Presentation - Bridges - Tunnels - Geotechnics - SAMAN
Presentation - Bridges - Tunnels - Geotechnics - SAMAN
Presentation - Bridges - Tunnels - Geotechnics - SAMAN
OF
TRANSPORT
DRAFT-FEASIBILITY STUDIES
TABLE OF CONTENTS
1 BRIDGES APPROACH
2 TUNNELS APPROACH
3 GEOTECHNICAL APPROACH
2
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
BRIDGES
3
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
REFURBISHMENT
BRIDGES RESTORATION
RENOVATION
EXTENSION
4
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
CONTENTS
1. Introduction (Basic Information)
3. Technical Considerations
8. Summary
5
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
6
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
7
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
3. Technical Considerations
1) Type of Existing Bridges and Structures are Steel, Concrete or
Masonry (Stone or Brick)
8
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Cross Section
Cross Section
Cross Section
Cross Section
Cross Section
Cross Section
13
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
14
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Steel Truss Bridge O.H Stone Arch Road Br. O.H Brick Arch + Con. Beam & Slab
16
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Number of
Items Proposed Type of Structure Span Length
Bridges/Culverts
- R.C Rahmen Bridge(1) 15m
Railway - PSC Girder Bridges(2) 25m, 20m
- 5 Bridges - PSC BOX Girder Bridge(1) 35m
Bridge
- R.C Box Culvert Bridge(1) 2×3m
- R.C Rahmen Road Bridge(1) 15m
Over Head - 3 Bridges - R.C Rahmen + Concrete Beam &
12m
Slab + R.C Rahmen(1)
Bridge
15.5m (No
- PS Concrete Pedestrian Bridge(1)
Modification)
1.5m, 2.0m,
Culvert - 52 Culverts - Concrete Box Culverts 2.5m or
2×1.5~2.0m 17
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Number of
Items Type of Structure Span Length
Bridges/Culverts
- Steel Trough Span Bridges(2) 6.2~6.6m
Railway
- 7 Bridges - Steel Plate Girder Trough Span(3) 18~19.5m
Bridge
- Masonry Stone/Brick Arch Bridges(2) 3~7.6m
Over Head - 1 Bridge - Steel Lattice Girder Pedestrian
17.8m
Bridge Bridge(1) (inside Kadugannawa Station)
19
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Number of
Items Proposed Type of Structure Span Length
Bridges/Culverts
- R.C Rahmen Bridges(2) 12m
25m
Railway - PSC Girder Bridge(1+2)
- 7 Bridges 2×20m
Bridge
4m
- R.C Box Culvert Bridges(2)
2×4m
Over Head - 1 Bridge - PSC Girder or Steel Lattice Girder
2×17.8m
Bridge Pedestrian Bridge(1)
1.5m, 2.0m,
Culvert - 31 Culverts - Concrete Box Culverts 2.5m, 3.0m
20
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Stone/Brick Arch Bridge O.H Steel Plate Girder Pedestrian Steel Plate Girder Road Br.
22
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Number of
Items Type of Structure Span Length
Bridges/Culverts
- PSC Girder + PSC BOX Girder Bridge(1) 2×20m+2×35m
- PSC Girder Bridge(1) 20m+25m
Railway
- 8 Bridges - R.C Box Culvert Bridges(3) 2×5m, 4m
Bridge
- PSC Girder Bridges(2) 23×25m, 14×25m
- PSC BOX Girder Bridge(1) 66×40m
- PSC Girder/R.C Rahmen Road Bridges(5) 2×15m, 15m
Over Head - 8 Bridges - PSC Girder or Steel Lattice Girder
15m
Bridge Pedestrian Bridge(1)
- Steel Plate Girder Pedestrian Bridges(2) 12m
2×2.5m,
Culvert - 38 Culverts - Concrete Box Culverts
1.5m, 2.0m, 2.5m
23
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Steel Plate Girder PSC Girder Road Br. Steel Plate Girder Road Br.
25
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
Number of
Items Type of Structure Span Length
Bridges/Culverts
- PSC Girder Bridges (3+2) 20m, 25m
Railway
- 35 Bridges - PSC Girder Bridges (1+6) (2~6)×25m
Bridge
- R.C Box Culvert Bridge (5+18) 5m, 2×3m
- PSC Girder Road Bridges(1+1) 25m
- PSC Girder or R.C Rahmen Road Bridges(0+3) 10m, 15m
Over Head - 7 Bridges
Bridge - PSC Girder or Steel Plate Girder
11m
Pedestrian Bridge(1+0)
- R.C Girder Pedestrian Bridge(1+0) 11m
1.5m, 2.0m,2.5m,
Culvert - 104 Culverts - Concrete Box Culverts
3.0m
26
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
8. SUMMARY
● Nearly all Bridges & Culverts need to be replaced or rebuilt for new
Double (or Single) Track Railway according to new Railway Alignment plan.
● Nearly all Over Head Bridges need to be replaced or rebuilt due to not
enough Vertical Clearance for Future Electrification of Railway System.
27
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
28
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅰ Tunnel Plan
1. Big Cut Area ( Cut Height ≥ 20.0m _ not fixed )
or Long Cut Area ( Cut Length ≥ 100.0m _ not fixed )
Big Cut Area Long Cut Area
BIG
CUT
29
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅰ Tunnel Plan
2. Important Obstacles above Tunnel
House Area
Temple
High voltage line
Vehic le Road
Pos ts of
30
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅱ Tunnel Construction Method
1. Bored Tunnel : Mountainous Area
2. Cut and Cover Tunnel : Urban Area
Bored Tunnel Cut and Cover Tunnel
31
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅲ Excavation Methods of Bored Tunnel
1. Drill and Blast in New Austrian Tunneling Method
2. Tunnel Boring Method in Shield Tunnel
Drill and Blast Tunnel Boring Method
TBM
Blasting
Drilling
32
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅳ Tunnel Support Principle in NATM
1. Main Support : Natural Ground Arch
2. Aux. Support : Shotcrete + Rockbolt + Steel Support
Ground Arc h
Shotc rete
Tunnel Shotcreting
Ground
Steel Support
Roc kbolt
Rockbolting
Steel Rib
33
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅴ Geometric Guideline for Tunnel Portal
1. Rockcover Depth ≥ 1.0 ~ 2.0D (D: Tunnel Diameter)
2. Adjust, Depending upon Facilities and Obstacles
Tunnel Portal Area
34
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅵ Proposed Tunnels of Kadugannawa-Peradeniya Section
1. In case of speed 80 km/h, 3 Tunnels
Tunnel 1 [K-P_T-1_80], Length = 100m
Tunnel 2 [K-P_T-2_80], Length = 330m
Tunnel 3 [K-P_T-3_80], Length = 120m
Tunnel ·Division Station Length(m)
Start 5+090
K-P_T-1_80 100
End 5+190
Start 6+640
KADUGANNAWA K-P_T-2_80 330
80km/h End 6+970
-PERADENIYA
Start 7+900
K-P_T-3_80 120
End 8+020
Sum 550
35
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 1 [K-P_T-1_80km/h], Length = 100m
STA.5+190
STA.5+090
T1-E
Proposed Line
Existing Line
T1-S
36
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 2 [K-P_T-2_80km/h], Length = 330m
STA.6+970
T2-S Proposed Line
STA.6+640
Existing Line
T2-E
Max. Cut Height = 37.0m
37
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 3 [K-P_T-3_80km/h], Length = 120m
STA.8+020
STA.7+900
Proposed Line
T3-S T3-E
Existing Line
38
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅵ Proposed Tunnels of Kadugannawa-Peradeniya Section
2. In case of speed 100 km/h, 3 Tunnels
Tunnel 1 [K-P_T-1_100], Length = 200m
Tunnel 2 [K-P_T-2_100], Length = 450m
Tunnel 3 [K-P_T-3_100], Length = 200m
Tunnel ·Division Station Length(m)
Start 2+900
K-P_T-1_100 200
End 3+100
Start 5+080
KADUGANNAWA K-P_T-2_100 450
100km/h End 5+530
-PERADENIYA
Start 6+100
K-P_T-3_100 200
End 6+300
Sum 850
39
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 1 [K-P_T-1_100km/h], Length = 200m
Existing Line
T1-E
T1-S
STA.3+100
Proposed Line
STA.2+900
40
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 2 [K-P_T-2_100km/h], Length = 450m
T2-E
STA.5+530
STA.5+080
41
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 3 [K-P_T-3_100km/h], Length = 200m
T3-E
T3-S
STA.6+300
Proposed Line
STA.6+100
42
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Ⅶ Proposed Tunnels of Katugastota-Matale Section
In case of speed 70 km/h, 2 Tunnels
Tunnel 1 [K-M_T-1_70], Length = 440m
Tunnel 2 [K-M_T-2_70], Length = 320m
Tunnel ·Division Station Length(m)
Start 28+980
K-M_T-1_70 440
End 29+420
KADUGASTOTA
70km/h Start 30+970
- MATALE
K-M_T-2_70 320
End 31+290
Sum 760
43
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 1 [K-M_T-1_70km/h], Length = 440m
Proposed Line
Existing Line
44
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
TUNNELS
Plan of Tunnel 2 [K-M_T-2_70km/h], Length = 320m
Proposed Line
Existing Line
45
THANK YOU !!
TUNNELS APPROACH
46
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
GEOTECHNICS
47
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
GEOTECHNICS
Geotechnical studies
Geotechnical studies ;
v Detailed geotechnical investigations of the
Site area based on the proposed conceptual
design of the Project
v Desk study of the geological / geotechnical
engineering aspects of the Site area.
v Reconnaissance Survey of the Site area
48
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
GEOTECHNICS
Scope of work for Detailed geotechnical investigation
Package Package-A Package-B Package-C
Kadugannawa- Katugastota-Matale Peradeniya-
Katugastota Gampola
Number of 66 75 48
Boreholes
Number of DCP tests 66 58 31
Number of Plate 10 10 5
load tests
Number of trial pits 66 30 20
Number of 10 10 -
Makintosh probing
tests
Laboratory tests As needed As needed As needed
49
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
GEOTECHNICS
Geotechnical issues at site
ead
50
SRI LANKA RAILWAY EFFICIENCY IMPROVEMENT PROJECT
BRIDGES, TUNNELS AND GEOTECHNICS APPROACH
GEOTECHNICS
Conclusion