PROJECT TYPE
Education
PROJECT INFORMATION
LOCATION
Барселона, Испания
TeamAliasB1B2_B1M3U3_TA_Group 3 ABC
GBIM
GBIM2 plannerly.gbim2@e-zigurat.com
TEAM DIRECTORY
01
BEP
BIM Execution Plan
BEP
01
1 Foreward
1.1 Overview
1.2 Document Issue Record
2 Project information
2.1 Project Information
2.2 Abbreviations
2.3 Key Contacts
3 Management
3.1 Standards
3.2 Planning of work and data segregation
3.3 Model Uses
3.4 Roles and Responsibilities
3.5 Coordination and Clash Issue Management
3.6 Common Data Environment
3.7 Collaboration Strategy
3.8 Structuring and classification of information
3.9 Naming requirements
3.10 Quality Assurance Plan
3.11 Security
3.12 Health and Safety
3.13 Handover Strategy
3.14 BIM Uses
3.15 Federation Strategy
4 Technical
4.1 Software Platforms
4.2 System Performance
4.3 Information Exchange
4.4 Project Coordinate
4.5 Level of Information Need
4.6 Asset Information Requirements (AIR)
4.7 Asset Information Model (AIM)
BEP
4.8 Trial
4.9 Training
01
BEP
1 Foreward
01
1.1 Overview
The intent of this BIM Execution Plan (BEP) is to provide a framework that will let the Team members
deploy building information modeling (BIM) technology and best practices on this project faster and more
cost-effectively.
This document delineates roles and responsibility, the detail and scope of information to be shared,
relevant business processes and supporting software, information exchange and final handover as outlined
in the EIR.
The BEP is prepared by the Team members together to demonstrate the proposed approach, and the
capability, capacity and competence of the delivery team and supply chain to meet the EIR.
This BEP will be a living document - revised and updated as necessary by the project team to reflect
changes in BIM development that occur during project execution
Revision: P01
Status: S01
BEP
2 Project information
01
2.1 Project Information
Project Name WeZig Office Building
2.2 Abbreviations
List of the abbreviations
01
IT Information Technology
BIM
Zigurat Syed Ehtesham eht.zaidi@gmail.com +966544079753
Manager
SCRUM
Master/
Zigurat John Chikarakara jchikarakara@gmail.com +27787426324
BIM
Coordinator
BIM
Zigurat Irina Kuzina kuzirin2016@gmail.com +79035266009
Coordinator
Architectural
Zigurat Laura Silvera laurasilvera.bim@gmail.com +34653752994
Lead
Structural
Zigurat Kweku Oware +233242923681
Lead kwekow@gmail.com
3 Management
01
3.1 Standards
The delivery team will follow he standards listed in section 3.1 of the EIR as follows:
• ISO 19650-1:2018
• ISO 19650-2:2018
• ISO 19650-3:2020
• ISO 19650-5:2020
• Uniclass 2015
Other standards:
ISO 16739-1:2018
ISO 29481-1:2016
ISO 29481-2:2012
ISO 12006-3:2007
ISO 16739
The LEAD APPOINTED PARTY is to work with APPOINTING PARTY to establish project segregation.
The agreed approach is to be documented in the BEP.
Each originating APPOINTED PARTY should develop and fully understand the method for developing
BIMs to coordinate and support the outputs required. It is advised that models are segregated into
multiple linked models, and the strategy for this is to be incorporated into the project BEP.
01
1050 Concrete Structures Modelling Concrete Frame modelling
Management
BEP
01
• Lead and manage the BIM process with overall responsibility for the
development and delivery of BIM Project Execution Plan and
Implementing BIM protocols and strategy for the project.
• Act as lead contact for BIM related items for all relevant project
stakeholders and manage collaboration among all parties.
• Ensure the deliverables are issued on schedule and in accordance
with the BIM development program.
• Organize and conduct BIM project meetings
• Coordinate with BIM Coordinators on monitoring the BIM progress
and compliance with the BIM PXP.
BIM Manager • Facilitate the use of composite trade models in construction
coordination/ clash mitigation meetings and provide clash detection
reports by the identification and resolution of all hard and soft
collisions within agreed tolerances for construction.
• Responsible for overall BIM Quality Control
• Responsible for preparing overall BIM Progress Report and
Dashboards.
• Defines the BIM roles and responsibilities for the project team.
• Review and approve models and documentation for submission;
• Facilitate the transfer of information across the CDE platform(s).
BEP
01
• Act as BIM Model Manager on their respective discipline.
• Formulates the BIM strategy with the BIM Manager.
• Participation in design reviews & coordination workshops &
resolution of model discrepancies.
• Maintain their respective discipline models throughout the project.
• Conduct regular BIM QA/QC checks.
BIM Coordinator by • Record and manage registers, BIM-related issues, RFI’s, and design
Discipline changes received.
(Architectural, Structural, • Ensure that all information received is documented and are updated
MEP) in the BIM on time.
• Coordinate and collaborate with the BIM Manager and other BIM
Coordinators.
• Review BIM models and documentation for sharing or submission;
• Will coordinate between teams/disciplines to minimize clashes
• Will coordinate between teams/disciplines to ensure maintainability
of E&M installations.
01
• Responsible for MEP modeling works.
• Work under the direction of MEP Coordinator.
• Generate CSD (Coordinated Services Drawings) and ISD (Individual
Services Drawings) from the BIM model as required.
• Capture and highlight any discrepancies found in BIM to BIM
MEP Modeler Coordinator.
• Ensure the geometric and information accuracy on BIM modeling;
• Provide input for CBWD
• Provide input for openings on ABWF works (e.g. ceiling panel
openings for E&M services, ceiling access panels, cladding openings,
etc.)
BEP
01
• Work in progress: Information being developed by its originator or task team, not accessible by
anyone else
• Shared: Information approved for sharing with other appropriate delivery teams or with the
appointing party
• Published: Information authorized for use for a construction or for asset management
• Archive: Journal of information transactions, providing an audit trail of information container
development
The successful implementation of CDE will include conducting workshops to ensure the information
management and delivery requirements are understood by the project team.
CDE solution and workflow is to enable the development of federated information models from different
task teams.
01
This workflow below will also be undertaken ad-hoc as required to support project delivery.
The delivery team confirm that classification of information within information containers should be in
accordance with Uniclass 2015 (ISO 19650-2 NA.4.4).
01
Example:
WZ1-ZIG-V4-01-M1-A-001-S01-P01
The naming and coding of other fields: volume, system, level, location, type, role number, status and
revisions to be applied across projects should be specified by the project team.
Arrangements should be made about the naming and coding of the storeys, zones, rooms, and objects be
the project team .
The project shall carry out checks based upon the Construction BIM Specification, under QA/QC
Requirements to ensure the BIM project’s compliance throughout the project.
Naming, such as the naming of the files and their Discipline BIM Weekly
corresponding folders Coordinator
Model
Compliance General settings, such as grid, survey point, project Discipline BIM Weekly
Check base point, shared coordinate and coordinate Coordinator
system, units, color, shared parameters, attributes,
reference links
Compliance to the BIM Particular Specification and BIM Manager Fortnightly / As required
01
other requirements
Project-specific
Sufficiently addressed BIM work scope, BIM uses BIM Manager Fortnightly / As required
BIM Execution
and methodologies
Plan Check
Model and process management internally and for BIM Manager Fortnightly / As required
collaboration
3.11 Security
The delivery team will use concepts and principles included in the ISO19650-5 to manage security
processes related to BIM.
We confirm we are aware of out a duty of confidentiality and responsibility to safeguard all Owner
information and/or data that they provide and/or access (particularly sensitive ones - for example, CCTV/
security installation information).
Building Maintenance
Programming Design Authoring Site Utilization Planning
Scheduling
BEP
Construction System
Site Analysis Design Reviews Building System Analysis
Design
01
3D Coordination 3D Coordination Asset Management
Space Management /
Structural Analysis Digital Fabrication
Tracking
Mechanical Analysis
Other Engineering
Analysis
Sustainability Evaluation
Code Validation
Phase Planning (4D Phase Planning (4D Phase Planning (4D Phase Planning (4D
Modeling) Modeling) Modeling) Modeling)
Since the employer’s BIM model will be developed to the Construction BIM model, the existing model
breakdown structure shall be used as a base reference to further develop the project’s federation strategy.
This approach will help the team to cut time and ease effort on setting-up the model breakdown structure
as well as preventing loss of information embedded in the models.
BEP
4 Technical
01
4.1 Software Platforms
Confirm the Software Platform and versions
The following are the software platform and version to be used in the project:
a. Intel Core i7 (10 generation) 16GB RAM 4GB NVIDIA GRAPHICS RAM 1TBHDD
b. Size: 1GB for information models and 100MB for other documents
such as;
Formal Information exchanges will be adopted in order to support key decision stages and/or milestones in
the project and they should be exchanged prior to the end of a stage to advise the decision gateways.
For this project, RIBA stages are used and information exchanges are as follows:
Responsibility
01
Number of
RIBA Lead
Description Information Purpose Appointing
Stage Appointed
Exchange Party
Party
1 Feasibility Study X
Preparation and
1 Preliminary Invitation to tender
Brief 1 X
response
1 Bid response X
5 Construction 2 Construction X
Handover and
6 1 Practical Completion X
Close Out
The project shall use the same Survey Point and Project Base Point to ensure alignments when
collaborating with other projects.
Project Coordinates
Northing:
Easting:
Elevation:
Northing
Easting
BEP
Elevation
Project Coordinates
01
Angle to True North
Such as:
The Lead appointed party will deliver the level of information need included in the EIR of this project.
Documentation
BEP
2. Location and spatial data – where the asset is and how it relates to other assets
01
3. Performance data – how this asset contributes to the serviceability target
4. Condition data – what is the life expectancy of the asset
The figure below shows the structure of the Asset Information Model.
4.8 Trial
The Lead appointed party will conduct an initial trial for the exchange of BIM data to help identify any
unknown and unique issues with collaboratively exchanging information amongst the appointed project
BEP
4.9 Training
01
Confirm the needed training
Such as:
Common Data
CDE Provider Once Online
Environment
BEP
02
General
ABC ABC ABC
Project Orientation
Grids
Levels
Scope Boundaries
Project Coordinates
Global Coordinates
Reference Planes
Matchlines
Spaces
Massing
ABC ABC
Areas
Rooms
ABC ABC
Zones
Structural
ABC ABC ABC
Bases
SCOPE
Pit Walls
Pits
02
ABC ABC ABC
Column Foundations
Column Foundations
Wall Foundations
Wall Foundations
Piles
Driven Piles
Pile Caps
Pile Caps
Grade Beams
Grade Beams
Slabs
Slabs-on-Grade
Steel Structures
Steel Columns
SCOPE
Steel Beams
02
ABC ABC ABC
Steel Framing
Metal Decks
Steel Welds
Columns
Concrete Columns
Beams
SCOPE
Concrete Beams
02
ABC ABC ABC
Floors
Basic Floor
Floor Deck
Floor Trusses
Floor Girders
Floor Columns
Floor Framing
Floor Toppings
Walls
Walls
Wall Openings
Stairs
Staircase
Stair Landings
SCOPE
Stair Railings
02
ABC ABC ABC
Stair Supports
Ramps
Ramp Slab
Roof
Architectural
ABC ABC ABC
Exterior Walls
Parapets
02
ABC ABC ABC
Exterior Windows
Exterior Windows
Exterior Doors
Exterior Doors
Interior Walls
02
ABC ABC ABC
Interior Doors
Interior Door
Door Frames
Door Hardware
Interior Windows
Interior Windows
02
ABC ABC ABC
Exterior Louvers
Exterior Vents
Horizontal Openings
Mechanical
ABC ABC ABC
HVAC Equipment
ABC ABC
02
ABC ABC ABC
Chilled Beams
Air Coils
Unit Ventilators
Cooling Systems
Central Cooling
ABC ABC
Evaporative Air-Cooling
ABC ABC
ABC ABC
Ventilation System
02
ABC ABC ABC
Ventilation Equipment
ABC ABC
ABC ABC
ABC ABC
02
ABC ABC ABC
ABC ABC
ABC ABC
02
ABC ABC ABC
Electrical
ABC ABC ABC
Electrical Power
ABC ABC
ABC ABC
Cable Trays
ABC ABC
Raceway Zones
Raceways
Raceway Supports
ABC ABC
Electrical Ducts
Wiring Devices
Lighting
Lighting Fixtures
02
ABC ABC ABC
Lighting Controls
Electrical Service
Power Distribution
Plumbing
ABC ABC ABC
Plumbing Fixtures
Sinks
Urinals
Taps / Faucets
02
ABC ABC ABC
Flush Valve
Sanitary Drains
Floor Drains
Storm Drains
Area Drains
Trench Drains
Roof Drains
Floor Sinks
Mop Sinks
02
ABC ABC
ABC ABC
ABC ABC
ABC ABC
Sanitary Piping
02
ABC ABC
ABC ABC
Fire Protection
ABC ABC ABC
Fire Protection
Fire-Extinguishing Piping
Fire Detectors
Fire Alarms
Fire-Extinguishing Fittings
Fire-Extinguishing Hangers
02
ABC ABC ABC
Fire Controls
ABC ABC
ABC ABC
Fire-Extinguishing Tanks
Fire Extinguishers
Conveying
ABC ABC ABC
Elevators / Lifts
Accessibility Lifts
Escalators
Utilities
ABC ABC ABC
02
ABC ABC ABC
ABC ABC
ABC ABC
ABC ABC
02
ABC ABC ABC
ABC ABC
02
ABC ABC ABC
ABC ABC
Culverts
Gutter Inlets
Curb Inlets
Catch Basins
Site Subdrainage
Site
SCOPE
04
Key Type Name Value Category Value Sample Units
Description: None
Description: None
Description: None
Description: None
INFORMATION LEGEND
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
General
Grids ABC
Levels ABC
Matchlines ABC
Spaces ABC
Massing ABC
Areas ABC
INFORMATION REQUIREMENTS
Rooms ABC
Zones
Structural
Bases ABC
Pits ABC
Piles ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Grade Beams ABC
Slabs ABC
Slabs-on-Grade ABC
INFORMATION REQUIREMENTS
Metal Decks ABC
Columns ABC
Beams ABC
Floors ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Floor Column Foundations ABC
Walls ABC
Walls ABC
Stairs ABC
Staircase ABC
INFORMATION REQUIREMENTS
Ramps ABC
Roof ABC
Architectural
Parapets ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Exterior Windows ABC
INFORMATION REQUIREMENTS
Interior Walls ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Interior Special Function Door Hardware ABC
INFORMATION REQUIREMENTS
Exterior Vents ABC
Mechanical
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Air Coils ABC
INFORMATION REQUIREMENTS
Ventilation Supply Air Duct Mains ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Outside Air Zones ABC
Electrical
INFORMATION REQUIREMENTS
Branch Wiring / Conduit Zones ABC
Raceways ABC
Lighting ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Electrical Service Transformers ABC
Plumbing
Sinks ABC
Urinals ABC
INFORMATION REQUIREMENTS
Shower Head / Faucets ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Hot Water Piping Mains ABC
INFORMATION REQUIREMENTS
Sanitary Piping Main Zones ABC
Fire Protection
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Fire Protection Specialties ABC
Conveying
Escalators ABC
Utilities
INFORMATION REQUIREMENTS
Site Water Piping Mains ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Design Reviews
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Sanitary Sewerage Utilities ABC
INFORMATION REQUIREMENTS
Storm Drainage Utilities ABC
Culverts ABC
Site
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
General
Grids ABC
Levels ABC
Matchlines ABC
Spaces ABC
Massing ABC
Areas ABC
INFORMATION REQUIREMENTS
Rooms ABC
Zones ABC
Structural
Bases ABC
Pits ABC
Piles ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Grade Beams ABC
Slabs ABC
Slabs-on-Grade ABC
INFORMATION REQUIREMENTS
Steel Framing ABC
Columns ABC
Beams ABC
Floors ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Floor Trusses ABC
Walls ABC
Walls ABC
Stairs ABC
Staircase ABC
INFORMATION REQUIREMENTS
Stair Landings ABC
Ramps ABC
Roof ABC
Architectural
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Parapets ABC
INFORMATION REQUIREMENTS
Exterior Doors ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Door Hardware ABC
INFORMATION REQUIREMENTS
Ceilings
Acoustical Suspended Ceilings ABC
Mechanical
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
HVAC Fire Dampers ABC
Evaporative Air-Cooling
INFORMATION REQUIREMENTS
ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Exhaust Air System ABC
INFORMATION REQUIREMENTS
Outside Air Terminals ABC
Electrical
Raceways ABC
Lighting ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Lighting Fixtures ABC
INFORMATION REQUIREMENTS
Power Distribution Panelboards ABC
Plumbing
Sinks ABC
Urinals ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
>1" Cold Water Piping Branches ABC
INFORMATION REQUIREMENTS
Hot Water Piping Riser Zones ABC
Fire Protection
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Fire Alarms ABC
INFORMATION REQUIREMENTS
Conveying
Escalators ABC
Utilities
05
7. Warranty End Date
1. Material (IfcLabel)
Coordination
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Site Fire Piping ABC
INFORMATION REQUIREMENTS
Sanitary Sewerage Piping Branches ABC
Culverts ABC
Group 3
Global BIM Management
Coordination
1. Material (IfcLabel)
2. ObjectType
powered by plannerly.com
3. Room Category
4. Room Number
5. Model Number
6. Supplier
67
INFORMATION REQUIREMENTS 05
powered by plannerly.com
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
General
Grids ABC
Levels ABC
Matchlines ABC
Spaces ABC
Massing ABC
Areas
INFORMATION REQUIREMENTS
Rooms ABC
Zones ABC
Structural
Bases ABC
Pits ABC
Piles ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Grade Beams ABC
Slabs ABC
Slabs-on-Grade ABC
INFORMATION REQUIREMENTS
Steel Framing ABC
Columns ABC
Beams ABC
Floors ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Floor Trusses ABC
Walls ABC
Walls ABC
Stairs ABC
Staircase ABC
INFORMATION REQUIREMENTS
Stair Landings ABC
Ramps ABC
Roof ABC
Architectural
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Parapets ABC
INFORMATION REQUIREMENTS
Exterior Doors ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Door Hardware ABC
INFORMATION REQUIREMENTS
Ceilings
Acoustical Suspended Ceilings ABC
Mechanical
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
HVAC Fire Dampers ABC
INFORMATION REQUIREMENTS
ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Exhaust Air System ABC
INFORMATION REQUIREMENTS
Outside Air Terminals ABC
Electrical
Raceway Zones
Raceways ABC
Lighting ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Lighting Fixtures ABC
INFORMATION REQUIREMENTS
Static Power Converters ABC
Plumbing
Sinks ABC
Urinals ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Cold Water Piping Mains ABC
INFORMATION REQUIREMENTS
Hot Water Hangers / Supports ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Fire Protection Pumps ABC
INFORMATION REQUIREMENTS
Fire Protection Cabinets ABC
Conveying
Escalators ABC
Utilities
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier
Site Fire Protection Distribution ABC
INFORMATION REQUIREMENTS
Sanitary Sewerage Piping Mains ABC
05
7. Warranty End Date
1. Material (IfcLabel)
Handover
3. Room Category
5. Model Number
4. Room Number
2. ObjectType
6. Supplier