ANNEXURE A
LABOUR QUOTATION
No. Particulars Unit Rate
A EXCAVATION
1 Up to 5'-0" depth CFT 6.24
2 From 5'-0" to 10'-0" depth CFT 7.40
3 From 10'-0" to 15'-0" depth CFT 9.25
B BACK FILING
1 Earth Filling Only Labour CFT 3.70
2 Earth levelling & Dressing Labour SFT 5.09
C FLOOR CONCRETE
1 Upto 4" PCC under Floor / Foundation SFT 8.79
2 Upto 5" PCC under Floor / Foundation SFT 9.71
3 Upto 6" PCC under Floor / Foundation SFT 10.18
4 6" Vat Mix SFT 8.33
5 9" Vat Mix SFT 9.94
D RCC WORK
1 Footing / Base With Shuttering CFT 115.63
2 RCC Pedestal / Column / Plinth Beam upto Plinth Level CFT 138.75
3 RCC Slab 5" Upto 10'.00 SFT 78.63
4 RCC Paradi 4" SFT 60.13
5 RCC Paradi 6" SFT 64.75
6 RCC Paradi 8" SFT 69.38
7 RCC Paradi 9" SFT 74.00
8 RCC Tappa NOS 786.25
9 Copping 5" x 9" RFT 69.38
10 Plinth Beam to 10'-0" lvl RFT/CFT 138.75
11 Lintel upto 6'th upto 10'0' ht RFT 78.63
12 Chajja upto 4"th upto 10'-0' ht SFT 115.63
13 Fixing Foundation Bolt 0 to 10' ht Nos 124.88
14 RCC Slab Beam 10' RFT/CFT 138.75
15 Vatta 4"X4" RFT 13.88
16 Vatta 6"X6" RFT 18.50
17 Machine Foundation In Floor Level CFT 124.88
18 Collumn Grouting In Floor Level SFT 115.63
19 Base Plate Only Labour NOS 138.75
F PLASTER WORK
1 Finish Plaster upto 10'0 ht SFT 14.80
2 D/C mala / sand face (bunch) plaster 10'-0' ht SFT 20.35
3 Patta Patti for single coat 4" /RFT 14.80
4 Patta Patti for double coat 4" / RFT 20.35
5 Tapak . Gici RFT 13.88
6 Zari Filling for tiles / electric zari RFT 14.80
7 D/C Tipni plaster (woden Gutka) upto 10'-0 ht SFT 23.13
8 ON R.C.C. Tancha SFT 4.63
G FLOORING WORK
1 I.P.S. Work 4 " thick SFT 12.49
2 I.P.S. Work 6" thick SFT 14.80
3 Extra For Trimax Work SFT 5.55
4 I.P.S Trimix Steel Zalli Work SFT 4.16
J DEPARTMENT
1 Mason Day 878.75
2 Labour Day 360.75
3 Rent for Braker Machine Day 2,312.50
K DISMANTALING WORK
1 9" / 14" Brick Wall SFT 18.50
2 RCC Beam/collumn/Slab/Wall Etc. CFT 259.00