LEVEL 4 – GUIDELINE

Drilling & Wells

GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

02 04/2020 Addition of GALLAF well specific information & attachments


01 Nov 2019 Addition of new combined manifold
00 Jun 2017 First issue
Rev. Date Purpose of the revision

Owning entity: OPS/DW Other approving entities: N/A

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 2 of 28

Revision Notes

Rev.: Date: Revision Description


00 Jun 2017 Full Appropriation of QA-DRL-GDE-0008 Rev 1.0
01 Nov 2019 Addition of new combined manifold SAP numbers and Chemical
Injection manifold
02 04/2020 Addition of GALLAF well specific information & attachments

Remarks:

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 3 of 28

Contents

1. OBJECTIVE............................................................................................................... 4

2. SCOPE.......................................................................................................................4

3. RELATED DOCUMENTS.......................................................................................... 4

4. DEFINITIONS AND ABBREVIATIONS......................................................................6

5. TYPICAL XMAS TREE AND WHO ARRANGEMENTS............................................ 7

6. STANDARD MANIFOLDS......................................................................................... 9
6.1 Summary Table of Manifolds Required for Existing Wells (Infill and Workover)................ 9
6.2 Manifold for Top of the SWAB Valve................................................................................ 10
6.3 Manifolds for THP Transmitter..........................................................................................11
6.4 Manifold for KWV............................................................................................................. 12
6.5 Manifold for C-section...................................................................................................... 13
6.6 Manifold for B-Section......................................................................................................14
6.7 Manifold for WHO Hydraulically-Operated Downhole Flow Control Valve.......................15
6.8 Manifold for WHO SSSV..................................................................................................17
6.9 Manifold for WHO Downhole Chemical Injection............................................................. 19

7. GALLAF SPECIFIC MANIFOLDS...........................................................................21


7.1 Summary Table of Manifolds Required for New Wells (GALLAF Phase 2)..................... 21
7.2 Change of Wellhead System to BHGE Vetco Generation 6............................................ 22
7.3 Manifold for WHO Hydraulically-Operated Downhole Flow Control Valve.......................26
7.4 Manifold for WHO SSSV..................................................................................................27

Appendix 1 Equipment Summary List and Symbols.............................................28


Attachments
Attachment #1 Battery Limit_P&ID Typical Water Injection Well
Attachment #2 Battery Limit_P&ID Typical Producer Well
Attachment #3 Example P&IDs
Attachment #4 HB Chemical Injection Manifold Technical Drawing
Attachment #5 SSSV Sigma Valve critical measurement

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 4 of 28

1. OBJECTIVE
This document details the instrumentation fittings which should be installed on every Xmas Tree
and Wellhead, prior to handing over for production operations.
The objective of this document is to provide an overview of the various fittings required to build
manifolds which will complete the barrier envelope on the different parts of the Xmas Tree and
wellhead after completion deployment. Also it shall serve to formalise the review process for
this information.

2. SCOPE
The scope of this document is to provide details of the manifolds which should be installed to
complete the barrier envelope prior to handing the well over to the Field Operations Department.
Any deviation from these configurations shall not be considered without the written consent of
the Drilling & Wells Manager.
RELATED DOCUMENTS
The reference documents listed below form an integral part of this document.

External documents
Unless otherwise indicated, the applicable version of these documents, including relevant
appendices and supplements, is the latest revision published.

Reference Title
27-21-0033-R01 Drawing Hytor FSV Kit 6Mo – Part 1
27-21-0036-R01 Drawing Hytor WHO Manifold HB
152990-001 Drawing Sigma Valves 3-way Fusible Valve

Attachment #1 Battery Limit_P&ID Typical Water Injection Well


Attachment #2 Battery Limit_P&ID Typical Producer Well
Attachment #3 Example P&IDs
Attachment #4 HB Chemical Injection Manifold Technical Drawing
Attachment #5 SSSV Sigma Valve critical measurement

North Oil Company documents


Unless otherwise indicated, the applicable version of these documents, including relevant
appendices and supplements, is the latest revision published.

Reference Title
SD-NOC-DW-614 D&W à FO Initial Well Handover Certificate
SD-NOC-DW-615 FO - D&W Well Handover Certificate

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 5 of 28

3. DEFINITIONS AND ABBREVIATIONS


DHG Downhole Pressure and Temperature Gauge
FSV Fire Safety Valve
KWV Kill Wing Valve
NPT National Pipe Thread
P&ID Piping & Instrumentation Diagram
THP Tubing Head Pressure
WH Well Head
WHO Well Head Outlet
SSSV Sub-Surface Safety Valve
SWCS Smart Well Control System

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 6 of 28

4. TYPICAL XMAS TREE AND WHO ARRANGEMENTS

Production
or
Back-produced Injection Well

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 7 of 28

Injection Well
(no back-flow production)

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 8 of 28

5. STANDARD MANIFOLDS
5.1 Summary Table of Manifolds Required for Existing Wells (Infill and Workover)
XMAS TREE
Manifold Name Manifold ID Material Number Quantity
Swab Cap A 1022360 1
THP Transmitter B 1022361 2
KWV C 1022362 1

WELLHEAD
Manifold Name Manifold ID Material Number Quantity
D/ C-Section D 1022363 1
B-Section E 1022364 1
Downhole Flow Control Valve* FB TBC 3 (based on 2-zone)
4 (based on 3-zone)
5 (based on 4-zone)
SSSV Kit Part 1 G 100158074 1
Chemical Injection** HB 1032110 1

* Downhole Flow Control Valve Manifolds for multi-zone completions


(one per zone + one common close line).

** Chemical Injection Manifold for Producer wells only.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 9 of 28

5.2 Manifold for Top of the SWAB Valve


1 manifold is required to be installed on top of the SWAB valve.

Material Description Quantity


100122432 1/2” NPT Multiport Needle Valve 6 kpsi 1
199183732 1/2” NPTM x 1/2” Parker Hannifin A-LOK® 6 kpsi 1
199183749 1/2” Parker Hannifin A-LOK® Plug 6 kpsi 1
199183752 1/2” NPTM Nipple 6 kpsi 2
199183677 1/2” NPTM Bull Plug 6 kpsi 2
100119577 1/2" NPTF x 1/2" NPTF Needle Valve 6 kpsi 2
1022360 SWAB Valve Manifold Assembly 1

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 10 of 28

5.3 Manifolds for THP Transmitter


2 manifolds are required for THP transmitter, 1 on both sides of Xmas Tree T-piece.

Material Description Quantity


199183629 1/2" NPTM x 1/2" NPTM Nipple 90 deg 6 Mo 6 kpsi 2
100119577 1/2" NPTF x 1/2" NPTF Needle Valve 6 kpsi 2
199183732 1/2" NPTM x 1/2" OD Parker Hannifin A-LOK® 6 kpsi 2
199183749 1/2" Parker Hannifin A-LOK® End Cap 6 kpsi 2
1022361 THP Transmitter Manifold Assembly 2

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 11 of 28

5.4 Manifold for KWV


1 manifold is required to be installed on the KWV.

Material Description Quantity


199183732 1/2" NPTM x 1/2" Parker Hannifin A-LOK® 6 kpsi 1
199183749 1/2" Parker Hannifin A-LOK® Plug 6 kpsi 1
100068349 1/2" NPTF x 1/2" NPTF Ball Valve 6 kpsi 1
199183752 1/2" NPTM Nipple 6 kpsi 1
1022362 KWV Manifold Assembly 1

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 12 of 28

5.5 Manifold for C-section


1 manifold is required to be installed on the C-section.
However, it is not necessary to install the manifold if Field Ops is going to install gas lift injection
line onto the D/ C-section, just after well handover.

Material Description Quantity


100122432 1/2” NPT Multiport Needle Valve 6 kpsi 1
199183732 1/2" NPTM x 1/2" Parker Hannifin A-LOK® 6 kpsi 1
199183749 1/2" Parker Hannifin A-LOK® Plug 6 kpsi 1
199183752 1/2" NPTM Nipple 6 kpsi 1
199183677 1/2” NPTM Bull Plug 6 kpsi 1
100119577 1/2" NPTF x 1/2" NPTF Needle Valve 6 kpsi 1
199146207 3,000 psi (200 barg) Pressure Gauge (Monel) 1
1022363 D/ C-section Manifold Assembly 1

Note: during the life of the well, leaks in tubing, casing or other hardware may occur. In these
scenarios there may be a requirement to add a separate pressure transducer on a temporary
basis to either the B-section or C-section where a transducer is not normally present.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 13 of 28

5.6 Manifold for B-Section


1 manifold is required to be installed on the B-section.

Material Description Quantity


100122432 1/2” NPT Multiport Needle Valve 6 kpsi 1
199183732 1/2" NPTM x 1/2" Parker Hannifin A-LOK® 6 kpsi 1
199183749 1/2" Parker Hannifin A-LOK® Plug 6 kpsi 1
199183752 1/2" NPTM Nipple 6 kpsi 1
199183677 1/2” NPTM Bull Plug 6 kpsi 1
100119577 1/2" NPTF x 1/2" NPTF Needle Valve 6 kpsi 1
199146205 1,500 psi (100 barg) Pressure Gauge (Monel) 1
1022364 B-section Manifold Assembly 1

Note: during the life of the well, leaks in tubing, casing or other hardware may occur. In these
scenarios there may be a requirement to add a separate pressure transducer on a temporary
basis to either the B-section or C-section where a transducer is not normally present.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 14 of 28

5.7 Manifold for WHO Hydraulically-Operated Downhole Flow Control Valve


1 manifold is required to be installed for each Hydraulically-Operated Downhole Flow Control
Valve and 1 manifold for the common return line.
In total, 3 manifolds are required to be installed on the WH for a 2-zone smart completion.
Consequently, 4 manifolds are required to be installed on the WH for a 3-zone smart completion.
Finally, 5 manifolds are required to be installed for a 4-zone smart completion.

FA

Material Description Quantity


100077268 1/2" NPTM x 1/2" NPTM Nipple 6 Mo 10 kpsi 8
100124110 1/2" NPTF T-block 6 Mo 10 kpsi 4
199146210 10,000 psi (700 barg) Pressure Gauge (Monel) 4
100122130 1/2" NPTF x 1/2" NPTF Needle Valve 6 Mo 10 kpsi 4
100135061 1/2” NPTM x 3/8” NPTM Reducer Nipple 10 kpsi 4
199146007 3/8” NPTF x Brunning Quick Nipple 10 kpsi 4
199107015 Corrosion Rubber Protector Cap 4

1022365 WHO Downhole Flow Control Valve Manifold Assembly 4

Note: FA will slowly be phased out and replaced by Manifold FB.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 15 of 28

1 manifold is required to be installed for each Hydraulically-Operated Downhole Flow Control


Valve and 1 manifold for common return line.
In total, 3 manifolds are required to be installed on the WH for a 2-zone smart completion.
Consequently, 4 manifolds are required to be installed on the WH for a 3-zone smart completion.
Finally, 5 manifolds are required to be installed for a 4-zone smart completion.

FB

Material Description Quantity


100077268 ½” NPTM x ½” NPTM Nipple 6 Mo 10 kpsi 8
100124110 ½” NPTF T-block 6 Mo 10 kpsi 4
199146210 10,000 psi (700 barg) Pressure Gauge (Monel) 4
100122130 ½” NPTF x ½” NPTF Needle Valve 6 Mo 10 kpsi 4
100122136 ½” NPTM x ½” NPTF Needle Valve 6 Mo 10 kpsi 4
*Not yet part of Manifold Assembly: 1022365
100135061 ½” NPTM x 3/8” NPTM Reducer Nipple 10 kpsi 4
199146007 3/8” NPTF x Brunning Quick Nipple 10 kpsi 4
199107015 Corrosion Rubber Protector Cap 4

TBC WHO Downhole Flow Control Valve Manifold Assembly 4

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 16 of 28

5.8 Manifold for WHO SSSV


1 manifold is required to be installed for SSSV.
Left with Sigma Fusible Plug (100158074 FSV Kit Part 1 supplied by Hytor) for well handover to
Field Operations. Engineering & Construction to install FSV Kit Part 2 (100158075) after well
handover.
Appendix 3 indicates the critical measurement of the Sigma Valve. Due to the system being fail
closed, over time the cap degrades resulting in an eventual leak.
Newly installed valves measure: 4-13/16” (4.8125”). This measurement is to be recorded for
future Well Services/Wellhead Maintenance activities.

Note: See Attachment #5 _SSSV Sigma Valve critical measurement for further detail.

GA

Material Description Quantity


199107049 3-way Fusible Plug 1/4" Ports 124 deg.C SS316 10 kpsi 1
100150887 1/2” NPTM x 1/4" NPTM Reducing Nipple 6 Mo 15 kpsi 1
100122130 1/2" NPTF x 1/2" NPTF Needle Valve 6 Mo 10 kpsi 1
100077268 1/2" NPTM x 1/2" NPTM Nipple 6 Mo 10 kpsi 1
100158074 WHO SSSV Manifold Assembly 1
If required, the orientation of the manifold on the WHO can be modified with the below 10 kpsi
Elbows. This can occur in occasions where clashes with other manifolds or pipework prevent
the standard manifold to be installed.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 17 of 28

Material Description Quantity


100122434 1/2” NPTM x 1/2" NPTF 90 deg Elbow 6 Mo 10 kpsi If required
100122435 1/2” NPTM x 1/2" NPTF 45 deg Elbow 6 Mo 10 kpsi If required
As highlighted in the SD-NOC-DW-614, Drilling & Wells hand over SSSV to Field Ops with a
“Locked Close” (temporary sign) for SSSV kit installation and pressure test.
Field Ops will ensure that SSSV Needle Valve is in “Locked Open” position (final sign).
Then, Drilling & Wells will only be operating this SSSV Needle Valve after this point and will be
tracked in each well handover certificate, as per SD-NOC-DW-615.
An example of temporary and final signs are shown in the below picture.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 18 of 28

5.9 Manifold for WHO Downhole Chemical Injection


1 double block and bleed manifold is required to be installed for Downhole Chemical Injection.

HA

Material Description Quantity


100077268 1/2" NPTM x 1/2" NPTM Nipple 6 Mo 10 kpsi 2
100122130 1/2" NPTF x 1/2" NPTF Needle Valve 6 Mo 10 kpsi 1
100122136 1/2” NPTM x 1/2" NPTF Needle Valve 6 Mo 10 kpsi 2
100124110 1/2" NPTF T-block 6 Mo 10 kpsi 1
1022366 WHO Downhole Chemical Injection Manifold Assembly 1

Note: HA will slowly be phased out and replaced by Manifold HB.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 19 of 28

1 integrated double block and bleed manifold is required to be installed for Downhole Chemical
Injection.

Note: See Attachment #4 for more details: Chemical Injection Manifold Technical Drawing

HB

Material Description Quantity


1032110 WHO Downhole Chemical Injection Manifold Assembly 1

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 20 of 28

6. GALLAF SPECIFIC MANIFOLDS


6.1 Summary Table of Manifolds Required for New Wells (GALLAF Phase 2)
XMAS TREE
Manifold Name Manifold ID Material Number Quantity
Swab Cap A 1022360 1
THP Transmitter B 1022361 2
KWV C 1022362 1

WELLHEAD
Manifold Name Manifold ID Material Number Quantity
D/ C-Section D 1022363 1
B-Section E 1022364 1
Downhole Flow Control Valve FC TBC 3 (based on 2-zone)
4 (based on 3-zone)
5 (based on 4-zone)
SSSV Kit Part 1 GB TBC 1
**Chemical Injection HB 1032110 1

*Downhole Flow Control Valve Manifolds for multi-zone completions


(one per zone + one common close).

**Chemical Injection Manifold for Producer wells only.

Manifold variations and changes from existing wells (infill and workover) will only be highlighted
in the following section

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 21 of 28

6.2 Change of Wellhead System to BHGE Vetco Generation 6

During the Gallaf project the Vendor supplying and installing the Wellhead system will change to
BHGE Vetco. They will be providing a system that has different connection into the main body of
the tree and wellhead (i.e. the Pressure Transmitter tie-in point and the WHO’s), all hubs will
remain to have ½” NPT (female) ports connection points.

Port Connection type Effected Autoclave Serial Comment


manifolds Number
Pressure 9/16” Autoclave - B 15MX98K8 – Monel Make-up torque =
transmitter 60 - 75 ft/lb
WHO blocks 1” MP Autoclave - All WHO 15MX168K8 – Monel Make-up torque =
manifolds 100 - 125 ft/lb

Due to the change of Wellhead system, it is necessary to introduce a x-over between the
wellhead/ tree and the respective manifolds.

Additionally a swivel will be provided, to be used if required for installation of manifolds without
the need to rotate the entire assembly during make-up.

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 22 of 28

X-Over for Pressure transmitter port to Manifold B:


9/16” male Autoclave x ½” NPT female _ Pressure Rating: 15,000 psi
NOC SAP Number: TBC

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 23 of 28

X-Over for Wellhead Outlet Ports:


1” MP male Autoclave x ½” NPT female _ Pressure Rating: 15,000 psi
NOC SAP Number: TBC

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 24 of 28

Swivel Adaptor:
½” NPT male x ½” NPT male _ Pressure Rating: 10,000 psi
NOC SAP Number: TBC

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 25 of 28

6.3 Manifold for WHO Hydraulically-Operated Downhole Flow Control Valve


1 manifold is required to be installed for each Hydraulically-Operated Downhole Flow Control
Valve and 1 manifold for common return line. Each line will be tied-in to the Smart Well Control
System (SWCS).
In total, 3 manifolds are required to be installed on the WH for a 2-zone smart completion.
Consequently, 4 manifolds are required to be installed on the WH for a 3-zone smart completion.
Finally, 5 manifolds are required to be installed for a 4-zone smart completion.

FC

The manifold FC allows for direct hook-up from the WH to the SWCS, and the added ability of
tie-in at the WH for flushing and/ or intervention function.
The connection for tie-in is 1/2" NPT female.
The below materials are the required quantity for one manifold.

Material Description Quantity


100077268 1/2" NPTM x 1/2" NPTM Nipple 6 Mo 10 kpsi 2
100124110 1/2" NPTF T-block 6 Mo 10 kpsi 2
199146210 10,000 psi (700 barg) Pressure Gauge (Monel) 1
100122136 1/2” NPTM x 1/2" NPTF Needle Valve 6 Mo 10 kpsi 3
199183722 1/2" NPTM x 1/4" Parker Hannifin A-LOK® 10 kpsi 1
199183747 1/4" Parker Hannifin A-LOK® Plug 1
TBC WHO Downhole Flow Control Valve Manifold Assembly 4

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 26 of 28

6.4 Manifold for WHO SSSV


1 manifold is required to be installed for SSSV.
One Needle Valve for isolation at the WHO. Engineering & Construction to install SSSV Kit Part
2 after well handover. Fusible Plug has been removed.

GB

Material Description Quantity


100122130 1/2" NPTF x 1/2" NPTF Needle Valve 6 Mo 10 kpsi 1
100077268 1/2" NPTM x 1/2" NPTM Nipple 6 Mo 10 kpsi 1
TBC WHO SSSV Manifold Assembly 1

Below SSSV Kit Part 2 manifold is supplied by D&W (for reference only).

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 27 of 28

Appendix 1 Equipment Summary List and Symbols

15 kpsi
Material Description Symbol
100108487 Schlumberger Sealtite DHG WHO Inconel 15 kpsi

100150887 1/2” NPTM x 1/4" NPTM Reducing Nipple 15 kpsi

10 kpsi
Material Description Symbol
100077268 1/2" NPTM x 1/2" NPTM Nipple 6 Mo 10 kpsi

100117103 Halliburton Antech DHG WHO 6 Mo 10 kpsi

100122130 1/2" NPTF x 1/2" NPTF Needle Valve 6 Mo 10 kpsi

100122434 1/2” NPTM x 1/2" NPTF 90 deg Elbow 6 Mo 10 kpsi N/A

100122435 1/2” NPTM x 1/2" NPTF 45 deg Elbow 6 Mo 10 kpsi N/A

100124110 1/2" NPTF T-block 6 Mo 10 kpsi

100135061 1/2” NPTM x 3/8” NPTM Reducer Nipple 10 kpsi

199107049 3-way Fusible Plug 1/4" Ports 124 deg.C 10 kpsi

199146007 3/8” NPTF x Brunning Quick Nipple 10 kpsi

199146210 10,000 psi (700 barg) Pressure Gauge (Monel)

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 4 – GUIDELINE GM-NOC-DW-601

Xmas Tree and Wellhead Fittings

Rev.: 02 Effective date: 04/2020 Page: 28 of 28

6 kpsi
Material Description Symbol
199183629 1/2" NPTM x 1/2" NPTM Nipple 90 deg 6 Mo 6 kpsi

100068349 1/2" NPTF x 1/2" NPTF Ball Valve 6 kpsi

100119577 1/2" NPTF x 1/2" NPTF Needle Valve 6 kpsi

100122432 1/2” NPT Multiport Needle Valve 6 kpsi

199183677 1/2” NPTM Bull Plug 6 kpsi

199183732 1/2” NPTM x 1/2” Parker Hannifin A-LOK® 6 kpsi

199183752 1/2” NPTM Nipple 6 kpsi

199183749 1/2” Parker Hannifin A-LOK® Plug 6 kpsi

3 kpsi
Material Description Symbol
199146207 3,000 psi (200 barg) Pressure Gauge (Monel)

1.5 kpsi
Material Description Symbol
199146205 1,500 psi (100 barg) Pressure Gauge (Monel)

Other equipment
Material Description Symbol
199107015 Corrosion Rubber Protector Cap N/A

END OF DOCUMENT

This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.

You might also like