Below is a
comprehensive method
statement for conduit
installation which can be used
for purpose of any project and it POPULAR METHODSTATEMENTS
can be approved easily by List Of Mandatory Tests For Transformers
consultants because it covers all August 5th, 2015
aspects of a standard conduit
The following routine tests specified in IEC726 shall be carried out at
installation method.
the manufacturer's works on [...]
We have also given the
download link for method List Of Common Tests For Diesel Generator Testing
statement for conduit installation August 5th, 2015
on below page which will help The following site tests shall be carried out in order to determine whether the
you to easily modify the word DG material and appa [...]
and excel files that also include
ITP, inspection checklists and Method Statement For Testing And Commissioning
Of Laboratory Air Flow Control System & Fumes
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 1/
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
risk assessment etc.
Hood Monitoring
TABLE OF CONTENTS July 27th, 2015
Below is the method statement description for performing the testing and
1. Purpose commissioning of laboratory [...]
8.1. Procedure
9.Construction
Program9.1
Housekeeping9.2
Protection of Executed
Works9.3
Responsibilities
9.4 Records
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 2/
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
12.Attachments
1. Purpose
DOWNLOAD METHOD
STATEMENT IN WORD
FORMAT
2. Scope of Works
For Installation of
GI Conduits
This method statement is
intended to outline the activities
and the methods used for the
Installation of GI conduits and
accessories. All activities will be
carried out in accordance with
the contract details and in full
compliance to the Contract
Specifications and documents.
All work within the rightsofway of
the standards and specifications
will be done in compliance with
requirements issued by
authorities.
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 3/
Li
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
0 Practice
5. Definitions
6. Resources
NO. DESCRIPTION
1 Bending machine
2 Die sets
3 Measuring tape
4 Screw driver
6 Oil
7 Drill machine
8 Screw driver
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 4/
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
The construction team will
ensure that any such
requirements are documented.
DOWNLOAD METHOD
STATEMENT IN
WORD FORMAT
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 5/
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
8. method
statement for
conduit
installation
General Procedure for conduit
installation is given below after
which area wise details are
provided like method statement
for conduit installation in slab,
walls and exposed areas etc.
GI conduits layout
complete with section
details.
MEP coordination drawing
complete with section
details.
Architectural Drawing
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 6/
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
inspector/ safety officer
before using the same for
installation.
3. Mark the reference points
on wall/ column as per civil
architectural drawing.
4. Identify the circuit start
point and end points to
mark the conduit route as
per approved drawings.
5. Make hole in wall/concrete
using drill machine for
rawal plug, fix rawal plug
inside hole and then fix
base of saddle by screw
every 2 meter span.
6. Use recommended and
approved GI conduiting &
bends as per site condition
and drawing. Remove
sharp edge of cut length of
conduit by filing.
7. Install conduits and all
accessories as per
approved shop drawing
and tight with saddle and
screw, make joints using
threaded fittings.
8. Installation of GI conduits
shall be checked by
internal quality engineer as
per drawings and quality of
installation before offering
consultant/client for
inspection.
9. Conduits are not to cross
pipe shafts, vents or
opening.
10. Additional threaded cuts on
GI conduits are to be
painted with zinc based
coating resistant to
corrosion.
11. Approved clamps to be
used for the supports.
12. Maximum spacing of
supports for different
conduit sizes to be
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 7/
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
clarified.
13. Conduits on walls are to be
run neatly, horizontally or
vertically.
14. Conduits are to be used for
exposed installations over
false ceilings when the
false ceiling is used as
return plenum.
15. Conduits is to be used for
all installation in elevator
machine room and shafts,
electrical equipment
rooms, parking floor, solid
waste rooms, etc.
16. All works on site will be as
per electrical specifications
and as per applicable
electrical wiring
regulations.
17. The risk assessment
mentioning necessary
control measures shall be
attached to this method
statement to follow and
implement the
requirements
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 8/
8/6/2015 Method Statement for Conduit Installation Including Accessories PVC &
GI
PVC Conduit Installation
Procedure
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 9/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC
low current and
power/Lights.
Just after completing the
work tight the conduits
with binding wire and mark
the circuit numbers.
identification for the raised
pipe in slab for upper slab
to be done for power, TV
and telephone systems
and closing the mouth of
pipe with the help of
masking tape .
The site Engineer/Foreman
should check the proper
size of conduit and circular
box, opening size in both
Electrical and Telephone
room and be sure the work
is completed as per
approved Electrical shop
drawing.
Before the concrete
pouring the PVC conduit
installation to be inspected
and approved by
consultant/client/contractor.
During concrete pouring,
keep electricians for taking
care of conduit to avoid
any damage by others or
dislocation of joints.
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 10/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC
Point & Flat Chisels
Trowel
Pipe Bender
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 11/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC
paths and don’t connect
with boxes until next day.
Next day, after setting of
box connect the dropped
conduits for switch/socket
to the box.
Make sure the conduits are
not visible from outside
their route which could lead
improper plastering.
Before the plastering work
issue the inspection
requests for client so that
approval can be taken.
GI Conduit Installation
(Exposed Conduiting)
Take the following shop
drawings approved for
construction.
GI Conduiting layout
complete with section
details.
MEP coordination
drawing complete with
section details.
Architectural Drawing
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 12/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC
approved drawings.
Make hole in concrete for
anchor bolts/rawel plug &
fix rawel plug inside hole
then fix base of saddle by
screw every 1m span.
Use approved GI
Conduiting & bends as per
site condition and drawing.
Remove sharp edge of cut
length of conduit by filing.
Join the lengths using the
threaded joints and fittings.
Install conduit and tight
with saddle and screw.
Make earthing of GI
Conduiting & Check for
continuity.
Apply the zinc paint on the
exposed threaded area
which is not covered.
Installation of
GI Conduiting shall be
checked by internal QA/QC
Engineer as per drawings
and quality of installation
before offering
consultant/client for
inspection.
9. Construction Program
9.1 Housekeeping
9.3 Responsibilities
9.4 Records
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 13/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC
In accordance with the Quality
Management System, the
following records will be
maintained as documentary
evidence of the establishment of
this method statement:
12. Attachments
ITP
Installation Checklists
Risk Assessment
DOWNLOAD METHOD
STATEMENT IN
WORD FORMAT
Share this:
More Method
Statements:
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 14/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC
1. Method Of Statement For
Installation of GI
Conduits & Accessories
For Electrical Works
Method Of Statement For
Installation of GI Conduits &
Accessories For Electrical Works
is given below for the reference
of our visitors if you want to use
this method statement...
3. Testing &
Commissioning Of CCTV
Cameras – Method
Statement The objectives of
the process of testing and
commissioning of CCTV camera
is to verify proper functioning of
the equipments and system after
installation, and to ensure the
performance of the installed
system...
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 15/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC
6. Method Statement For
Installation Of
Emergency Lighting
System The below method
statement describes some
standard operating steps to install
the emergency lighting system for
any kind of project the method
statement can be modified as
per different project...
8. METHOD STATEMENT
FOR TESTING &
COMMISSIONING OF
PRESSURIZATION UNIT
The purpose of this procedure is
to define the step by step method
to implement the correct practices
for the precommissioning &
commissioning of Pressurization
Unit through the guidelines
contained...
http://www.methodstatementhq.com/methodstatementinstallationgiconduitsaccessories.html 16/
8/6/20 Method Statement for Conduit Installation Including Accessories PVC