Mobilink Project On Site Swap SOP

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

Mobilink Project On Site Swap SOP

Internal use only▲

Red Lines
All the rules must be follow otherwise will get punishment !
Prohibit entering site besides receiving war room approval .

Top 1 Work must with safety helmet, hat torch and safety belt.

Top 2 Prohibit touch any unconcerned existing equipment.

Top 3 Prohibit phone power off, must have the another SIM card of other operator.

Top 4 Prohibit leaving site besides receiving war room approval .

Top 5 Pre swap preparation and data collection of all existing system with snaps.

Top 6 ZTE unused material must picked from site through MMAF submission after swap.

Top 7 E/// dismantled equipment MMAF must be submitted along with equipment pictures.

Top 8 BSS engineer will leave the site after confirmation by RF of successful site DT .

Top 9 BSS engineer will leave the site after site alarm verification from PMCL OAN hotline.

© ZTE Corporation. All rights reserved


2
11 steps lead swap to be successfully Internal use only▲

Notice
Any access issue please contact War room:
03107606611/03106356611
Any technical issues (RF/Optical fiber)can not solved please contact site
engineer to support on site immediately.
Any material issues can not solved please contact site engineer to
support on site immediately.
Team leader must report to Mobilink NOC while enter and leaving site.

© ZTE Corporation. All rights reserved


3
Internal use only▲
1. Swap preparation
Notice : Follow preparation must be ready before go to the site.
1. Documents

BBU and RRU connection scenario Provider: Yu Guang Hui/War Room:03155104495/0310760661


– 《 SDR Commissioning solution 》 Provider: Yu Guang Hui/War Room:03155104495/0310760661
– 《 Label standard 》 Provider: Atif: 03459889898
《 BOM & DO 》 Provider: Saqib: 03458577070,Asim: 0315-7117708
《 Communication Matrix 》 Provider: Swap Team Lead
2.Material ( Each site )
– On site Material Box check to ensure all the required material is available on site and if not then
Escalate to respective Team Leader.
– Spares requirement must be calculated and in hand with site engineer for on spot
Rectification if any equipment got faulty.
3.Work order from Customer:
Communication
Plan
Call NOC and Back office team to proceed further
© ZTE Corporation. All rights reserved
4
4. Tools ( Also include heat Gun) Internal use only▲

Hat torch Safety helmet Safety Belt RJ45 crimping tool Safety Gloves Camera
Crone (LSA)
(Lampu Kepala)

Level Ruler Ethernet Cable Tester Cross & Slotted Dust Cleaner/vacuum
screwdriver Cable Cutter Hex/Allen Key Sets
(water pass) (Kabel LAN Tester) cleaner
(Obeng Lengkap)

Drill & Drill Bits Multifunctional Cable stripping tool Adjustable spanners LAN cable Laptop
(Alat Bor & Mata Bor) Crimping tools (Kunci Inggris)

© ZTE Corporation. All rights reserved


5
Internal use only▲
2. Site access
Notice : Any access issue please contact War room, Tel: 03107606611/03106356611
Send message in Line to inform enter the site.

Night Swap Arrival must before 21:00

Day Swap Arrival must before 6:00

3. Environment double checking


Check the follow points and make sure all the points must be ready before swap.
SN Check point
1 If label of the MCB of existing Ericsson 2G,3G and DCS system are correctly

2 If the DC power cable for DCPD7 connected correctly

3 If DC power cable for RRU connected correctly


4 If optical fiber connected correctly ( There should not any cross with power and fiber).
5 If all board quantity are correct including Dummy
6 If alarm cable has been laid to existing DDF correctly with Labels
7 If CAT6 cable connected correctly with Labels
8 If labels of jumpers, fibers and power cable have been finished

9 Check transmission power ,IF,LAN cable connections

10 Check BLVD connections for transmission

11 Electrical and Mechnical tilt of installed Anteena. © ZTE Corporation. All rights reserved
6
Internal use only▲
3.1. Anteena Audit

• Check Physically the condition of anteena on site.


• Record electrical and Mechanical tilt.
• If E-tilt and M-Tilts are faulty inform responsible manager.
• Check the Anteena port condition if faulty inform the responsible manager.

© ZTE Corporation. All rights reserved


7
4. RRU Relations Internal use only▲

Not More then 6 sectors:


•GSM 900 R8881/R8863 in order of cells (lower at first) takes 0, 1, and 2
•DCS1800 R8881/R8863 in order of cells (lower at first) takes 3, 4, and 5

4.1 Ready for swap


 Report to war room after everything are ready for swap.
 Team leader start swap receive war room order of starting swap.
© ZTE Corporation. All rights reserved
8
5. RRU Connectivity diagram Internal use only▲

© ZTE Corporation. All rights reserved


9
Before Antenna Swapping-
Trace the BTS and do the labeling on existing antenna for every sector.
1.Trace the RF cables from BTS to Antenna for each sector and identify the correct antenna and
sector.
Standard labeling to be done at Existing Antenna and its cables-

Sector Identification Color Scheme

Sector 1
Sector 2
Sector 3

Color Labeling Standard for RF cable a (Feeder /Jumper near Antenna port)
A. 1st Sec GSM, For Jumper 900 (for Tx/Rx 1 string-Red and for Rx 2 String-Red)
1st Sec GSM, For Jumper 1800 (for Tx/Rx 3 string-Red and for Rx 4 String-Red)
B. 2nd Sec GSM, For Jumper 900 (for Tx/Rx 1 string-Yellow and for Rx 2 String-Yellow)
2nd Sec GSM, For Jumper 1800 (for Tx/Rx 3 string-Yellow and for Rx 4 String-Yellow)
C. 3rd Sec GSM, For Jumper 900 (for Tx/Rx 1 string-Blue and for Rx 2 string-Blue)
3rd Sec GSM, For Jumper 1800 (for Tx/Rx 3 string-Blue and for Rx 4 string-Blue)
Before Installation of RRU and its power/optical cables/RF Jumpers
Do the Color Labeling before installation/Mounting RRU and its cables

For RRU 8863


1. 1st Sec RRU Power cable / OFC - 2 string -Red
2. 2nd Sec RRU Power cable / OFC - 2 string -Yellow
3. 3rd Sec RRU Power cable / OFC -2 string -Blue

For RRU 8881


1. 1st Sec RRU Power cable / OFC - 1 string -Red
2. 2nd Sec RRU Power cable / OFC- 1 string -Yellow
3. 3rd Sec RRU Power cable / OFC - 1 string -Blue
Internal use only▲
6. Swap Solution: Outdoor to Outdoor Swap
Notice : Any issues happen can not solve please contact site engineer to support on site.
Swap Solution Summary:
1. Reuse the existing antennas;
2. Reuse the existing AC power system
3. IDUs will be installed in the ZTE BC8910 cabinet

© ZTE Corporation. All rights reserved


12
Internal use only▲
6.1. Indoor Scenario: Indoor Macro site swap to outdoor distributed site.
Notice : Any issues happen can not solve please contact site engineer to support on site.
Swap Solution Summary:
1. Pre-install new rectifier and ZTE BTS(BC cabinet and RRUs) in the proposed location.
2. IDUs will remain in the shelter.
3. New Power system (ATS, DB and New Rectifier) should be installed before swap.

© ZTE Corporation. All rights reserved


13
Internal use only▲
6.2. Indoor Micro site swap to Indoor distributed site
Notice : Any issues happen can not solve please contact site engineer to support on site.
Swap Solution Summary:
For this scenario, we will use the BS8906+RRU to swap the original Micro BTS.

© ZTE Corporation. All rights reserved


14
Internal use only▲
7. Connect external alarm cable
1. Disconnect existing Ericsson external alarm cable and make labelling.
2. Connect ZTE external alarm cable according to the follow definition.
3. Report to war room confirm the status.

Cable
SN Definition DB25 Definition Color
Sequence
1 SA-1 Door Open DB25_1/DB25_14 White-Blue

White-
2 SA-2 Over Heat DB25_2/DB25_15
Orange

3 SA-3 AC Power Fail DB25_3/DB25_16 White-Green

4 SA-4 Low Battery DB25_4/DB25_17 White-Brown

5 SA-5 DC Rectifier Fail DB25_5/DB25_18 Red-Blue

Generator
6 SA-6 DB25_6/DB25_19 Red-Orange
Running

7 SA-7 Generator Failed DB25_7/DB25_20 Red-Green

8 SA-8 Low Fuel DB25_8/DB25_21 Red-Brown

© ZTE Corporation. All rights reserved


15
Internal use only▲
8. Site clearance
1. Make water proof for all connected jumpers & feeders, power cable.
2. Seal the disconnected feeder ,jumper connectors and fix.
3. Proper routing of Fiber jumpers power cable
4. Clean the site and check the complete labeling before leaving
9. Cross feeder and VSWR alarm clearance
Wait for cross feeder, Sector / Partial Swapping and VSWR confirmation from war room and confirmation from DT team.
 If the site have issues, swap team do rectification immediately until all issues solved.
 If the site have no issues, swap team can leave site.

10. Swap document


Team leader record all site information for ATP.

11. Leave Site


 After the completion of the above work and received the leave approval from war room can leave site.
 Send message in Line to inform leaving site.
© ZTE Corporation. All rights reserved
16
Thank you