TASK 38-10-00-614-002-A
Self explanatory
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
ZONE/ACCESS
ZONE DESCRIPTION
171AL
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 38-10-00-861-053-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 38-10-00-865-053-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-10-00-210-054-A
C. Make sure that the APU BLEED switch on the AIR COND panel 30VU is set to OFF if the
APU is running.
D. Get Access
4. Procedure
(1) Turn and pull the fill and drain handle at service panel 2023VU from the NORMAL
position to the FILL position.
(2) Operate the water faucet in the lavatories to let air into the system.
(3) Push and turn the fill and drain handle to the NORMAL position.
NOTE: The light in the membrane switch comes on when the depressurization valve 4MD
opens.
(2) Operate the water faucet in the lavatories to let air into the system.
(a) Press the membrane switch 'WATER SYS DEPRESS' on the FAP 124RH again.
(b) The light in the membrane switch 'WATER SYS DEPRESS' is off.
The message 'VACUUM SYSTEM DISABLED - WATER DEPRESS ACTIVE' comes on.
NOTE: The green light in the 'WATER DEPRESS' button comes on when the depressurization
valve 4MD opens.
(2) Operate the water faucet in the lavatories to let air into the system.
(a) Push the 'WATER DEPRESS' button on the FAP 120RH again.
5. Close-up
Subtask 38-10-00-862-051-A
A. De-energize the ground service network
B. Close Access