LAYOUT - BBCS PROJECT:
CGK063
scale1 : 300
TITLE:

OVERALL GROUND FLOOR HYDRANT LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 300 CGK063-DSCO-1A-01-DR-M-7200 C
1 2 3 4 5 6 7

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7207 FOR


CONTINUATION

1800
1800
FUEL PUMP A FIRE PAV FIRE PAV A
STORE ROOM ELECTRICAL

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7203 FOR


4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

FUEL PUMP B

CONTINUATION
CORRIDOR
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG MDF RM
4.5M DIA X 4M(H)
BUFFER TANK

65,000KG
63M3

DAHU GALLERY
B
CORRIDOR
DAHU GALLERY
1800

2500KG

2500KG

2500KG
2500KG
SSF

SSF

PPU

PPU

MECH ER 1.1
2500KG
CWP

CHILLER MSDB-1.1MA1 UPS BATT


DC PANEL

160kVA 4 Min

6.2M X 4.2M X 3.6M(H)


28,000KG
2500KG
CHWP

COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG

COLD AIR PLENUM


MSB-1.1MA

C
DATA HALL DATA HALL
2500KG
CWP

UPS BATT
DC PANEL

160kVA 4 Min

MSDB-1.1MA2
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CHILLER
6.2M X 4.2M X 3.6M(H)
CHILLER PLANTROOM
CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)

28,000KG
2500KG
COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

CHWP

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


UPS BATT
DC PANEL

160kVA 4 Min
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
MSDB-1.1MA3 - - - -
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
2500KG
CWP

PT. DSCO Indonesia


Kencana Tower, Level 2,
MSDB-1.1MA

CHILLER Business Park Kebon Jeruk,


Jl Raya Meruya llir
6.2M X 4.2M X 3.6M(H) COOLING TOWER
11.0M X 7.4M X 7.1M(H) No.88 Jakarta Barat 11620, Indonesia
28,000KG
42,000KG TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
2500KG
CHWP

CIVIL/ STRUCTURAL ENGINEER :

UPS BATT
VB + E Pte Ltd
DC PANEL

MSDB-1.1MA4 160kVA 4 Min


# 05-09 Harbour Link Complex

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7202 FOR


D 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
CONTINUATION Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 1 - BBCS PROJECT:
CGK063
scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR HYDRANT LAYOUT 1

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7201 C
CHILLED WATER PIPE WEIGHT ON GROUND SLAB: 2,500KG/M2 (AVERAGE)

CONDENSER WATER PIPE WEIGHT ON ROOF: 1,000KG/M2 (AVERAGE)


1 2 3 4 5 6 7

COOLING TOWER PLANT ABOVE CHILLER PLANTROOM

2500KG
CWP

MSDB-1.1MA
CHILLER REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7201 FOR
6.2M X 4.2M X 3.6M(H) COOLING TOWER CONTINUATION
28,000KG 11.0M X 7.4M X 7.1M(H)
42,000KG

2500KG
CHWP
UPS BATT

DC PANEL
MSDB-1.1MA4 160kVA 4 Min

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7204 FOR


2500KG
CWP
CHILLER
6.2M X 4.2M X 3.6M(H)
28,000KG

FILTER
SAND

CONTINUATION
FILTER
SAND
2500KG
CHWP

FILTER
SAND

FILTER
SAND
COOLING TOWER
11.0M X 7.4M X 7.1M(H)
42,000KG

CORRIDOR
INDUSTRIAL
1800

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG

2000KG
WATER PLANT
CWP

CWP

CWP

CWP

CWP

CWP

CWP

CWP
ROOM

E
STAIRCASE 03
1200

FILTER

FILTER
SAND

SAND
4200KG

4200KG

4200KG

4200KG
STAIRCASE

HX

HX

HX

HX

FILTER

FILTER
SAND

SAND
3mx2mx2mH 3mx2mx2mH
9M3 9M3
11,000KG
11,000KG

DATA HALL

COLD AIR PLENUM COLD AIR PLENUM F

AIR LOCK
MAKE UP WATER TANK 1
21M x 5M x 5M(H)
EFF CAP:477M3
550,000KG

MAKE UP WATER TANK 2


21M x 5M x 5M(H)
550M3
550,000KG

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
DAHU GALLERY REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
2.3B
G MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733

1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 2 - BBCS #12-07 The Metropolis Tower 2
Singapore 138589
singapore@aedas.com
aedas.com

scale 1 : 100
AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR HYDRANT LAYOUT 2

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7202 C
8 9 10 11 12 13
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7208 FOR
CONTINUATION

FIRE PAV FIRE PAV FIRE PAV


ELECTRICAL
ROOM 1.3
ELECTRICAL ELECTRICAL A
ROOM 1.2 ROOM 1.1
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7201 FOR

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7205 FOR


CORRIDOR
CONTINUATION

CONTINUATION
B
DAHU GALLERY DAHU GALLERY 1.1A
DAHU GALLERY 1.1B

VESTIBULE
COLD AIR PLENUM COLD AIR PLENUM COLD AIR PLENUM

C
DATA HALL DATA HALL DATA HALL

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
D T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7204 FOR
CONTINUATION Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 3 - BBCS CGK063
scale 1 : 100
TITLE:

PARTIAL GROUND FLOOR HYDRANT LAYOUT 3

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7203 C
8 9 10 11 12

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7203 FOR


CONTINUATION

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7206 FOR


REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7202 FOR

CONTINUATION
CONTINUATION

DATA HALL

COLD AIR PLENUM IHB COLD AIR PLENUM COLD AIR PLENUM F

VESTIBULE

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
DAHU GALLERY DAHU GALLERY DAHU GALLERY PT. DSCO Indonesia
1.3B 1.3A
2.3A G Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733

1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 4 - BBCS #12-07 The Metropolis Tower 2
Singapore 138589
singapore@aedas.com
aedas.com

scale 1 : 100
AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR HYDRANT LAYOUT 4

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7204 C
13 14 15 16 17 18 19

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7209 FOR


CONTINUATION

UP

1800
1800
HOUSE LOAD CATCHER ROOM 3 CATCHER ROOM 2 A
ROOM
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7203 FOR

UP
CONTINUATION

LOADING DOCK

FCC

B
FIRE CV IHB

OPEN
OFFICE

SECURITY
CONTROL
LOADING
AIR DOCK
LOCK

ENTRY
LOBBY
C
WC

STORAGE
C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF
B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
MEDIUM A - NOT ISSUED - - - -
OFFICE CONF. REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
FIBRE ROOM
OFFICE MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
OFFICE OFFICE OFFICE Business Park Kebon Jeruk,
Jl Raya Meruya llir
MEDIUM STORAGE FIBRE No.88 Jakarta Barat 11620, Indonesia
CONF. TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
ROOM
CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
ELECTRICAL D # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
CONF. T +65 6561 4078 F +65 6561 5198
SEC. Mechanical & Electrical (LEAD) Consultant:
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7206 FOR
CONTINUATION ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 5 - BBCS AGILE No.: 000-000000-000


PROJECT:
scale 1 : 100 CGK063

TITLE:

PARTIAL GROUND FLOOR HYDRANT LAYOUT 5

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7205 C
13 14 15 16 17 18 19
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7205 FOR
CONTINUATION

FIBRE ROOM
OFFICE

OFFICE OFFICE OFFICE


MEDIUM STORAGE FIBRE
CONF.
ROOM

ELECTRICAL D
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7204 FOR

CONF.
SEC.
MDF
FLEX ROOM

JAN.
CONTINUATION

STORAGE
QUIET
LARGE ROOM
CONFERENCE
ROOM
LOGISTICS
PARTS
FIBRE

SHWR.
E

CICO OUT
BREAK SEC. DISK
MEN WOMEN WC
ROOM MDF DESTRUCT. FIBRE

CICO IN
STORAGE

CICO
JAN. RED ZONE
OFFICE

STORAGE STORE

F
AIR LOCK

AC CONDENSER ZONE

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B 20JUL2020 ISSUE FOR 50% REVIEW CYY AUNG YY BF
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

325
PT. DSCO Indonesia

200
G Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 6 - BBCS


AGILE No.: 000-000000-000
scale 1 : 100 PROJECT:
CGK063

TITLE:

PARTIAL GROUND FLOOR HYDRANT LAYOUT 6

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7206 C
1 2 3 4 5 6 7

1 2 3 4 4.1 5 6 7

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7208 FOR


CONTINUATION
7750 8400 9300
air discharge
600 3548 10110
air discharge air discharge
10110 10110
air discharge
UP

GENERATOR YARD

GENSET with GENSET with GENSET with GENSET with


CAMLOCK CAMLOCK CAMLOCK CAMLOCK
200
FUEL + REFILL

150
POINT

air intake air intake air intake air intake


UP UP UP UP UP UP

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


RMU RMU RMU - - - -
LOAD BANK Containerise Containerise Containerise
B
A
-
-
NOT ISSUED
NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
(Outdoor) (Outdoor) (Outdoor)
XFMR XFMR XFMR CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:
1800
1800

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7201 FOR #12-07 The Metropolis Tower 2 singapore@aedas.com
CONTINUATION Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 7 - BBCS TITLE:

scale 1 : 100 PARTIAL GROUND FLOOR HYDRANT LAYOUT 7

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7207 C
8 9 10 11 12

8 9 10 11 12 13

REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7209 FOR


REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7207 FOR

1800

10110
air discharge air discharge
10824 10824 10110
air discharge
10110
air discharge air discharge
10110

CONTINUATION
UP UP UP UP
CONTINUATION

GENERATOR YARD
GENSET with GENSET with GENSET with GENSET with GENSET with GENSET with
CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK CAMLOCK

UP
FALL 1:15 (MAX.)

air intake air intake air intake air intake air intake air intake
UP UP UP UP UP UP UP UP UP

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


RMU RMU RMU RMU RMU RMU B - NOT ISSUED - - - -
Containerise Containerise Containerise Containerise Containerise Containerise A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,

UP
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
(Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor) (Outdoor)
CIVIL/ STRUCTURAL ENGINEER :
XFMR XFMR XFMR XFMR XFMR
VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7203 FOR #12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
CONTINUATION
AGILE No.: 000-000000-000
PROJECT:
CGK063

1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 8 - BBCS TITLE:


scale 1 : 100 PARTIAL GROUND FLOOR HYDRANT LAYOUT 8

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-01-DR-M-7208 C
13 14 15 16 17 18 19

13 14 14.8 15 15.4 16 16.6 17 18 1919.1


REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7208 FOR

5653 4245
air discharge
1255 3747 air discharge 5478 7120 3950 11100 4070 625 5530
CONTINUATION

UP UP UP

5500 9225 11070

air discharge

GENSET with GENSET with GENERATOR YARD GENSET with


CAMLOCK CAMLOCK CAMLOCK

UP
UP

FALL 1:16 (MAX.)

air intake air intake air intake


UP UP UP UP
UP

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B - NOT ISSUED - - - -
RMU RMU RMU A - NOT ISSUED - - - -
Containerise Containerise Containerise REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

(Outdoor) (Outdoor) (Outdoor) CIVIL/ STRUCTURAL ENGINEER :

XFMR XFMR VB + E Pte Ltd


# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

UP
1800
1800

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
REFER TO DWG NO: CGK063-DSCO-1A-01-DR-M-7205 FOR
CONTINUATION
AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:
1 PARTIAL GROUND FLOOR HYDRANT LAYOUT 9 - BBCS PARTIAL GROUND FLOOR HYDRANT LAYOUT 9
scale 1 : 100
SCALE: DRAWING NO.: REV.:
1 : 100 CGK063-DSCO-1A-01-DR-M-7209 C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

LAYOUT 7 LAYOUT 8 LAYOUT 9

LAYOUT 5
CO2
4.5KG

B
CO2
4.5KG

LAYOUT 1 LAYOUT 3 CO2


4.5KG

CO2
4.5KG
C

CO2
4.5KG
D
CO2
4.5KG

4.5KG
CO2
CO2
4.5KG

LAYOUT 2 LAYOUT 4 LAYOUT 6 C 31AUG2020 ISSUE FOR 80% REVIEW


B - NOT ISSUED
CYY
-
AUNG
- -
YY
-
BF

A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

F PT. DSCO Indonesia


Kencana Tower, Level 2,
4.5KG
CO2
4.5KG
CO2
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

G VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 OVERALL ROOF FLOOR HYDRANT LAYOUT - BBCS
scale1 : 300 TITLE:

OVERALL ROOF FLOOR HYDRANT LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 300 CGK063-DSCO-1A-RF-DR-M-7210 C
1 2 3 4 5 6 7

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B - NOT ISSUED - - - -
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
REFER TO DWG NO: CGK063-DSCO-1A-RF-DR-M-7212 FOR
CONTINUATION CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
D 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 PARTIAL ROOF FLOOR HYDRANT LAYOUT 1 - BBCS
scale 1 : 100 TITLE:

PARTIAL ROOF FLOOR HYDRANT LAYOUT 1

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-RF-DR-M-7211 C
1 2 3 4 5 6 7

REFER TO DWG NO: CGK063-DSCO-1A-RF-DR-M-7211 FOR


CONTINUATION
D

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B - NOT ISSUED - - - -
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
G Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
1 PARTIAL ROOF FLOOR HYDRANT LAYOUT 2 - BBCS
scale 1 : 100 AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:

PARTIAL ROOF FLOOR HYDRANT LAYOUT 2

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-RF-DR-M-7212 C
13 14 15 16 17 18 19

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B - NOT ISSUED - - - -
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
REFER TO DWG NO: CGK063-DSCO-1A-RF-DR-M-7214 FOR
CONTINUATION CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
D Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063
1 PARTIAL ROOF FLOOR HYDRANT LAYOUT 5 - BBCS
scale 1 : 100 TITLE:

PARTIAL ROOF FLOOR HYDRANT LAYOUT 5

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-RF-DR-M-7213 C
13 14 15 16 17 18 19

REFER TO DWG NO: CGK063-DSCO-1A-RF-DR-M-7213 FOR


CONTINUATION
D

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


B - NOT ISSUED - - - -
A - NOT ISSUED - - - -
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
G Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 PARTIAL ROOF FLOOR HYDRANT LAYOUT 6 - BBCS PROJECT:
scale 1 : 100 CGK063

TITLE:

PARTIAL ROOF FLOOR HYDRANT LAYOUT 6

SCALE: DRAWING NO.: REV.:


1 : 100 CGK063-DSCO-1A-RF-DR-M-7214 C
TO BE CONNECTED
TO PUBLIC
EJECTOR PIT INTERMEDIATE LAST IC:11
IC :06 IC : XX 3.5 x 3.0 x 4.0(D) MANHOLE BEFORE TL : 42.83m
TL : 45.20m TL : 41.50m TL: 41.90 m GOING SEWAGE IL : 41.63m
IL : 40.82m IL : 41.21m IL : 37.90 m MANHOLE 228I D : 1.2m
D :4.38m D : 0.29m
0
IC :16 1 :10
, SWS@ Ø150, 1:100 SWS@ Ø150, 1:100 SWS@ Ø150, 1:100 SWS@ Ø150, 1:100 SWS@ Ø150, 1:0
150
TL : 42.80m Ø EP PH MONITORING
IL : 41.09m S @ L=34.2 m L=33.9 m L=33.8 m L=23.5 m L=118.6 m DN CONTROL PANEL
SW
SWS@ Ø150, 1:100 7 m
D :1.71m 8. IC :07 IC :08 IC :09
L =1

L=13.7 m
IC :10

SWS@ Ø150, 1:100 SWS@ Ø150, 1:100 SWS@ Ø150, 1:100


L=31.4 m TL : 42.80m TL : 42.80m TL : 41.90m
DN IL : 40.59m IL : 40.25m IL : 39.89m TL : 41.90m
IL : 39.55m

L=34.5 m
Ø250 FIRE HYD

D :2.21m D :2.55m D :2.01m


IC :15 H H H D : 2.35m H

SWS@ Ø150, 1:100 SWS@ Ø150, 1:100


TL : 42.80m
IL : 41.26m

L=32.5 m
D :1.54m IC :05

H
TL : 45.50m
IL : 42.62m
D :2.88m

L=22.7 m
IC :14 IC :04
TL : 42.80m TL : 45.50m

H
IL : 41.56m IL : 42.86m

L=29.1 m
D :1.24m D :2.64m

L=17.9 m
FROM IC 12
IC :03

H
IC :13 TL : 45.50m

L=36.6 m
TL : 42.80m IL : 43.01m
DN
IL : 41.86m D :2.49m

Ø250 FIRE HYD


D :0.94m UP

Ø250 FIRE HYD


SWS@ Ø150, 1:100
DN
FROM IC 02A IC :02

L=16.2 m
TL : 45.50m

H
IL : 43.38m
D :2.12m

10 11 12 12.1 13 13.1 13.2 14 14.9 15 16


FROM IC 01A

NOT REQUIRED
REQUIRED

4070 625 5530


IC :01
PDU

NOT
PDU TL : 45.50m
PDU

PDU
IL : 43.54m
D :1.96m

11100
SWP Ø150 1:100
UP PDU

UP
PDU

H
PDU
PDU

UP

10770
H PDU
SWP Ø200 1:190 SWP Ø200 1:190

8-POD BUILDING 2
PDU

SWP Ø100 1:100


PDU

REQUIRED

ROOM 2
ROOM ROOM 1 CATCHER

SWP Ø200 1:190


PDU
H

9525
H

PDU

SWP Ø200 1:190


NOT
PDU

HOUSELOADCATCHER
PDU SWP Ø100 1:100

4849
REQUIRED
PDU

650
NOT
PDP@ Ø50, L=107.7 m

5656
DAHU

DAHU
SWP Ø100 1:100
SWP Ø100 1:100

REQUIRED

ELECTRICAL ROOM 1.1

DAHU

DAHU

10110
NOT

DAHU

DAHU
SWP Ø100 1:100
SWP Ø100 1:100

DAHU

DAHU

10110
DAHU

DAHU
SWP Ø200 1:190

SWP Ø200 1:190


UP SWP Ø100 1:100
SWP Ø100 1:100

148529

9
MECHANICAL ROOM 1.1
ELECTRICAL ROOM 1.2

DAHU

DAHU

MECHANICAL ROOM 1.3


COLD AIR PLENUM

10110
COLD AIR PLENUM
H

DAHU

DAHU
DATA HALL
SWP Ø100 1:100
SWP Ø100 1:100

8
DAHU

DAHU

10660
DAHU

DAHU
SWP Ø100 1:100
SWP Ø100 1:100

7
0.6x0.6x0.6 SUMP
DAHU

DAHU
ELECTRICAL ROOM 1.3

MECHANICAL ROOM 1.1

MECHANICAL ROOM 1.3

8445
SWP Ø100 1:100 SWP Ø100 1:100
COLD AIR PLENUM

COLD AIR PLENUM


DAHU

DAHU
DATA HALL

6
PDP@ Ø50, L=74.0 m
DAHU

DAHU
Ø250 FIRE HYD

Ø250 FIRE HYD

10110
SWP Ø100 1:100 SWP Ø100 1:100
DAHU

DAHU

5
DAHU

DAHU
SWP Ø100 1:100 SWP Ø100 1:100

10110
SWP Ø200 1:190

SWP Ø200 1:190


PDP@ Ø50, L=185.7 m

ELECTRICAL ROOM 1.4

Ø100 IWP
DAHU

DAHU

H
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF

4
DAHU

DAHU
SWP Ø100 1:100 SWP Ø100 1:100 B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF

10110
A 08JUN2020 ISSUENOT
FORISSUED
30% REVIEW ZLT CC YY BF
DAHU

DAHU

3
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
DAHU

DAHU

SWP Ø100 1:100 SWP Ø100 1:100

6089
MEP ENGINEER:
GULLY TRAP FOR BIN CENTER

2
REQUIRED

STORE RM

STORE RM
CORRIDOR

MECH.ER-1

MECH.ER-2

9900
DSCO Group Pte Ltd
NOT

# 04-02 HarbourFront Tower 2


VENT PIPE FOR GULLY TRAP
H

1
SWP Ø100 1:100 3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020
Ø150 IWP

Ø150 IWP

SWS@ Ø100, 1:60 CIVIL/ STRUCTURAL ENGINEER :

Ø150 IWP VB + E Pte Ltd


0.6x0.6x0.6 SUMP
Ø150 IWP

# 05-09 Harbour Link Complex


GT 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
DN PDP@ Ø50, L=127.0 m Mechanical & Electrical (LEAD) Consultant:
Ø150 IWP FROM
SECONDARY INCOMING

Ø250 FIRE HYD


ARCHITECT:

4300 11500 11000 10620 11000 10620 10625


H H
69665
H Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
A

Singapore 138589 aedas.com


H
C

AGILE No.: 000-000000-000


PROJECT:

TITLE:
ACMV SERVICES
EXTERNAL SITE WIDE SERVICES LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 800 CGK063-DSCO-ZZ-XX-DR-M-8003 C
1 2 3 4.1
4 5 6 7 8 9 10 11 12 13 14 14.8
15 15.4 16 16.6 17 18 19.1
19 20

1:200 1:200 1:200


1:200

UP

E
C 31AUG2020 ISSUE FOR 80% REVIEW
B - NOT ISSUED
A - NOT ISSUED
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


F Kencana Tower, Level 2,
Business Park Kebon Jeruk,
Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
G 61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


1 OVERALL GROUND FLOOR FUEL OIL DISTRIBUTION LAYOUT PROJECT:

scale1 : 300 CGK063

TITLE:
ELECTRICAL SERVICE
OVERALL GROUND FLOOR FUEL OIL DISTRIBUTION LAYOUT

SCALE: DRAWING NO.: REV.:


1 : 300 CGK063-DSCO-1A-01-DR-M-8015 C
IN

100mm THICK PU INSULATION


AND JACKETING

MANHOLE
Solder to Runner And Pop
Rivet Runner to Elbow

CHWR
BTU AAV

Up to 460mm
OUT Meter
SLAB 1. Approved type : To be approved by building landlord.
RC BEAM T FM 2. The flow sensor shall measure the average flow in the pipeline rather than a single point measurement with
+ / -0.1% repeatability.
ELEVATION VIEW T
3. The BTU Meter shall calculate instantaneous density and enthalpy.
4. The BTU Meter shall store the maximum usage rate for reference to contractual provisions for
permissible peak demand.
28.5mm 5. The BTU Meter shall be field programmable.
Reducer 6. The BTU Meter shall provide re-transmission of any imput or calculated variable in the form of

CHWS
4-20mA for instantaneous power connection to the building BAS System.
7. The BTU Meter shall provide options for dry contact or AC / DC solidstate switch to transmit the totalizer value
SMALL DOUBLE VANE DUCT ELBOW in the form of pulse output for connection to the BAS or RS485 interface with BMS.
8. An industrial rated NEMA 4 enclosure must be installed for protection against harsh environment.

BTU Meter Location To be


Co-ordinated,Details shall be
R=25.4mm
Submiited for Approval
R=50.8mm

BTU METER CONNECTION


PLAN VIEW

SMALL DOUBLE VANE

DETAIL OF SMALL DOUBLE VANE DUCT ELBOW BUFFER TANK DETAILS BTU METER SPECIFICATION

20 GA
55m
mR

75mm
55m
mR

150mm
STRAINER

2HR FIRE RATED


PARTITION / CONCRETE BLOCK WALL

PIPE SLEEVE

FSC FIRE PANEL (FIRE STOP MATERIAL) ,


100mm THK (EQUAL FIRE RATING AT THE WALL)

ABESCO FIRE RATED ACRYLIC INTUMESCENT MASTIC

1000

75 75
TURNING VANES FOR DUCT
Ø400mm CHW PIPE
STRAINER DETAIL
WIDTH UP TO 380MM

RIGID POLYURETHANE INSULATION CLASS O PER


BS475 PART 6&7 C/W GALVANISED JACKETING C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
FSC FIRE PANEL WRAPS WITH ALUMINUM FOIL
SURFACE, 75mm THK (DENSITY : 100kg/m³) A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
(EQUAL FIRE RATING AT THE WALL) REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

1D 1D MEP ENGINEER:
3 3 50mm RIGID POLYURETHANE INSULATION CLASS O
PER BS475 PART 6&7 C/W GALVANISED JACKETING
Air Flow 'B'
Branch Duct D
DSCO Group Pte Ltd
# 04-02 HarbourFront Tower 2
D D1+D 3 HarbourFront Place, Singapore 099254
D Note : T +65 6216 0022 F +65 6216 0020
1) Find Approx. Dimension For D1
(when Not Shown On Plan)
D2 D1
From Formula : CIVIL/ STRUCTURAL ENGINEER :
Splitter Rod
D1 Area 'B' Air Flow 'B'
= =
D1+D2 Area 'A' Air Flow 'A' VB + E Pte Ltd
Splitter Damper
Air Flow However D1 & D2 Shall Not # 05-09 Harbour Link Complex
Be Less Than 100mm. 61 Alexandra Terrace, Singapore 119936
2) Take Off May Split From Top Or T +65 6561 4078 F +65 6561 5198
Bottom As Well As Side Mechanical & Electrical (LEAD) Consultant:
Splitter Rod
Air Flow 'A' ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
DETAIL OF SUPPLY BRANCH TAKE OFF TYPICAL PENETRATION DETAIL FOR CHILLED WATER PIPE DIAMETER
DETAIL OF EQUAL DOUBLE ELBOW #12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
ACMV SERVICES
STANDARD MECHANICAL DETAILS 1

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-8100 C
1416 1416 1416

Anchored
Bolt

470
217 1220 1220 1220 1220 217
Stirrup Hanger Angle Iron
Welded
Locknut
Neoprene-In Shear Mounting

13mm Dia. Rod


Non-Skid Ribbed

Spring

M-20 STIFFINER PLATE


6MM FULL WELD TO BASE
STEEL STRUCTURE
Steel Rod Metal Clamp
64
70
DETAIL 1
510

320 150
M-20 PLATE FILLET
STEEL STRUCTURE WELD 6MM ALL
PROVISION FOR ROUND (By MEP) Angle Iron
EXTERNAL PIPE M12 ANCHOR BOLT
RISER(By Builder)
Sheet Metal Half Sleeve
150mm Long 3mm Thick
Wooden Insulation Half Sleeve
On This Portion Only
TYPE 1 TYPE 2
Notes:
(Ø200mm Pipe And Below) (Ø800mm &Ø1000mm Pipe) ELEVATION Types Of Anchoring Are To Be Decided By END ELEVATION
The Structural Engineer

DETAIL 1

TYPICAL VIBRATION ISOLATION SUPPLY AIR GRILLE (SAG) INSTALLATION HORIZONTAL PIPE SUPPORT (FOR PIPES UP TO & INCLUDING
DETAIL OF PIPE ANCHOR
HANGER FOR FAN COIL UNITS (FIXED BLADE) 200mm NOMINAL DIAMETER)

G.I Pipe Sleeve (0.8mm Formed Sleeve/Steel Pipe Sleeve)


Expansion Bolt M 10 Fire Stop
Caulking
Chilled Water Pipe with Insulation

Full Welding

Hanger Rod (10mm)

U-Channel

CHWS / CHWR PIPE


76x38x67kg/m 8mm Neoprene
Wall/Partition(Dry Wall)/Block Wall Pad

Caulking

Insulation
50 'C' Channel
Welding
Rubber PIPE SIZE GALVANISED PIPE SLEEVE SIZE
(6mm) Ω Clamp
NOMINAL DIA INNER DIA OUTER DIA NOMINAL DIA

32 38.85 42.9 50

40 44.75 48.8 65
Leak Detection Tape Pipe Sleeve
Galvanised Sheet 50 56.30 60.8 80
Steel Tray
65 72.10 76.6 100
Fibre Glass Insulation
Dia (mm) Span (m) 80 84.65 89.5 150
100 4 100 109.50 114.9 ~25mm
150
50-80 3.5 150 160.70 166.1 200
DETAIL "2" DETAIL "3"
15-40 2.5

DRAIN PIPE HANGER TYPICAL CHILLED WATER PIPE TYPICAL CHILLED WATER RISER SUPPORT TYPICAL SUPPORT FOR ACMV DUCT
PENETRATION THROUGH WALL/PARTITION/SLAB AT ALTERNATE FLOOR

PIPEWORKS (INCLUDE
DPT
CWR BY CHILLER SUPPLIER PIPING, ACCESSORIES
AND CONNECTIONS)
Ø 400mm BY M&E CONTRACTOR
P VSD P P
M NRV
AV
CHWR

M
Ø 250mm

Ø 250mm
TP P
EJ TGM T
CHWR
Pressure Independent and Balancing
Control Valve
EJ DC
MANUAL TGM T BV
AIR VENT
P T
TP P F
tp
PICV
AV
CHWS
Fan Coil Unit tp
CHWR CHILLER
CHWS
REDUCER COOLING TOWER
C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF
P T
Drain Off
B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
Clean out CHWS Quick Fill Line A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
TYPICAL CHILLER CHILLED WATER PIPING CONNECTION
Insulated Secondary Drain Pan REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
Clean out
Ø25 Insulated Condensate Drain Pipe DPT MEP ENGINEER:
To Floor Trap In Ahu Plantroom PIPEWORKS (INCLUDE
FALSE CEILING BY CHILLER SUPPLIER PIPING, ACCESSORIES
Ø 100mm AND CONNECTIONS)
T Themostat BY M&E CONTRACTOR
Make up Pipe P VSD P P
M NRV DSCO Group Pte Ltd
AV
CWS
# 04-02 HarbourFront Tower 2
TP P
C.T. Basin
EJ TGM T 3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

M EJ DC
TGM T BV
Ø 400mm Ø 100mm TP P F CIVIL/ STRUCTURAL ENGINEER :
D AV
CWS CWR
M

TYPICAL FCU PIPING CONNECTION Drain Pipe To Nearest floor trap CHILLER
(BLOWDOWN)
VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
TYPICAL PIPING CONNECTION FOR COOLING TOWER TYPICAL CHILLER CONDENSER WATER PIPING CONNECTION T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

PROJECT:
CGK063

TITLE:
ACMV SERVICES
STANDARD MECHANICAL DETAILS 2

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-8101 C
Flexible
Conduit Vibration
Slab Isolator
Access
Fusable Link Panel
'C' Channel
Link
Trunking Cadmiun Plated
Centre Bracket
Air Flow

Fan Galvanised Steel


Duct Duct Retaining Angles
Flow To Add Rockwool
For Any Gap

Silencer Silencer

Flexible Hanger Flexible


Connection Rod Connection
Fan Terminal Box
Rc Slab
Blade Stop Angle Galvanised Steel
Air Flow
Lug

Galvanised Bracket With


Silencer Stainless Steel Bush Galvanised Steel
& Cap Nut Damper Spring
Fan Galvanised Steel
Duct Damper Blade

Flow
Omega support for silencer

Fan Terminal Box

INSTALLATION OF GALVANISED STEEL CURTAIN TYPICAL FLOOR TYPE FIRE DAMPER


TYPE FIRE DAMPERS AT FIRE RATED WALL
TYPICAL AXIAL FAN INSTALLATION CONSTRUCTION THROUGH FLOOR SLAB
(SINGLE SECTION)

Angle Support Weilded


To Channel

Adjusting Screw

Reinforcing Bars Min.


Cover 50
Wall Slab

Spring Isolator

Stud (by Builder)

'High Temperature'
Rockwool (by Builder)
FIRE DAMPER 18 Gauge Metal Pan 75 Concrete Base

Finished Floor

ELEVATION
PUMP BASE

PUMP INSTALLATION DETAIL FIRE DAMPER SUPPORT BASE SUPPORT DETAILS

INSULATED DUCT & INSULATED DUCT WITH JACKETING

TABLE 1
G.I Pipe Sleeve (0.8mm Formed Sleeve/Steel Pipe Sleeve)
Fire Stop
Caulking
Chilled Water Pipe with Insulation

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
Wall/Partition(Dry Wall)/Block Wall
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

TABLE 2 MEP ENGINEER:

DSCO Group Pte Ltd


PIPE SIZE GALVANISED PIPE SLEEVE SIZE # 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
NOMINAL DIA INNER DIA OUTER DIA NOMINAL DIA T +65 6216 0022 F +65 6216 0020
Duct
32 38.85 42.9 50

Perforated Galvanised Steel Sheet 40 44.75 48.8 65 CIVIL/ STRUCTURAL ENGINEER :


Internal Insulation
DETAIL "4" 60kg/m3 Rockwool 50 56.30 60.8 80 VB + E Pte Ltd
50mm Thick
65 72.10 76.6 100 # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
80 84.65 89.5 150 T +65 6561 4078 F +65 6561 5198
100 109.50 114.9 150 Mechanical & Electrical (LEAD) Consultant:
150 160.70 166.1 200
ARCHITECT:

DETAIL "5"
Aedas Pte Ltd
11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
TYPICAL DUCTWORK WITH INTERNAL INSULATION ( FOR ACOUSTIC TREATMENT ) TYPICAL CHILLED WATER PIPE
AND CEILING MOUNTED SUPPORT FOR RECTRANGULAR DUCT WORK PENETRATION THROUGH WALL/PARTITION/SLAB AGILE No.: 000-000000-000
PROJECT:
CGK063

TITLE:
ACMV SERVICES
STANDARD MECHANICAL DETAILS 3

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-8102 C
Insulated Plenum

Anchored Jubliee Clip


Bolt

Angle Iron
Welded
Stirrup Hanger
Locknut
Centurylon 13mm Dia. Rod
Insulation
13mm Thick
Metal Clamp Rubber Gasket

Refrigerant Copper Pipe Angle Iron


Sheet Metal Half Sleeve Flexible Duct
150mm Long 3mm Thick Gradient Water Detection
Tape
Refrigerant Copper Pipe Wooden Insulation Half Sleeve Galvanised Sheet
On This Portion Only Metal Tray
Centurylon
Insulation Control Wiring
13mm Thick
ELEVATION END ELEVATION

False Ceiling

Adjustable
Controller

TYPICAL REFRIGERANT PIPE & WIRING HORIZONTAL PIPE SUPPORT


TYPICAL LINEAR SUPPLY AIR GRILLE
IN TRUNKING DETAIL (IF APPLICABLE) (FOR PIPES UP TO & INCLUDING 200mm NOMINAL DIAMETER)

PRESSURE RELIEF
PRESSURE GAUGE
VACUUM VENT
QUICK FILL

DISCHARGE NOZZLES AS PER


MANUFACTURER RECOMMENDATION
TEMPERATURE SENSOR

DETAIL A TEMPERATURE SENSOR 100mm THICK PU INSULATION


AND JACKETING
TEMPERATURE SENSOR
IN
DETAIL B TEMPERATURE SENSOR
TEMPERATURE SENSOR
MANHOLE
TEMPERATURE SENSOR
TEMPERATURE SENSOR
SUCTION NOZZLES AS PER
MANUFACTURER RECOMMENDATION

OUT
Hold Down Clip SLAB
RC BEAM

ELEVATION VIEW
Cable Joint

Hold Down Clip


DETAIL A

PLAN VIEW
DETAIL B

TYPICAL WATER DETECTION SENSING CABLE INSTALLATION TYPICAL FLEXIBLE DUCT AND CEILING DIFFUSER INSTALLATION BUFFER TANK DETAILS

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
Solder to Runner And Pop A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
Rivet Runner to Elbow
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
CHWR

BTU MEP ENGINEER:


AAV
Up to 460mm

Meter

1. Approved type : To be approved by building landlord. DSCO Group Pte Ltd


T FM 2. The flow sensor shall measure the average flow in the pipeline rather than a single point measurement with # 04-02 HarbourFront Tower 2
+ / -0.1% repeatability.
3 HarbourFront Place, Singapore 099254
3. The BTU Meter shall calculate instantaneous density and enthalpy. T +65 6216 0022 F +65 6216 0020
T
4. The BTU Meter shall store the maximum usage rate for reference to contractual provisions for
permissible peak demand.
28.5mm 5. The BTU Meter shall be field programmable. CIVIL/ STRUCTURAL ENGINEER :
Reducer 6. The BTU Meter shall provide re-transmission of any imput or calculated variable in the form of
VB + E Pte Ltd
CHWS

4-20mA for instantaneous power connection to the building BAS System.


7. The BTU Meter shall provide options for dry contact or AC / DC solidstate switch to transmit the totalizer value # 05-09 Harbour Link Complex
SMALL DOUBLE VANE DUCT ELBOW in the form of pulse output for connection to the BAS or RS485 interface with BMS. 61 Alexandra Terrace, Singapore 119936
8. An industrial rated NEMA 4 enclosure must be installed for protection against harsh environment. T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:
BTU Meter Location To be
Co-ordinated,Details shall be
R=25.4mm ARCHITECT:
Submiited for Approval
R=50.8mm
Aedas Pte Ltd
BTU METER CONNECTION 11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

SMALL DOUBLE VANE


AGILE No.: 000-000000-000
PROJECT:
CGK063
DETAIL OF SMALL DOUBLE VANE DUCT ELBOW BTU METER SPECIFICATION STORM RESISTANT LOUVER
TITLE:
ACMV SERVICES
STANDARD MECHANICAL DETAILS 4

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-8103 C
GATE VALVE

Spigot
CHECK VALVE
Socket Steel Pipe PVC Pipe
Spigot End
PRESSURE GAUGE Rubber Gasket Socket End PVC Collar
Welded Joint

Steel Pipe Solvent


Cement PVC Pipe

a. Push-On Joint b. Steel Welded Joint c. PVC Joint


Holes &
Masonary
Fixing
FLEXIBLE CONNECTION
RAWL BOLT Pipe Steel Pipe Copper Tube Or
PRESSURE GAUGE Bold And Nut Stainless Steel Pipe
Thread Joint
Gasket Compression Collar
Flange Steel Collar
GATE VALVE
Pipe Copper Tube Or
Ø25 DRAIN PIPE TO NON SLIP RUBBER Steel Pipe Stainless Steel Pipe
NEAREST FLOOR TRAP
GASKET
INERTIA BLOCK
SUCTION COLD WATER PIPE d. Flanged Joint e. Screwed Joint f. Copper Tube And Stainless
ADJUSTMENT Steel Pipe Non-Manipulative
ANGLE SUPPORT Compression Joint

STRAINER FLEXIBLE
CONNECTION
LATERALLY STABLE SPRING
ASSEMBLY Copper Tube Or Light Gauge Light Gauge
Stainless Steel Pipe Copper Tube Copper Tube
RIBBED NEOPRENE PAD Capillary Joint
Compression Collar Capillary Collar Bronze Welded
Joint

Copper Tube Or Light Gauge Light Gauge


Stainless Steel Pipe Copper Tube Copper Tube

g. Copper Tube And Stainless h. Copper Tube i. Bronze Welded


Steel Pipe Manipulative Capillary Joint Joint
Compression Joint
PLINTH (BY OTHERS)

TYPICAL PUMP CONNECTION DETAIL VERTICAL PIPE SUPPORT STANDARD PIPE JOINTING

HIGH & LOW LEVEL ALARM SWITCH Ø100 VENT PIPE C/W INSERT SCREEN
MIN 600 X 600 ACCESS PANEL
100 100 HIGH LEVEL INDICATOR
Slab WARNING LEVEL
INLET PIPE WATER Ø25 WARNING Ø80 OVERFLOW PIPE
LEVEL
TO SUIT LAYOUT SENSOR PIPE C/W TO CONNECT TO DRAIN PIPE
RL: +9.60 MOSQUITO

750
SCREEN OF
Rawl Bolt MAXIMUM 25

400
Nut & Washer APERTURE SIZE 75
OF 0.65mm 25
Threaded Mild Steel Rod
STAINLESS STEEL
Galvanised Steel 'C' Channel INTERNAL & EXTERNAL
CAT LADDLE
M.S. Bolt & Nut ø65 SUCTION PIPE

1250
(TO TRANSFER PUMPS)
TO SUIT LAYOUT C/W SAMPLING TAP WITH LOCK
Galvanised Steel Clamp Ø80 DRAIN PIPE TO
ACCESS CAT LADDER NEAREST SCUPPER DRAIN
Rubber Gasket WITHIN ENCLOSURE END WITH 150
VERTICAL AIR GAP ABOVE THE DRAIN
FILLET WELD ALL ROUND (C/W NETTING WITH APERTURE SIZE OF 0.65MM)

CONTRACTOR TO COORDINATE WITH BUILDER Ø65 DRAIN PIPE


TO CAST IN CONCRETE WITH ASSEMBLY

MIN 800
C/W SAMPLING
TAP WITH LOCK
BOTH ENDS FLANGED PIPE

Cold Water Pipe

COLD WATER PIPE SUPPORT PUDDLE FLANGE DETAIL DOMESTIC WATER TRANSFER TANK AT LEVEL 1 (FRP) DETAIL

560

R.C WALL
PRIMARY SIDE

2 NOS. HIGH & LOW LEVEL ALARM SWITCH NOTE:


2 NOS. Ø100 VENT PIPE
560
2 NOS. 600 X 600 (MIN) ACCESS PANEL 1) ALL ELECTRICAL BOARDS WITH PREFIX
HIGH 2 NOS. LEVEL INDICATOR CP-XXX SHALL FOLLOW THE TYPICAL
WARNING LEVEL CONTROL PANEL BOARD SHOWN.
WATER
INLET PIPE Ø25 WARNING Ø80 OVERFLOW PIPE
TO SUIT LAYOUT
LEVEL 2) ALL PUMP CONTROL PANELS SERVING
SENSOR PIPE C/W TO CONNECT TO DRAIN PIPE G.I PIPE SLEEVE
RL: +77.05 MOSQUITO PUMPS LOCATED AT CONFINED UNDERGROUND SLUICE VALVE
750

SCREEN OF SPACE AREA SHALL BE LOCATED ABOVEGROUND PIPE


MAXIMUM 25 FOR EASE OF ACCESS.
400

APERTURE SIZE 75
OF 0.65mm 25
560

2 SETS OF
STAINLESS STEEL N/O
ø65 SUCTION PIPE
INTERNAL & EXTERNAL (TO BOOSTER PUMPS)
CAT LADDLE TO SUIT LAYOUT C/W SAMPLING TAP WITH LOCK
1250

PRESSURE N/C
2240

Ø80 DRAIN PIPE TO REDUSING VALVE


NEAREST SCUPPER DRAIN
EXTERNAL WITHIN ENCLOSURE END WITH 150 FSB APPROVED FIRE STOP
ACCESS CAT LADDER VERTICAL AIR GAP ABOVE THE DRAIN SEALING COMPOUND N/O
(C/W NETTING WITH APERTURE SIZE OF 0.65MM)
560

Ø65 DRAIN PIPE


PRESSURE GAUGE
MIN 800

C/W SAMPLING
TAP WITH LOCK
RSJ BEAMS

UPSTAND BEAMS
(BY BUILDERS) SECONDARY SIDE
560

HIGH LEVEL DOMESTIC WATER TANK AT ROOF (FRP) DETAIL TYPICAL PUMP CONTROL PANEL PIPE SLEEVE FOR FIRE-RATED WALL TYPICAL PRESSURE REDUCING VALVE INSTALLATION DETAILS

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


GATE VALVE
# 04-02 HarbourFront Tower 2
CHECK VALVE
3 HarbourFront Place, Singapore 099254
FLEXIBLE
CONNECTION
T +65 6216 0022 F +65 6216 0020
SUCTION

CIVIL/ STRUCTURAL ENGINEER :


STRAINER

PLAN ELEVATION
A FRONT ELEVATION VB + E Pte Ltd
RC PLINTH (BUILDER)
SECTION A-A
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:
GATE VALVE

NEW
Aedas Pte Ltd
PRESSURE VESSEL 11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com
DWBP-1 DWBP-2

GATE VALVE
AGILE No.: 000-000000-000
DISCHARGE STOP COCK
PROJECT:
NEW DISCHARGE PIPE TO RECONNECT PLAN ELEVATION
TO EXISTING PIPES AND NEW PIPES.
CGK063

BOOSTER PUMPS AND HYDRO-PNEUMATIC TANK


TITLE:
ACMV SERVICES
STANDARD MECHANICAL DETAILS 5

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-8104 C
15°
15°
Ø13mm HOLES WASTE
PIPE

FLOOR TRAP INLET C/W TRAP VENTILATING


A 50 A B B RISING PIECE AND SCREW IN COVER
CONNECT TO
PIPE (MIN. Ø50mm)

Ø295

Ø260

Ø255

Ø225
Ø180

Ø140
VENTILATING
STACK

DISCHARGE STACK
(MIN. Ø100)
FLOOR TRAP
FRAME & GRATING
VENTILATION STACK
Ø180 (MIN. Ø75)

Ø190 EXTENSION PIECE


PLAN
WATER LEVEL WATER CLOSET SUITE WASH BASIN

MAX. 600
PLAN RISER
WATER SEAL Ø100mm PIPE CONNECT TO
DISCHARGE
PIPE/STACK

R 900
VENTILATION PIPE
10 (MIN. Ø50)
WASTE PIPE
(MIN. Ø32)

40
Ø190

50
50
SECTION A-A FLOOR TRAP
FRAME & COVER

95° FLOOR TRAP DETAIL 1

131
25

OUTLET RC SLAB

Ø100
T.W.L. 270
REMOVABLE

600 (MAX.)
425
5 ALUMINIUM
50

ALLOY NON-PERFORATED CORNER


200

125
STRAINER FLOOR TRAP
275

150mm
Ø13mm HOLES
50

270
AT 50mm CRS. CONCREATE STUR
CLEANING EYE
CAST IRON 100 300mm x 300mm x 400mmH FLOOR TRAP
3 Ø100 UPVC FLOOR TRAP
50

Ø100mm PIPE

100
(P-TYPE)

A A
50

45° BEND
GROUND LEVEL DISCHARGE PIPE
FLOOR TRAP

150mm
Ø225 Ø100 (P-TYPE) (MIN. Ø100)

15 15 15
Ø180

SECTION A - A SECTION B - B
CAST IRON GULLY TRAP FLOOR TRAP INLET C/W
ALUMINIUM ALLOY STRAINER SCREW IN COVER

FLOOR TRAP DETAIL 2

PIPING ARRANGEMENT FOR FLOOR TRAP (P-TYPE)


CAST IRON GULLY TRAP PLAN FLOOR TRAP FLOOR TRAP DETAIL & WATER CLOSET PAN CONNECTED IN SERIES

UPVC COWL

FALSE CEILING

LOOP VENTING PIPE


(MIN Ø25mm)
TO BE TERMINATED TO
TO THE ATMOSPHERE

WASH BASIN WASH BASIN WASH BASIN WASH BASIN


TRAP VENTILATING
PIPE (MIN. Ø50mm)

CONNECT TO
VENTILATING BOTTLE TRAP
STACK

CLEAN-OUT
WASTE CAP
FLOOR TRAP
FRAME & GRATING PIPE
(C/W MOSQUITO TRAP) COMMON WASTE PIPE ( MIN Ø75mm)

MAX. 600
CONNECT TO
DISCHARGE
PIPE/STACK

CONNECTION TO INSPECTION CHAMBER / MANHOLE WITH TUMBLING BAY LOOP VENTING REQUIREMENT FOR WASH BASIN CONNECTED IN SERIES

CONNECTION TO INSPECTION CHAMBER / MANHOLE WITH BACKDROP INSPECTION CHAMBER DETAIL

C 31AUG2020 ISSUE FOR 80% REVIEW ZLT CC YY BF


B 21JUL2020 ISSUE FOR 50% REVIEW ZLT CC YY BF
A 08JUN2020 ISSUE FOR 30% REVIEW ZLT CC YY BF
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D

MEP ENGINEER:

DSCO Group Pte Ltd


# 04-02 HarbourFront Tower 2
3 HarbourFront Place, Singapore 099254
T +65 6216 0022 F +65 6216 0020

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
T +65 6561 4078 F +65 6561 5198
Mechanical & Electrical (LEAD) Consultant:

ARCHITECT:

Aedas Pte Ltd


11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
Singapore 138589 aedas.com

AGILE No.: 000-000000-000


PROJECT:
CGK063

TITLE:
TYPICAL DETAIL OF FT,VS & SWS INSTALLATION AT SLAB ACMV SERVICES
TYPICAL DETAIL OF UPVC VENT STACK PENETRATE THROUGH THE ROOF SLAB TYPICAL DETAIL OF SWS HUBLESS PIPE INSULATION WASTE SUMP DETAIL
LEVEL 2 TO LEVEL 7 STANDARD MECHANICAL DETAILS 6

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-8105 C
GALVANISED PIPE SPRINKLER PIPE SUPPORT SPAN
PIPE SIZE SLEEVE SIZE
NOMINAL DIA INNER DIA OUTER DIA NOMINAL DIA
PIPE Ø (mm) SPACING OF SUPPORTS
PIPE RISER OR DROPPER 32 38.85 42.9 50
CAULKING MAT'L 32 1.8m
40 44.75 48.8 65
G.I. PIPE SLEEVE
40 1.8m
FFL 50 56.30 60.8 80
50 2m
65 72.10 76.6 100
65 2.5m
80 84.65 89.5 150
80 3m
R.C. SLAB 100 109.50 114.9 150
100 4m
FR SEALANT 150 160.70 166.1 200
150 4m
200 3m

250 3m

PIPE SLEEVE DETAIL FOR


HANGER SPACING TEST SPRINKLER CONNECTION DETAIL
PIPES THROUGH SLABS

100 100

WALL OR BEAM

G.S. CHANNEL
MECHANICAL
ANCHOR BOLT
T ASSEMBLY
LOCKNUT C/W WASHER

DIAMETER VARIES U-BOLT DIAMETER RANGE PIPE


(Ø65mm AND ABOVE)
Ø50 - Ø80 PIPE-M10
Ø100 - Ø150 PIPE-M12
FILLET WELD ALL ROUND
CONTRACTOR TO COORDINATE WITH BUILDER
TO CAST IN CONCRETE WITH ASSEMBLY
BOTH ENDS FLANGED PIPE

SPRINKLER MAIN
DISTRIBUTION PIPE

TYPICAL MECHANICAL T ASSEMBLY FOR


PUDDLE FLANGE DETAIL WALL VERTICAL SIDE SUPPORT
SPRINKLER PIPE (WET SYSTEM ONLY)

WELDED STEEL FABRIC

100mm

SPRINKLER
RANGE PIPE

1" x 1/2" REDUCER DRY DROPPER


(TYPICAL INSTALLATION)

ENCLOSURE
FALSE CEILING FALSE CEILING
ENCLOSURE
CEILING
BOARD
100mm THK. CONC. APRON GALVANIZED IRON GAS PIPE TO BS 1387 OR SS 17 EJECTION COVER PLATE
(NOT SUBJECTED TO VEHICULAR CLASS C WRAPPED WITH PETROLATUM TAPE OR SPRING CEILING
TRAFFIC) DUCTILE IRON TO BS 4772 CLASS K9. (REFER BOARD
SUBCLAUSE 3.4.1) EJECTION COVER PLATE
SPRING
CEMENT
MORTAR

C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


PIPE CHANNEL FOR SERVICE PIPES TYPICAL DETAIL OF ROYAL FLUSH TYPICAL DRY PENDANT TYPE SPRINKLER INSTALLATION B - NOT ISSUED CYY AUNG YY BF

LAID ACROSS THE BUILDING APRON CONCEALED SPRINKLER (WET SPRINKLER) (PRE-ACTION SPRINKLER) A -
REV. DATE
NOT ISSUED
DESCRIPTION
CYY AUNG YY BF
DRWN ENGR CHK APP'D

MEP ENGINEER:

PT. DSCO Indonesia


M12 DROP IN M10 DROP IN
Kencana Tower, Level 2,
ANCHORS ANCHORS
Business Park Kebon Jeruk,
CEILING SLAB Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia
M6 ANCHOR BOLT
TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
MAX. 450
WITH WASHER
AND NUT CIVIL/ STRUCTURAL ENGINEER :

SPRINKLER HEAD VB + E Pte Ltd


RAWL BOLT RAWL BOLT
NUT & WASHER NUT & WASHER # 05-09 Harbour Link Complex
61 Alexandra Terrace, Singapore 119936
100Ø TO 150Ø - M12Ø DROP ROD 32Ø TO 80Ø - M10Ø DROP ROD T +65 6561 4078 F +65 6561 5198
GALVANISED STEEL 25mm x 3mm Mechanical & Electrical (LEAD) Consultant:
'C' CHANNEL 75x50x5mm THICK MS
FLAT BAR
ARCHITECT:

GALVANISED STEEL CLAMP GALVANISED STEEL CLAMP


SWIVEL RING HANGER Aedas Pte Ltd
SWIVEL RING HANGER 11 North Buona Vista Drive, T +65 6734 4733
#12-07 The Metropolis Tower 2 singapore@aedas.com
M6 ANCHOR BOLT
Singapore 138589 aedas.com
WITH WASHER
AND NUT

AGILE No.: 000-000000-000


SPRINKLER PIPE SPRINKLER PIPE PROJECT:
CGK063

TYPICAL SPRINKLER PIPE SUPPORT TYPICAL SPRINKLER PIPE SUPPORT TYPICAL UPRIGHT SPRINKLER INSTALLATION TITLE:

FIRE PROTECTION STANDARD DETAIL 1


(Ø100 & Ø150 PIPES) (Ø32 TO Ø80 PIPES) (FOR PRE ACTION SPRINKLERS)
SCALE: DRAWING NO.: REV.:
N.T.S CGK063-DSCO-ZZ-XX-DR-M-8120 C
EXCAVATED Ø150 FIRE PIPE
TRENCH

FULL CONCRETE HAUNCHING

SECTION A - A
GATE VALVE

A PRESSURE GAUGE P CHECK VALVE

FLEXIBLE CONNECTION
A P
GATE VALVE CONCENTRIC REDUCER
ELEVATION

FULL CONCRETE HAUNCHING


EXCAVATED TRENCH

Ø150 FIRE PIPE BASE PLATE

STRAINER

ECCENTRIC REDUCER
INTERIA BLOCK
SPRING

PLAN CONCRETE BLOCK

TYPICAL CONCRETE HAUNCHING DETAIL BRANCH CONTROL VALE (BCV)


TYPICAL END SUCTION PUMP INSTALLATION
FOR UNDERGROUND FIRE WATER PIPE (BELOW THE DRIVEWAY) DETAIL FOR SPRINKLER RISER

STANDARD C.I SURFACE Ø150


INCOMING
BOX AND COVER Ø150 FL D/F BEND SUPPLY
TAMPER PROOF
ISOLATOR FOR
COMPRESSOR

RISER MOUNTED
AIR COMPRESSOR

ALARM GONG

TAMPER SWITCH

OUTGOING VALVE
PLAN TEST STOP VALVE

LOW PRESSURE
ALARM SWITCH

DOUBLE PILLAR HYDRANT OR


TRIPPLE PILLAR HYDRANT STANDARD C.I SURFACE CHECK VALVE

BOX AND COVER GATE VALVE


PREACTION VALVE

TAMPER SWITCH
CHECK VALVE
PRESSURE GAUGE P P
STOP VALVE
Ø150/Ø100 D/FL
LENGTHENING PIECE DRAIN PIPE CONNECTED

Ø40
TO EXISTING SPRINKLER
75 THK CONC SYSTEM DRAIN PIPE
Ø150 FL FOUNDATION SLAB GATE VALVE
D/F BEND WITH BRC NO A10
CONC SUPPORT

Ø50 TO DRAIN
TO DRAIN
F.F.L STRAINER
CONC SUPPORT
BAKAU PILES IF REQUIRED
TO BE DECIDED ON SITE
ELEVATION
TYPICAL DETAIL OF DRY PRE-ACTION
TYPICAL DETAIL OF INSTALLATION OF DOUBLE PILLAR HYDRANT SPRINKLER CONTROL VALVE TYPICAL VERTICAL PUMP INSTALLATION
(C/W TEST DRAIN VALVE & FLOW METER)

TO SYSTEM C 31AUG2020 ISSUE FOR 80% REVIEW CYY AUNG YY BF


WIRE MESHED GLASS B - NOT ISSUED CYY AUNG YY BF
DOOR LOCK A - NOT ISSUED CYY AUNG YY BF
FIRE BRIGADE
REV. DATE DESCRIPTION DRWN ENGR CHK APP'D
TEST STOP VALVE
BREECHING INLET

TO
VIEW 'B' MEP ENGINEER:
SPRINKLER SYS.
PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
TO ALARM Jl Raya Meruya llir
FRONT ELEVATION DETAIL 'A' GONG No.88 Jakarta Barat 11620, Indonesia
PRESSURE TEL: +62 21 2949 0611 FAX: +62 21 2949 0612
GAUGE

CIVIL/ STRUCTURAL ENGINEER :

VB + E Pte Ltd
# 05-09 Harbour Link Complex
Ø150 B.I. PIPE 61 Alexandra Terrace, Singapore 119936
WATER CHECK VALVE
T +65 6561 4078 F +65 6561 5198
ALARM VALVE Mechanical & Electrical (LEAD) Consultant:
279

ARCHITECT:

PRESSURE
GAUGE Aedas Pte Ltd
TO DRAIN
11 North Buona Vista Drive, T +65 6734 4733
TO DRAIN #12-07 The Metropolis Tower 2 singapore@aedas.com
3mmx25mm Singapore 138589 aedas.com
COPPER PIPE

VIEW 'B'
AGILE No.: 000-000000-000
Ø16mm PROJECT:
EARTHING ROD
CGK063

TITLE:
4-WAY BREECHING INLET TYPICAL DETAIL FOR INSTALLATION OF SPRINKLER CONTROL VALVE INDOOR HYDRANT BOX (IHB) KOTAK HIDRAN DALM (800 X 180 X 300)
(C/W TEST DRAIN VALVE & FLOW METER)
FIRE PROTECTION STANDARD DETAIL 2

SCALE: DRAWING NO.: REV.:


N.T.S CGK063-DSCO-ZZ-XX-DR-M-8121 C