Quantity of Cement / Sand and Gravel in a concrete

Mix Ratios CementSand Gravel


M10 1 3 6
M15 1 2 4
M20 1 1.5 3
M25 1 1 2

Wet Volume 1 cum


Dry Vol Conc 54% cum increased by wet vol

Density
Cement 1440 kg/cum
Sand 1450-1600 kg/cum
Gravel 1450-1500 kg/cum

M15 Mix
Consideration: Total 1+2+4 7
Volume Wet 1 cum wet
Dry Vol 1.54 of wet vol

Cement Sand Gravel


Cum 0.22 0.44 0.88
Kg 316.8 660 1320
Cft 7.7679 15.385 31.05305

Note:
1 bag 50 kgs sand
1 bag 1.226 cft sand
General Ratio Consideration
Cement Sand Total 1 1 square wall
1 6 7 12 mm Internal pplaster
20 mm External plaster
33 % factor for Dry vol to Wet Vol
Volumne of mortar in plaster 1440 kg/cum cement density
1500 kg/cum sandt density
1.226 Sand Factor to cft
1 1 0.02 0.02 cum

Dry volum 0.02 1.33 0.0266 cum

Cement 5.47 kgs say 0.10944 bags


Sand 0.80 cft
Alternative solution for sand
0.81 cft
Standard Size
440 102.5 215 mm 100mm 140mm 215mm