Activities

NPM Solution Overall


1 NPM Project Management
2 Vehicle and Driver
3 SIM card provision
4 Office Network Access
5 Third Party Data Interface(Performance, Configuration, MR, call trace...) Provision
6 Third Party OSS/EMS Access Permission
7 Third Party Equipment New Feature Application (First Node)
8 Third Party Equipment Upgrade and Bug Fixing
9 Sites & Nodes Access
10 Network hardware and license provision for network adjustment and expansion
11 Network hardware(including boards, antenna and feeder system) problem verification, fix and replacement
12 Non RF issues troubleshooting: Transmission, core, HLC, Wireless, power, external interference
13 Special Offers from customer, congestion, sudden Traffic increase
14 External interference issues
Solution Scope
1 Network Performance Troubleshooting
2 Network Parameter Audit and Optimization
3 Network Capacity Audit and Optimization
4 RF Performance Optimization
5 Normal complaint Handling and Analysis
6 VIP Assurance
7 Network KPI Optimization
8 Intelligent Frequency Optimization Service (IFOS)
9 ACP based Optimization
10 Multi-Network Coordination Optimization
11 Feature Introduction
12 Field actions: design action, RTWP, hardware issues, onsite action for each area
13 Network Insight Smart Planning & Optimization
14 Key Event Assurance
16 BM Report deliverable
17 Drive test log file data collection for quarter BM per city for GUL technologies
18 Drive test log file data collection for normal complaints
19 Drive test log file data collection for Benchmark inter operators for 2 cities
20 Provide the final analysis, report and deliverable for city, benchmark and complaints report
21 Follow the optimization action and comment after deliverable received
22 Site audit before ACP, design action implementation (Tilt, Azimuth) with pictures
Acceptance
1 Acceptance Methodology and Procedure
2 Acceptance Data Collection
3 Production and Submission of Acceptance Report
4 Approval of Acceptance Report
Almadar Huawei

R OK
R OK
R OK
R OK
R OK
R OK
R OK
R OK
R OK
R OK
R S OK
R OK
R OK
R S OK

S R OK
S R OK
S R OK
S R OK
S R OK
S R NOK
S R OK
S R NOK We already used this service before
S R NOK We already used this service before
S R OK
S R OK
R S OK
S R OK
S R OK
S R NOK
S R NOK
S R OK
S R NOK
S R OK for complains
S R OK
S R NOK

A R
S R
I R
R S