Marking Guideline: National Certificate April Examination Quantity Surveying N6 14 APRIL 2015
Marking Guideline: National Certificate April Examination Quantity Surveying N6 14 APRIL 2015
QUANTITY SURVEYING N6
MARKING GUIDELINE
NATIONAL CERTIFICATE
APRIL EXAMINATION
QUANTITY SURVEYING N6
14 APRIL 2015
QUESTION 1
1.1 1.1.1 Nominated suppliers are appointed by the Architect for the supply
only and delivery of specialist materials onto site. (2)
1.1.3 Escalations are increased costs for labour and materials as from
tender date to invoice date. (1)
1.2 1.2.1 M
1.2.2 No.
1.2.3 Sets
1.2.4 Kg.
1.2.5 Tons
1.2.6 M
1.2.7 M2
1.2.8 M2
1.2.9 M
QUESTION 2
2.1.2 0,895 m
2.1.3 3,550 m
2.1.4 1,640 m
2.1.5 0,890 m
2.1.6 1,190 m
2.1.7 1,155 m
2.1.8 3,250 m
2.1.9 0,900 m
2.2
2.2.1
̸ 2.2.4
335 Excavation in earth for septic ̸
1.64 tank n.e. 2 mdp 8.30 1 Bk wl in
1.75 550 2/150 300 1.45 ext. hard burnt
1.19 900 550 bks in 1 : 3 cm
2/150 300 850
0.89 2.24
0.85 1 750 0.55 (3)
\
# 2.2.5
̸
Backfill to sides and top of 0.90 ½ bk ditto
septic tank
1.45 \
\ (2)
(3)
2.2.2
̸
Excavation for c.a
0.89 Ddt
Backfill a.b
0.90
\ (3)
0.70
2.2.3
̸
15 MPa conc. In
3.55
tank bottom slab
1.64
1.16 3
Cube x 0,15 = m
0.97
#
Ddt
Backfill a.b
\ (3)
(14)
[25]
Copyright reserved Please turn over
MARKING GUIDELINE -5- T1370(E)(A14)T
QUANTITY SURVEYING N6
QUESTION 3
3.1 3.2
3.1.1
3.1.2
The following in No 18 roof trusses
Queen post all hoisted in fixed in position
1,732 ÷ 2 ̸
0,866 m
38 x 114 mm
Timber in length
3.1.3 In leghth n.e.
2,4 m long
Cos 30 x hypo = 1 500
18/ 1.73 -kp
18/2/
Cos 30 0.87 -qp
18/2
1.73 m 1.73 -structs
\
3.1.4 ̸
38 x 114 mm timber
Tie beam In length exc. 3,9 m n.e 6,6 m
-rafter
622 – 2 x 110 = 18/2/ 3.59
6,0 m -tie beam
18/ 6.00
\
3.1.5
Rafter.
Cos Ɵ = adj ̸
hypo 18/ Splay cut end to
2
rafter .a.u
hypo. Cos 30 = 3000 \
Cos 30
2771
hypo = 710 819
Cos 30
rafter 3,59 m
(5) (10)
3.3
̸
2/ 13.10 75 x 100 PVC gutter in
brackets fixed to fascia bd.
2/220 12 660
2/220 440
13 100
\
̸
2/
2 ex. On gutter for s.e
̸
2 Do for 75 mm dia outlet
̸
75 dia PVC r.w down pipe
a.u. incl. brackets
2/ 3.20 (provisional)
2 800
100
300
3 200
̸
2 ex. on 75 dia down pipe for
swan neck offset
#
Do. for shoe
QUESTION 4
̸
CONCRETE STAIRS 2.16 Fmwk to soffit of stairs
1.00 2.16√ Stairs
̸ 2.00
ITEM ITEM Allow the provisional sum of 0.50 1.00√
R16 000,00 for the supply 3.16√ # 800
and fixing steel reint. -300
500√
#
landg √
2.00 6/ 1.00 6.00√ ̸
2.60 y = 2.16√ 2/ 2.16 4.32√ Fmwk to risers, waists. Etc
0.15 0.78√ 0.50 0.50√ n.e. 300 mm hi
1.24√ \ 10.82√
\
1.00 ̸
1.80 Ddt
0.15 0.27√ Ditto /
0.27√ Opg 2.16 2.16√ E.o fmwk for smooth shutter surface
\
\
(1) (2)
Concrete
Formwork
Reinforcement
3
M
25 MPa in r.c M2
In stars inclusive fmwk to soffit Item
of landing Of stairs and landg allow the provision
1,24 1 Ddt 3,16 1 sum of R16,000
0,27 T 0,27 1 3 m2 for supply and
0,97 fixing of steel
1m3 reinforcement
M2 item 1
fmwk to sides
and soffit of
slab
0,57 2
1 m2 item
allow for profit
item 1
M
e.o. fmwk for
smooth shutter
surface to do.
2,16 2
2m
SQUARING
Number Column/Pages√
Check Side Casts√
Lines, Decimals√
Timesing, Dotting : on ½√
Totals √
ABSTRACTING
Check Squaring√
Run-through (must be done correctly)√
Separate Sheets / Sub – Section√
Order√
Run through abstract√
Reduce√
No ditto (fmwk)√
Columns√
Copy exactly√
Lines√
Units, Reference√
BILLING
Heading√
Unit amount√
Columns√
No abbreviation√
No decimals√
Ditto√
Summary √
(25)
[25]
TOTAL: 100
CONCRETE STAIRS
Unit of Amount
BILL NO 2 Measurem. Quantity Rate R C
Concrete
3
1. 25 mpa reinforce concrete M 1
in stairs inclusive of landings
Formwork
2
3. Ditto to sides and soffit of slab M 1
Carried to summary
Copyright reserved