UNIVERSITI TEKNOLOGI MARA

FORMATIVE ASSESSMENT

COURSE : MEASUREMENT OF CIVIL ENGINEERING WORKS


COURSE CODE : DQS363
TOPIC : CONCRETE WORK
ASSIGNMENT : 2
WEEK OF ISSUE : WEEK 7
WEEK OF : WEEK 8
SUBMISSION (please refer to your lecturer on the exact date)

INSTRUCTIONS TO STUDENTS

1. Answer the question in the Dimension Paper (Slip-sort) and Bill of Quantities for Civil
Engineering Works.

2. All measurement must be strictly in accordance with the principles laid down in
Malaysian Standard Method of Measurement for Civil Engineering Works (MyCESMM2).

3. This assessment is to achieve CLO2 and CLO3 as per stated below:


a. CLO2: Measure based on drawings and specifications by using the current
Malaysian Civil Engineering Method of Measurement (MyCESMM) for works in
Earthworks, CONCRETE WORK and Roads and Pavings.
b. CLO3: Organize all measured works, and compile a complete Bills of Quantities
for Earthworks, CONCRETE WORK and Roads and Pavings based on the current
Malaysian Civil Engineering Method of Measurement (MyCESMM).

4. The mode of this assessment is groupwork. Please refer to your lecturer on the number
of group members in a group. It is advisable that each group must not exceed THREE
(3) number of members.

5. The answer must be in handwritten.

6. Please attached the Declaration of Plagiarism by each group members together with this
assessment.

7. List down the group members at the front page of the answer.
QUESTION

Prepare a Bill of Quantities complete with taking off for all Concrete Work (except
reinforcement) for the proposed Suction Tank Platform as indicated in drawing
PUB/DQS363/1-3

(20 marks)
CONFIDENTIAL APPENDIX 1(1) AP/APR 2009/QSD393

UNIVERSin TEKNOLOGI MARA

Earth Level A
NOTES:

yOU CAN MAKE ALL NECESSARY


AND REASONABLE ASSUMPTIONS
WHERE APPLICABLE

500mm 450mm 20.00 450mm 500mm


30.00mm

300mm
450mm
•f-l Void No.2 Size -Suspended Slab Void No.1 Size Column ±
Column
450 x 4 5 0 m m
L_.
1
800 x 600mm
J- x 125mm thick El Size 1m x 8m
x 125mm Thick Kf 800 x 700mm
x 125mm Thick
450 x 450mm

| Upstand Beam Type A |


auu mm Length
- Machine Bed Size
3.30m x 2.80m x 0.80m d e e p 7000mm
| Upstand Beam Type B |
800 mm Length

| Upstand Beam Type C |


800 mm Length PROJECT TITLE:

| Upstand Beam Type C |


P R O P O S E D RETAINING W A L L
800 mm Length
I 1 r T" S U C T I O N T A N K PLATFORM

L
Column bass size
1mx1mx300mmthk
Column stump size
-_r I
Column b a s e size — '
1 m x 1m x 300mm ttik
Column stump size
|J I
Column base size —
1mx1mx300mmthk
Column stump size
a
2000mm
DRAWING TITLE:

350 x450mm 350 x450mm 350 x450mm


PLAN

ELEMENT:

CHECKED BY:
Earth Level B

ROSU HUSSIN, MISM


Registered Q S NO.19B4/MF00S39

DRAWN BY HISHAM

PLAN SCALE

DATE
1:100
MARCH2009
APRIL 2022

DRAWING NO.

PUB/QSD393/1
PUB/DQS363/1

© Hak Cipta Universiti Teknologi MARA' CONFIDENTIAL


CONFIDENTIAL APPENDIX 1(2) AP/APR 2009/QSD393

350mm

Earth Level A = 101m -Concrete wall Top Level = 101.10m


UMVERSITITEKNOLOGI M A R A

-Concrete Slab Top Level = 100.70m


NOTES:

YOU CAN MAKE ALL NECESSARY


AND REASONABLE ASSUMPTIONS
WHERE APPLICABLE

Concrete upstand beam top level = 96.60m

Concrete bed top level = 96m


>
600mm Concrete bed top level = 95.30m
PROJECT TITLE:
300mm Sloping Earth Level
300mm PROPOSED RETAINING WALL
SUCTION TANK PLATFORM
400mm

DRAWING TITLE:

SECTION A-A
Column stump size 350mm x 450mm ELEMENT:
Concrete column base top level = 93.50m
.M;
SECTION A-A r~
CHECKED BY:

ROSUHUSSIN.M1SM
Registered OS No.19a4/MF00539

DRAWN BY HISHAM

1. All Reinforced Concrete shall be type grade 30 cement to BS12 mixed with 20mm Aggregate. SCALE 1:50

DATE APRIL 2009


MARCH 2022
2. Provide 50mm thick blinding screed type grade C15 under bed, ground beam, and footing
DRAWING NO.
3. All formwork shall be rough finish except for formwork to exposed surfaces shall be fair finished

PUB/QSD393/2
PUB/DQS363/2

© Hak CIpta Unhrersiti Teknologi MARA CONFIDENTIAL


CONFIDENTIAL APPENDIX 1(3) AP/APR 2009/QSD393

, 240mm 110mm 90mm150mmllomm 180mnl 1)0mm,


110mm, ,130mm ,110mm
,110it

t—rr
i i n
I I ni i f I fH f T
100mm 100mm
NOTES:

330mm 330mm 330mm


YOU CAN MAKE ALL NECESSARY
AND REASONABLE ASSUMPTIONS
WHERE APPLICABLE

170mm 170mm 170mm

\
300mm thick RC Bed 300mm thick RC Bed 300mm thick RC Bed

Upstand Beam Type A Upstand Beam Type B Upstand Beam Type C

DETAIL OF UPSTAND BEAM

PROJECT TITLE:

300mm 300mm
300mm x 300mm x 300mm Pocket
300mm x 300mm x 300mm Pocket PROPOSED RETAINING WALL
SUCTION TANK PLATFORM

300mm
DRAWING TITLE:

300mm
DETAIL OF UPSTAND BEAM
AND MACHINE BASE

ELEMENT:
300mm thick RC Bed

CHECKED BY:

DETAIL OF MACHINE BASE


ROSUHUSSIN.MISM
Registered QS No.1984/MF00539
NOTE:
DRAWN BY HISHAM

1. All Reinforced Concrete shall be type grade 30 cement to BS 12 mixed with 20mm Aggregate. SCALE 1:20

2. Provide 50mm thick blinding screed type grade C15 under bed, ground beam, and footing DATE
DATE APRIL 2009
MARCH 2022

DRAWING NO.
3. All formwork shall be rough finish except for formwork to exposed surfaces shall be fair finished
PUB/QSD393/3
PUB/DQS363/3

© Hak Cipta Universiti Teknologi MARA CONFIDENTIAL