C. MECHANICAL
1 ADIP-3655-2300-018-DGM-0009 GA Drawing Pebble Crusher Tower IFC Review with Comment 2 14-Mar-22 ADIP/HEKSA/524/III/2022 77
ADIP/HEKSA/422/I/2022
2 ADIP-3655-2310-018-DGM-0004 GA Drawing SAG Mill Feed Conveyor Ball Charger IFC Return for Correction 2 22-Apr-22 38
REPLACE
3 ADIP-3655-2310-018-DGM-0008 GA Drawing SAG Mill Trommel Screen Discharge Chute Re-IFC Return for Correction 2A 20-May-22 TRS-ETI-HEKSA-PBY-0053 10
5 ADIP-3655-2320-018-DGM-0007 GA Drawing Ball Mill Trommel Screen Discharge Chute Re-IFC Review with Comment 2A 01-Apr-22 ADIP/HEKSA/558/IV/2022 59
D. PIPING
6 ADIP-3655-2300-018-DIR-0001 3D Model Area 2300 - Stock Pile & Reclaim Apron Feeders IFC Review with Comment 2 26-Jan-22 ADIP/HEKSA/408/I/2022 124
7 ADIP-3655-2310-018-DIR-0001 3D Model Area 2310 - SAG Mill & Ball Mill Re-IFA Approved 1A 04-Mar-22 ADIP/HEKSA/505/III/2022 87
8 ADIP-3655-2310-018-DIG-0001 Piping GA Drawing Area 2310 - SAG Mill & Ball Mill (new) IFA Approved 1 09-May-22 TRS-ETI-HEKSA-PBY-0035 21
11 ADIP-3655-2100-018-DII-0001-03 Isometric Air Low Pressure System IFA Approved 1 14-Apr-22 ADIP/HEKSA/580/IV/2022 46
13 ADIP-3655-2100-018-DII-0001-07 Isometric Slurry Carbon Water System IFA Approved 1 14-Apr-22 ADIP/HEKSA/580/IV/2022 46
14 ADIP-3655-2100-018-DII-0001-08 Isometric Slurry Process System IFA Return for Correction 1 09-May-22 TRS-ETI-HEKSA-PBY-0035 21
22 ADIP-3655-2100-018-DII-0001-17 Isometric Raw Water System IFA Return for Correction 1 09-May-22 TRS-ETI-HEKSA-PBY-0035 21
E. ELECTRICAL
28 ADIP-3655-2100-018-SLE-0012-2 Electrical Interconnection Diagram MV Re-IFA Approved with Note 1A 10-May-22 TRS-ETI-HEKSA-PBY-0038 20
F. INSTRUMENT
29 ADIP-3655-2200-018-DWG-0001 Instrument Loop Drawing - Area 2200 - Crushing Re-IFC Return for Correction 2A 10-May-22 TRS-ETI-HEKSA-PBY-0038 20
34 ADIP-3655-2700-018-DWG-0001 Instrument Loop Drawing - Area 2700 - Reagents Re-IFC Return for Correction 2A 10-May-22 TRS-ETI-HEKSA-PBY-0038 20
35 ADIP-3655-2800-018-DWG-0001 Instrument Loop Drawing - Area 2800 - Tailings Thickening Re-IFC Return for Correction 2A 10-May-22 TRS-ETI-HEKSA-PBY-0038 20
37 ADIP-3655-2300-018-CFC-0003 Structural Calculation Pebble Crusher IFA Return for Correction 1 30-Nov-21 ADIP/HEKSA/281/XI/2021 181
38 ADIP-3655-2300-018-CFC-0006 Foundation Calculation Pebble Crusher Feed Conveyor IFC Return for Correction 2 09-May-22 TRS-ETI-HEKSA-PBY-0030 21
Oustsanding Document Poboya Under Revise Heksa
Update : 28-May-22
Return
No. Document Number Description Last Status Transmittal Overdue Remarks
Date
39 ADIP-3655-2300-018-CFC-0007 Foundation Calculation Pebble Crusher Re-IFA Approved 1A 23-Apr-22 TRS-ETI-HEKSA-PBY-0023 37
46 ADIP-3655-2600-018-CFC-0010 Foundation Calculation Fire Water Pump Set Not Yet Submit
Calculation of Foundation Potable Water Tank 2650-TK-
47 ADIP-3655-2600-018-CFC-0012 IFA Approved with Note 1 21-Mar-22 ADIP/HEKSA/540/III/2022 70
012
48 ADIP-3655-2600-018-CFC-0014 Foundation Calculation Safety Shower Backup Pump Not Yet Submit
49 ADIP-3655-2600-018-CFC-0018 Calculation of Foundation for Diesel Day Tank IFA Return for Correction 1 17-Mar-22 ADIP/HEKSA/538/III/2022 74
51 ADIP-3655-2600-018-CFC-0032 Structure Calculation Diesel Fuel Storage Tank Shelter IFA Approved 1 09-Mar-22 ADIP/HEKSA/518/III/2022 82
52 ADIP-3655-2600-018-CFC-0033 Foundation Calculation Diesel Fuel Storage Tank Shelter IFA Approved 1 09-Mar-22 ADIP/HEKSA/518/III/2022 82
55 ADIP-3655-2700-018-CFC-0002 Foundation Calculation Reagents Area IFA Return for Correction 1 23-Apr-22 TRS-ETI-HEKSA-PBY-0023 37
56 ADIP-3655-2700-018-CFC-0006 Calculation of Foundation for Sodium Hydroxide Tank IFA Return for Correction 1 04-Apr-22 ADIP/HEKSA/564/IV/2022 56
57 ADIP-3655-2200-018-CDR-0005 Foundation Drawing Crusher Re-IFC Return for Correction Rev 2A 28-Apr-22 Replace by Email 32
Foundation Drawing Pebble Crusher Feed Conveyor (2330- IFC Return for Correction 2
58 ADIP-3655-2300-018-CDR-0008 09-May-22 TRS-ETI-HEKSA-PBY-0031 21 Percepatan
CV-005) Re-IFC Approved 2A (Unofficial)
59 ADIP-3655-2300-018-CDR-0009 Foundation Drawing Pebble Tower IFA Approved 1 12-May-22 TRS-ETI-HEKSA-PBY-0043 18
IFA Approved 1
62 ADIP-3655-2600-018-CDR-0005 Foundation Drawing Raw Water Pump 2620-PP-015 & 016 08-Mar-22 ADIP/HEKSA/511/II/2022 83 Percepatan
IFC Approved 2 (Unofficial)
Foundation Drawing Gland Water Pump 2620-PP-017 & IFA Approved 1
63 ADIP-3655-2600-018-CDR-0007 08-Mar-22 ADIP/HEKSA/511/II/2022 83 Percepatan
018 IFC Approved 2 (Unofficial)
Foundation Drawing Process Water Pump 2630-PP-021 &
64 ADIP-3655-2600-018-CDR-0009 IFA Approved with Note 1A 21-Mar-22 ADIP/HEKSA/540/III/2022 70
022
65 ADIP-3655-2600-018-CDR-0010 Foundation Drawing Diesel Fire Water Pump Set IFA Approved with Note 1 28-Apr-22 TRS-ETI-HEKSA-PBY-0029 32
66 ADIP-3655-2600-018-CDR-0012 Foundation Drawing Potable Water Storage Tank IFA Return for Correction 1 04-Apr-22 ADIP/HEKSA/564/IV/2022 56
69 ADIP-3655-2600-018-CDR-0018 Foundation Drawing Diesel Day Tank 2669-TK-013 & 014 IFA Return for Correction 1 17-Mar-22 ADIP/HEKSA/538/III/2022 74
73 ADIP-3655-2600-018-CDR-0024 Structural Drawing Air Compressor Shelter Re-IFC Return for Correction 2A 27-May-22 TRS-ETI-HEKSA-PBY-0057 3
74 ADIP-3655-2600-018-CDR-0025 Foundation Drawing Air Compressor Shelter Re-IFC Return for Correction 2A 27-May-22 TRS-ETI-HEKSA-PBY-0057 3
Return
No. Document Number Description Last Status Transmittal Overdue Remarks
Date
82 ADIP-3655-2600-018-CDR-0038 Structural Drawing Diesel Day Tank Shelter IFA Return for Correction 1 17-Mar-22 ADIP/HEKSA/538/III/2022 74
83 ADIP-3655-2600-018-CDR-0039 Foundation Drawing Diesel Day Tank Shelter IFA Return for Correction 1 17-Mar-22 ADIP/HEKSA/538/III/2022 74
84 ADIP-3655-2600-018-CDR-0040 Foundation Drawing Process Water Tank 2620-TK-011 IFA Return for Correction 1 04-Apr-22 ADIP/HEKSA/564/IV/2022 56
85 ADIP-3655-2700-018-CDR-0002 Foundation Drawing Reagents Area IFA Approved with Note 1 23-Apr-22 TRS-ETI-HEKSA-PBY-0023 37
86 ADIP-3655-2100-018-DCG-0001 Road & Pavement Drawing IFA Return for Correction 1 09-May-22 TRS-ETI-HEKSA-PBY-0037 21
88 ADIP-3655-2100-018-MTC-0005 MTO for Piping IFC Return for Correction 2 11-May-22 TRS-ETI-HEKSA-PBY-0041 19
89 ADIP-3655-2100-018-PQP-0001 Project Quality Plan Re-IFA Review with Comment 1A 14-Dec-21 ADIP/HEKSA/308/XII/2021 167
90 ADIP-3655-21000-018-QCP-0001 Quality Control Plan IFA Review with Comment 1 21-Feb-22 ADIP/HEKSA/479/II/2022 98
91 ADIP-3655-2100-018-SEW-0001 Steel Erection Work Procedure IFA Return for Corection 1 25-Oct-21 ADIP/HEKSA/185/X/2021 217
92 ADIP-3655-2100-018-FTW-0001 Fabrication Tank Procedure IFA Review with Comment 1 29-Sep-21 ADIP/HEKSA/95/IX/2021 243
93 ADIP-3655-2100-018-EWP-0001 Earth Work Procedure Re-IFC Review with Comment 2A 21-Apr-22 TRS-ETI-HEKSA-PBY-0015 39