SQUDFY212200052 - TPDDL & DTL - 33,66 & 220kV DC - Technical Offer Details
SQUDFY212200052 - TPDDL & DTL - 33,66 & 220kV DC - Technical Offer Details
SQUDFY212200052 - TPDDL & DTL - 33,66 & 220kV DC - Technical Offer Details
The preliminary design information included with this technical offer may be refined after the award of an
order. Skipper’s intent is to meet the enquiry specification with the following technical offer details, it is
client responsibility to read and understand specifications listed in technical offer details in order assure that
we have correctly interpreted enquiry requirements. Please contact Skipper’s representative for any
questions / clarification; we assure that your questions/clarifications will be addressed as quickly as
possible.
Pole Design:
Steel pole configuration is based on quote drawing attached along with this document.
Steel monopole shaft consists of 12-side shape sections. Slip Joint between sections are included in our
proposal. In the slip joint design, minimum overlap shall be 1.5 times the maximum inside diameter of outer
section at the slip joint.
Conductor arms use 6 side shape cross section. Arms are connected to pole shaft through bolted
connection between 3-piece weld at inside end of arm and through plates welded to pole shaft.
Under extreme loading condition, steel pole could incur bigger deflection than lattice pole. Extra secondary
bending moment and stress due to deflection (P-∆ analysis) is included in our non-linear finite element
analysis. Safety and strength of poles are guaranteed in all loading conditions specified by design codes.
Reinforced concrete foundation (M25) is used for steel poles. Cage Assembly (Anchor bolt, Top Template
& bottom Template) are part of the foundation which will be used to connect Pole & Foundation. Base plate
is welded at bottom of pole shaft and pole is fixed to foundation through base plate to anchor bolts
connection. Foundation designs shall be in customer’s scope
MATERIAL GRADES
Tolerances and Weld specifications are in accordance with Skipper's standard specification.
Systems are in place that will provide the following levels of test report traceability:
The test reports and inspection records are maintained at Skipper Manufacturing Plant location. When
requested, these can be provided to the customer no sooner than two weeks after the fabrication of the
component.
SPECIFIC REQUIREMENTS FROM THE CLIENT (YES / NO) IF YES MENTION BELOW
1. Climbing Arrangement:
Climbing Device Step Bolts are considered from 2.5m above ground level OR Ladder is
considered at same height from ground level.
2. Deflection Criteria: As per CBIP manual publication no. 323 released in July, 2014
Attachments: Request client to read below attachments in conjunction with the technical offer details
mentioned above.
REFERANCES
a) Rating 33/66/220 kV
b) No. of Circuit 2
c) Peak/Ground Wire #1 (For 66/220kV)
d) Configuration Vertical
2. WIND DETAIL
e) Basic wind speed 50 m/sec (Wind Zone – V) ----- As per Customer Requirement
f) Topography Flat Terrain
g) Terrain category 2.0 ----- Cl. 8.3.2.1 of IS 802 (P1/S1) : 2015
h) Reliability Level 1
i) Return period 50 ----- Table 1 of IS 802 (P1/S1) : 2015
66 220
Voltage Level (Kv) 33
c) Max. Temperature of
a. Conductor 85 deg. C
b. Ground wire 53 deg. C
5. INSULATOR DETAILS ----- Table 3.3 of CBIP Manual
Line Suspension String Tension String
Voltage
Length(mm Wt.(Kg)*
Type Length(mm) Dxl.(mm) Wt.(Kg)* Type Dia.(mm)
)
9. TYPES OF POLE
Following types of pole are to be considered in the design :
33kV-PC(0-15D)_BXA@10m
66kV-PC(0-15D)_BXA@18/21/24m
66kV-PC-CT(0-15D)_BXA@24m
220kV-PC(0-15D)_BXA@28m
220kV-PC(0-20D)_BXA@22m
Loads due to conductor & Earth wire for different loading conditions are to be calculated as per IS:802 – 2015
11. MEMBER DESIGN ………….As per ASCE/SEI 48-19, “Design of Steel Transmission Pole Structure”
2.0% of height @ Safety Normal Condition & 5% of height @ Ultimate Load Condition
14. REFERANCES
IS 802 (Part1/Sec1) : 2015
IS 5613 (Part2/Sec1) : 1985
IS 5613 (Part2/Sec2) : 1985
IS 1364 (Part2) : 1982
IS 1364 (Part3) : 2002
CBIP Manual – July 2014
5 4 3 2 1
*Dt = TOP DIAMETER OF POLE (A/F)
Db = BOTTOM DIAMETER OF POLE (A/F)
E Bd = DIAMETER OF BASE PLATE (A/F) E
D D
7
4 10
C C
1
BASE PLATE
NOTES:
B B
KIPPER
Limited
300 TOC KOLKATA
A
G.L. PROJECT :- SQUDFY212200052 A
CLIENT :- TPDDL PROJECT
NAME DATE TITLE:~ SH. NO.
ELEVATION VIEW APPROVED DK 18.08.2021
CHECKED RM 18.08.2021
DESIGNED MZ 18.08.2021 REF. DWG NO:- REV. NO.
REV. NO. DATE DESCRIPTION SCALE NTS DWG NO:-
5 4 3 2 1
5 4 3 2 1
E E
*Dt = TOP DIAMETER OF POLE (A/F)
Db = BOTTOM DIAMETER OF POLE (A/F)
Bd = DIAMETER OF BASE PLATE (A/F)
D D
7
4 10
C C
1
BASE PLATE
NOTES:
B B
KIPPER
Limited
300 TOC KOLKATA
A
G.L. PROJECT :- SQUDFY212200052 A
CLIENT :- TPDDL PROJECT
NAME DATE TITLE:~ SH. NO.
ELEVATION VIEW APPROVED DK 18.08.2021
DESIGNED RM 18.08.2021
DRN. MZ 18.08.2021 REF. DWG NO:- REV. NO.
REV. NO. DATE DESCRIPTION SCALE NTS DWG NO:-
5 4 3 2 1
5 6 4 3 2 1
*Dt = TOP DIAMETER OF POLE (A/F)
Db = BOTTOM DIAMETER OF POLE (A/F)
Bd = DIAMETER OF BASE PLATE (A/F)
E E
D D
7
4 10
C C
1
BASE PLATE
NOTES:
B B
KIPPER
Limited KOLKATA
A ELEVATION VIEW PROJECT :- SQUDFY212200041_MPPTCL-NIT-21_132kV-DC-CT Pole A
CLIENT :- MPPTCL PROJECT
NAME DATE TITLE:~ SH. NO.
APPROVED DK 16.08.2021
CHECKED RM 16.08.2021
DESIGNED MZ 16.08.2021 REF. DWG NO:- REV. NO.
REV. NO. DATE DESCRIPTION SCALE NTS DWG NO:-
5 6 4 3 2 1
5 4 3 2 1
E *Dt = TOP DIAMETER OF POLE (A/F) E
Db = BOTTOM DIAMETER OF POLE (A/F)
Bd = DIAMETER OF BASE PLATE (A/F)
D D
7
4 10
C C
1
BASE PLATE
NOTES:
B B
KIPPER
Limited
300 TOC KOLKATA
A
G.L. PROJECT :- SQUDFY212200052 A
CLIENT :- DTL PROJECT
NAME DATE TITLE:~ SH. NO.
ELEVATION VIEW APPROVED
DESIGNED MZ 13.04.2021
DRN. MZ 13.04.2021 REF. DWG NO:- REV. NO.
REV. NO. DATE DESCRIPTION SCALE NTS DWG NO:-
5 4 3 2 1