DQS 360: CONSTRUCTION PROJECT MANAGEMENT
ASSIGNMENT 1: PROJECT REPORT
THE TASK:
As construction project manager for a Proposed Mix Development on lots 2601 and 2602 at
Persiaran Iskandar Perdana 80, Seri Iskandar Perak. Table below shows 10 activities as a
project planning proposal to show the sequences of the project activities. The project start date
on 4 April 2022.
v) Discuss how far the utilisation of project management software affects the project
performance in terms of time, cost, scope and quality of a construction project.
2
DQS 360: CONSTRUCTION PROJECT MANAGEMENT
ASSIGNMENT 1: PROJECT REPORT
REPORT REQUIREMENTS
Kindly note that the report must be prepared and compile in PDF file format in Times New
Roman (12 font) 1.5 spacing and must be in numbering system. Report is to be submitted
online. Make sure that your report follows the rubrics given below.
RUBRICS ASSESSMENT
1. Introduction = 5 marks
2. Definition AoA and Precedence diagram = 10 marks
3. Project planning calculation = 30 marks
4. Microsoft Project Software application = 20 marks
5. Discussion = 10 marks
6. Conclusion = 5 marks
7. References = 5 marks
8. Organisation of report = 10 marks
9. Peer assessment (Individual marks) = 5 marks
1. Introduction = 5 marks
3
DQS 360: CONSTRUCTION PROJECT MANAGEMENT
ASSIGNMENT 1: PROJECT REPORT
5. Discussion = 10 marks
a. Exemplary – 9-10 : Discussion all the key contents are presented outstandingly
clear, effective and logical. Smooth flow of ideas and expression with no errors.
b. Excellent – 7-8 : Discussion all the key contents are excellent presented effective
and logical but not in logical manner.
c. Good – 5-6 : Discussion all the key contents are good presented but not in logical
manner.
d. Average – 3-4 : Discussion all the key contents are moderate presented but not in
logical manner.
e. Poor – 1-2 : Discussion is poor all the key contents but not clearly reflected.
f. Very Poor – 0 : No appropriate discussion were made.
6. Conclusion = 5 marks
4
DQS 360: CONSTRUCTION PROJECT MANAGEMENT
ASSIGNMENT 1: PROJECT REPORT
7. References = 5 marks